Patent number: 12215470Abstract: The present application provides a water replacement type storage field construction method, including the following steps: construction of a water-stop enclosure; construction of drainage after enclosing: after enclosing the water-stop enclosure, draining water in an enclosed range of the water-stop enclosure, exposing a pit, so as to form dry construction condition; construction of a stacking yard: under the dry construction condition, constructing the stacking yard on the pit, including constructing a lower low-level terrace and a higher high-level terrace; wherein the low-level terrace is lower than an average water level at an outer side of the water-stop enclosure, the high-level terrace is able to be used for walking a stacking-reclaiming device, and the stacking-reclaiming device is able to convey material to or from warehouses; and construction of the warehouses: constructing warehouses on the low-level terrace.Type: GrantFiled: May 3, 2024Date of Patent: February 4, 2025Assignee: CCCC FIRST HARBOR ENGINEERING CO., LTD.Inventors: Wei Pan, Yiyong Li, Zengjun Li, Fanli Meng, Naishu Zhang, Jinfang Hou, Chuang Du
-
Publication number: 20240368852Abstract: The present application provides a water replacement type storage field construction method, including the following steps: construction of a water-stop enclosure; construction of drainage after enclosing: after enclosing the water-stop enclosure, draining water in an enclosed range of the water-stop enclosure, exposing a pit, so as to form dry construction condition; construction of a stacking yard: under the dry construction condition, constructing the stacking yard on the pit, including constructing a lower low-level terrace and a higher high-level terrace; wherein the low-level terrace is lower than an average water level at an outer side of the water-stop enclosure, the high-level terrace is able to be used for walking a stacking-reclaiming device, and the stacking-reclaiming device is able to convey material to or from warehouses; and construction of the warehouses: constructing warehouses on the low-level terrace.Type: ApplicationFiled: May 3, 2024Publication date: November 7, 2024Inventors: Wei PAN, Yiyong LI, Zengjun LI, Fanli MENG, Naishu ZHANG, Jinfang HOU, Chuang DU
-
Publication number: 20240190541Abstract: The present application provides a top-lock pull-out type connecting device and an immersed tube construction ship; the connecting device comprising a support member, fixedly connected to the load-bearing element and located on a side of the load-bearing element facing the borne element; a sliding member, been able to slide relative to the load-bearing element in a connection direction of the load-bearing and borne elements; an ejector rod, used to push the sliding member, fixedly connected to the borne element; a first locking member, used to lock the ejector rod, movably connected between an end of the sliding member close to the borne element and the support member, and can to be driven by the sliding member to be close to or away from the ejector rod; and a second locking member, used to lock the sliding member, and connected between an end of the sliding member away from the borne element and the load-bearing element.Type: ApplicationFiled: February 22, 2024Publication date: June 13, 2024Inventor: Zengjun LI
-
Patent number: 11674283Abstract: The present application provides a semi-submersible immersed tube transportation and installation integrated ship and a construction process; the integrated ship includes: a deck structure; two floating structures, ballast water being able to be injected therein; and upper portions or top surfaces of the two floating structures are connected by the deck structure; and two support mechanisms, disposed on opposite sides of the two floating structures respectively; and each support mechanism is disposed at a lower portion or a bottom of the floating structure. The integrated ship can reduce the draught of the integrated ship carrying an immersed tube and realize the transportation requirements of shallow waterway.Type: GrantFiled: September 15, 2022Date of Patent: June 13, 2023Assignee: CCCC FIRST HARBOR ENGINEERING CO., LTD.Inventors: Yiyong Li, Naishou Zhang, Chuang Du, Zengjun Li, Yuanping Fu, Yuxi Feng, Jianning Zhang
-
Patent number: 11655608Abstract: The present application provides a water stopping device of suspension and sliding type, including: a water stop; a first end thereof is connected with a first joint segment and a second end thereof is connected with a second joint segment to form a water stopping cavity; at least one first rod; a first end thereof is connected with the first joint segment and a second end thereof is movably connected with the second joint segment; and at least one first hanging structure, connected with the water stop and the corresponding first rod, and slidably provided on the corresponding first rod. The water stopping device can be applied in joint construction of an immersed tunnel.Type: GrantFiled: December 6, 2022Date of Patent: May 23, 2023Assignee: CCCC FIRST HARBOR ENGINEERING CO., LTD.Inventors: Zengjun Li, Naishou Zhang, Wei Pan, Yiyong Li, Qiang Wang, Jinjin Ning, Chuang Du
