Modular construction system for use with poured concrete or light concrete
The system of the present invention relates to the formation of the two majors components of any building, namely floors/ceilings and walls. It is a principle of the present invention to pre-fabricate the form elements such that fluid concrete is poured into the forms and, once the concrete is cured, these form elements become part of the finished building. According to the present invention, the pre-fabricated wall forms include the intended finished surfaces of the walls, such as but not limited to, stone, pre-cast concrete, and metal. Alternatively, the finished surface of the wall panel may be one that will accept a final finish coating, such as but not limited to, paint and wall paper, with minimal preparation. The floor/ceiling forms are configured such that the ceiling finishing material, such as but not limited to, sheet rock, any commercially available ceiling material and suspending ceiling grid elements, may be readily attached. Floor finishing material, such as but not limited to, tiles, linoleum, and carpeting, may installed directly of the cured concrete floor with minimal preparation to the surface of the concrete.
The present invention relates to poured concrete construction methods and, in particular, it concerns a modular system for the construction of floors, walls and foundations using concrete or light concrete.
Concrete walls traditionally have been constructed by first setting up two spaced apart form panels and pouring concrete into the space between the form panels. After the concrete hardens, the builder then removes the forms, leaving the cured concrete wall. This technique has been found to present a number of drawbacks. For example, formation of concrete walls and floors using the traditional technique is inefficient because of the time required to erect the forms, wait until the concrete cures, and take down the forms a further drawback is the use of cranes and similar heavy machinery used to set some forms in place. The traditional forming and fabricating technique, therefore, is an expensive, labor-intensive process. Further time and expense in incurred in order to attach finish covering to the walls and ceilings.
Techniques have been developed for forming modular concrete walls. Some modular walls are constructed using an insulating material for the form panels. The modular form panels are set up, typically generally parallel to each other, with connecting components holding the two form panels in place relative to each other. Concrete is then poured into the space between the form panels. Unlike the traditional forming technique, however, the insulating form panels remain in place after the concrete has cured. That is, the form panels become a permanent part of the building after the concrete cures. The concrete walls made using this technique can be stacked on top of each other many stories high to form all of a building's walls. The developers of such systems, however, have gone to great lengths to devise ways to connect the form panels, as evidenced by U.S. Pat. No. 4,730,422 to Young.
There is therefore a need for a modular system for the construction of concrete floors and walls, in which the form panels include a substantially finished outer surface on at least one side of the wall and provides for easy attachment of ceiling finishing material. It would be beneficial if the system provided for instillation of plumbing and electrical components after the concrete has cured.
SUMMARY OF THE INVENTIONThe present invention is a modular system for the construction of concrete floors and walls.
According to the teachings of the present invention there is provided, A method for fabrication of a concrete floor comprising: (a) deploying a plurality of interconnected floor-and-beam forming elements so as to construct a substantially horizontal floor mold, each the floor-and-beam forming element configured with at least one beam-forming trough flanked by floor-forming support; (b) deploying a plurality of support plates such that at least one the support plate is deployed between adjacent ones of the beam-forming troughs so as to span a distance between the adjacent ones of the beam-forming troughs, the support plates connected to facing sides of the adjacent ones of the beam-forming troughs and an underside of the floor-forming supports, the support plates projecting downwardly substantially perpendicular to the floor-forming supports and substantially perpendicular to a length of the beam-forming troughs; (c) deploying a volume of fluid concrete onto a top surface of the floor area such that the fluid concrete substantially fills the beam-forming troughs and regions above the floor-forming supports are covered to a predefined depth; and (d) allowing the fluid concrete to cure.
According to a further teaching of the present invention there is also provided attaching at least one floor thickness guide to a top surface of at least one the floor-forming support, so as to facilitate determination of the predefined depth of the fluid concrete.
According to a further teaching of the present invention the at least one floor thickness guide is implemented as a plurality of the floor thickness guides deployed such that the top surfaces of the plurality of the floor thickness guides is co-planar.
