System, method and computer program product for enhancing commercial value of electrical power produced from a renewable energy power production facility
A method, system and computer program product enhance the commercial value of electrical power produced from a wind turbine production facility. Features include the use of a premier power conversion device that provides an alternative source of power for supplementing an output power of the wind turbine generation facility when lull periods for wind speed appear. The invention includes a communications infrastructure and coordination mechanism for establishing a relationship with another power production facility such that when excess electrical power is produced by the wind turbine facility, the excess may be provided to the power grid while the other energy production facility cuts back on its output production by a corresponding amount. A tracking mechanism keeps track of the amount of potential energy that was not expended at the other facility and places this amount in a virtual energy storage account, for the benefit of the wind turbine facility. When, the wind turbine power production facility experiences a shortfall in its power production output it may make a request to the other source of electric power, and request that an increase its power output on behalf of the wind turbine facility. This substitution of one power production facility for another is referred to herein as a virtual energy storage mechanism. Furthermore, another feature of the present invention is the use of a renewal power exchange mechanism that creates a market for trading renewable units of power, which have been converted into “premier power” and/or “guaranteed” by secondary sources of power source to provide a reliable source of power to the power grid as required by contract.
Latest ABB AB Patents:
1. Field of the Invention
The present invention is directed to a system, method and computer program product that relates to a renewable power production facility, such as a wind turbine generated power production facility that produces electrical power that is applied to a power grid. More specifically, the present invention is directed to systems, methods and computer program product for enhancing the commercial value of electric power produced by wind turbine facilities so as to make that electric power as commercially valuable and fungible as electric power produced by other plants such as fossil fuel power plants, hydroelectric plants, nuclear plants and the like.
2. Discussion of the Background
Wind power is a “natural” power production source that instinctively should be regarded as an optimum source of energy for producing electric power. Wind power does not require the burning of fossil fuels, does not result in nuclear waste by-products, does not require the channeling of water sources, and does not otherwise disturb the environment. On the other hand, wind power is a variable (stochastic) power generation source, thus not offering power production facilities the type of control that the power production and grid facility would like to have in producing commercially reliable power. To address this variability issue, even the early pioneers of wind power attempted to identify ways to “store” wind generated electric power in times of excess, so as to later compensate for times when there are lulls in the wind. For example, Poul La Cour (1846-1908) from Denmark, was one of the early pioneers in wind generated electricity. Poul La Cour built the world's first electricity generating wind turbine in 1891. This design included DC generators and stored energy as hydrogen. Poul La Cour was concerned with the storage of energy because he used the electricity from his wind turbines for electrolysis in order to produce hydrogen for the gas lights in his school. This concept of energy storage has not been abandoned and even modem inventors of wind turbine electric generation facilities are still trying to identify ways to use physical media to store the energy produced by windmills (see e.g., U.S. Pat. No. 5,225,712, which uses fuel cells, batteries, and the like as physical media to store electrical power). In the early days, wind energy plants were generally isolated from one another and provided small scale generation facilities. Through a variety of experiments wind energy plants have generally evolved and now a common theme is to group a number of wind turbines together so as to form farms that can generate up to tens of megawatts via the aggregation of smaller plants that produce slightly above only one megawatt each. Most modem rotor blades on large wind turbines are made of glass fiber reinforced plastics (GRP). These wind power plants are today planned to grow slightly above three megawatts per unit, limited by a reliable size of the wind turbine, (the “propeller”).
A perplexing task that has somewhat stifled the use of wind power plants is that there has been no commercially viable way, in light of the price of fuel generated by other power plants, to effectively store electricity generated by windmills during periods of peak production, so as to make up for periods when the wind slows. As a consequence, the capital cost, lack of production control, size, and reliability problems limited the proliferation of such wind plants between the periods of 1890 and 1970. As a consequence, the use of wind power declined sharply both with the spread of steam-engines and with the increase in scale of electrical power utilization. Thus, windmills generally were only limited for small scale processes and were unable to compete with large scale steam powered electrical power facilities. Furthermore, the commercial cost of such wind-generated power was much greater compared to those with generating systems based on coal, oil, gas and hydro.
