Zhenying CHEN has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Patent number: 12240736Abstract: Provided is a construction method for a fully prefabricated multi-story concrete plant, the construction method may achieve full coverage of a hoisting operation of the large beam and column prefabricated components of a floor by employing a single intelligent hoisting robot, an angle change of the track devices, an angle change of a moving device, and a self-lifting device. It is not necessary to arrange a transition track at the turn of the installation route, which saves space and installation cost, and overcomes the disadvantage of high cost caused by the traditional prefabricated construction mode of multi-story concrete plant, which needs to arrange a plurality of large hoisting equipment. It may achieve the mechanization and intelligence of the whole construction process of the fully prefabricated multi-story concrete plant.Type: GrantFiled: October 25, 2021Date of Patent: March 4, 2025Assignees: GMC GRAND-BAY INTELLIGENT MANUFACTURING AND TECHNOLOGY CO., LTD., GUANGZHOU WU YANG CONSTRUCTION MACHINERY CO., LTD.Inventors: Long Wang, Zhenying Chen, Wenshen Zhong, Zhen Yu, Jiali Cao, Tao He, Cheng Li, Yafei Zhang
-
Publication number: 20250070230Abstract: Provided are a sulfide solid electrolyte, and a preparation method and use thereof. The sulfide solid electrolyte has a chemical composition formula of Li6P1-a(M)aS5X (where M is one or more selected from the group consisting of V, Nb, and Ta, and X is one or more selected from the group consisting of F, Cl, and Br). The preparation method includes: weighing raw materials of a Li source, a P source, an S source, an M source, and an X source, and mixing to be uniform to obtain a mixture, and subjecting the mixture to ball milling to obtain a precursor powder of the sulfide solid electrolyte; sieving the precursor powder to obtain a sieved powder, and then pressing the sieved powder into a solid sheet; and subjecting the solid sheet to vacuum high-temperature sintering to obtain the sulfide solid electrolyte.Type: ApplicationFiled: May 12, 2023Publication date: February 27, 2025Inventors: Xi ZHANG, Jinhui ZHU, Zhenying CHEN
-
Patent number: 12018499Abstract: Provided is an accumulative sliding construction method of segmental track-changing for unequal-span structure, which divides the unequal-span structure into at least two sliding sections according to span variation, and a plurality of track segments corresponding to the spans of each sliding section. By providing sliders on the main truss/beam of each sliding section at positions corresponding to the track segments that each main truss/beam need to pass through, the sliding section smoothly passes through the sliding track segments to be in position; in addition, the main truss/beam of each sliding section is provided with temporary lengthening auxiliary structure or divided into an initial-mounted unit and rear-mounted units to allow the main truss/beam of each sliding section to pass through the track segments smoothly and to be in place.Type: GrantFiled: March 5, 2020Date of Patent: June 25, 2024Assignees: GUANGZHOU CONSTRUCTION ENGINEERING CO., LTD., GUANGZHOU WU YANG CONSTRUCTION MACHINERY CO., LTD.Inventors: Long Wang, Huqing Liang, Wei Wei, Wuji Lan, Zhenying Chen, Jianming Wen, Dehui Lu, Jiali Cao, Wenjian Ye
-
Publication number: 20240010476Abstract: Provided is a construction method for a fully prefabricated multi-story concrete plant, the construction method may achieve full coverage of a hoisting operation of the large beam and column prefabricated components of a floor by employing a single intelligent hoisting robot, an angle change of the track devices, an angle change of a moving device, and a self-lifting device. It is not necessary to arrange a transition track at the turn of the installation route, which saves space and installation cost, and overcomes the disadvantage of high cost caused by the traditional prefabricated construction mode of multi-story concrete plant, which needs to arrange a plurality of large hoisting equipment. It may achieve the mechanization and intelligence of the whole construction process of the fully prefabricated multi-story concrete plant.Type: ApplicationFiled: October 25, 2021Publication date: January 11, 2024Inventors: Long WANG, Zhenying CHEN, Wenshen ZHONG, Zhen YU, Jiali CAO, Tao HE, Cheng LI, Yafei ZHANG
-
Publication number: 20220120100Abstract: Provided is an accumulative sliding construction method of segmental track-changing for unequal-span structure, which divides the unequal-span structure into at least two sliding sections according to span variation, and a plurality of track segments corresponding to the spans of each sliding section. By providing sliders on the main truss/beam of each sliding section at positions corresponding to the track segments that each main truss/beam need to pass through, the sliding section smoothly passes through the sliding track segments to be in position; in addition, the main truss/beam of each sliding section is provided with temporary lengthening auxiliary structure or divided into an initial-mounted unit and rear-mounted units to allow the main truss/beam of each sliding section to pass through the track segments smoothly and to be in place.Type: ApplicationFiled: March 5, 2020Publication date: April 21, 2022Inventors: Long WANG, Huqing LIANG, Wei WEI, Wuji LAN, Zhenying CHEN, Jianming WEN, Dehui LU, Jiali CAO, Wenjian YE