According to a further teaching of the present invention the interconnection of the floor-and-beam forming elements is implemented such that a top surface of the floor-forming supports is substantially co-planar.
According to a further teaching of the present invention, implementation of the interconnection includes attachment of two adjacent floor-forming supports.
According to a further teaching of the present invention, the support plates are implemented with an outer contour that is substantially equivalent to a cross section of an area below the floor-forming support, between the adjacent ones of the beam-forming troughs and a line connecting bottom surfaces of the adjacent ones of the beam-forming troughs.
According to a further teaching of the present invention the deploying a plurality of support plates includes insertion of tabs protruding from edges of the support plates through corresponding slots provided in the floor-and-beam forming elements, thereby providing a plurality of anchoring points for the concrete.
According to a further teaching of the present invention, at least one of the plurality of support plates is implemented with precut holes to accommodate plumbing and electrical components.
According to a further teaching of the present invention there is also provided deployment of a false bottom in at least one the beam-forming trough so as to prevent the fluid concrete from flowing therein so as to form a void in a bottom region of the beam-forming trough into which fasteners penetrate, thereby facilitating attachment of ceiling finishing material.
According to a further teaching of the present invention there is also provided sealing at least one end of an area below the floor-forming support and between the adjacent ones of the beam-forming troughs by use of an end sealing plate deployed substantially adjacent to the at least one end and projecting downwardly substantially perpendicular to the floor-forming supports and substantially perpendicular the beam-forming troughs.
According to a further teaching of the present invention the floor-and-beam forming element is implemented as an element fabricated from steel.
There is also provided according to the teachings of the present invention a method for the fabrication of a wall comprising: (a) deploying a plurality of interconnected substantially rectangular wall-forming elements on a floor, each the wall-forming element configured with at least two substantially parallel spaced apart substantially rectangular wall panels, wherein an outer surface of each of the wall panels is configured as a substantially finished wall surface, the at least two wall panels being coupled at each of four corners of the rectangle by wall-panel corner-connecting elements; and (b) deploying a volume of fluid concrete so as to substantially fill a region between the wall panels.
According to a further teaching of the present invention, each one of the plurality of the wall-forming elements is interconnected to adjacent ones of the plurality of the wall-forming elements by attachment of adjacent ones of the wall-panel corner-coupling brackets one to another.
According to a further teaching of the present invention the wall-panel corner-connecting element is implemented as a substantially “L” shaped element, the wall-panel corner-connecting element thereby spanning at least a partial length of two sides of the wall-forming element when attached to the wall panels.
According to a further teaching of the present invention, the attachment of the adjacent ones of the wall-panel corner-coupling brackets one to another is implemented using self-tapping sheet metal screws.
According to a further teaching of the present invention, the coupling of the wall panels is implemented by providing a lengthwise groove in each edge surface of each the wall panels into which a tongue protruding form each the wall-panel corner-coupling bracket is affixed.
There is also provided according to the teachings of the present invention a system for fabrication of a concrete floor comprising: (a) a plurality of interconnected floor-and-beam forming elements so as to construct a substantially horizontal floor mold, each the floor-and-beam forming element configured with at least one beam-forming trough flanked by floor-forming support; and (b) plurality of support plates such that at least one the support plate is deployed between adjacent ones of the beam-forming troughs so as to span a distance between the adjacent ones of the beam-forming troughs, the support plates connected to facing sides of the adjacent ones of the beam-forming troughs and an underside of the floor-forming supports, the support plates projecting downwardly substantially perpendicular to the floor-forming supports and substantially perpendicular to a length of the beam-forming troughs; wherein a volume of fluid concrete is poured onto a top surface of the floor area such that the fluid concrete substantially fills the beam-forming troughs and regions above the floor-forming supports are covered to a predefined depth, and allowing the fluid concrete to cure.
According to a further teaching of the present invention there is also provided at least one floor thickness guide attached to a top surface of at least one the floor-forming support, so as to facilitate determination of the predefined depth of the fluid concrete.