Nevertheless, being strong advocate for windmills, Denmark pioneered the effort between the era of 1970 and 1985 to bring back windmill technology in an attempt to make windmill generated electricity a mainstay of modem electric generation plants. To this end, Denmark established some rules regarding grid connections from the windmills, (e.g., Specifications for Connecting Wind Farms to the Transmission Network”, ELTRA I/S ELT 1999-411a., as well as Swedish documents TAMP-1122400 and DAMP-1101300, Sv. Elverksforeningen, the entire contents of which being incorporated herein by reference).
As recognized by the present inventors, there are several drawbacks associated with using wind power systems. First, it should be recognized that there is a strict frequency control on the AC power that is provided to the grid. For example, in the power grid in Europe, the AC frequency is held generally constant at 50 hertz, with an attempt to maintain a maximum frequency variation between plus or minus 0.1 hertz. This means that there must be a continuous balance between the input of energy and the output of electrical power in such an AC system. If consumption is greater than production, the grid frequency drops. If production is greater than consumption, the grid frequency rises. Thus, power companies that provide power to the electric grid must be coordinated so that those adding power are doing so at a time when the demand for that power exists, and also is done in coordination with other providers. While there is a system that is employed to coordinate the activities of different power producers as will be discussed with respect to
A number of different options have been attempted to make wind turbine generated power facilities more reliable and predictable, thus “more mainstream” as compared to other power production facilities. In a first typical windmill power generation facility, an asynchronous machine is used that acts as a generator but also inherently consumes reactive power from the AC grid. Consequently, the facility employs a fixed capacitor bank so as to compensate the amount of reactive power that is consumed, thus providing for a more reasonable power factor (cosine of the angle between current and voltage). However, as recognized by the present inventors, there is a risk with such systems, namely where the capacitor bank causes the system to become self-magnetized thus causing the frequency to differ by as much as tens of hertz from the standard oscillation frequency after a fault occurs.
Many wind power plants are erected with a speed adaptation mechanism (usually a gearbox) between the wind turbine and the electric generator so that an AC frequency produced by the wind turbine generator matches that of the power grid. These systems use a mechanical gearbox to increase the speed of the generator shaft. However, the use of this mechanical gearbox increases the cost by three to five times the cost of the generator, also having dramatic increases in the mean time between failure, and mean time to repair of the device, thus not making these designs commercially competitive with the more reliable and less costly fossil fuel power production facilities.
Some windmill-based systems attempt to address power quality aspects at the grid connection, which often manifest themselves as a tower shadow that provides a low-frequency periodic disturbance. This low-frequency periodic disturbance is referred to as “flicker” (e.g. about a 1 hertz variation) that provides for an inconsistent wavering light or power production. These facilities provide static-VAR compensators (SVC) or local energy storage units to provide compensation power.
More elaborate schemes have been developed to make wind-power more competitive with other types of power in the market. Once again the systems are based on the use of energy storage.
Reactive power is important to the operation of an AC power grid. As discussed in U.S. Pat. No. 4,941,079, the contents of which being incorporated herein by reference, some of the advantages are explained. In all AC generator stations of the power utilities, such control is typically achieved through a speed governor and a field excitation regulator. The PWM converter is not encumbered by the long time constants associated with the speed governors and with the generator field inductance. For this reason, the PWM converter is expected to surpass the performance of the AC generator station in providing dynamic enhancement in the utility system. Thus, the general state of the art suggests that the use of power electronics, such as pulse width modulation-based (PWM) converters, provides reactive power control separate from active power control. However, as recognized by the present inventors, rotating electric machines, like generators and compensators, possess not only an ability to control reactive power, but also an overload capability which is superior to all types of power electronics systems, especially PWM IGBT (Insulated Gate Bipolar Transistor), with very limited overload capability. Furthermore, rotating electric machines are able to control the amount of reactive or active power seen from a power source connected to the machine. The primary control of the reactive power is achieved by an automatic voltage regulator (AVR), which controls the magnitude of the output voltage waveform and thereby can control the magnitude of the terminal voltage at the machine. The corresponding control of the active power is achieved by the automatic load-frequency control (ALFC) loop, which uses the frequency as an indirect measure of the active power balance in the grid.
