Patents by Inventor Yusuke Horii

Yusuke Horii has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20240097441
    Abstract: A management system includes a plurality of resources configured to be electrically connected to an external power supply, and a management device configured to manage the resources. The management device includes a planning unit and a management unit. The planning unit is configured to determine a power balancing plan of each of the resources by using first information on a use schedule of each of the resources and second information indicating a magnitude of an environmental load in a process of generating electric power to be supplied by the external power supply. The management unit is configured to manage the resources to cause each of the resources to operate according to the power balancing plan or a modified power balancing plan in power balancing of the external power supply.
    Type: Application
    Filed: August 3, 2023
    Publication date: March 21, 2024
    Applicants: TOYOTA JIDOSHA KABUSHIKI KAISHA, CHUBU ELECTRIC POWER MIRAIZ CO., INC., CHUBU ELECTRIC POWER CO., INC.
    Inventors: Yusuke HORII, Eiko Megan UCHIDA, Masashi TANAKA, Masato EHARA, Sachio TOYORA, Tomoya TAKAHASHI, Akinori MORISHIMA, Takuji MATSUBARA, Tohru NAKAMURA, Ryou TAKAHASHI, Kenta ITO, Toshiki SUZUKI, Atsushi MIYASHITA, Takashi OCHIAI
  • Patent number: 11929612
    Abstract: A first switching unit switches a first power grid from an isolated operation to a grid-connected operation. In switching the first power grid from the isolated operation to the grid-connected operation, the first switching unit determines a master and a slave among a plurality of power adjustment resources and allows the first power grid to be connected to the second power grid after master-slave control by means of the master and the slave such that electric power of the first power grid is in synchronization with electric power of the second power grid. The first switching unit preferentially selects as the master, a power adjustment resource close to a point of connection between the first power grid and the second power grid from among the plurality of power adjustment resources.
    Type: Grant
    Filed: November 5, 2021
    Date of Patent: March 12, 2024
    Assignee: Toyota Jidosha Kabushiki Kaisha
    Inventors: Shigetaka Hamada, Haruka Hirose, Yusuke Horii, Toru Nakamura, Takaaki Sano
  • Patent number: 11912154
    Abstract: A power management system includes a plurality of power adjustment resources electrically connected to a microgrid. The plurality of power adjustment resources include a plurality of EVSEs, each of EVSEs including a parking space. When any one of a plurality of power feeding vehicles is parked in the parking space, an EVSE enables power feeding from a vehicle parked in the parking space to the microgrid. A CEMS server manages the parking space. When a balance of power supply and demand in the microgrid is in an overdemand state, the CEMS server allocates the parking space to a power feeding vehicle that responds to a request for power feeding to the microgrid, of the plurality of power feeding vehicles.
    Type: Grant
    Filed: November 17, 2021
    Date of Patent: February 27, 2024
    Assignee: Toyota Jidosha Kabushiki Kaisha
    Inventors: Shigetaka Hamada, Haruka Hirose, Yusuke Horii, Toru Nakamura, Takaaki Sano
  • Patent number: 11870116
    Abstract: A power management system includes a plurality of power adjustment resources electrically connected to a microgrid, and a CEMS server that manages the plurality of power adjustment resources. The plurality of power adjustment resources include a plurality of FCEVs that supply electric power to the microgrid. Each of the plurality of FCEVs executes a refresh process that removes an oxide film formed on a catalyst electrode of an FC stack by causing the FC stack to generate electric power exceeding prescribed electric power. The CEMS server adjusts execution timings of the refresh process in the plurality of FCEVs during power supply to the microgrid, so as to respond to a request to adjust power supply and demand in the microgrid.
    Type: Grant
    Filed: November 9, 2021
    Date of Patent: January 9, 2024
    Assignee: Toyota Jidosha Kabushiki Kaisha
    Inventors: Shigetaka Hamada, Haruka Hirose, Yusuke Horii, Toru Nakamura, Takaaki Sano
  • Patent number: 11710983
    Abstract: In switching of a microgrid from an isolated operation to an interconnected operation with a power grid, a CEMS server determines a first master DER and slaves based on a master plan and performs master-slave control. When the first master DER goes down, the CEMS server compares remaining capacities of power-storage-type DERs included in a DER group. The CEMS server then determines a DER with the highest remaining capacity as a second master DER among the power-storage-type DERs included in the DER group and performs master-slave control.
    Type: Grant
    Filed: November 15, 2021
    Date of Patent: July 25, 2023
    Assignee: Toyota Jidosha Kabushiki Kaisha
    Inventors: Shigetaka Hamada, Haruka Hirose, Yusuke Horii, Toru Nakamura, Takaaki Sano
  • Publication number: 20230060964
    Abstract: A power management system includes a photovoltaic power generator connected to a power network, an energy storage device configured to be connected to the power network, and a server. The server is configured to: acquire a predicted value of solar radiation at a prediction time at a point where the photovoltaic power generator is installed; calculate a predicted value of power generated by the photovoltaic power generator at the prediction time by using the predicted value of solar radiation; set a target range of an SOC of the energy storage device by using the predicted value, and control the SOC in such a way that the SOC falls within the target range by the prediction time; and set the target range to a wider range when reliability of the predicted value is low than when the reliability of the predicted value is high.
