Patents by Inventor Zhuqing Mao

Zhuqing Mao has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20230251314
    Abstract: A motor malfunction monitoring device for monitoring a malfunction of a drive motor, includes: vibration sensors for detecting for one or more components of the drive motor transverse vibration in a direction parallel to a mounting plane of the drive motor and perpendicular to a longitudinal direction of the drive motor or longitudinal vibration in a direction perpendicular to both the mounting plane and the longitudinal direction of the drive motor; a voltage sensor for detecting a voltage of the drive motor or a current sensor for detecting a current of the drive motor; and a data storage storing a database of normal operation spectrums of one of the transverse vibration or the longitudinal vibration during a normal operation of the drive motor, and of one of the voltage or the current during a normal operation of the drive motor.
    Type: Application
    Filed: April 19, 2023
    Publication date: August 10, 2023
    Inventors: Kaishen LIU, Shouzhe LI, Haiping XING, Zhuqing MAO, Weiwei LIU, Liang LI, Dawei ZHAO, Jun ZHANG
  • Patent number: 11702917
    Abstract: A turbine fracturing system and a controlling method thereof, a controlling apparatus and a storage medium are provided. The turbine fracturing system includes: N turbine fracturing apparatuses, wherein each of the N turbine fracturing apparatuses comprises a turbine engine, and N is an integer greater than or equal to 2; a fuel gas supply apparatus connected to the N turbine engines, wherein the fuel gas supply apparatus is configured to supply fuel gas and distribute the fuel gas to the N turbine engines as gaseous fuel; and a fuel liquid supply apparatus connected to at least one of the N turbine engines and configured to supply liquid fuel to at least one of the N turbine engines in a case that at least one of a flow rate and a pressure of the fuel gas decreases.
    Type: Grant
    Filed: July 23, 2021
    Date of Patent: July 18, 2023
    Assignee: Yantai Jereh Petroleum Equipment & Technologies Co., Ltd.
    Inventors: Zhuqing Mao, Rikui Zhang, Peng Zhang, Jianwei Wang, Jihua Wang, Xiaolei Ji
  • Patent number: 11702919
    Abstract: This disclosure generally relates to power generation methods and systems based on gas turbine engines, and particularly to mobile and adaptive power generation systems and methods based on gas turbine engine for supplying mechanical and/or electrical power for fracturing operations at an oil wellsite. Various systems, platforms, components, devices, and methods are provided for flexibly and adaptively configure one of more gas turbines, hydraulic pumps, and electric generators to support both fracturing and electric demands at a well site. The disclosed implementations enable and facilitate a mobile, adaptive, and reconfigurable power system to provide both mechanical and electric power for hydraulic fracturing operation.
    Type: Grant
    Filed: May 3, 2022
    Date of Patent: July 18, 2023
    Assignee: Yantai Jereh Petroleum Equipment & Technologies Co., Ltd.
    Inventors: Peng Zhang, Liang Lv, Rikui Zhang, Zhuqing Mao, Jianwei Wang, Chunqiang Lan, Yipeng Wu, Xincheng Li, Ning Feng, Ting Zhang, Jianglei Zou, Haibo Zhang, Ligong Wu, Cong Zhang, Wanchun Zha, Qiong Wu
  • Patent number: 11702920
    Abstract: A fracturing control method is applied to a fracturing system including a plurality of fracturing pump sets. The method includes: turning on a first fracturing pump set according to a total required output of the fracturing system and priorities of the plurality of fracturing pump sets; adjusting an operating parameter of the first fracturing pump set according to an actual output of the first fracturing pump set and an output threshold corresponding to the first fracturing pump set, so that the actual output of the first fracturing pump set is f1 times the output threshold; and if the operating output of the first fracturing pump set is less than the total required output, turning on a second fracturing pump set, a priority of the second fracturing pump set being lower than a priority of the first fracturing pump set.
    Type: Grant
    Filed: September 21, 2022
    Date of Patent: July 18, 2023
    Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Zhuqing Mao, Haiping Xing, Shouzhe Li, Liang Li, Kaishen Liu
  • Publication number: 20230220757
    Abstract: A fracturing and power generation switchable apparatus, a well site, a control method of the well site, a control device, and a storage medium are provided. The fracturing and power generation switchable apparatus includes a power device, a speed transmission device, and a bearing base. The switchable apparatus is configured to switch between a first state and a second state, under the first state, the plunger pump is fixed on the bearing base and is connected with the speed transmission device, and the switchable apparatus is supplied as a fracturing apparatus, and under the second state, the electric generator is fixed on the bearing base and is connected with the speed transmission device, and the switchable apparatus is supplied as a power generation apparatus.
