Patents by Inventor Yanan DONG

Yanan DONG has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11959243
    Abstract: A method for constructing a large-span station by two-wing open type semi-covered excavation and semi-reverse construction, is divided into three stages of excavation. First, excavate a first-stage inner small foundation pit, then excavate a second-stage annular foundation pit within the first-stage retaining piles and outside the range of the first-stage inner small foundation pit, and finally excavate a third-stage semi-covered excavation foundation pit below the first-stage inner small foundation pit and the second-stage annular foundation pit. By setting graded retaining piles, middle upright post piles, middle top plates, local waist beams and local concrete supports in the soil-rock combination strata, so that the force transfer between the foundation pit enclosure and the station main body structures and the underlying rock layer is clear and reliable, and a stable frame structure is achieved.
    Type: Grant
    Filed: July 24, 2023
    Date of Patent: April 16, 2024
    Assignees: Beijing Urban Construction Design & Development Group Co., Limited
    Inventors: Fucai Hua, Gang Lei, Zhihui Yang, Jianye Zhu, Liang Zhang, Ning Li, Yanan Dong, Ningning Li
  • Publication number: 20240092922
    Abstract: This disclosure relates to anti-TNFRSF9 (tumor necrosis factor receptor superfamily member 9) antibodies, antigen-binding fragments, and the uses thereof.
    Type: Application
    Filed: September 11, 2023
    Publication date: March 21, 2024
    Inventors: Yi Yang, Jingshu Xie, Chunyan Dong, Fang Yang, Chengyuan Lu, Yuelei Shen, Jian Ni, Yanan Guo, Yunyun Chen
  • Publication number: 20240076848
    Abstract: A method for constructing a large-span station by two-wing open type semi-covered excavation and semi-reverse construction, is divided into three stages of excavation. First, excavate a first-stage inner small foundation pit, then excavate a second-stage annular foundation pit within the first-stage retaining piles and outside the range of the first-stage inner small foundation pit, and finally excavate a third-stage semi-covered excavation foundation pit below the first-stage inner small foundation pit and the second-stage annular foundation pit. By setting graded retaining piles, middle upright post piles, middle top plates, local waist beams and local concrete supports in the soil-rock combination strata, so that the force transfer between the foundation pit enclosure and the station main body structures and the underlying rock layer is clear and reliable, and a stable frame structure is achieved.
    Type: Application
    Filed: July 24, 2023
    Publication date: March 7, 2024
    Applicants: Beijing Urban Construction Design&Development Group Co., Limited
    Inventors: Fucai HUA, Gang LEI, Zhihui YANG, Jianye ZHU, Liang ZHANG, Ning LI, Yanan DONG, Ningning LI