    Type: Application
    Filed: August 11, 2022
    Publication date: March 2, 2023
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Tamaki OZAWA, Toru NAKAMURA, Akinori MORISHIMA, Yusuke HORII, Wataru MATSUMURA
  • Publication number: 20230040754
    Abstract: A power management system includes a photovoltaic power generation device installed in a predetermined area and connected to a power grid disposed in the predetermined area, an acquisition device configured to acquire a wind direction at a reference point at which the photovoltaic power generation device is installed in the predetermined area, and an arithmetic device configured to calculate a predicted value of a solar radiation amount at the reference point at a prediction target time and calculate generated power of the photovoltaic power generation device by using the predicted value.
    Type: Application
    Filed: June 21, 2022
    Publication date: February 9, 2023
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Tamaki OZAWA, Toru NAKAMURA, Akinori MORISHIMA, Yusuke HORII, Wataru MATSUMURA
  • Publication number: 20230035591
    Abstract: A power management system includes a first server configured to manage electric vehicle supply equipment in a microgrid and a second server configured to manage power supply and demand balance of a power system. The electric vehicle supply equipment is configured to execute a charging and discharging operation that suppresses a voltage fluctuation of the microgrid by exchanging power between the microgrid and a vehicle, and a reactive power compensation operation that suppresses a voltage fluctuation of the power system by controlling reactive power of the microgrid.
    Type: Application
    Filed: May 23, 2022
    Publication date: February 2, 2023
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Tamaki OZAWA, Toru NAKAMURA, Akinori MORISHIMA, Yusuke HORII, Wataru MATSUMURA
  • Publication number: 20220396171
    Abstract: A power management system includes a plurality of power adjustment resources electrically connected to a microgrid MG, and a CEMS server that manages the power adjustment resources. The CEMS server outputs a power adjustment request to the power adjustment resources when suppression of power consumption or consumption of surplus power in the microgrid MG is requested, and gives an incentive to a “responding resource” as the power adjustment resource that performs power adjustment in response to the power adjustment request among the power adjustment resources. The CEMS server increases the incentive more as a deviation of a time period during which the power adjustment is performed by the responding resource, with respect to a time period determined in the power adjustment request is smaller.
    Type: Application
    Filed: April 25, 2022
    Publication date: December 15, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Tamaki OZAWA, Tohru NAKAMURA, Akinori MORISHIMA, Yusuke HORII, Wataru MATSUMURA
  • Publication number: 20220396170
    Abstract: A power management system includes a plurality of power adjustment resources electrically connected to a microgrid MG, and a CEMS server that manages the power adjustment resources. The CEMS server outputs a power adjustment request to a plurality of power adjustment resources when suppression of power consumption or consumption of surplus power is requested in the microgrid MG, and gives an incentive to the power adjustment resource that performs power adjustment in response to the power adjustment request among the power adjustment resources. The CEMS server increases the incentive more as a deviation of a second power amount adjusted by a responding resource with respect to a first power amount requested for adjustment by the power adjustment request is smaller.
    Type: Application
    Filed: April 25, 2022
    Publication date: December 15, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Tamaki OZAWA, Tohru NAKAMURA, Akinori MORISHIMA, Yusuke HORII, Wataru MATSUMURA
  • Publication number: 20220305940
    Abstract: A power adjustment system adjusts charging and discharging power of a plurality of electrified vehicles in a virtual power plant that uses the electrified vehicles as energy resources. The power adjustment system includes: a first processor configured to manage charging and discharging of the electrified vehicles based on vehicle information of each individual electrified vehicle included in the electrified vehicles; and a second processor configured to control charging and discharging between the electrified vehicles and a plurality of chargers and dischargers connected to a power distribution grid based on charge and discharge information supplied from the first processor. The charge and discharge information is generated based on the vehicle information of the each individual electrified vehicle, and includes a charge and discharge constraint of an electrified vehicle group composed of the electrified vehicles and a charge and discharge constraint of the each individual electrified vehicle.
    Type: Application
    Filed: March 18, 2022
    Publication date: September 29, 2022
    Applicants: TOYOTA JIDOSHA KABUSHIKI KAISHA, TOYOTA TSUSHO CORPORATION
    Inventors: Shunsuke KOBUNA, Yusuke HORII, Masato EHARA, Yukio NEZU, Chinatsu TAKEUCHI, Kenji YODOSE
  • Publication number: 20220239108
    Abstract: A power management system includes a CEMS server that outputs a DR request to a plurality of power adjustment resources such that balancing is achieved every prescribed time period. The plurality of power adjustment resources include: a power-storage-type DER that stores the supply power in an energy form of at least one of electricity, heat and gas fuel; and a consumption-type DER that consumes the supply power by at least one of air conditioning and lighting. In a case where it is expected in the middle of the prescribed time period that the actual amount of power exceeds the planned amount of power at the end of the prescribed time period, the CEMS server outputs, to the power-storage-type DER more preferentially than to the consumption-type DER, the DR request for decreasing the actual amount of power in comparison with before expectation.
