Supplier synchronization system and method
A system and method for synchronization of a supplier's production with a manufacturer's production is disclosed. A manufacturer's supply orders are submitted to suppliers during the manufacturer's production taking into account the time required to manufacture, transport, unload, stage, and move the supplies to a location at a production line. Associated with each supply order is a production delivery time that indicates when the supplies are needed at the manufacturer's facility. The supplier, upon receipt of the supply order, starts its manufacturing process to produce the requested supplies to meet the manufacturer's production delivery time. The supplies are then shipped from the supplier to the manufacturer's facility for use in the manufacturer's production line. Upon arrival at the manufacturer's facility, some supplies may be moved immediately to the production line. Other supplies may be moved within minutes or hours of arrival at the manufacturer's facility. In either case, supplies manufactured by the supplier during the production run are consumed by the end of the production run so that no inventory for certain supplies is maintained by the manufacturer.
Latest Honda of America Mfg., Inc Patents:
This application is a continuation of U.S. application Ser. No. 09/632,683, filed Aug. 7, 2000, which is expressly incorporated herein by reference.
TECHNICAL FIELDThe present invention relates to supply ordering for a manufacturing facility. More particularly, the present invention relates to a system and method for ordering supplies to synchronize supplier production with a manufacturer's production requirements.
BACKGROUND OF THE INVENTIONManufacturers often maintain a large inventory of supplies and parts in order to meet production requirements at their assembly plants. Inventory may be maintained at the assembly plant as well as at warehouses and other storage facilities. Supplies and parts are stored at these various locations until they are needed at the assembly plant production line. The maintenance of inventory at assembly plants and related facilities can be very costly to a manufacturing organization. The space requirements for simply holding inventory may be significant and therefore, costly. Costs may also be increased if inventory must be moved from one location to another before it is used in a production line. Furthermore, a large amount of inventory reduces flexibility to respond to market demand.
Many manufacturers have attempted to control inventory costs by reducing the amount of inventory they maintain. For example, some manufacturers may wait to place supply orders until shortly before a particular part is needed. Using this approach, a manufacturer may reduce the amount of time that a part or supply is in its inventory. However, the manufacturer is still required to maintain an inventory using this approach. A manufacturer may also ask a supplier to postpone delivery of a particular order until shortly before the supplies are needed. Using this approach, the supplier effectively maintains the inventory on behalf of the manufacturer. Any associated costs are likely to be passed on to the manufacturer so there is no real benefit to the manufacturer to have the supplier postpone delivery.
Some attempts have been made to control inventory through the ordering process. U.S. Pat. No. 5,765,143 to Sheldon, et al. discloses a system and method for controlling inventory of vendors at one level of a part distribution chain. The inventory control system generates order data in response to reference data that is indicative of sales, inventory, demographics, and/or market characteristics of at least two vendors. The order data relates to a recommended inventory increase transaction, inventory reduction transaction, and a recommended stocking level of one or more parts by the vendor.
U.S. Pat. No. 5,974,394 to Bellini, et al. discloses a system for enterprise planning across a supply chain. The system operates bi-directionally so that integrated planning-and scheduling information is exchanged horizontally and vertically across the supply chain. Each organization that participates in the supply chain can view the entire supply chain and assist the enterprise in executing more efficient planning strategies. However, the system does not address problems related to inventory control.
U.S. Pat. No. 5,983,195 to Fierro discloses a system and method for scheduling product orders that results in a dynamic association of customer product orders with physical products on a production line. A product order record and a physical product record list attributes related to the physical features of a manufactured item. The attributes of each record are compared to determine if the product order may be associated with the physical product on the production line. The physical product is then used to fulfill the product order. The dynamic association may occur at different points in the manufacturing process. The system and method do not address problems related to inventory control.
None of the above references relate to the synchronizing of production between a supplier and a manufacturer so that the inventory maintained by a manufacturer is eliminated or reduced significantly.
