Patents by Inventor Yanhui Pan

Yanhui Pan has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20240097140
    Abstract: A current collector, an electrode sheet, and a fabrication method for a current collector are disclosed. The current collector includes a support layer, a first electrically conductive layer and a second electrically conductive layer. The support layer has a first surface and a second surface arranged opposite to each other. The first electrically conductive layer has a grid structure distributed on the first surface and/or the second surface of the support layer. The second electrically conductive layer is provided on a surface of the first electrically conductive layer away from the support layer.
    Type: Application
    Filed: November 30, 2023
    Publication date: March 21, 2024
    Inventors: Yanhui CUI, Yi PAN, Riguo MEI
  • Publication number: 20230323621
    Abstract: A grouting double-locking pressure real-time sensing system includes: a positioning structure fixed to a ground; wherein an expandable positioning structure passes through the positioning structure, and an input end of the expandable positioning structure is connected to the grouting structure; the pressure real-time monitoring component is connected to the expandable positioning structure; the expandable positioning structure comprises a hollow conduit, an expandable assembly, an upper positioning member, and a lower positioning member; wherein the upper positioning member and the lower positioning member are respectively connected to two ends of the expandable assembly; the hollow conduit passes through the upper positioning member and the lower positioning member, and is threaded to the the lower positioning member; the upper positioning member is fixed to the positioning structure; when rotating the hollow conduit, the lower positioning member moves up and down, so as to expand or contract the expandable
    Type: Application
    Filed: June 14, 2023
    Publication date: October 12, 2023
    Inventors: Fuming Wang, Peng Zhao, Hongyuan Fang, Yanhui Pan, Hui Liu, Xianfeng Zhao
  • Patent number: 11708933
    Abstract: The present application discloses a pipeline radar and television inspection robot which includes a robot body, a directional drilling lifting device, a directional drilling rotary device, a directional drilling swing device, a radar, cameras and a driving apparatus; wherein the directional drilling lifting device is on a front part of the robot body; the directional drilling rotary device is on the directional drilling lifting device; the directional drilling swing device is on the directional drilling rotary device; the radar and the cameras are on the directional drilling swing device; the driving apparatus are on a bottom of the robot body. The directional drilling lifting device, the radar and the cameras are plugged in the robot body. The robot body electrically connects to cables which electrically connect to a control system. The cameras and the radar are able to be adjusted and the components are connected as modules.
    Type: Grant
    Filed: September 24, 2020
    Date of Patent: July 25, 2023
    Assignees: Zhengzhou University, WELEAD Infrastructure Engineering Technology (Zhengzhou), Ltd.
    Inventors: Hongyuan Fang, Peng Zhao, Bin Li, Jianwei Lei, Chengchao Guo, Yanhui Pan, Haijun Li, Wei Wu, Zongsheng Lu
  • Patent number: 11618802
    Abstract: The present invention relates to a polymer expanding material in infiltration or seepage multi-water environment and a preparation method thereof, belonging to a technical field of polymer expanding foam materials. The polymer expanding material includes the following parts of materials by weight: 20-30 parts of rosin polyester polyol, 20-50 parts of isocyanate, 20-40 parts of PhireGuard® MB-512, 5-10 parts of HFO-1233zd, 1-2 parts of surfactant, 0.01-1 part of catalyst, and 0.01 parts of benzoyl chloride. The present invention has high sand fixing body strength, fast curing speed, good elastoplasticity, good pouring property and permeability, and good expanding property, which is suitable for infiltration or seepage multi-water environment, especially for dam infiltration, piping, and other problems during construction and subsequent operation of water conservancy projects.
    Type: Grant
    Filed: April 27, 2020
    Date of Patent: April 4, 2023
    Assignees: Zhengzhou University, SAFEKEY Engineering Technology (Zhengzhou), Ltd.
    Inventors: Hongyuan Fang, Peng Zhao, Lei Wang, Yanhui Pan, Bin Li, Manjun Li, Kangjian Yang
  • Patent number: 11585467
    Abstract: Trenchless methods for forming a curved hole channel with a steel sleeve and pipeline lifting are provided, including steps of: (T1) drilling a straight hole channel, and inserting the steel sleeve into the straight hole channel; (T2) inserting a guiding pipe into the steel sleeve, and determining a bending direction of a hole channel to be formed; and (T3) inserting a flexible steel-wire pipe into the guiding pipe, and punching to form the curved hole channel. With applying the creative trenchless method for forming the curved hole channel, a specially-made grouting pipe is accurately inserted to a bottom of a subsiding pipeline section, so that a polymer material is conveniently injected to a bottom of a disease position. Though utilizing an expansion force generated by the polymer material, the subsiding pipeline section is uplifted, so as to realize trenchless repairing.