In an improvement to the system shown in
Recently there have been a number of wind power plants that have been erected at wind farms with constant-speed and/or variable-speed units connected to the same point in the electric power distribution grid. These systems, simplify the power quality issues like the remedial use of static-VAR compensators, discussed above, as well as simplifying maintenance and operation. The present inventors recognize that such connections have not simplified the power grid starting procedures, maintenance, fault handling based on large-short-circuit power, etc. With regard to fault handling, it is noted that grid operators require, desirably, the ability of a power plant to produce high short-circuit power conditions so that there is sufficient electrical current available to trip circuit breakers on the transmission grid, should a fault be detected. One of the problems with conventional wind power plants is that they do not possess this capability, thereby creating a potential hazard for devices that are connected to the grid.
The discussion up to this point has been focused on different techniques that have been attempted in wind power plant facilities to adapt the electricity generated from wind power to make the power suitable for application onto transnational, national, or regional power grids. However, as recognized by the present inventors, there is yet another shortcoming besides simply the application of the power to the power grids, namely the commercial viability and scalability of the electricity generated from wind power as an economic competitor with other types of electric power. In order to appreciate the limitations with wind generated electric power, a discussion of how other types of power is handled is in order. The present discussion will be directed primarily to that in Scandinavian countries, although it is equally applicable in other countries and regions where electric power deregulation has been instituted. Many of these topics are addressed in “The Swedish Electricity Market and the Role of Svenska Kraftnat”, published by Svenska Kraftnat, the National Swedish Grid Company, 1999, available at www.svk.se.
As seen in
As is clear from the detailed communications that exist between the different entities in
With regard to most of the power delivery, electricity power options are traded as part of a Nordic power exchange futures market. The combined use of electric power options and forward and future power contracts offers greater opportunity for spreading and handling of risk in power trading. A notable feature in how trading is performed, is that Nord Pool's electric power options are standardized and thus carry a number of fixed terms and conditions. For example, the forward contracts are based on two seasonal contracts and two year contracts. A new series is listed on the first trading day of the exercise day of the previous contract series. The exercise day is the third Thursday of the month before the first delivery month of the underlying instrument. Details of how the power exchange is performed is described in the document “Eloption”, May 1, 1999, available from www.nordpool.com, the entire contents of which being incorporated herein by reference.
What is notable however, as recognized by the present inventors, is that electricity from wind power, and the limitation within a wind-variable system, is not well suited with the current state-of-the-art systems for providing power to the power grid. For example, the risk is high to a wind turbine provider for entering into a forward contract, given the stochastic nature of wind power, and thus the stochastic nature of a wind turbine as a power generation source, that could be expected to be generated by that provider at the time of delivery. While wind powered systems that employ physical assets as part of the system for providing actual energy storage present one potential solution. The inherent expense of such systems makes the opportunity to offer power during periods of low wind speed very expensive since the wind power operator needs to purchase the physical assets for storing the electrical power.