According to a further teaching of the present invention the at least one floor thickness guide is implemented as a plurality of the floor thickness guides deployed such that the top surfaces of the plurality of the floor thickness guides is co-planar.
According to a further teaching of the present invention the interconnection of the floor-and-beam forming elements is such that a top surface of the floor-forming supports is substantially co-planar.
According to a further teaching of the present invention, the interconnection includes attachment of two adjacent floor-forming supports.
According to a further teaching of the present invention, the support plates have an outer contour that is substantially equivalent to a cross section of an area below the floor-forming support, between the adjacent ones of the beam-forming troughs and a line connecting bottom surfaces of the adjacent ones of the beam-forming troughs.
According to a further teaching of the present invention the plurality of support plates are deployed such that tabs protruding from edges of the support plates are inserted through corresponding slots provided in the floor-and-beam forming elements, thereby providing a plurality of anchoring points for the concrete.
According to a further teaching of the present invention, at least one of the plurality of support plates includes precut holes to accommodate plumbing and electrical components.
According to a further teaching of the present invention there is also provided a false bottom deployed in at least one the beam-forming trough so as to prevent the fluid concrete from flowing therein so as to form a void in a bottom region of the beam-forming trough into which fasteners penetrate, thereby facilitating attachment of ceiling finishing material.
According to a further teaching of the present invention there is also provided at least one end sealing plate configured to seal at least one end of an area below the floor-forming support and between the adjacent ones of the beam-forming troughs, the end sealing plate deployed substantially adjacent to the at least one end and projecting downwardly substantially perpendicular to the floor-forming supports and substantially perpendicular the beam-forming troughs.
According to a further teaching of the present invention, the floor-and-beam forming element is fabricated from steel.
There is also provided according to the teachings of the present invention a system for the fabrication of a wall comprising a plurality of interconnected substantially rectangular wall-forming elements deployed on a floor, each the wall-forming element configured with at least two substantially parallel spaced apart substantially rectangular wall panels, wherein an outer surface of each of the wall panels is configured as a substantially finished wall surface, the at least two wall panels being coupled at each of four corners of the rectangle by wall-panel corner-connecting elements, wherein a volume of fluid concrete is poured so as to substantially fill a region between the wall panels.
According to a further teaching of the present invention each one of the plurality of the wall-forming elements is interconnected to adjacent ones of the plurality of the wall-forming elements is by attachment of adjacent ones of the wall-panel corner-coupling brackets one to another.
According to a further teaching of the present invention the wall-panel corner-connecting element is a substantially “L” shaped element, the wall-panel corner-connecting element thereby spanning at least a partial length of two sides of the wall-forming element when attached to the wall panels.
According to a further teaching of the present invention the adjacent ones of the wall-panel corner-coupling brackets is attached one to another using self-tapping sheet metal screws.
According to a further teaching of the present invention the wall panels include a lengthwise groove in each edge surface of each the wall panels into which a tongue protruding form each the wall-panel corner-coupling bracket is affixed.
There is also provided according to the teachings of the present invention a method for fabrication of a building foundation constructed on a pre-graded site comprising: (a) deploying a layer of gravel so as to cover a per-defined surface area of the site to a predefined depth; (b) deploying on the layer of gravel a symmetrical arrangement of a plurality of spaced apart foundation cavity forms so as to form trough regions between adjacent ones of the foundation cavity forms, the symmetrical arrangement substantially covering a predefined surface area of the gravel, the foundation cavity forms configured so as to form a cavity region thereunder; (c) erecting a foundation boarder so as to define a periphery of the foundation; (d) deploying an amount of fluid concrete within the foundation boarder so as to substantially fill the trough regions and a region above the foundation cavity forms to a substantially uniform predefined depth, and the foundation cavity forms prevent the flow of the fluid concrete into the cavity region; (e) leveling a top surface of the concrete; and (f) allowing the concrete to cure.
According to a further teaching of the present invention, the foundation cavity forms are implemented as four connected side panels connected to a top panel configured from at least one piece of material.
According to a further teaching of the present invention the at least one piece of material is implemented as a sheet of metal.