-
Publication number: 20230151579Abstract: The present application provides a water stopping device of suspension and sliding type, including: a water stop; a first end thereof is connected with a first joint segment and a second end thereof is connected with a second joint segment to form a water stopping cavity; at least one first rod; a first end thereof is connected with the first joint segment and a second end thereof is movably connected with the second joint segment; and at least one first hanging structure, connected with the water stop and the corresponding first rod, and slidably provided on the corresponding first rod. The water stopping device can be applied in joint construction of an immersed tunnel.Type: ApplicationFiled: December 6, 2022Publication date: May 18, 2023Inventors: Zengjun LI, Naishou ZHANG, Wei PAN, Yiyong LI, Qiang WANG, Jinjin NING, Chuang DU
-
Publication number: 20230017526Abstract: The present application provides a semi-submersible immersed tube transportation and installation integrated ship and a construction process; the integrated ship includes: a deck structure; two floating structures, ballast water being able to be injected therein; and upper portions or top surfaces of the two floating structures are connected by the deck structure; and two support mechanisms, disposed on opposite sides of the two floating structures respectively; and each support mechanism is disposed at a lower portion or a bottom of the floating structure. The integrated ship can reduce the draught of the integrated ship carrying an immersed tube and realize the transportation requirements of shallow waterway.Type: ApplicationFiled: September 15, 2022Publication date: January 19, 2023Inventors: Yiyong LI, Naishou ZHANG, Chuang DU, Zengjun LI, Yuanping FU, Yuxi FENG, Jianning ZHANG
-
Patent number: 10836459Abstract: A self-propelled integrated ship for transporting and installing immersed tubes of an underwater tunnel comprises a first ship body and a second ship body which are parallel with each other, a connection structure is arranged between the first ship body and the second ship body; the first ship body, the second ship body and the connection structure are provided with hauling and hoisting devices, a loading space is formed between the first ship body and the second ship body and below the connection structure; a to-be-installed member is arranged in the loading space and is connected with the ship; and the first ship body and the second ship body are provided with propelling power devices and positioning devices. The loading space is provided in a lower part of the integrated ship, and a member to be transported is placed in the loading space and floated in the water, so that most of the weight of the member is shared by buoyancy. The member is transported to a designated site and installed precisely.Type: GrantFiled: May 14, 2019Date of Patent: November 17, 2020Assignee: CCCC FIRST HARBOR ENGINEERING CO., LTD.Inventors: Yiyong Li, Qiang Guo, Zengjun Li
-
Patent number: 10781567Abstract: A foundation treatment method for piling a foundation structure by penetrating a hardpan layer, i.e., a Deep Slurry Mixing method, comprising following steps: disturbing, by a mechanical device, a location where the foundation structure is to be piled, so that the mechanical device penetrates the hardpan layer of a natural foundation; then injecting clay slurry into the hardpan layer of the natural foundation by a pumping device, an improved foundation is formed after mixing; and piling the foundation structure. The method can change soil property of the original natural foundation, break the hardpan layer, reduce piling resistance of the steel plate cylinder or similar foundation structure, reduce uneven force during the piling process and improve driveability.Type: GrantFiled: October 9, 2019Date of Patent: September 22, 2020Assignee: CCCC FIRST HARBOR ENGINEERING CO., LTD.Inventors: Yiyong Li, Naishou Zhang, Chao Gao, Zengjun Li, Bingchuan Guo
-
Patent number: 10689828Abstract: The present application discloses a dredging system for a pre-paved gravel foundation bed surface in open sea deep water, including a dredging mechanism, which includes a dredging suction head, a power component and a dredging pipeline, wherein the dredging suction head is connected with the dredging pipeline; the dredging pipeline is communicated with the power component; the dredging suction head includes at least one ridge surface suction port and at least one furrow suction port; the openings of all the furrow suction ports are lower than those of all the ridge surface suction ports; a lifting mechanism, which is connected with the dredging suction head and is used for lifting the dredging suction head to the gravel foundation bed surface; a moving mechanism, which is connected with the lifting mechanism and is used for driving the dredging suction head to move within a dredging range of the gravel foundation bed surface.Type: GrantFiled: January 12, 2018Date of Patent: June 23, 2020Assignees: Shanghai Zhenhua Heavy Industries Co., Ltd., No. 2 Engineering Co. of CCCC First Harbor Engineering Co., Ltd.Inventors: Ming Lin, Xuejun Wang, Gang Yin, Linlin Yuan, Faqiang Su, Hong Xiang, Bin Xie, Dejin Liu, Bo Meng, Wei Xu, Zengjun Li, Jianjun Zhang, Jinbao Liu, Xiangwei Zhang, Xiangrong Zhou, Mingxiang Wang, Hongbo Wei, Chunfeng Zhu, Ziyang Bi, Jiangwei Song, Zhenjie Tao, Ling Zhu
-
Publication number: 20200040542Abstract: A foundation treatment method for piling a foundation structure by penetrating a hardpan layer, i.e., a Deep Slurry Mixing method, comprising following steps: disturbing, by a mechanical device, a location where the foundation structure is to be piled, so that the mechanical device penetrates the hardpan layer of a natural foundation; then injecting clay slurry into the hardpan layer of the natural foundation by a pumping device, an improved foundation is formed after mixing; and piling the foundation structure. The method can change soil property of the original natural foundation, break the hardpan layer, reduce piling resistance of the steel plate cylinder or similar foundation structure, reduce uneven force during the piling process and improve driveability.Type: ApplicationFiled: October 9, 2019Publication date: February 6, 2020Inventors: YIYONG LI, Naishou Zhang, Chao Gao, Zengjun Li, Bingchuan Guo
-
Publication number: 20190263483Abstract: A self-propelled integrated ship for transporting and installing immersed tubes of an underwater tunnel comprises a first ship body and a second ship body which are parallel with each other, a connection structure is arranged between the first ship body and the second ship body; the first ship body, the second ship body and the connection structure are provided with hauling and hoisting devices, a loading space is formed between the first ship body and the second ship body and below the connection structure; a to-be-installed member is arranged in the loading space and is connected with the ship; and the first ship body and the second ship body are provided with propelling power devices and positioning devices. The loading space is provided in a lower part of the integrated ship, and a member to be transported is placed in the loading space and floated in the water, so that most of the weight of the member is shared by buoyancy. The member is transported to a designated site and installed precisely.Type: ApplicationFiled: May 14, 2019Publication date: August 29, 2019Inventors: Yiyong LI, Qiang GUO, Zengjun LI
-
Publication number: 20190145081Abstract: The present application discloses a dredging system for a pre-paved gravel foundation bed surface in open sea deep water, including a dredging mechanism, which includes a dredging suction head, a power component and a dredging pipeline, wherein the dredging suction head is connected with the dredging pipeline; the dredging pipeline is communicated with the power component; the dredging suction head includes at least one ridge surface suction port and at least one furrow suction port; the openings of all the furrow suction ports are lower than those of all the ridge surface suction ports; a lifting mechanism, which is connected with the dredging suction head and is used for lifting the dredging suction head to the gravel foundation bed surface; a moving mechanism, which is connected with the lifting mechanism and is used for driving the dredging suction head to move within a dredging range of the gravel foundation bed surface.Type: ApplicationFiled: January 12, 2018Publication date: May 16, 2019Inventors: Ming LIN, Xuejun WANG, Gang YIN, Linlin Yuan, Faqiang SU, Hong XIANG, Bin XIE, Dejin LIU, Bo MENG, Wei XU, Zengjun LI, Jianjun ZHANG, Jinbao LIU, Xiangwei ZHANG, Xiangrong ZHOU, Mingxiang WANG, Hongbo WEI, Chunfeng ZHU, Ziyang BI, Jiangwei SONG, Zhenjie TAO, Ling ZHU
-
Patent number: 7808774Abstract: A system for measuring temperature and current at coupling points in an electric distribution network. A monitor device is connected to a series of measuring devices using radio waves. The monitor device sequentially interrogates measuring devices to determine the temperature and current of each one. The measuring devices include a core surrounding the conductor which provides power by induction to each measuring device and also provides a measure of the current. A temperature sensor connected to the core provides the temperature measurement.Type: GrantFiled: August 30, 2006Date of Patent: October 5, 2010Inventors: Boon Hou Tay, Zengjun Li
-
Publication number: 20080068212Abstract: A system for measuring temperature and current at coupling points in an electric distribution network. A monitor device is connected to a series of measuring devices using radio waves. The monitor device sequentially interrogates measuring devices to determine the temperature and current of each one. The measuring devices include a core surrounding the conductor which provides power by induction to each measuring device and also provides a measure of the current. A temperature sensor connected to the core provides the temperature measurement.Type: ApplicationFiled: August 30, 2006Publication date: March 20, 2008Inventors: Boon Hou Tay, Zengjun Li