    Type: Grant
    Filed: May 10, 2020
    Date of Patent: February 21, 2023
    Assignees: Infrastructure Renewal Institute of Southern China, WELEAD Infrastructure Engineering Technology (Zhengzhou), Ltd.
    Inventors: Fuming Wang, Hongyuan Fang, Peng Zhao, Yanhui Pan, Bin Li, Hang He
  • Publication number: 20230041315
    Abstract: A silicate-modified polymer grouting material for leakage plugging is provided, which belongs to the technical field of silicate modification, includes 60% by weight of silicate-modified aqueous solution component, and about 40% of structural flame-retardant isocyanate. According to the proportion of the main total amount, the main components are classified into inorganic components, so the silicate-modified polymer grouting material for leakage plugging has excellent flame retardant performance, oxygen index ?35%, adhesion ?1.5 mPa, maximum reaction temperature ?95° C., odor level (80° C.) ?3.5, fog test ?5 mg (without physical additive flame retardants diffusion to the environment). In particular, a main component of the silicate-modified aqueous solution, endows it with good surface resistance.
    Type: Application
    Filed: September 15, 2022
    Publication date: February 9, 2023
    Inventors: Peng Zhao, Hongyuan Fang, Lei Wang, Mingrui Du, Yanhui Pan, Hui Liu
  • Publication number: 20230045296
    Abstract: The present invention relates to a silicate-modified high-toughness and low-heat polymer grouting material for reinforcement, which belongs to the technical field of materials. About 60% by weight of the raw materials of the silicate modified grouting material of the present invention is the silicate modified aqueous solution, and about 40% is the structural flame retardant isocyanate, and main components of the polymer grouting material are classified into inorganic components according to the main total proportion. The silicate-modified high-toughness and low-heat polymer grouting material for reinforcement of the present invention has excellent flame retardancy and compressive performance, wherein a compressive strength is ?60 MPa, an oxygen index is ?30%, and a maximum reaction temperature is ?100° C., an odor grade (80° C.) is ?3.5, a fog test is ?5 mg (no physical additive flame retardant diffuses to the environment), bonding is ?3 MPa, a shear strength is ?20 MPa, and a tensile strength is ?20 MPa.
    Type: Application
    Filed: September 20, 2022
    Publication date: February 9, 2023
    Inventors: Peng Zhao, Hongyuan Fang, Lei Wang, Yanhui Pan, Mingrui Du, Chao Zhang, Hui Liu
  • Patent number: 11499284
    Abstract: A trough plate for constructing a locked polymer anti-seepage wall includes a plate body, a guide tube, a grouting pipe and an anti-blocking head. A construction method of the locked polymer anti-seepage wall includes the steps of positioning an Nth trough plate and then pressing the Nth trough plate into ground, wherein N is a natural number larger than and equal to 1; engaging an (N+1)th trough plate with the Nth trough plate, and then pressing the (N+1)th trough plate into the ground; connecting a grouting pipe of the Nth trough plate with a grouting machine, pulling out the Nth trough plate, and simultaneously grouting through the grouting pipe of the Nth trough plate by the grouting machine; and repeating the steps (B) and (C) till the locked polymer anti-seepage wall is completed, wherein the steps (B) and (C) are repeated every time, N is automatically increased by 1.
    Type: Grant
    Filed: May 29, 2021
    Date of Patent: November 15, 2022
    Assignees: Zhengzhou University, Henan Institute of Sun Yat-sen University
    Inventors: Fuming Wang, Chengchao Guo, Chaojie Wang, Mingsheng Shi, Peng Zhao, Yanhui Pan, Xianfeng Zhao, Binghan Xue, Yanjie Hao, Xijun Zhang, Yangyang Xia, Yingli Wang
  • Patent number: 11473713
    Abstract: A trenchless integrative repair method includes steps of: S1, pre-casting steel rings according to an internal diameter of a defect pipeline, and forming grouting holes in the steel rings; S2, loading the steel rings to a defect position inside the pipeline, and fitting the steel rings to an internal wall of the pipeline to form reinforcing rings; S3, selecting a number of the grouting holes according to subsidence distribution; drilling a hole in the pipeline to reach a subsidence position and inserting a grouting pipe; steadily grouting the subsidence position with a polymer grouting system, and observing a lift condition of the pipeline; removing the grouting pipe after the pipeline is lifted to a predetermined level; and S4, pulling a lining pipe into the pipeline, and fitting the lining pipe to the steel rings and pipeline walls adjacent to the steel rings; curing the lining pipe.
