Publication number: 20250164371
Abstract: Disclosed in the present invention is a water filling and drainage test device and method for a prefabricated crack-containing reinforced concrete lining pressure tunnel. The test device comprises a cylindrical barrel, a reinforced concrete lining containing prefabricated cracks, surrounding rock, geotechnical cloth, a front flange, a rear flange, and a monitoring instrument. The surrounding rock is proximate to an inner wall of the cylindrical barrel, and the reinforced concrete lining containing the prefabricated cracks is inside of the surrounding rock; and the front flange and the rear flange are fixed at two ends of the cylindrical barrel. The test device is used for carrying out a water filling and drainage test on the pressure tunnel, and observing the change in the width of the prefabricated cracks and the conditions of the pressure tunnel.
Type:
Application
Filed:
August 29, 2023
Publication date:
May 22, 2025
Applicants:
ENG CST MAN BR OF CN STN PWRGRID PWR GEN CO. LTD., CHINA INST OF WATER RESOURCES AND HYDROPWR RES, GUANGXI UNIVERSITY
Inventors:
Xueshan LIU, Qiang ZHANG, Peng ZHANG, Zhi ZHENG, Xiaogang WANG, Zhengyun QIN, Kai GUO, Dingcai PAN, Gang ZHOU, Yujie WANG, Yueyang ZHENG, Yufei HUANG, Yunli SHI, Chunhua SONG, Pengtao YING, Qiqi ZHANG, Hecheng HUANG, Lipeng LIU