SUMMARY OF THE INVENTIONThe present invention is a system and method for synchronizing production between a supplier and a manufacturer to meet the manufacturer's production needs. Production is synchronized such that the manufacturer's requests for supplies are submitted to suppliers during production taking into account the time required to manufacture, transport, stage, and move the supplies to a location at the manufacturing production line. The manufacturer's production schedules are shared with the various suppliers so that each supplier can plan and prepare to process incoming supply orders and to deliver supplies in accordance with the manufacturer's projected production needs. During the production process, delivery requests for supplies are submitted to different suppliers based on the manufacturer's production needs at a particular time. Associated with each supply order is a production delivery time that indicates when the supplies are needed at the manufacturer's facility. Supply orders are based in part on actual production requirements rather than projected production requirements. Prior to submitting a supply order, a supplier may be, asked to provide a capacity confirmation to make sure the supplier is able to meet the delivery request.
The supplier, upon receipt of the delivery request, starts its manufacturing process to produce the requested supplies to meet the manufacturer's production delivery time. Upon completion of the manufacturing process, the supplies are shipped from the supplier to the manufacturer's facility for use in the manufacturer's production line. In some cases, the final assembly process is synchronized rather than the entire production. The incoming supplies are then moved to a location in the manufacturing production line for use in the production or assembly process. Upon arrival at the manufacturer's facility, some supplies may be moved immediately to the manufacturing production line. Other supplies may be moved within minutes or hours of arrival at the manufacturer's facility. The differences are caused in part by trailer cubing efficiency. In a few instances, the time to move the supplies to the manufacturing production line may be longer. The rate at which supplies are consumed upon delivery may depend upon the level of synchronization between the supplier's production system and the manufacturer's production needs. Some suppliers may require a longer lead time to deliver supplies due to production and transportation constraints. However, because ordering is based in part on actual production requirements and takes into account the supplier manufacturing and delivery time, most supplies are consumed within minutes or hours of arrival at the manufacturer's facility. Because supplies are both produced and consumed as they are needed, the manufacturer and the supplier are not required to carry an inventory of supplies other than for transportation efficiency. By tying supplier production with the manufacturer's production needs and minimizing the lead time required to produce and transport supplies, the costs associated with maintaining an inventory are virtually eliminated.
The system of the present invention comprises a plurality of manufacturer and supplier computer systems through which information regarding production schedules, production sequences, supply orders, production delivery times, acknowledgments, etc. is exchanged. The system may further comprise seller computer systems that communicate with the manufacturer computer systems to exchange information regarding seller orders, product delivery times, etc. Communications between the manufacturer's computer systems and suppliers' computer systems are coordinated so that supply orders and delivery timings are submitted from the manufacturer's computer systems to the suppliers' computer systems during the manufacturer's production process. Upon receipt of a supply order and delivery schedule, a supplier starts its own manufacturing process so that the requested supplies are delivered in accordance with the production delivery time of the supply order.
Using the present invention, a manufacturing operation can develop a supply pipeline that virtually eliminates the need to maintain a manufacturing supply inventory other than for transportation efficiency. Supplies are ordered based on the manufacturer's production needs. Supplies are produced when a supplier receives a supply order from the manufacturer. Supplies are consumed within minutes or hours after delivery of the supplies to the manufacturer's facility. The synchronization of the supplier's and manufacturer's production results in a cycle of production and consumption that reduces lead time and virtually eliminates the need to maintain an inventory.
BRIEF DESCRIPTION OF THE DRAWINGS
Referring to
In some cases, the supplies may be used in equipment that operates in the production or assembly process. In either case, supplies are made available as needed to keep the production line operational. In accordance with the present invention, supplies are ordered from different suppliers as they are needed. The need for supplies is determined in conjunction with the manufacturer's production sequence which sets forth what supplies are required at a particular location and at a particular time in order to continue production. Production sequences are determined at the earliest point in the production line. A production sequence comprises information and details regarding the item to be produced. For example, in an automobile manufacturing application, the production sequence may comprise the model, type, options, and color for the automobiles to be produced at a particular assembly line. Assuming no other changes are made to the production sequence, by production run time, supply requirements timing at the location is clear and may be communicated to suppliers through supply orders.