    Type: Grant
    Filed: April 27, 2020
    Date of Patent: October 18, 2022
    Assignees: Infrastructure Renewal Institute of Southern China, WELEAD Infrastructure Engineering Technology (Zhengzhou), Ltd.
    Inventors: Fuming Wang, Hongyuan Fang, Peng Zhao, Yanhui Pan, Bin Li, Hang He
  • Patent number: 11346487
    Abstract: A support tool for leakage repair of an inspection well includes: a curved loading plate having multiple grouting holes thereon, a telescopic adjustment device, and a base; wherein: one end of the telescopic adjustment device is connected to an inner side face of the curved loading plate, and the other end of the telescopic adjustment device is connected to the base; the telescopic adjustment device adjusts a distance between the curved loading plate and the base. The support tool is firstly hoisted at a leakage position of the inspection well; then a telescopic length of the telescopic adjustment device is adjusted, so that the curved loading plate and the base are in a close contact with opposite sides of the inspection well wall; and a grouting system is used to inject a double-slurry quick-setting repair material into a grouting pipe on the curved loading plate for plugging leakage.
    Type: Grant
    Filed: May 11, 2020
    Date of Patent: May 31, 2022
    Assignees: Infrastructure Renewal Institute of Southern China, WELEAD Infrastructure Engineering Technology (Zhengzhou), Ltd.
    Inventors: Fuming Wang, Hongyuan Fang, Peng Zhao, Yanhui Pan, Bin Li, Hang He
  • Patent number: 11319690
    Abstract: A method for constructing an assembled recyclable rectangular working well with preset detachable door openings comprises steps of: (I) designing according to functional requirements for a rectangular working well; (II) constructing by supporting piles; (III) installing prefabricated top beam; (IV) edge protection construction; (V) alternate construction of earthwork excavation, retaining slabs and internal support breast beams; (VI) installing the ladder entering the rectangular working well; (VII) rectangular working well back cover; (VIII) demolition of the detachable subsection support piles in the door part and completing the construction of the assembled recyclable rectangular working well in the preset detachable door hole; (IX) after the operation in the well is completed, during the backfilling process of the rectangular working well, gradually recovering the working well components such as the retaining slab, the internal support girder, the prefabricated crown beam and the supporting piles.
    Type: Grant
    Filed: June 3, 2020
    Date of Patent: May 3, 2022
    Assignees: Infrastructure Renewal Institute of Southern China, WELEAD Infrastructure Engineering Technology (Zhengzhou), Ltd.
    Inventors: Fuming Wang, Hongyuan Fang, Yanhui Pan, Peng Zhao, Chengchao Guo
  • Patent number: 11274784
    Abstract: A in-service repair method combing externally bonded pre-stressed FRP and polymer grouting for PCCP with broken wire, includes excavating PCCP, supporting the PCCP, treating outer wall of PCCP, bonded an external of the PCCP with pre-stressed FRP for repairing, laying grouting pipe, backfilling and grouting for densing. First of all, excavating a PCCP pipeline to be repaired and supporting the PCCP pipeline with a supporting device, smoothing the outer wall of the PCCP pipeline at a broken wire position and applying primer, and winding the FRP around a damaged portion of the PCCP pipeline, pre-stressing the FRP by applying a pre-stressing device and applying dipping glue to the FRP after tension to stick the FRP on the pipe wall, then laying a grouting pipe, backfilling the pipeline repaired, and finally injecting polymer into the soil after backfilling and compacting the soil by the grouting pipe pre-buried.
    Type: Grant
    Filed: June 3, 2020
    Date of Patent: March 15, 2022
    Assignees: WELEAD Infrastructure Engineering Technology (Zhengzhou), Ltd., SAFEKEY Engineering Technology (Zhengzhou), Ltd.
    Inventors: Fuming Wang, Hongyuan Fang, Kejie Zhai, Peng Zhao, Yanhui Pan
  • Patent number: 11231139
    Abstract: A method for detecting and repairing external diseases of a buried drainage pipeline includes steps of: S1, controlling a robot to enter the pipeline to perform comprehensive detection of pipeline diseases; S2, analyzing detected pipeline diseases with a computer terminal based on detection results of the robot, and determining locations of external diseases of the pipeline; S3, controlling the robot to detect a depth of the external diseases of the pipeline relative to a ground surface; S4, determining a projection position of the external diseases of the pipeline on the ground surface according to detection results of the step S2, and drilling a hole from the ground surface; determining a drilling depth according to detection results of the step S3, and inserting a grouting pipe; and S5, grouting and repairing the external diseases of the pipeline through the grouting pipe.
