Patents by Inventor Xuezhen WU

Xuezhen WU has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20240102386
    Abstract: The present disclosure relates to a construction method for a deformable anchor cable capable of being prestressed. The anchor cable includes an outer sleeve, a shrinkage pipe, an inner sleeve, a steel strand, an anchor and a tray. When the anchor cable is in use, a hole is drilled first, then the anchor cable is mounted in the drilled hole, and finally a prestress is applied to the steel strand of the anchor cable. According to the construction method, the construction is convenient; the anchor cable has the characteristics of high strength and large deformation, and can be easily prestressed; and the large deformation is realized by squeezing the inner sleeve by means of the anchor, which completely overcomes the problem of breaking a cold-drawn rod during the large deformation process.
    Type: Application
    Filed: December 4, 2023
    Publication date: March 28, 2024
    Inventors: Xuezhen WU, Yujing JIANG, Tao DENG, Gang WANG, Zhenchang GUAN, Qing YE
  • Patent number: 11913338
    Abstract: The present invention relates to a support method of preset internal cable for in-situ tunnel expansion project, comprising a cable, lockset and an anchoring agent, wherein before the excavation of the newly-built tunnel, a borehole is drilled into the surrounding rock from the in-situ tunnel, and the cable is installed in the borehole and pre-stressed, so as to play a supporting role at the moment of excavation of the newly-built tunnel. The cable is fixed in the depth of the surrounding rock by the anchoring agent, and the lockset of the cable is set at the position of the excavation contour line of the newly-built tunnel inside the surrounding rock. The present invention provides a method that does not interfere with the excavation construction and can effectively support the surrounding rock of the expanded tunnel in advance.
    Type: Grant
    Filed: October 14, 2021
    Date of Patent: February 27, 2024
    Assignee: Fuzhou university
    Inventors: Xuezhen Wu, Tao Deng, Zhenchang Guan, Yujing Jiang, Sihong Liu
  • Patent number: 11867062
    Abstract: The present disclosure relates to a construction method for a deformable anchor cable capable of being prestressed. The anchor cable includes an outer sleeve, a shrinkage pipe, an inner sleeve, a steel strand, an anchor and a tray. When the anchor cable is in use, a hole is drilled first, then the anchor cable is mounted in the drilled hole, and finally a prestress is applied to the steel strand of the anchor cable. According to the construction method, the construction is convenient; the anchor cable has the characteristics of high strength and large deformation, and can be easily prestressed; and the large deformation is realized by squeezing the inner sleeve by means of the anchor, which completely overcomes the problem of breaking a cold-drawn rod during the large deformation process.
    Type: Grant
    Filed: June 8, 2022
    Date of Patent: January 9, 2024
    Assignee: Fuzhou University
    Inventors: Xuezhen Wu, Yujing Jiang, Tao Deng, Gang Wang, Zhenchang Guan, Qing Ye
  • Publication number: 20230392480
    Abstract: A self-entry exploitation device and method for marine natural gas hydrates is provided. The exploitation device includes a self-entry structural body (1), a sand control device (2) and a gas-liquid lifting system. The self-entry structural body (1) is a gravity anchor. The sand control device (2) and the gas-liquid lifting system are mounted on the self-entry structural body (1). At least one cavity (21) is formed between the self-entry structural body (1) and the sand control device (2), and the cavity (21) is communicated with at least one channel. The sand control device (2) allows liquid and gas to pass through to enter the cavity (21) and is able to filter out silt. The gas-liquid lifting system includes at least one lifting power device (31) and has an end connected to the cavity (21) and an end extending out through a pipeline.
    Type: Application
    Filed: January 4, 2021
    Publication date: December 7, 2023
    Applicant: FU ZHOU UNIVERSITY
    Inventors: Xuezhen WU, Yujing JIANG, Dayong LI
  • Publication number: 20230349293
    Abstract: The present invention relates to a support method of preset internal cable for in-situ tunnel expansion project, comprising a cable, lockset and an anchoring agent, wherein before the excavation of the newly-built tunnel, a borehole is drilled into the surrounding rock from the in-situ tunnel, and the cable is installed in the borehole and pre-stressed, so as to play a supporting role at the moment of excavation of the newly-built tunnel. The cable is fixed in the depth of the surrounding rock by the anchoring agent, and the lockset of the cable is set at the position of the excavation contour line of the newly-built tunnel inside the surrounding rock. The present invention provides a method that does not interfere with the excavation construction and can effectively support the surrounding rock of the expanded tunnel in advance.