Based on supply requirements at the production line for the production sequence, orders for supplies are transmitted to suppliers during the production process 103. In one embodiment of the present invention as shown in
Referring to
In an example embodiment, supply order data may be exchanged between the manufacturer computer 120 and supplier A computer 106 and supplier B computer 108 using XML. The XML guidelines and conventions for designing text formats allow the manufacturer and suppliers to easily and quickly produce files with supply order data. In addition, XML may be used to share manufacturer production schedules with suppliers so that suppliers can prepare and plan for the supply orders that are submitted during the production process.
The supply order data submitted by the manufacturer computer to the supplier computers comprises a production sequence. For example, in an automobile manufacturing plant, a production sequence may comprise information and details about the model, type, options, and color for the automobiles to be produced at a particular assembly line. The supply order data further comprises a production delivery- time and a production line location. The production delivery time indicates when the supplies are needed for the production sequence. The production line location indicates where the supplies are needed for the production sequence. When submitting supply order requests to suppliers, the manufacturer computer 120 takes into account the time required by the supplier to produce and transport the supplies, and the time required by the manufacturer to stage and move the supplies to a location on the production line. The time required to complete the activities so the supplies are available at a production line location differs depending on the type of supply requested, the location of the supplier, etc. Tolerances for delays in transmission time for supply orders through computer systems, in manufacturing, in transporting, in staging, in moving, etc. may be factored in as well so that a supplier is able to meet the production delivery time associated with a particular supply order even if an unanticipated event occurs. Tolerances may differ depending on the type of activity such as computer communications, producing supplies, transporting supplies, etc.
Referring to
Referring to
How quickly supplies are made available at the production line depends on a number of factors including the type of supply and the manner in which it is used at the production line. Some supplies may be held at the manufacturer's receiving facility for only a few minutes while others are held for hours. Some supplies may arrive ready to be installed on the manufacturer's products while other supplies require some preparation by the manufacturer before they can be consumed. In either case, all supplies of certain types may be consumed by the end of a production run or shift so that no inventory is maintained by the manufacturer.
Referring to
Industrial Applicability
The present invention assists a large-scale assembly plant manufacturing operation in eliminating or significantly reducing inventory by synchronizing supplier production with the manufacturer's production. Upon receipt of a supply order, a supplier starts its manufacturing process to produce the requested supplies to meet the manufacturer's production delivery time. Upon arrival at the manufacturer's facility, supplies are moved to the production line so they are consumed by the end of the production run. As a result, the manufacturer is not required to maintain inventory for certain supplies.
While particular embodiments of the invention have been illustrated and described, various modifications and combinations can be made without departing from the spirit and scope of the invention, and all such modifications combinations, and equivalents are intended to be covered and claimed.
Claims
1. A method for synchronizing a supplier's production with a manufacturer's production comprising the steps of:
- establishing a production schedule for said manufacturer's production;
- determining a time needed to receive supplies from a supplier, said time needed to receive supplies determined by said manufacturer;
- transmitting a supply order to said supplier in accordance with said time needed to receive supplies, said supply order comprising a production delivery time according to said production schedule for said manufacturer's production;
- starting said supplier's production in accordance with said production delivery time according to said production schedule for said manufacturer's production;
- receiving supplies from said supplier in accordance with said production delivery time according to said production schedule for said manufacturer's production;
- moving said supplies to said manufacturer's production line;
- starting production at said manufacturer's production line in accordance with said manufacturer's production schedule; and
- consuming said supplies in accordance with said production schedule established for said manufacturer's production.
2. The method of claim 1 wherein the step of determining a time needed to receive supplies from a supplier comprises the steps of:
- determining a time required by said supplier to produce supplies;
- determining a time required by said supplier to transport said supplies to said manufacturer;
- determining a time required by said manufacturer to unload said supplies;
- determining a time required by said manufacturer to said stage supplies;
- determining a time required by said manufacturer to move said supplies to a location on said manufacturer's production line; and
- determining a total time by adding said time required by said supplier to produce supplies, said time required by said supplier to transport said supplies to said manufacturer, said time required by said manufacturer to unload said supplies, said time required by said manufacturer to stage said supplies, and said time required by said manufacturer to move said supplies to a location on said manufacturer's production line.
3. The method of claim 2 further comprising the step of adding time to said total time to account for delays in each activity.
4. The method of claim 1 wherein the step of transmitting a supply order to said supplier comprises the steps of:
- transmitting a production sequence;
- transmitting said production delivery time; and
- transmitting a production line location.
