Patents by Inventor Yongguang GAO

Yongguang GAO has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11401674
    Abstract: Disclosed are a pile-bottom grouting cavity and a method for using same, and a cast-in-place pile body and a method for constructing same. The pile-bottom grouting cavity comprises: a grouting capsule, having an expansion state in which the grouting capsule is filled with grout to bear a pile body, and a contracted state in which the grouting capsule is hollow; a grouting pipe in communication with an inner cavity of the grouting capsule to grout the grouting capsule; and a fixing plate, with the grouting capsule being arranged on the fixing plate, and the fixing plate being provided with a through hole that is in communication with the bottom of an accommodation hole, such that slurry and/or sediment in the accommodation hole pass through the fixing plate. The aim thereof is to solve the problems in the prior art of hole wall collapse and excessive sediment that seriously affect the quality of construction in a grouting pile with a grouting capsule during the construction of a cast-in-place bored pile.
    Type: Grant
    Filed: June 28, 2019
    Date of Patent: August 2, 2022
    Inventors: Yunfei Gao, Yongguang Gao
  • Publication number: 20210348355
    Abstract: A grouting consolidation method for a full casing borehole guide prefabricated pile, comprising the following steps: S1, driving a drilling rig carrying a casing (1) to perform borehole construction, the borehole construction being performed to a preset hole depth to form a borehole (2); S2. the casing (1) being housed in the borehole (2); S3. implanting a prefabricated pile (4) into the borehole (2) so that the prefabricated pile (4) reaches a hole bottom of the borehole (2); S4. injecting a slurry (3) into the borehole (2); S5. pulling out the casing (1) so that the prefabricated pile (4) and an inner cavity of the borehole (2) are fixed and cemented into an integrated structure.
    Type: Application
    Filed: June 14, 2019
    Publication date: November 11, 2021
    Inventors: Yongguang GAO, Yunfei GAO
  • Publication number: 20210010218
    Abstract: Disclosed are a pile-bottom grouting cavity and a method for using same, and a cast-in-place pile body and a method for constructing same. The pile-bottom grouting cavity comprises: a grouting capsule, having an expansion state in which the grouting capsule is filled with grout to bear a pile body, and a contracted state in which the grouting capsule is hollow; a grouting pipe in communication with an inner cavity of the grouting capsule to grout the grouting capsule; and a fixing plate, with the grouting capsule being arranged on the fixing plate, and the fixing plate being provided with a through hole that is in communication with the bottom of an accommodation hole, such that slurry and/or sediment in the accommodation hole pass through the fixing plate. The aim thereof is to solve the problems in the prior art of hole wall collapse and excessive sediment that seriously affect the quality of construction in a grouting pile with a grouting capsule during the construction of a cast-in-place bored pile.
    Type: Application
    Filed: June 28, 2019
    Publication date: January 14, 2021
    Inventors: Yunfei GAO, Yongguang GAO