Patents by Inventor Yuanjun JIANG

Yuanjun JIANG has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20220222393
    Abstract: The present disclosure relates to a prediction method and system for an initiation volume of a debris flow slope source. The prediction method includes: dividing a debris flow source slope to be predicted into soil columns; determining a positional relationship between a selected central soil column and six adjacent soil columns around; calculating a most unfavorable sliding surface of the soil column and an unbalanced force on the sliding surface according to an upper bound theorem of a limit analysis; determining whether the most unfavorable sliding surface is unstable; determining a mode and a size of a force exerted by an unstable soil column on a surrounding soil column according to a break status of a connection bond of a lateral tensile stress of the central soil column; and finally determining whether the soil column is fluidized, and predicting an initiation volume of the debris flow source slope.
    Type: Application
    Filed: June 7, 2021
    Publication date: July 14, 2022
    Inventors: Yuanjun Jiang, Xiaobo Hu, Lijun Su, Xin Xia
  • Patent number: 10247591
    Abstract: A new experimental device for debris flow simulation, including a material supply device, a flow channel, a stacking groove, a pole, a first high-speed camera, a second high-speed camera, a fixing frame, and a sliding rail. The material supply device is used to release the debris flow simulation material to the flow channel, to realize the start of the debris flow simulation. The stacking groove is used for the accumulation of the debris flow. The pole is used to support the stacking groove and adjust the slope of the stacking groove. The fixing frame is used to fix the first high-speed camera. The second high-speed camera can monitor the movement of the debris flow. The invention can flexibly simulate the movement characteristics of various debris flow and obtain the test data, so as to provide data support for the subsequent study.
    Type: Grant
    Filed: September 18, 2017
    Date of Patent: April 2, 2019
    Assignee: INSTITUTE OF MOUNTAIN HAZARDS AND ENVIRONMENT, CHINESE ACADEMY OF SCIENCES
    Inventors: Yuanjun Jiang, Siyou Xiao, Yue Song, Zhen Jiang, Meng Wang
  • Publication number: 20190051146
    Abstract: A three-dimensional multi-point and multi-index early warning method for risk at a power grid tower in a landslide section, including: (1) classifying the risk level of each index; (2) obtaining the value of various indexes of the power grid tower in a landslide section during a certain period of time. (3) calculating the single-index measure of each index, and obtaining the evaluating matrix of the single index measure; (4) determining the weight of each index; (5) calculating the multi-index comprehensive measure of the landslide and power tower; (6) introducing the confidence level ? to determine the comprehensive risk level of the power tower instability; (7) performing early warning based on risk level. The invention greatly improves the warning accuracy of the landslide, and realizes the accurate judgment and warning of danger of the tower.
    Type: Application
    Filed: September 5, 2017
    Publication date: February 14, 2019
    Applicant: Institute of Mountain Hazards and Environment, Chinese Academy of Sciences
    Inventors: Yuanjun JIANG, Siyou XIAO, Yue SONG, Zhen JIANG, Meng WANG
  • Publication number: 20180087945
    Abstract: A new experimental device for debris flow simulation, including a material supply device, a flow channel, a stacking groove, a pole, a first high-speed camera, a second high-speed camera, a fixing frame, and a sliding rail. The material supply device is used to release the debris flow simulation material to the flow channel, to realize the start of the debris flow simulation. The stacking groove is used for the accumulation of the debris flow. The pole is used to support the stacking groove and adjust the slope of the stacking groove. The fixing frame is used to fix the first high-speed camera. The second high-speed camera can monitor the movement of the debris flow. The invention can flexibly simulate the movement characteristics of various debris flow and obtain the test data, so as to provide data support for the subsequent study.
    Type: Application
    Filed: September 18, 2017
    Publication date: March 29, 2018
    Applicant: Institute of Mountain Hazards and Environment, Chinese Academy of Sciences
    Inventors: Yuanjun JIANG, Siyou XIAO, Yue SONG, Zhen JIANG, Meng WANG