Patents by Inventor Xuexiang Xiong

Xuexiang Xiong has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11760397
    Abstract: A method for extracting and analyzing spatial information of a control and protection zone of rail transit with multiple threshold constraints, including the following steps: 1, performing format conversion on a data file and extracting a plurality of coordinate points; 2, selecting key points from the plurality of coordinate points for data simplification to obtain a simplified limit line, a simplified outer structure edge line and a simplified boundary line of construction; 3, programming the simplified limit line, the simplified outer structure edge line, and the simplified boundary line of construction, calling a database, and reading data therefrom for spatial relationship comparison; 4, determining whether the construction of a rail-involved construction project intrudes into a control and protection zone of rail transit according to a result of the spatial relationship comparison, thus completing the extraction and analysis of the spatial information of the control and protection zone of rail transit.
    Type: Grant
    Filed: February 5, 2021
    Date of Patent: September 19, 2023
    Assignee: Chongqing Survey Institute
    Inventors: Hanxin Chen, Xuexiang Xiong, Changzheng Yuan, Degui Teng, Zejun Xiang, Jing Ming, Chun Yu, Chao Li, Heng Zhang, Bo Hu, Datao Wang, Hao Tang, Jiangwei Lin
  • Publication number: 20220169295
    Abstract: A method for extracting and analyzing spatial information of a control and protection zone of rail transit with multiple threshold constraints, including the following steps: 1, performing format conversion on a data file and extracting a plurality of coordinate points; 2, selecting key points from the plurality of coordinate points for data simplification to obtain a simplified limit line, a simplified outer structure edge line and a simplified boundary line of construction; 3, programming the simplified limit line, the simplified outer structure edge line, and the simplified boundary line of construction, calling a database, and reading data therefrom for spatial relationship comparison; 4, determining whether the construction of a rail-involved construction project intrudes into a control and protection zone of rail transit according to a result of the spatial relationship comparison, thus completing the extraction and analysis of the spatial information of the control and protection zone of rail transit.
    Type: Application
    Filed: February 5, 2021
    Publication date: June 2, 2022
    Applicant: CHONGQING SURVEY INSTITUTE
    Inventors: Hanxin Chen, Xuexiang Xiong, Changzheng Yuan, Degui Teng, Zejun Xiang, Jing Ming, Chun Yu, Chao Li, Heng Zhang, Bo Hu, Datao Wang, Hao Tang, Jiangwei Lin