    Type: Application
    Filed: October 14, 2021
    Publication date: November 2, 2023
    Applicant: FUZHOU UNIVERSITY
    Inventors: Xuezhen WU, Tao DENG, Zhenchang GUAN, Yujing JIANG, Sihong LIU
  • Publication number: 20230304383
    Abstract: The invention discloses a suction cylinder exploitation device and method for marine natural gas hydrates. The exploitation device comprises an exploitation cylinder, a water pump, a sand control device, a liquid-gas filling system and the like. Through the specially-designed exploitation cylinder and mating devices thereof, the exploitation cylinder can sink below a seabed surface to exploit natural gas hydrates deep below the seabed surface and can be withdrawn. A series of problems such as high well drilling and completion cost of traditional deep-sea drilling exploitation methods, and damage, collapses and sand generation of plain concrete wellbores under the effect of formation pressure are solved, and the limitations that traditional capping depressurization methods can only exploit submarine superficial hydrates and are low in exploitation efficiency are overcome.
    Type: Application
    Filed: January 4, 2021
    Publication date: September 28, 2023
    Applicant: FU ZHOU UNIVERSITY
    Inventors: Xuezhen WU, Dayong LI, Yujing JIANG
  • Publication number: 20220397037
    Abstract: The present disclosure relates to a construction method for a deformable anchor cable capable of being prestressed. The anchor cable includes an outer sleeve, a shrinkage pipe, an inner sleeve, a steel strand, an anchor and a tray. When the anchor cable is in use, a hole is drilled first, then the anchor cable is mounted in the drilled hole, and finally a prestress is applied to the steel strand of the anchor cable. According to the construction method, the construction is convenient; the anchor cable has the characteristics of high strength and large deformation, and can be easily prestressed; and the large deformation is realized by squeezing the inner sleeve by means of the anchor, which completely overcomes the problem of breaking a cold-drawn rod during the large deformation process.
    Type: Application
    Filed: June 8, 2022
    Publication date: December 15, 2022
    Inventors: Xuezhen WU, Yujing JIANG, Tao DENG, Gang WANG, Zhenchang GUAN, Qing YE
  • Patent number: 9909966
    Abstract: The present invention relates to a shear test device and test method of rock mass discontinuities under constant normal stiffness condition. The device includes: a base used for placing a test piece; a loading framework fixedly connected with the base; a shear loading system used for applying a shear force to the test piece; a normal loading system used for applying a normal pressure to the test piece; a normal displacement monitoring system used for measuring the magnitude of normal displacement of the test piece in real time; and a computer control system used for receiving the data of the normal displacement of the test piece in real time, and constantly adjusting the normal pressure applied by the normal loading system to the test piece according to the principle that the normal stiffness of the test piece is unchanged.
    Type: Grant
    Filed: July 24, 2017
    Date of Patent: March 6, 2018
    Assignee: Shandong University of Science and Technology
    Inventors: Yujing Jiang, Xuezhen Wu, Gang Wang
  • Publication number: 20180031458
    Abstract: The present method for testing the bonding strength of rock bolt-grout-surrounding rock comprises the following steps: step 1, fabricating the simulative body of a rock bolt provided with a first surface, wherein the concave-convex characteristic of the first surface is consistent with the surface appearance of a rock bolt, and the first surface is a plane; step 2, pouring a grout layer for simulating the grout material on the first surface of the simulative body of the rock bolt; step 3, pouring a surrounding rock layer for simulating the surrounding rock material on the solidified grout layer, wherein the simulative body of the rock bolt, the grout layer and the surrounding rock layer form a simulative anchoring body; and step 4, performing a shear test along the simulative stress direction of the simulative anchoring body to obtain mechanical parameters reflecting the bonding strength of the anchoring body.
    Type: Application
    Filed: July 24, 2017
    Publication date: February 1, 2018
    Inventors: Yujing JIANG, Xuezhen WU, Gang WANG, Shuchen LI, Qi WANG, Yue CAI
  • Publication number: 20180031457
    Abstract: The present invention relates to a shear test device and test method of rock mass discontinuities under constant normal stiffness condition. The device includes: a base used for placing a test piece; a loading framework fixedly connected with the base; a shear loading system used for applying a shear force to the test piece; a normal loading system used for applying a normal pressure to the test piece; a normal displacement monitoring system used for measuring the magnitude of normal displacement of the test piece in real time; and a computer control system used for receiving the data of the normal displacement of the test piece in real time, and constantly adjusting the normal pressure applied by the normal loading system to the test piece according to the principle that the normal stiffness of the test piece is unchanged.
    Type: Application
    Filed: July 24, 2017
    Publication date: February 1, 2018
    Inventors: Yujing JIANG, Xuezhen WU, Gang WANG