According to a further teaching of the present invention there is also provided deploying floor support elements projecting upwards from the top surface of the concrete so as to support a floor a distance of between 0.5-1.5 meters above the top surface, thereby forming a service space between the top surface and bottom surface of the floor.
There is also provided according to the teachings of the present invention a building foundation for deployment on a pre-graded site covered by a layer of gravel, the building foundation comprising: (a) a symmetrical arrangement of a plurality of spaced apart foundation cavity forms deployed on the layer of gravel so as to form trough regions between adjacent ones of the foundation cavity forms, the symmetrical arrangement substantially covering a predefined surface area of the gravel, the foundation cavity forms configured so as to form a cavity region thereunder; and (b) a foundation boarder erected so as to define a periphery of the foundation; wherein an amount of fluid concrete is deployed within the foundation boarder so as to substantially fill the trough regions and a region above the foundation cavity forms to a predefined depth, and the foundation cavity forms prevent the flow of the fluid concrete into the cavity region.
According to a further teaching of the present invention, the foundation cavity forms are configured as four connected side panels connected to a top panel configured from at least one piece of material.
According to a further teaching of the present invention the at least one piece of material includes a sheet of metal.
According to a further teaching of the present invention there is also provided floor support elements projecting upwards from the top surface of the concrete so as to support a floor a distance of between 0.5-1.5 meters above the top surface, thereby forming a service space between the top surface and bottom surface of the floor.
BRIEF DESCRIPTION OF THE DRAWINGSThe invention is herein described, by way of example only, with reference to the accompanying drawings, wherein:
The present invention is a modular system for the construction of concrete floors and walls.
The principles and operation of a modular system for the construction of concrete floors and walls according to the present invention may be better understood with reference to the drawings and the accompanying description.
By way of introduction, the system of the present invention relates to the formation of the majors components of any building, namely floors/ceilings (
According to the present invention, the pre-fabricated wall forms include the intended finished surfaces of the walls, such as but not limited to, marble, granite or other stone, pre-cast concrete, metal, gypsum board, and wood or wood products. Alternatively, the finished surface of the wall panel may be one that will accept a final finish coating, such as but not limited to, paint and wall paper, with minimal preparation.
The floor/ceiling forms are configured such that the ceiling finishing material, such as but not limited to, sheet rock, any commercially available ceiling material and suspending ceiling grid elements, may be readily attached. Floor finishing material, such as but not limited to, tiles, linoleum, and carpeting, may installed directly of the cured concrete floor with minimal preparation to the surface of the concrete.
Referring now to the construction of floors and ceilings according to the teachings of the present invention, there are three main components that are assemble at the construction site in order to construct a floor. While all of the components of the present invention, with the exception of the wall panels, described herein are preferably produced from sheets, or rolls, of steel, each of these components may be produced from any suitable material, such as, but not limited to, sheet metal, aluminum, carbon composites, fiberglass, and plastics.
The thickness of the finished floor may be varied, as required for each application depending on the span and weight requirements, by varying the depth of the concrete when it is poured onto the surface of the floor forms. It will be appreciated that the underside of subsequent finished floors will provide the ceiling for the rooms below. The thickness of the floor that is in contact with the ground may be of such a thickness so as to constitute the foundation of the building. An alternative preferred embodiment of a foundation is discussed with regard to
Turning now to
When produced from steel, as illustrated herein, the floor-and-beam forming elements may be fabricated, on or off the job site, from a roll of material that passes through a suitable shaping machine such as is commonly use in the fabrication of “continuous rain gutters.” An advantage of the style of fabrication is the ability to produce floor-and-beam forming elements of the required length from individual elements of the correct length. Alternately, floor-and-beam forming elements may be produced off site from individual steel sheets by use of a press.