    Type: Grant
    Filed: April 27, 2020
    Date of Patent: January 25, 2022
    Assignees: Infrastructure Renewal Institute of Southern China, WELEAD Infrastructure Engineering Technology (Zhengzhou), Ltd.
    Inventors: Fuming Wang, Hongyuan Fang, Peng Zhao, Yanhui Pan, Bin Li, Hang He
  • Patent number: 11149400
    Abstract: A thin-slotting lifting synchronous grouting device and its usage method are provided. The device includes a hollow force-bearing column through which a feeding pipe passes; wherein: left and right cutting plates are respectively fixedly arranged on each side of the hollow force-bearing column; a left connecting plate is fixedly arranged on an outside of the left cutting plate; a right guiding column is fixedly arranged on an outside of the right cutting plate; center lines of the left connecting plate, the right guiding column and the hollow force-bearing column are in a same plane; a top end of to the feeding pipe is connected to a grouting device, and a bottom end is connected to a spraying device; a spraying nozzle of the spraying device stretches out along the hollow force-bearing column; and a lower end of the hollow force-bearing column is connected with a disposable conical head.
    Type: Grant
    Filed: April 27, 2020
    Date of Patent: October 19, 2021
    Assignees: Infrastructure Renewal Institute of Southern China, WELEAD Infrastructure Engineering Technology (Zhengzhou), Ltd.
    Inventors: Fuming Wang, Hongyuan Fang, Peng Zhao, Yanhui Pan, Xianfeng Zhao, Yingli Wang
  • Patent number: 11149399
    Abstract: A track-type shotcrete integrated system includes: a proportioner working bin, a storage bin, a power bin, and load-bearing legs, wherein bottom sections of the load-bearing legs are equipped with a track chassis for moving, and the track chassis is electrically connected to a track controller; the storage bin contains a storage tank I and a storage tank II for storing different raw materials; a feed pump I is installed on a top of the storage tank I, and a feed pump II is installed on a top of the storage tank II; inlet pipes of the feed pump I and the feed pump II insert into the storage tank I and storage tank II respectively, and outlet pipes of the feed pump I and the feed pump II are connected to a feed pipe I and a feed pipe II respectively.
    Type: Grant
    Filed: April 27, 2020
    Date of Patent: October 19, 2021
    Assignees: Infrastructure Renewal Institute of Southern China., WELEAD Infrastructure Engineering Technology (Zhengzhou), Ltd.
    Inventors: Fuming Wang, Hongyuan Fang, Peng Zhao, Yanhui Pan, Xianfeng Zhao, Yingli Wang
  • Patent number: 11143027
    Abstract: A construction method of a rectangular working well includes steps of: (I) designing functional requirements for the rectangular working well; (II) constructing a caisson of an enclosing structure of the rectangular working well; (III) constructing an edge protector; (IV) excavating earthwork of the rectangular working well; (V) forming a bottom cover for the rectangular working well, and pre-embedding a sliding track, a pull ring and a back wall anchor; (VI) installing a ladder for entering the rectangular working well; (VII) preventing joint leakage; (VIII) installing a water-proof pressure plate at an entrance of the preset pipe jacking hole; (IX) constructing the sliding back wall; (X) lifting the sandwich concrete slab wall at a top of the preset pipe jacking hole; and (XI) performing pipe jacking. The structure system constructed by the present invention has many advantages such as clear function, safety, quickness, and flexible design.
    Type: Grant
    Filed: April 23, 2020
    Date of Patent: October 12, 2021
    Assignees: Infrastructure Renewal Institute of Southern China, WELEAD Infrastructure Engineering Technology (Zhengzhou), Ltd.