Aside from providing long term planning, there is also short-term balance requirements that may be placed on system operators for filling gaps or short falls in expected power demands or load variations. A time table for trading imbalance is shown in
As recognized by the present inventors, a limitation with conventional wind power systems is that unless there is some physical media for storing the electrical power at the local generation facility, conventional systems cannot reliably perform in either the balance regulation or the longer term Nord Pool exchange, due to variability of the wind power. This concept is reflected in the article by Lennart Söder “The Operation Value of Wind Power in the Deregulated Swedish Market”, Royal Institute of Technology, Sweden, Nordic Wind Power Conference 13-14, March 2000, page 5, paragraph 4.1.3, where it is explained that for wind power the construction of the exchange makes it difficult to put bids. The bids on Nord Pool have to be put 12 to 36 hours in advance of real delivery. Lennart Soder states that this makes it in reality nearly impossible to trade wind power bids since the forecasts normally are too bad for this time. Thus, wind power is generally recognized as a environmentally friendly type of power, however not as commercially valuable or fungible as other types of electricity such as that generated by fossil fuels.
To further emphasize this point, an article by Ackermann, T., et al. “Wind Energy Technology and Current Status: A Review”, Renewable and Sustainable Energy Reviews, Paragammon Press, April 2000, pages 317-366, the entire contents of which being incorporated herein by reference, shows in
The present description of the invention is not intended to be limited to the discussion in the following few paragraphs in this section, but rather is a synopsis of selected facets of the present invention. For a more complete understanding of the present invention should be construed in light of this entire document. Nevertheless, an object of the present invention is to address the above-identified and other shortcomings of conventional systems and apparatuses using wind turbine technology.
Another feature of the present invention is to provide a system, method, and computer program product that convert electrical power generated from wind into premier power. In one embodiment, the premier power is ensured by a virtual energy storage mechanism. In another embodiment, or as a supplement to the first embodiment, an xM machine is employed as part of a co-active converter to ensure steady, fixed frequency power is reliably applied to the power grid.
Another feature of the present invention is to provide a system, method and computer program product for controlling communications between a wind power based electricity production facility and a virtual energy storage facility, so that excess electrical power produced by the wind power facility may be captured at the virtual energy storage facility by way of time-effective communication between the two facilities. The virtual energy storage facility may be used to generate electricity to compensate for periods when wind speed decreases.
Another feature of the present invention is to convert wind power into premier power so that wind power-based units of electrical power may be available for forward contracts as part of a “renewable exchange” that enables the transfer of wind power units (i.e., a predetermined amount of power), perhaps coupled or guaranteed power produced by other energy production facilities, so that electricity generated from wind power may also become a “fungible” source of electric power.
Another feature of the present invention is to incorporate a meteorological sensing and prediction mechanism so as to facilitate communications with a virtual energy storage facility so that the wind power may be reliably supplemented with energy either stored or released from a virtual energy storage facility.
A further feature of the present invention is the incorporation of a “co-active converter” that is able to provide substation short circuit power so as to have sufficient fault current to blow fuses or to operate circuit breakers as necessary to protect components connected to the grid when installation faults occur in the network.
A further feature of the present invention is the use of a co-active converter in connection with a number of different wind farms instead of just one co-active converter per wind production facility.
A further feature of the present invention is the use of a co-active converter as a mechanism for providing reactive power without relying solely on power electronics for providing reactive power.
Another feature of the present invention, in at least one embodiment, is to include a co-active converter at a wind power production facility where the co-active converter includes at least a static converter and a rotating converter, both device being able to withstand DC voltage stress.
Another object of the present invention is to include a prime mover that may be driven by vegetable oil, diesel, gas or the like to the shaft of the rotating converter in a co-active converter so as to carry out startup procedures if the power grid is completely down, i.e. black-grid start, thus enabling a capability to recover a dead grid as well as to assist in power priming procedures.