As illustrated in
An embodiment of a floor-thickness guide 30 constructed according to the teachings of the present invention, as illustrated in
In some applications, it may be necessary to provide an area for what is commonly referred to as a “wet room,” such as, but not limited to a room the houses a toilet, bath tub, shower, laundry facilities, or any combination of these. Typically, the surface of the floor of a wet room is 2-3 cm lower than the surface of the surrounding floor area. Construction of such a lowered floor surface may be accomplished, for example, by surrounding the periphery of the wet room with floor thickness guides of the height used for the higher “normal” height floor, and deploying floor thickness guides that are 2-3 cm shorter in the area of the wet room.
The dimensions of the floor-and-beam forming elements 2 may be varied so as to meet the requirements of a particular building project. That is, as illustrated in
A full floor mold consisting of a plurality of floor-and-beam forming elements is assembled to the required dimensions such that the top surfaces of the floor-forming supports lie substantially in a plane substantially parallel to the plane of the finished floor as defined in the architectural plans. It should be noted that the principles of the present invention are equally applicable to substantially any floor surface whether horizontal or sloping. According to the principles of the present invention, a floor may be constructed at substantially any degree of slope onto which fluid concrete may be poured with utility. The top surfaces of the floor-thickness guides are substantially all co-planar. Once the full floor area of floor-and-beam forming elements is assembled, fluid concrete is poured onto the top surface thereby filling the beam-forming troughs and area above the floor-forming supports with a volume of fluid concrete to a depth as indicated by the floor-thickness guides. The fluid concrete is then leveled using the top surface of the floor-thickness guides 30 as supports for the leveling instrument, such as a substantially straight board of suitable length, as is a common practice in concrete construction. The plurality of support plates 20 and 22 provide further support for the floor-forming supports 6 and 8, rigidity against twisting for the beam-forming troughs 4, and as the concrete cures, the plurality of attachment tabs 26 provide anchoring points for the concrete. When the floor-and-beam forming elements are deployed atop a wall, it may be necessary to seal the area under the floor-forming supports between the beam-forming troughs. In such instances, an end sealing plate 28, such as the non-limiting example illustrated in
During assembly of the full floor area of floor-and-beam forming elements, support plates 20 with pre-cut holes may be deployed as required by the architectural plans. This facilitates the instillation of plumbing and electrical components, allowing the components to past through the holes. At points where is it necessary for the plumbing or electrical components to past through the floor, a custom hole may be cut using any number of hole-cutting tools. When it is necessary for the plumbing or electrical components to be installed in a direction perpendicular to the beam troughs, a hole is cut through the appropriate beam troughs after the concrete has cured.
In some applications, the exposed steel bottom surface may be suitable as the finished ceiling surface. Alternatively, for applications where a substantially planar ceiling surface is required, a false bottom 60 may be deployed in the bottom of the beam-forming troughs before the fluid concrete is poured so as to create a hollow space, or void, a the bottom of the troughs when the concrete cures. This enables the insertion of fasteners, such as, but not limited to, screws and pop-rivets through the steel at the bottom of the beam-forming so as to attach ceiling finishing elements, such as, but not limited to, sheet rock and suspending ceiling grid elements.
Turning now to the construction of wall according to the present invention, and in particular the fabrication of wall-forming elements 100, each of which is separately pre-fabricated by coupling two substantially rectangular wall panels 102a and 102b at each of their four corners using substantially “L” shaped corner-coupling brackets 104 configured so as to span at least part of the length of two adjacent sides of the wall panels 102a and 102b. A plurality of wall-forming elements is used for wall construction. Preferably, as illustrated in
The interior wall panel 102b may be configured from substantially any interior wall material, such as but not limited to, gypsum board, wood, and pre-cast concrete.
A full wall form consists of a plurality of adjoining wall-forming elements 100, as illustrated in
Wall corners are formed, as illustrated in
Similar to the wall panels mentioned above, the corner panels 120 and 122 are preferably, configured with a lengthwise groove (not shown) on the each of the end surface into which a tongue 128 protruding from the wall-corner brackets is inserted and affixed, preferably with and adhesive such as, but not limited to, epoxy or plastic resins.
When the architectural plans call for a door or window, door or window cap elements such as, but not limited, to those (152 and 154) illustrated in
Once the full wall forms are assembled, fluid concrete is poured into the space between the wall panels 102a and 102b and allowed to cure.