    Type: Application
    Filed: January 10, 2022
    Publication date: July 28, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220194257
    Abstract: A power management system includes a plurality of power adjustment resources electrically connected to a microgrid. The plurality of power adjustment resources include a plurality of EVSEs, each of EVSEs including a parking space. When any one of a plurality of power feeding vehicles is parked in the parking space, an EVSE enables power feeding from a vehicle parked in the parking space to the microgrid. A CEMS server manages the parking space. When a balance of power supply and demand in the microgrid is in an overdemand state, the CEMS server allocates the parking space to a power feeding vehicle that responds to a request for power feeding to the microgrid, of the plurality of power feeding vehicles.
    Type: Application
    Filed: November 17, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220200285
    Abstract: When electric power supply from a power grid to a microgrid is interrupted and the microgrid performs an isolated operation, a CEMS server reads various types of information (priority setting information, information on operating ratios of first power adjustment resources during a prescribed period, meteorological information, and resource information) from a storage, and creates an operation plan during the prescribed period using such information. The priority setting information includes a priority A being a priority that does not allow a stop of electric power supply. The CEMS server performs the isolated operation of the microgrid based on the operation plan.
    Type: Application
    Filed: November 17, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220200335
    Abstract: A first switching unit switches a first power grid from an isolated operation to a grid-connected operation. In switching the first power grid from the isolated operation to the grid-connected operation, the first switching unit determines a master and a slave among a plurality of power adjustment resources and allows the first power grid to be connected to the second power grid after master-slave control by means of the master and the slave such that electric power of the first power grid is in synchronization with electric power of the second power grid. The first switching unit preferentially selects as the master, a power adjustment resource close to a point of connection between the first power grid and the second power grid from among the plurality of power adjustment resources.
    Type: Application
    Filed: November 5, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220200020
    Abstract: A power management system includes a plurality of power adjustment resources electrically connected to a microgrid, and a CEMS server that manages the plurality of power adjustment resources. The plurality of power adjustment resources include a plurality of FCEVs that supply electric power to the microgrid. Each of the plurality of FCEVs executes a refresh process that removes an oxide film formed on a catalyst electrode of an FC stack by causing the FC stack to generate electric power exceeding prescribed electric power. The CEMS server adjusts execution timings of the refresh process in the plurality of FCEVs during power supply to the microgrid, so as to respond to a request to adjust power supply and demand in the microgrid.
    Type: Application
    Filed: November 9, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220194251
    Abstract: A server that manages a plurality of power adjustment resources electrically connectable to a power network includes a determination unit and a first permission unit. The determination unit determines, before a vehicle including a power storage starts charging of the power storage by using the power network, whether or not electric power corresponding to charging power can be supplied to the power network by having at least one of the power adjustment resources respond to the charging of the power storage. When the determination unit determines that electric power can be supplied, the first permission unit permits supply of electric power from the power network to the vehicle.
    Type: Application
    Filed: November 5, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220194250
    Abstract: Before start of vehicle charging by using a power network, a first determination unit determines whether reserve of the power network is not less than a first reference value. When reserve of the power network is not less than the first reference value, a first permission unit permits supply of electric power from the power network to a vehicle. When reserve of the power network is smaller than the first reference value, a second determination unit determines whether or not electric power corresponding to charging power can be supplied to the power network by having at least one of power adjustment resources respond to vehicle charging. When the second determination unit determines that electric power can be supplied, a second permission unit permits supply of electric power from the power network to the vehicle.
    Type: Application
    Filed: October 22, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220200336
    Abstract: In switching of a microgrid from an isolated operation to an interconnected operation with a power grid, a CEMS server determines a first master DER and slaves based on a master plan and performs master-slave control. When the first master DER goes down, the CEMS server compares remaining capacities of power-storage-type DERs included in a DER group. The CEMS server then determines a DER with the highest remaining capacity as a second master DER among the power-storage-type DERs included in the DER group and performs master-slave control.
    Type: Application
    Filed: November 15, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220200021
    Abstract: A power management system includes power adjustment resources (including FCEVs) electrically connected to a microgrid, and a CEMS server that manages the power adjustment resources. Each of FCEVs includes: a supply valve that adjusts an amount of hydrogen supplied to an FC stack; a compressor that adjusts an amount of oxygen supplied to the FC stack; and an ECU. The ECU executes decrease control that temporarily decreases at least one of the amount of hydrogen supplied to the FC stack and the amount of oxygen supplied to the FC stack. The CEMS server determines execution timings of the decrease control in FCEVs during power supply to the microgrid.
    Type: Application
    Filed: November 17, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO