Patents by Inventor Yisheng Ye

Yisheng Ye has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11898447
    Abstract: A full-circle secondary lining inverted arch construction formwork system for a long-distance tunnel and a formwork transporting method adopt a customized steel formwork, a steel pipe support, and a turn buckle. The steel pipe support is arranged on the longitudinal main edge, and is provided between the longitudinal rails and a primary lining for supporting vertical buoyancy. The turn buckle is arranged between two sides of the formwork and a reserved steel bar for resisting horizontal load generated during asymmetric pouring. A cantilever gantry crane and a transportation flat car are used for formwork transporting, wherein travel rails of the cantilever gantry crane and the transportation flat car are integrated on the customized steel formwork, and there is no other rail. According to the present, the formwork has high strength and rigidity, the formwork system is simple.
    Type: Grant
    Filed: April 12, 2021
    Date of Patent: February 13, 2024
    Assignees: CCTEB INFRASTRUCTURE CONSTRUCTION INVESTMENT CO., LTD., CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GROUPCO;LTD
    Inventors: Xiaosong Dai, Kaiyang Liu, Ruihua Jia, Changyi Su, Haihua Gu, Yisheng Ye, Wei Chen, Xiaofei Xie, Hao Zhou, Jian Cui, Yisheng Luo, Wenbo Lu
  • Patent number: 11480054
    Abstract: A rapid construction method for a secondary lining of a small-section tunnel includes steps of: transporting and store secondary lining steel bars to a designated position in the tunnel with a steel bar transport vehicle and a wheel type dump truck; after the tunnel is cleaned, simultaneously constructing the secondary lining from two ends to a middle of the tunnel; constructing a lower inverted arch with a customized inverted arch formwork and then constructing an upper arch wall with a plurality of portal arch wall formwork trolleys; wherein the portal arch wall formwork trolleys form a set, and are connected by hinges, so as to construct in a curve tunnel. The rapid construction method has a long single construction section, and procedure connection is compact, thereby realizing rapid and efficient construction of the secondary lining.
    Type: Grant
    Filed: April 12, 2021
    Date of Patent: October 25, 2022
    Assignees: CCTEB INFRASTRUCTURE CONSTRUCTION INVESTMENT CO., LTD., CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GROUP CO; LTD
    Inventors: Xiaosong Dai, Nanshan Yu, Kaiyang Liu, Yisheng Ye, Haijun Zhu, Changyi Su, Qing Sun, Shangzhi Jiang, Qin Cao, Jian Cui, Lishan Cui
  • Publication number: 20210231014
    Abstract: A full-circle secondary lining inverted arch construction formwork system for a long-distance tunnel and a formwork transporting method adopt a customized steel formwork, a steel pipe support, and a turn buckle. The steel pipe support is arranged on the longitudinal main edge, and is provided between the longitudinal rails and a primary lining for supporting vertical buoyancy. The turn buckle is arranged between two sides of the formwork and a reserved steel bar for resisting horizontal load generated during asymmetric pouring. A cantilever gantry crane and a transportation flat car are used for formwork transporting, wherein travel rails of the cantilever gantry crane and the transportation flat car are integrated on the customized steel formwork, and there is no other rail. According to the present, the formwork has high strength and rigidity, the formwork system is simple.
    Type: Application
    Filed: April 12, 2021
    Publication date: July 29, 2021
    Inventors: Xiaosong Dai, Kaiyang Liu, Ruihua Jia, Changyi Su, Haihua Gu, Yisheng Ye, Wei Chen, Xiaofei Xie, Hao Zhou, Jian Cui, Yisheng Luo, Wenbo Lu
  • Publication number: 20210231015
    Abstract: A rapid construction method for a secondary lining of a small-section tunnel includes steps of: transporting and store secondary lining steel bars to a designated position in the tunnel with a steel bar transport vehicle and a wheel type dump truck; after the tunnel is cleaned, simultaneously constructing the secondary lining from two ends to a middle of the tunnel; constructing a lower inverted arch with a customized inverted arch formwork and then constructing an upper arch wall with a plurality of portal arch wall formwork trolleys; wherein the portal arch wall formwork trolleys form a set, and are connected by hinges, so as to construct in a curve tunnel. The rapid construction method has a long single construction section, and procedure connection is compact, thereby realizing rapid and efficient construction of the secondary lining.
    Type: Application
    Filed: April 12, 2021
    Publication date: July 29, 2021
    Inventors: Xiaosong Dai, Nanshan Yu, Kaiyang Liu, Yisheng Ye, Haijun Zhu, Changyi Su, Qing Sun, Shangzhi Jiang, Qin Cao, Jian Cui, Lishan Cui