    Type: Application
    Filed: March 15, 2023
    Publication date: July 13, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Peng ZHANG, Liang LV, Rikui ZHANG, Zhuqing MAO, Jianwei WANG, Chunqiang LAN, Yipeng WU, Xincheng LI
  • Publication number: 20230193734
    Abstract: Fracturing equipment includes an electric-driven apparatus and an electric-power supply apparatus. The electric-driven apparatus includes at least one motor, at least one lubrication module, and at least one heat dissipation module. The electric-power supply apparatus includes a first electric-power supply and a second electric-power supply, where the at least one motor is powered by the first electric-power supply, and the at least one lubrication module and the at least one heat dissipation module are powered by at least one of the first electric-power supply or the second electric-power supply.
    Type: Application
    Filed: February 10, 2023
    Publication date: June 22, 2023
    Inventors: Kaishen LIU, Shouzhe LI, Zhuqing MAO, Sheng CHANG, Shuzhen CUI, Liang LV, Jifeng ZHONG, Shanwu FU, Chunqiang LAN, Ruijie DU, Jian ZHANG, Xiaolei JI
  • Patent number: 11683878
    Abstract: A fracturing well site system includes an electric-driven apparatus, a fuel-driven apparatus, an electric-power supply apparatus and a grounding system. The grounding system includes a first grounding terminal which is spaced from each of the electric-driven apparatus, the fuel-driven apparatus and the electric-power supply apparatus by a preset distance. The fuel-driven apparatus and at least one of the electric-driven apparatus and the electric-power supply apparatus are connected to the first grounding terminal, and the first grounding terminal is configured to ground the fuel-driven apparatus and the at least one of the electric-driven apparatus and the electric-power supply apparatus.
    Type: Grant
    Filed: July 20, 2022
    Date of Patent: June 20, 2023
    Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Kaishen Liu, Shouzhe Li, Zhuqing Mao
  • Patent number: 11677238
    Abstract: Embodiments of the present application provide electric power supply methods and electric power supply systems related to the field of electrical energy technology. An electric power supply method includes: acquiring an electrical energy parameter of electrical energy delivered by an upstream power supply system, and determining, based on the electrical energy parameter, whether a preset power supply condition for supplying power to a downstream target power-consuming system is met; determining a target distribution port corresponding to the target power-consuming system from a plurality of preset distribution ports when the preset power supply condition is met; controlling a supply of electric power to the target power-consuming system through the target distribution port.
    Type: Grant
    Filed: April 25, 2022
    Date of Patent: June 13, 2023
    Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Weiwei Liu, Kaishen Liu, Shouzhe Li, Zhuqing Mao, Haoliang Sun
  • Patent number: 11662384
    Abstract: The present disclosure relates to a motor malfunction monitoring device, and a drive motor for oilfield operations including: a signal acquisition module configured to acquire operation data of the drive motor, wherein the signal acquisition module comprises a vibration signal acquisition unit and/or an electrical signal acquisition unit, the vibration signal acquisition unit comprises one or more vibration sensors mounted at a component to be detected of the drive motor during use and provided for detecting transverse vibration and/or longitudinal vibration, and/or the electrical signal acquisition unit comprises a voltage sensor and a current sensor for detecting a voltage and a current of the drive motor, respectively; a data storage module storing therein a database of normal operation spectrums created when the drive motor runs normally; and a signal analysis module configured to extract an acquired operation data spectrum of the operation data acquired, compare the acquired operation data spectrum with
    Type: Grant
    Filed: January 22, 2021
    Date of Patent: May 30, 2023
    Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Kaishen Liu, Shouzhe Li, Haiping Xing, Zhuqing Mao, Weiwei Liu, Liang Li, Dawei Zhao, Jun Zhang
  • Publication number: 20230145963
    Abstract: A combustion-gas supply system and a combustion-gas supply method thereof, a device equipped with a turbine engine, and a fracturing system are provided. The combustion-gas supply system includes a main pipeline and a multi-functional pipeline; the main pipeline includes a first sub-pipeline and a second sub-pipeline; the first sub-pipeline includes a first gas intake pipe, a first gas supply valve and a first gas outlet pipe arranged in sequence; the second sub-pipeline includes a combustion-gas supply valve and a gas supply pipe, the first gas outlet pipe is connected with the combustion-gas supply valve, the gas supply pipe is configured to be connected with a turbine engine, the multi-functional pipeline includes a second gas intake pipe, a second gas supply valve and a second gas outlet pipe arranged in sequence, and the second gas outlet pipe is communicated with the first gas outlet pipe.