These and other objects and advantages made available by the present invention are accomplished with a wind-turbine-based facility that includes one or more wind-turbine generators that produce variable AC from a generator, converts the variable AC to DC, and then collects the DC in a collection and transmission grid. The output of the collection and transmission grid then is converted from DC-to-AC in a co-active converter. The co-active converter may take several forms, but in one embodiment includes a separately powered rotating machine with a compensator to provide reactive power control for the system regardless if the wind turbine devices are actually producing power. The combination of the wind turbine production facility with the co-active converter is coupled with a communication mechanism that coordinates communication between the wind production facility and a virtual energy storage device that produces electric power by releasing a predetermined amount of stored resources (e.g., water, if a hydro-plant) to compensate for commitments by the wind turbine facility. Likewise, excess power production at the wind turbine power production facility may be captured at the virtual energy storage facility in the form of potential energy (e.g., hydro reserve in the case of hydroelectric plant). This potential energy is fingible, in that it may be bought, sold or used to generate power at a later time. Thus, the potential energy has a real market value, the expected price for which varies based on load demands and availability of other energy sources, which may vary daily and seasonally, for example.
By creating “premier” power that is both reliable in terms of short term variation long term reliability as well as during fault conditions, the electrical power produced by a wind turbine generation facility according to the present invention is able to be coupled via “guaranteed” contracts with a virtual energy storage facility, thus making the electricity generated from wind power as fungible as other types of power sources. As a consequence, by creating the premier power, the opportunity exists for creating a renewable exchange to permit the transfer and obligation of wind generated electrical power in units that can be freely sold on the power market. Furthermore, creating “premier” power and providing a virtual energy storage mechanism for essentially preserving a potential energy associated with that “premier” power greatly enhances the commercial value of that power since that power is now made fungible (i.e., may be bought, sold or released on demand). Thus, unlike AC power produced from conventional renewable energy power production facilities, premier power is fungible, and thus may be traded for power (or reserve energy) associated with another power producer, such as a hydroelectric plant. Accordingly, creating a virtual energy storage facility, enables operators of renewable energy power production facilities to collect energy, which has an inherent market value.
BRIEF DESCRIPTION OF THE DRAWINGSA more complete appreciation of the invention and many of the attendant advantages thereof will be readily obtained as the same becomes better understood by reference to the following detailed description when considered in connection with the accompanying drawings, wherein:
Referring now to the drawings wherein like reference numerals refer to corresponding structures in the several views,
The control center processor 500 cooperates with the premier power facilities 505 and hydroelectric plant 511 (or alternatively thermoelectric plant 515 and/or third party wind farm 517) so as to make the electrical output from wind farm 503 a reliable source of electric power. The premier power facilities 505, in cooperation with the process 500 includes a capability to ensure that the form of electric power (stability of output waveform, ability to produce or sink reactive power, and provide short circuit power), when coupled with a “virtual energy storage” (VES) facility (hydroelectric plant 511 in this embodiment, although other plants may be used as discussed herein also as virtual energy storage sources as well) is producible in fungible energy units. More particularly, while the premier power facilities 505 places the output waveform from the wind farm 503 in a suitable form for connection to the power grid, it also includes an adequate short circuit current capability which is used when there is a fault in the grid and significant amount of current is required to trip circuit breakers in this fault mode of operation). The premier power facilities 505 also had an ability to provide reactive power to the grid at a position that is near the wind farm 503. As recognized by the present inventors, the longer term output power from the wind farm 503 may be made sufficiently predictable and reliable, in a business setting, such that units of the electrical power produced by the wind farm may be “guaranteed” by contractual relationships or other agreements with hydroelectric plant 511, in this example. These agreements are helpful in the event of a wind lull for the wind farm 503, where a control message is dispatched to the hydroelectric plant 511 to provide a compensating amount of electric power to offset the short fall from the wind farm. Using the cooperative arrangement the energy output obligation from the wind farm is achieved by asking the hydroelectric plant 511 to output sufficient power to compensate for the temporary short fall from the wind farm.
While the above discussion illustrates the case where the wind farm requires supplemental power to be produced at the virtual energy storage facility, the reciprocal relationship is equally important. When the wind farm produces more power than planned, the surplus power may be saved in the form of virtual energy at the virtual energy storage facility. Once stored, the stored energy is completely fungible and may be withdrawn upon request, or possibly even sold to a third party, for use under the control of that third party. Moreover, by having preserved a predetermined amount of energy in the virtual energy storage facility, the stored energy is available as a resource to be converted to electric power at the demand of the wind farm operator, or simply preserved for a longer period of time or sold to a third party. In this way, the virtual energy storage facility offers the equivalent of a bank account, where the “currency” is chemical or potential energy.