    Inventors: Fuming Wang, Hongyuan Fang, Yanhui Pan, Peng Zhao, Chengchao Guo
  • Publication number: 20210285180
    Abstract: A trough plate for constructing a locked polymer anti-seepage wall includes a plate body, a guide tube, a grouting pipe and an anti-blocking head. A construction method of the locked polymer anti-seepage wall includes the steps of positioning an Nth trough plate and then pressing the Nth trough plate into ground, wherein N is a natural number larger than and equal to 1; engaging an (N+1)th trough plate with the Nth trough plate, and then pressing the (N+1)th trough plate into the ground; connecting a grouting pipe of the Nth trough plate with a grouting machine, pulling out the Nth trough plate, and simultaneously grouting through the grouting pipe of the Nth trough plate by the grouting machine; and repeating the steps (B) and (C) till the locked polymer anti-seepage wall is completed, wherein the steps (B) and (C) are repeated every time, N is automatically increased by 1.
    Type: Application
    Filed: May 29, 2021
    Publication date: September 16, 2021
    Inventors: Fuming Wang, Chengchao Guo, Chaojie Wang, Mingsheng Shi, Peng Zhao, Yanhui Pan, Xianfeng Zhao, Binghan Xue, Yanjie Hao, Xijun Zhang, Yangyang Xia, Yingli Wang
  • Patent number: 11104612
    Abstract: The present invention provides a rapid-hardening underground pipeline grouting repair polymer and a preparing method thereof for underground pipes. The rapid-hardening underground pipeline grouting repair polymer comprises the base resin and the hardener, weight ratio of which is 2:1-1:1. The base resin comprises 50 to 160 parts by weight of an isocyanate; 20 to 100 parts of a chlorophosphate mixture with a density over 1400 kg/m3; a parts by weight ratio of the isocyanate and chlorophosphate is 1:1-4:1. The hardener comprises 30 to 60 parts by weight of a chlorophosphate mixture with a density over 1400 kg/m3, 5 to 15 parts of a propyl formate, a methyl propionate or a mixture of a propyl formate and a methyl propionate, 15 to 55 parts of a polyol, 1 to 3 parts of a surfactant, 2 to 6 parts of a catalyst, 0 to 0.5 parts of water and 0 to 1 parts of a colorant.
    Type: Grant
    Filed: May 18, 2019
    Date of Patent: August 31, 2021
    Assignee: Infrastructure Renewal Institute of Southern China
    Inventors: Fuming Wang, Hongyuan Fang, Lei Wang, Peng Zhao, Yanhui Pan
  • Patent number: 11085166
    Abstract: A pressing-pulling device includes: a pressing-pulling bracket, wherein slotting oil cylinders are symmetrically and vertically mounted on the pressing-pulling bracket, and a piston rod of each of the slotting oil cylinders faces downwardly; a bottom end of the piston rod is connected to a connecting plate, and a through-hole is provided in a middle of the connecting plate; a continuous lifting mechanism is installed in a middle of the pressing-pulling bracket, and a slotting rod is vertically inserted into the continuous lifting mechanism; a lifting ring is installed at a top end of the slotting rod; a bottom end of the slotting rod extends downwardly through the through-hole to connect to a slotting cutter; a locking device is fixed on the connecting plate near the through-hole for fixing the slotting rod.
    Type: Grant
    Filed: April 23, 2020
    Date of Patent: August 10, 2021
    Assignees: WELEAD Infrastructure Engineering Technology (Zhengzhou), Ltd., SAFEKEY Engineering Technology (Zhengzhou), Ltd.
    Inventors: Fuming Wang, Hongyuan Fang, Peng Zhao, Chengchao Guo, Yanhui Pan, Xianfeng Zhao, Guobin Qiao, Zhihui Jia, Hui Liu
  • Patent number: 11079057
    Abstract: A trenchless rehabilitation device for disconnects on large-diameter concrete drainage pipe and method thereof is provided; which includes: a pipe CCTV, a water blocking device, a lining repairing permanent structure, and a grouting device. The pipe CCTV is configured to determine the location of the pipe disconnection; the water blocking device is configured to form the working space; then the rubber seal lining short tube and multiple expanded round fixed steel plates are configured to form the inner repair permanent structure, and the grouting equipment is configured to insert the expanded round fixed steel plates. The grouting holes are configured to polymer grouting on the periphery of the pipe disconnection and the soil void. The trenchless repair process provided by the present invention can form a composite pipeline disjointed repair structure of inner repair permanent structure and polymer grouting material.
    Type: Grant
    Filed: June 10, 2020
    Date of Patent: August 3, 2021
    Assignees: WELEAD Infrastructure Engineering Technology (Zhengzhou), Ltd., SAFEKEY Engineering Technology (Zhengzhou), Ltd.
    Inventors: Fuming Wang, Hongyuan Fang, Peng Zhao, Yanhui Pan, Bin Li, Hang He