    Type: Application
    Filed: April 7, 2022
    Publication date: May 11, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Peng Zhang, Rikui Zhang, Jianwei Wang, Xiaolei Ji, Zhuqing Mao
  • Publication number: 20230119896
    Abstract: The present disclosure is directed to a system for fracturing operation in oil/gas fields. The disclosed fracturing system is integrated onto a semitrailer that can be conveniently transported to any oil field. The disclosed fracturing system further includes major components needed for delivering high-pressure fracturing fluid into a wellhead, including but not limited to at least one power generation source and at least one plunger pump driven by the at least one power generation source via simple transmission mechanisms utilizing reduction gearbox and/or transmission shafts. The power generation source, in particular, includes a turbine engine capable of being powered by 100% natural gasified liquid fuel.
    Type: Application
    Filed: October 19, 2022
    Publication date: April 20, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Rikui ZHANG, Xiance LI, Xincheng LI, Chunqiang LAN, Yipeng WU, Zhuqing MAO, Sheng CHANG, Xiaolei JI, Jixin WANG, Peng ZHANG
  • Publication number: 20230119876
    Abstract: An operation method of a turbine fracturing device and a turbine fracturing device are provided. The turbine fracturing device includes a turbine engine, a speed reducer, a brake mechanism, and a fracturing pump, the method includes: driving, by the turbine engine, the fracturing pump to perform a fracturing operation through the speed reducer so as to keep the fracturing pump in an operating state, the fracturing pump being configured to suck fluid of a first pressure and discharge fluid of a second pressure, the second pressure being greater than the first pressure; and in response to an idling instruction, the turbine engine entering an idling state and triggering a brake operation so as to keep the fracturing pump in a non-operating state.
    Type: Application
    Filed: December 15, 2022
    Publication date: April 20, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Zhuqing MAO, Rikui ZHANG, Peng ZHANG, Jianwei WANG, Jihua WANG, Xiaolei JI, Xincheng LI, Yuxuan SUN, Yipeng WU, Chunqiang LAN, Liang LV
  • Publication number: 20230116458
    Abstract: A power supply system for an electrically driven wellsite facility is provided. The power supply system includes a combined power supply module configured to be connected with the electrically driven wellsite facility, the combined power supply module comprising at least one generator and at least one power distribution station, wherein the at least one generator and the at least one power distribution station are disposed in parallel or combined to a power grid for supplying power to the electrically driven wellsite facility.
    Type: Application
    Filed: March 11, 2022
    Publication date: April 13, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Kaishen LIU, Shouzhe LI, Jifeng ZHONG, Zhuqing MAO
  • Publication number: 20230106683
    Abstract: A fracturing apparatus and a fracturing system are provided. The fracturing apparatus includes: a plunger pump configured to pressurize a fracturing fluid to form a high-pressure fracturing fluid; a turbine engine coupled to the plunger pump and configured to provide a driving force to the plunger pump; an auxiliary unit including a driving electric motor, the auxiliary unit being configured to provide the fracturing apparatus with at least one selected from the group consisting of start-up assist function, lubrication function, cooling function, and air supply function; and a power supply electrically coupled to the driving electric motor of the auxiliary unit to provide driving power.
    Type: Application
    Filed: December 9, 2022
    Publication date: April 6, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Rikui ZHANG, Xiance LI, Xincheng LI, Chunqiang LAN, Yipeng WU, Zhuqing MAO, Sheng CHANG, Xiaolei JI
  • Publication number: 20230092705
    Abstract: An evaluation method and an evaluation device for evaluating a health state of well site equipment, and a storage medium are provided. The evaluation method for evaluating the health state of the well site equipment includes: obtaining operating parameters of a component to be tested of equipment to be tested in at least one dimension, the at least one dimension including an operating data dimension, an environmental data dimension, and a maintenance data dimension; obtaining evaluation values of a health state of the component to be tested in various dimensions based on the operating parameters of the various dimensions; obtaining a comprehensive evaluation value of the health state of the component to be tested based on the evaluation values of the health state of the component to be tested in the various dimensions.