It will be readily appreciated that since no forms need to be removed from the finished wall and since the wall forms of the present invention provide a substantially sturdy wall before the concrete is fully cured, work may begin on the next phase of construction without the delay of waiting for the concrete to fully cure and removal of all of the forms. Such delay is common practice with conventional concrete construction methods. That is to say, deployment of the floor/ceiling forms for the next level may be started while the concrete in the newly constructed walls is still curing.
An alternative preferred embodiment of a building foundation according to the present invention, as illustrated in
As shown in
The foundation may further include floor support elements 210 projecting upwards from the top surface of concrete in the floor region 206 so as to support a floor 212 a distance of between 0.5-1.5 meters above the floor region 206, thereby forming a service space 220 between floor region 206 and bottom surface of the floor 212. The floor support elements are preferably constructed from fluid concrete poured into forms deployed on floor region 206. alternatively, the floor support elements 210 may be constructed from, by non-limiting example, pre-cast concrete, metal or wood.
It will be appreciated that the above descriptions are intended only to serve as examples and that many other embodiments are possible within the spirit and the scope of the present invention.
Claims
1. A method for fabrication of a concrete floor comprising:
- (a) deploying a plurality of interconnected floor-and-beam forming elements so as to construct a substantially horizontal floor mold, each said floor-and-beam forming element configured with at least one beam-forming trough flanked by floor-forming support;
- (b) deploying a plurality of support plates such that at least one said support plate is deployed between adjacent ones of said beam-forming troughs so as to span a distance between said adjacent ones of said beam-forming troughs, said support plates connected to facing sides of said adjacent ones of said beam-forming troughs and an underside of said floor-forming supports, said support plates projecting downwardly substantially perpendicular to said floor-forming supports and substantially perpendicular to a length of said beam-forming troughs;
- (c) deploying a volume of fluid concrete onto a top surface of said floor area such that said fluid concrete substantially fills said beam-forming troughs and regions above said floor-forming supports are covered to a predefined depth; and
- (d) allowing said fluid concrete to cure.
2. The method of claim 1, further comprising attaching at least one floor thickness guide to a top surface of at least one said floor-forming support, so as to facilitate determination of said predefined depth of said fluid concrete.
3. The method of claim 2, wherein said at least one floor thickness guide is implemented as a plurality of said floor thickness guides deployed such that said top surfaces of said plurality of said floor thickness guides is co-planar.
4. The method of claim 1, wherein said interconnection of said floor-and-beam forming elements is implemented such that a top surface of said floor-forming supports is substantially co-planar.
5. The method of claim 1, wherein implementation of said interconnection includes attachment of two adjacent floor-forming supports.
6. The method of claim 1, wherein said support plates are implemented with an outer contour that is substantially equivalent to a cross section of an area below said floor-forming support, between said adjacent ones of said beam-forming troughs and a line connecting bottom surfaces of said adjacent ones of said beam-forming troughs.
7. The method of claim 6, wherein said deploying a plurality of support plates includes insertion of tabs protruding from edges of said support plates through corresponding slots provided in said floor-and-beam forming elements, thereby providing a plurality of anchoring points for said concrete.
8. The method of claim 1, wherein at least one of said plurality of support plates is implemented with precut holes to accommodate plumbing and electrical components.
9. The method of claim 1, further comprising deployment of a false bottom in at least one said beam-forming trough so as to prevent said fluid concrete from flowing therein so as to form a void in a bottom region of said beam-forming trough into which fasteners penetrate, thereby facilitating attachment of ceiling finishing material.
10. The method of claim 1, further comprising sealing at least one end of an area below said floor-forming support and between said adjacent ones of said beam-forming troughs by use of an end sealing plate deployed substantially adjacent to said at least one end and projecting downwardly substantially perpendicular to said floor-forming supports and substantially perpendicular said beam-forming troughs.
11. The method of claim 1, wherein said floor-and-beam forming element is implemented as an element fabricated from steel.
