Patents by Inventor Yukihisa MIYAGAWA

Yukihisa MIYAGAWA has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10169059
    Abstract: An analysis support method includes: searching for a second physical machine that has a configuration similar to a first physical machine on which a first virtual machine to be analyzed is executed, the second physical machine having configurations similar to the first physical machine before and after a change of a state of a virtual machine executed on the second physical machine; and searching for a second virtual machine that is executed on the second physical machine and similar to the first virtual machine before and after the change of the state of the virtual machine.
    Type: Grant
    Filed: June 2, 2014
    Date of Patent: January 1, 2019
    Assignee: FUJITSU LIMITED
    Inventors: Ichiro Kotani, Yasuhide Tobo, Takaaki Nakazawa, Yukihisa Miyagawa, Yoshikazu Oda, Kenichi Mori, Naoki Tateishi, Kenichi Shimazaki, Kiyoshi Kouge
  • Patent number: 10169102
    Abstract: A load calculation program that causes a computer a process includes acquiring processor usage information including usage of a processor of an managed computer, which is a management object, and usage of the processor for each of a plurality of virtual machines generated by a hypervisor executed on the managed computer; acquiring data transmission information including a data transmission amount for each virtual network interface used by the plurality of virtual machines; detecting a first virtual network interface that performs data transmission without routing through the hypervisor among the plurality of virtual network interfaces, based on the processor usage information and the data transmission information; and calculating load information including processor usage for data transmission of each of the plurality of virtual machines, based on whether or not each of the virtual machines uses the first virtual network interface.
    Type: Grant
    Filed: January 5, 2016
    Date of Patent: January 1, 2019
    Assignee: FUJITSU LIMITED
    Inventors: Naoki Tateishi, Kiyoshi Kouge, Kensuke Tokoda, Ichiro Kotani, Satoshi Ohta, Takaaki Nakazawa, Satoshi Matsuda, Hui Li, Kazunori Kandani, Saeko Nakamura, Yukihisa Miyagawa, Yuki Torii, Yoko Yonemoto
  • Patent number: 9921861
    Abstract: An information processing apparatus calculates, at the time of moving a virtual machine which operates on a first physical machine, an amount of a first resource which the virtual machine can use on a second physical machine without sharing with another virtual machine. The information processing apparatus estimates response time of the virtual machine at the time of moving the virtual machine to the second physical machine on the basis of response time of the virtual machine at the time of the virtual machine operating on the first physical machine and the amount of the first resource. At this time the information processing apparatus uses different algorithms at the time of a resource used by the virtual machine being within the first resource and at the time of the virtual machine using a second resource which the virtual machine shares with another virtual machine.
    Type: Grant
    Filed: June 19, 2014
    Date of Patent: March 20, 2018
    Assignee: FUJITSU LIMITED
    Inventors: Yasuhide Tobo, Ichiro Kotani, Yoshikazu Oda, Yukihisa Miyagawa, Kiyoshi Kouge, Kenichi Shimazaki
  • Publication number: 20160253383
    Abstract: A non-transitory computer-readable storage medium storing therein a management-information acquiring program that causes a computer to execute a process includes acquiring queries to a target database for a management target service system, specifying a reference target table in the database based on names of target tables included in the queries and content of the queries, specifying a reporting target table on the basis of data of the reference target table, causing the database to execute an acquisition query to the reporting target table, and acquiring specific management information from the reporting target table.
    Type: Application
    Filed: February 22, 2016
    Publication date: September 1, 2016
    Applicant: FUJITSU LIMITED
    Inventors: Kensuke Tokoda, Kiyoshi KOUGE, Takaaki Nakazawa, Satoshi Ohta, Yuki Torii, Yukihisa Miyagawa, Satoshi Matsuda, Kenichi Mori, Yoko Yonemoto, Saeko Nakamura, Takeshi Kawaguchi, Ichiro Kotani, Shinnosuke Nagakura, HUI LI, Naoki Tateishi, Kazunori Kandani
  • Publication number: 20160203030
    Abstract: A load calculation program that causes a computer a process includes acquiring processor usage information including usage of a processor of an managed computer, which is a management object, and usage of the processor for each of a plurality of virtual machines generated by a hypervisor executed on the managed computer; acquiring data transmission information including a data transmission amount for each virtual network interface used by the plurality of virtual machines; detecting a first virtual network interface that performs data transmission without routing through the hypervisor among the plurality of virtual network interfaces, based on the processor usage information and the data transmission information; and calculating load information including processor usage for data transmission of each of the plurality of virtual machines, based on whether or not each of the virtual machines uses the first virtual network interface.