    Type: Application
    Filed: May 18, 2022
    Publication date: March 23, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Kaishen LIU, Yuanjie XIE, Shouzhe LI, Zhuqing MAO, Hao YANG, Weiwei LIU, Kai WANG, Shuzhen CUI
  • Patent number: 11608726
    Abstract: A fracturing and power generation switchable apparatus, a well site, a control method of the well site, a control device, and a storage medium are provided. The fracturing and power generation switchable apparatus includes a power device, a speed transmission device, and a bearing base. The switchable apparatus is configured to switch between a first state and a second state, under the first state, the plunger pump is fixed on the bearing base and is connected with the speed transmission device, and the switchable apparatus is supplied as a fracturing apparatus, and under the second state, the electric generator is fixed on the bearing base and is connected with the speed transmission device, and the switchable apparatus is supplied as a power generation apparatus.
    Type: Grant
    Filed: July 8, 2021
    Date of Patent: March 21, 2023
    Assignee: Yantai Jereh Petroleum Equipment & Technologies Co., Ltd.
    Inventors: Peng Zhang, Liang Lv, Rikui Zhang, Zhuqing Mao, Jianwei Wang, Chunqiang Lan, Yipeng Wu, Xincheng Li
  • Publication number: 20230074794
    Abstract: A fracturing well site system includes an electric-driven apparatus, a fuel-driven apparatus, an electric-power supply apparatus and a grounding system. The grounding system includes a first grounding terminal which is spaced from each of the electric-driven apparatus, the fuel-driven apparatus and the electric-power supply apparatus by a preset distance. The fuel-driven apparatus and at least one of the electric-driven apparatus and the electric-power supply apparatus are connected to the first grounding terminal, and the first grounding terminal is configured to ground the fuel-driven apparatus and the at least one of the electric-driven apparatus and the electric-power supply apparatus.
    Type: Application
    Filed: November 16, 2022
    Publication date: March 9, 2023
    Inventors: Kaishen LIU, Shouzhe LI, Zhuqing MAO
  • Publication number: 20230064964
    Abstract: A mounting bracket and an auxiliary mechanism are disclosed. The mounting bracket includes a mounting base, a first mounting plate, a second mounting plate and a tubular connection structure; the first mounting plate and the second mounting plate are fixed on the mounting base; the second mounting plate and the first mounting plate are oppositely arranged and spaced apart; the first mounting plate includes at least one first mounting hole and a first fixing hole, the second mounting plate includes a second fixing hole, and the first mounting hole is configured to mount a motor or an oil pump; one end of the tubular connection structure is connected with an edge of the first fixing hole, and another end of the tubular connection structure is connected with an edge of the second fixing hole.
    Type: Application
    Filed: May 4, 2022
    Publication date: March 2, 2023
    Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.
    Inventors: Jianwei WANG, Xiaolei JI, Rikui ZHANG, Peng ZHANG, Zhuqing MAO, Chunqiang LAN, Yipeng WU
  • Patent number: 11596047
    Abstract: A fracturing well site system includes an electric-driven apparatus, a fuel-driven apparatus, an electric-power supply apparatus and a grounding system. The grounding system includes a first grounding terminal which is spaced from each of the electric-driven apparatus, the fuel-driven apparatus and the electric-power supply apparatus by a preset distance. The fuel-driven apparatus and at least one of the electric-driven apparatus and the electric-power supply apparatus are connected to the first grounding terminal, and the first grounding terminal is configured to ground the fuel-driven apparatus and the at least one of the electric-driven apparatus and the electric-power supply apparatus.
    Type: Grant
    Filed: May 20, 2021
    Date of Patent: February 28, 2023
    Assignee: YANTAI JEREH PETROLEUM EQUIPMENTS TECHNOLOGIES CO., LTD.
    Inventors: Kaishen Liu, Shouzhe Li, Zhuqing Mao
  • Patent number: 11572775
    Abstract: An operation method of a turbine fracturing device and a turbine fracturing device are provided. The turbine fracturing device includes a turbine engine, a speed reducer, a brake mechanism, and a fracturing pump, the method includes: driving, by the turbine engine, the fracturing pump to perform a fracturing operation through the speed reducer so as to keep the fracturing pump in an operating state, the fracturing pump being configured to suck fluid of a first pressure and discharge fluid of a second pressure, the second pressure being greater than the first pressure; and in response to an idling instruction, the turbine engine entering an idling state and triggering a brake operation so as to keep the fracturing pump in a non-operating state.
    Type: Grant
    Filed: August 26, 2022
    Date of Patent: February 7, 2023
    Assignee: Yantai Jereh Petroleum Equipment & Technologies Co., Ltd.
    Inventors: Zhuqing Mao, Rikui Zhang, Peng Zhang, Jianwei Wang, Jihua Wang, Xiaolei Ji, Xincheng Li, Yuxuan Sun, Yipeng Wu, Chunqiang Lan, Liang Lv