12. A method for the fabrication of a wall comprising:
- (a) deploying a plurality of interconnected substantially rectangular wall-forming elements on a floor, each said wall-forming element configured with at least two substantially parallel spaced apart substantially rectangular wall panels, wherein an outer surface of each of said wall panels is configured as a substantially finished wall surface, said at least two wall panels being coupled at each of four corners of said rectangle by wall-panel corner-connecting elements; and
- (b) deploying a volume of fluid concrete so as to substantially fill a region between said wall panels.
13. The method of claim 12, wherein each one of said plurality of said wall-forming elements is interconnected to adjacent ones of said plurality of said wall-forming elements by attachment of adjacent ones of said wall-panel corner-coupling brackets one to another.
14. The method of claim 13, wherein said wall-panel comer-connecting element is implemented as a substantially “L” shaped element, said wall-panel corner-connecting element thereby spanning at least a partial length of two sides of said wall-forming element when attached to said wall panels.
15. The method of claim 14, wherein said attachment of said adjacent ones of said wall-panel comer-coupling brackets one to another is implemented using self-tapping sheet metal screws.
16. The method of claim 14, wherein said coupling of said wall panels is implemented by providing a lengthwise groove in each edge surface of each said wall panels into which a tongue protruding form each said wall-panel corner-coupling bracket is affixed.
17. A system for fabrication of a concrete floor comprising:
- (a) a plurality of interconnected floor-and-beam forming elements so as to construct a substantially horizontal floor mold, each said floor-and-beam forming element configured with at least one beam-forming trough flanked by floor-forming support; and
- (b) plurality of support plates such that at least one said support plate is deployed between adjacent ones of said beam-forming troughs so as to span a distance between said adjacent ones of said beam-forming troughs, said support plates connected to facing sides of said adjacent ones of said beam-forming troughs and an underside of said floor-forming supports, said support plates projecting downwardly substantially perpendicular to said floor-forming supports and substantially perpendicular to a length of said beam-forming troughs;
- wherein a volume of fluid concrete is poured onto a top surface of said floor area such that said fluid concrete substantially fills said beam-forming troughs and regions above said floor-forming supports are covered to a predefined depth, and allowing said fluid concrete to cure.
18. The system of claim 17, further comprising at least one floor thickness guide attached to a top surface of at least one said floor-forming support, so as to facilitate determination of said predefined depth of said fluid concrete.
19. The system of claim 18, wherein said at least one floor thickness guide is implemented as a plurality of said floor thickness guides deployed such that said top surfaces of said plurality of said floor thickness guides is co-planar.
20. The system of claim 17, wherein said interconnection of said floor-and-beam forming elements is such that a top surface of said floor-forming supports is substantially co-planar.
21. The system of claim 17, wherein said interconnection includes attachment of two adjacent floor-forming supports.
22. The system of claim 17, wherein said support plates have an outer contour that is substantially equivalent to a cross section of an area below said floor-forming support, between said adjacent ones of said beam-forming troughs and a line connecting bottom surfaces of said adjacent ones of said beam-forming troughs.
23. The system of claim 22, wherein said plurality of support plates are deployed such that tabs protruding from edges of said support plates are inserted through corresponding slots provided in said floor-and-beam forming elements, thereby providing a plurality of anchoring points for said concrete.
24. The system of claim 17, wherein at least one of said plurality of support plates includes precut holes to accommodate plumbing and electrical components.
25. The system of claim 17, further comprising a false bottom deployed in at least one said beam-forming trough so as to prevent said fluid concrete from flowing therein so as to form a void in a bottom region of said beam-forming trough into which fasteners penetrate, thereby facilitating attachment of ceiling finishing material.
26. The system of claim 17, further comprising at least one end sealing plate configured to seal at least one end of an area below said floor-forming support and between said adjacent ones of said beam-forming troughs, said end sealing plate deployed substantially adjacent to said at least one end and projecting downwardly substantially perpendicular to said floor-forming supports and substantially perpendicular said beam-forming troughs.
