Patents by Inventor Yonghong Gu

Yonghong Gu has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11313192
    Abstract: The present invention discloses a method for lowering an oil pipe in a gas well without well-killing, a soluble bridge plug and a material preparation method thereof, wherein, the method comprises the steps of: lowering a bridge plug in a wellbore such that the bridge plug blocks the wellbore at a predetermined location in the wellbore; injecting water in the wellbore after the pressure in the wellbore has been relieved so as to replace gases in the wellbore; and lowering an oil pipe in the wellbore to the location of the bridge plug. The method for lowering an oil pipe in a gas well without well-killing, the soluble bridge plug and the material preparation method thereof provided in the present invention successfully solve the problem of high cost for lowering an oil pipe under pressure after a fracturing fluid has been injected into the casing.
    Type: Grant
    Filed: April 4, 2018
    Date of Patent: April 26, 2022
    Inventors: Xianwen Li, Qiaorong Han, Yanming Zhang, Xu Ma, Zhanguo Ma, Yangming Hu, Changjing Zhou, Yuanxiang Xiao, Huaqiang Shi, Baochun Chen, Yonghong Gu, Xiaoyong Wen, Xuan'ang Lai, Yong Ding, Liang Ye, Qianyun Zhao, Xinxing Ma, Yajuan Wang, Man Bi, Hua Shi, Mingfang He, Xiaorui Liu, Wei Gao, Hongying Li, Yun Ling, Ruifen Hao, Lei Shen, Guohui Su, Shaowei Zhou, Shusheng Li, Zhe Li
  • Publication number: 20200040682
    Abstract: The present invention discloses a method for lowering an oil pipe in a gas well without well-killing, a soluble bridge plug and a material preparation method thereof, wherein, the method comprises the steps of: lowering a bridge plug in a wellbore such that the bridge plug blocks the wellbore at a predetermined location in the wellbore; injecting water in the wellbore after the pressure in the wellbore has been relieved so as to replace gases in the wellbore; and lowering an oil pipe in the wellbore to the location of the bridge plug. The method for lowering an oil pipe in a gas well without well-killing, the soluble bridge plug and the material preparation method thereof provided in the present invention successfully solve the problem of high cost for lowering an oil pipe under pressure after a fracturing fluid has been injected into the casing.
    Type: Application
    Filed: April 4, 2018
    Publication date: February 6, 2020
    Inventors: Xianwen Li, Qiaorong Han, Yanming Zhang, Xu Ma, Zhanguo Ma, Yangming Hu, Changjing Zhou, Yuanxiang Xiao, Huaqiang Shi, Baochun Chen, Yonghong Gu, Xiaoyong Wen, Xuan'ang Lai, Yong Ding, Liang Ye, Qianyun Zhao, Xinxing Ma, Yajuan Wang, Man Bi, Hua Shi, Mingfang He, Xiaorui Liu, Wei Gao, Hongying Li, Yun Ling, Ruifen Hao, Lei Shen, Guohui Su, Shaowei Zhou, Shusheng Li, Zhe Li