-
Patent number: 8935890Abstract: The present invention disclosed an apparatus for reverse rectification, relating to the field of civil engineering technology. The apparatus for reverse rectification comprises two sets of steel plate hooks, which are reversely arranged and respectively fixed on the building and the skewed large-scale structure that needs to be rectified, and a jack which is horizontally placed on the steel plate hooks. The steel plate hooks, which are driven by the jack, push the skewed structure towards the existed building, whereby the skewed structure and the existed building can be spliced correctly. This present invention has more advantages, e.g. simple structure and convenient operability, which can improve the construction efficiency and reduce the construction costs. Therefore it can be widely used in the field of civil engineering technology. Further, the present invention also discloses a method for reverse rectification by using the apparatus.Type: GrantFiled: September 9, 2013Date of Patent: January 20, 2015Assignees: Guangzhou DI•ER Construction Engineering Co., Ltd., Guangzhou Construction Engineering Co., Ltd.Inventors: Zhenying Chen, Long Wang, Junyue Gao, Mingqiu Yao, Shaobin Tang, Han Huang, Jingwen Hu, Qianyi He, Weijian Yu, Guoxiong Wang
-
Publication number: 20140305069Abstract: The present invention disclosed an apparatus for reverse rectification, relating to the field of civil engineering technology. The apparatus for reverse rectification comprises two sets of steel plate hooks, which are reversely arranged and respectively fixed on the building and the skewed large-scale structure that needs to be rectified, and a jack which is horizontally placed on the steel plate hooks. The steel plate hooks, which are driven by the jack, push the skewed structure towards the existed building, whereby the skewed structure and the existed building can be spliced correctly. This present invention has more advantages, e.g. simple structure and convenient operability, which can improve the construction efficiency and reduce the construction costs. Therefore it can be widely used in the field of civil engineering technology. Further, the present invention also discloses a method for reverse rectification by using the apparatus.Type: ApplicationFiled: September 9, 2013Publication date: October 16, 2014Applicants: Guangzhou Construction Engineering Co., Ltd., Guangzhou DI-ER Construction & Engineering Co., Ltd.Inventors: Zhenying CHEN, Long WANG, Junyue GAO, Mingqiu YAO, Shaobin TANG, Han HUANG, Jingwen HU, Qianyi HE, Weijian YU, Guoxiong WANG
-
Patent number: 8745956Abstract: A method for lifting an asymmetric integral construction is provided, including the steps of determining proper lifting points on a construction to be lifted according to the position relationship between the construction and a base supporter, setting a dragging point on the bottom of the construction, the dragging point being located on the extension line of the connection between the gravity center of construction and the centroid of the lifting points, determining a projection point of the dragging point on the ground, arranging a dragging device between the dragging point and the projection point, installing a lifting system at a proper position, conducting lifting operation by means of the lifting system cooperated with the dragging device, and rectifying and fixing the construction after it is in place.Type: GrantFiled: July 11, 2013Date of Patent: June 10, 2014Assignees: Guangzhou Construction Engineering Co., Ltd., Shanghai YeSheng Mechanical & Electrical Control Technology Co., Ltd.Inventors: Long Wang, Junyue Gao, Zhenying Chen, Wei Wei
-
Publication number: 20140017059Abstract: A method for lifting an asymmetric integral construction is provided, including the steps of determining proper lifting points on a construction to be lifted according to the position relationship between the construction and a base supporter, setting a dragging point on the bottom of the construction, the dragging point being located on the extension line of the connection between the gravity center of construction and the centroid of the lifting points, determining a projection point of the dragging point on the ground, arranging a dragging device between the dragging point and the projection point, installing a lifting system at a proper position, conducting lifting operation by means of the lifting system cooperated with the dragging device, and rectifying and fixing the construction after it is in place.Type: ApplicationFiled: July 11, 2013Publication date: January 16, 2014Inventors: Long WANG, Junyue GAO, Zhenying CHEN, Wei WEI