    Type: Application
    Filed: January 5, 2016
    Publication date: July 14, 2016
    Applicant: FUJITSU LIMITED
    Inventors: Naoki Tateishi, Kiyoshi KOUGE, Kensuke Tokoda, Ichiro Kotani, Satoshi Ohta, Takaaki Nakazawa, Satoshi Matsuda, HUI LI, Kazunori Kandani, Saeko Nakamura, Yukihisa Miyagawa, Yuki Torii, Yoko Yonemoto
  • Patent number: 9378056
    Abstract: A program that performs a virtual machine move control predicts a resource shortage, predicted to occur for a predetermined time period, of a physical server that includes multiple virtual machines and that is included in a management server; specifies a virtual machine that eliminate the resource shortage by moving, at a time point at which the predicted resource shortage occurs, among the virtual machine included in the physical server, for which the resource shortage is predicted, to another physical server; and moves the specified virtual machine to the other physical server on the basis of the resource usage of the specified virtual machine for the predetermined time period and on the basis of a time point that is associated with the resource usage.
    Type: Grant
    Filed: April 23, 2013
    Date of Patent: June 28, 2016
    Assignee: FUJITSU LIMITED
    Inventors: Yoshikazu Oda, Kenichi Shimazaki, Yasuhide Tobo, Yukihisa Miyagawa, Yuki Nojiri
  • Publication number: 20150370626
    Abstract: A data management apparatus obtains first operation information about a specified operation from an information processing apparatus; specifies second operation information that matches a registered operation pattern from the first operation information, by utilizing operation pattern information that includes correspondence information between the specified operation and the registered operation pattern, the operation pattern information being stored in a first memory; obtains a second log from a first log of the information processing apparatus, the second log corresponds to time periods in which the specified operations that are not permitted by the registered operation pattern are done, the first log being stored in a second memory; and specifies a time period of a log extracted on the basis of a performance value indicated by the second log.
    Type: Application
    Filed: June 11, 2015
    Publication date: December 24, 2015
    Applicant: Fujitsu Limited
    Inventors: Yukihisa Miyagawa, Kiyoshi KOUGE, Yasuhide Tobo, Ichiro Kotani, Takaaki Nakazawa, Yuki Torii
  • Publication number: 20150007177
    Abstract: An information processing apparatus calculates, at the time of moving a virtual machine which operates on a first physical machine, an amount of a first resource which the virtual machine can use on a second physical machine without sharing with another virtual machine. The information processing apparatus estimates response time of the virtual machine at the time of moving the virtual machine to the second physical machine on the basis of response time of the virtual machine at the time of the virtual machine operating on the first physical machine and the amount of the first resource. At this time the information processing apparatus uses different algorithms at the time of a resource used by the virtual machine being within the first resource and at the time of the virtual machine using a second resource which the virtual machine shares with another virtual machine.
    Type: Application
    Filed: June 19, 2014
    Publication date: January 1, 2015
    Inventors: Yasuhide Tobo, Ichiro Kotani, Yoshikazu Oda, Yukihisa Miyagawa, Kiyoshi KOUGE, Kenichi Shimazaki
  • Publication number: 20150007176
    Abstract: An analysis support method includes: searching for a second physical machine that has a configuration similar to a first physical machine on which a first virtual machine to be analyzed is executed, the second physical machine having configurations similar to the first physical machine before and after a change of a state of a virtual machine executed on the second physical machine; and searching for a second virtual machine that is executed on the second physical machine and similar to the first virtual machine before and after the change of the state of the virtual machine.
    Type: Application
    Filed: June 2, 2014
    Publication date: January 1, 2015
    Applicant: FUJITSU LIMITED
    Inventors: Ichiro KOTANI, Yasuhide Tobo, Takaaki Nakazawa, Yukihisa Miyagawa, Yoshikazu Oda, Kenichi Mori, Naoki Tateishi, Kenichi Shimazaki, Kiyoshi Kouge
  • Publication number: 20130346973
    Abstract: A program that performs a virtual machine move control predicts a resource shortage, predicted to occur for a predetermined time period, of a physical server that includes multiple virtual machines and that is included in a management server; specifies a virtual machine that eliminate the resource shortage by moving, at a time point at which the predicted resource shortage occurs, among the virtual machine included in the physical server, for which the resource shortage is predicted, to another physical server; and moves the specified virtual machine to the other physical server on the basis of the resource usage of the specified virtual machine for the predetermined time period and on the basis of a time point that is associated with the resource usage.
    Type: Application
    Filed: April 23, 2013
    Publication date: December 26, 2013
    Applicant: FUJITSU LIMITED
    Inventors: Yoshikazu ODA, Kenichi SHIMAZAKI, Yasuhide TOBO, Yukihisa MIYAGAWA, Yuki NOJIRI