27. The system of claim 17, wherein said floor-and-beam forming element is fabricated from steel.
28. A system for the fabrication of a wall comprising a plurality of interconnected substantially rectangular wall-forming elements deployed on a floor, each said wall-forming element configured with at least two substantially parallel spaced apart substantially rectangular wall panels, wherein an outer surface of each of said wall panels is configured as a substantially finished wall surface, said at least two wall panels being coupled at each of four corners of said rectangle by wall-panel corner-connecting elements, wherein a volume of fluid concrete is poured so as to substantially fill a region between said wall panels.
29. The system of claim 28, wherein each one of said plurality of said wall-forming elements is interconnected to adjacent ones of said plurality of said wall-forming elements is by attachment of adjacent ones of said wall-panel corner-coupling brackets one to another.
30. The system of claim 29, wherein said wall-panel comer-connecting element is a substantially “L” shaped element, said wall-panel comer-connecting element thereby spanning at least a partial length of two sides of said wall-forming element when attached to said wall panels.
31. The system of claim 30, wherein said adjacent ones of said wall-panel corner-coupling brackets is attached one to another using self-tapping sheet metal screws.
32. The system of claim 30, wherein said wall panels include a lengthwise groove in each edge surface of each said wall panels into which a tongue protruding form each said wall-panel corner-coupling bracket is affixed.
33. A method for fabrication of a building foundation constructed on a pre-graded site comprising:
- (a) deploying a layer of gravel so as to cover a per-defined surface area of the site to a predefined depth;
- (b) deploying on said layer of gravel a symmetrical arrangement of a plurality of spaced apart foundation cavity forms so as to form trough regions between adjacent ones of said foundation cavity forms, said symmetrical arrangement substantially covering a predefined surface area of said gravel, said foundation cavity forms configured so as to form a cavity region thereunder;
- (c) erecting a foundation boarder so as to define a periphery of the foundation;
- (d) deploying an amount of fluid concrete within said foundation boarder so as to substantially fill said trough regions and a region above said foundation cavity forms to a substantially uniform predefined depth, and said foundation cavity forms prevent the flow of said fluid concrete into said cavity region;
- (e) leveling a top surface of said concrete; and
- (f) allowing said concrete to cure.
34. The method of claim 33, wherein said foundation cavity forms are implemented as four connected side panels connected to a top panel configured from at least one piece of material.
35. The method of claim 34, wherein said at least one piece of material is implemented as a sheet of metal.
36. The method of claim 33, further comprising deploying floor support elements projecting upwards from said top surface of said concrete so as to support a floor a distance of between 0.5-1.5 meters above said top surface, thereby forming a service space between said top surface and bottom surface of said floor.
37. A building foundation for deployment on a pre-graded site covered by a layer of gravel, the building foundation comprising:
- (a) a symmetrical arrangement of a plurality of spaced apart foundation cavity forms deployed on the layer of gravel so as to form trough regions between adjacent ones of said foundation cavity forms, said symmetrical arrangement substantially covering a predefined surface area of the gravel, said foundation cavity forms configured so as to form a cavity region thereunder; and
- (b) a foundation boarder erected so as to define a periphery of the foundation;
- wherein an amount of fluid concrete is deployed within said foundation boarder so as to substantially fill said trough regions and a region above said foundation cavity forms to a predefined depth, and said foundation cavity forms prevent the flow of said fluid concrete into said cavity region.
38. The building foundation of claim 33, wherein said foundation cavity forms are configured as four connected side panels connected to a top panel configured from at least one piece of material.
39. The building foundation of claim 34, wherein said at least one piece of material includes a sheet of metal.
40. The building foundation of claim 33, further comprising floor support elements projecting upwards from said top surface of said concrete so as to support a floor a distance of between 0.5-1.5 meters above said top surface, thereby forming a service space between said top surface and bottom surface of said floor.
Type: Application
Filed: Sep 17, 2003
Publication Date: Mar 17, 2005
Inventor: Gilbert Ben-Lulu (Ashdod)
Application Number: 10/663,906