5. The method of claim 4 wherein the step of transmitting a production sequence to said supplier comprises the step of transmitting details about a model, type, options, and color for an automobile.
6. The method of claim 1 wherein the step of transmitting a supply order to said supplier comprises the step of transmitting a supply order to said supplier in accordance with TCP/IP.
7. The method of claim 1 wherein the step of transmitting a supply order to said supplier comprises the step of transmitting a supply order to said supplier in accordance with XML.
8. The method of claim 1 wherein the step of transmitting a supply order to said supplier comprises the step of requesting a capacity confirmation from said supplier prior to transmitting a supply order.
9. A system for synchronizing a supplier's production with a manufacturer's production comprising:
- a manufacturer's production line;
- a production schedule for said manufacturer's production line;
- a manufacturer computer adapted to transmit supply orders to a supplier computer based on the production status at said manufacturer's production line, said supply orders transmitted to said supplier when the production status indicates supplies are needed to meet said production schedule;
- a supplier computer adapted to receive supply orders from a manufacturer computer, said supply orders comprising production delivery times in accordance with said production schedule for said manufacturer's production line;
- a supplier production line for producing supplies in accordance with a production delivery time in a supply order from said manufacturer computer, said production delivery time in accordance with said production schedule for said manufacturer's production line; and
- a production line location at said manufacturer's production line for holding said supplies produced by-said supplier, said supplies consumed in accordance with said production schedule for said manufacturer's production line.
11. The system of claim 9 wherein said supply order comprises a production line location.
12. The system of claim 9 wherein said supply order comprises a production sequence.
13. The system of claim 12 wherein said production sequence comprises a model, a type, a plurality of options, and a color for an automobile.
14. The system of claim 9 wherein said manufacturer computer and said supplier computer are adapted for communication in accordance with TCP/IP.
15. The system of claim 9 wherein said manufacturer computer and said supplier computer are adapted for communication in accordance with XML standards.
16. The system of claim 9 further comprising a capacity confirmation from said supplier computer.
17. A method for synchronizing a supplier's production with a manufacturer's production comprising the steps of:
- establishing a production schedule for said manufacturer's production;
- transmitting to a supplier a supply order comprising a production sequence, a production delivery time, and a production line location at said manufacturer in accordance with said production schedule for said manufacturer's production;
- starting said supplier's production in accordance with said production delivery time in accordance with said production schedule for said manufacturer's production;
- receiving supplies from said supplier in accordance with said production delivery time in said supply order, said production delivery time in accordance with said production schedule for said manufacturer's production;
- moving said supplies to said production line location; and
- consuming said supplies at said production line location in accordance with said production schedule for said manufacturer's production.
18. The method of claim 17 wherein said production sequence comprises the step of transmitting details about a model, a type, a plurality of options, and a color for an automobile.
19. The method of claim 17 wherein the step of starting said supplier's production in accordance with said production delivery time comprises the step of starting said supplier's production to meet said production delivery time of said production schedule for said manufacturer's production.
20. The method of claim 17 wherein said production delivery time is based on a time required by said supplier to produce supplies, a time required by said supplier to transport said supplies to said manufacturer, a time required by said manufacturer to unload said supplies, a time required by said manufacturer to said stage supplies, and a time required by said manufacturer to move said supplies to said production line location.
21. The method of claim 17 wherein the step of transmitting a supply order to said supplier comprises the step of transmitting a supply order to said supplier in accordance with TCP/IP.
22. The method of claim 17 wherein the step of transmitting a supply order to said supplier comprises the step of transmitting a supply order to said supplier in accordance with XML.
23. The method of claim 17 wherein the step of transmitting a supply order to said supplier comprises the step of requesting a capacity confirmation from said supplier.
Type: Application
Filed: Jun 23, 2003
Publication Date: Mar 24, 2005
Patent Grant number: 7533043
Applicant: Honda of America Mfg., Inc (Marysville, OH)
Inventors: Trish Carney (Marengo, OH), Ted Kondo (Marysville, OH), Masayuki Tamai (Dublin, OH), Neil Vining (Ostrander, OH)
Application Number: 10/601,379