As will be appreciated throughout this discussion, by having recognized that the availability of rapid and real time communication between the control center processor and the hydroelectric plant 511, the water reserve held at the hydroelectric plant, may be used as a virtual energy storage facility for the wind farm 503. More particularly, in the event of over capacity production by the wind farm 503, the premier power facilities 505 communicates this condition to the control center processor 500, which sends a message to the hydroelectric plant 511, requesting that the hydroelectric plant 511 produce a corresponding lesser amount of electric power during this period of overproduction. The total output power from both the wind farm 503 and the hydroelectric plant 511 is thus held to be consistent with the aggregate delivery requirement for both the hydroelectric plant 511 and wind farm 503. Moreover, at any given time, the wind farm 503 and the hydroelectric plant have certain contractual obligations to produce predetermined amounts of power. This predetermined amount of power in the aggregate will equal a certain level of power. However, recognizing that for maximizing power output, the wind farm 503 does not have precise control over the amount of power it produces at any given instant in time, by communicating from the wind farm 503 to the hydroelectric plant the amount of overproduction, the hydroelectric plant 511 can adjust its output level so as to compensate for the surplus. Likewise, for a shortfall, the wind farm 503 may communicate to the hydroelectric plant the amount of extra power that the hydroelectric plant will need to generate in order to compensate for the shortfall by the wind farm 503. The hydroelectric plant 511 will thus be able to save a predetermined amount of its water reserve for use at a later time. This amount of water (or electrical equivalent) is held on account for the wind farm 503 for use at a later time. While not shown on this figure, any adjustment made in output power from the wind farm 503 and the hydroelectric plant 511 is communicated to a system operator so that the system operator may also dispatch commands regarding adjustments that may need to be made to reactive power control at the different facilities so as to balance the reactive power loads placed on the grid. If there is a large electric distance between the wind power mills and the virtual energy storage facility, these facilities are able to provide voltage support at least at two sites, independent of one another. In the preferred embodiment, the wind power park is able to provide the voltage support via the xM at the wind power park site, and at the hydroelectric plant voltage support is provided by synchronous generators, independent of whether the wind power turbines actually produce active power at the time of delivery. Thus, the present embodiment is able to provide adequate voltage control, which is able to kept to within a predetermined voltage limit at the point of common connection.
The connection between the premier power facilities 505, the renewable energy control center processor 500 and the hydroelectric plant 511 (as well as the other communication links shown in
The communication link is a secure link, provided with encryption such as by way of a virtual private network (VPN). Alternatively, instead of a Web interface using the Internet, digital communication links including proprietary links may also be used for interfacing the control processors at the hydroelectric plant 511 and the premier power facilities 505 by way of the control center processor 500 for example. In this way, when requests are made by the wind farm 503 to either increase or decrease the power production level at the hydroelectric plant 511, the processor (not shown in
By providing, in a reliable fashion, units of electrical power that are at least partially derived from the wind farm 503, enables the wind generated electrical power to be on par with other types of power in a commercial setting. The present inventors have recognized that by making this power reliable both in terms of the quality of the power provided to the grid, and also in terms of the contractual reliability with which the wind power may be provided to the grid, perhaps by relationships with virtual energy storage facilities, wind power units may also be traded on a power market. As previously discussed, the power exchange 500 includes long term contracts for providing predetermined amounts of power to the grid. Thus, by being able to have guaranteed certain output levels of power from the wind farm, the wind farm operator may also participate in this power exchange by entering into forward contracts. It should be stated that while the present invention discusses wind power as a preferred embodiment it is also applicable for solar power for example or other time varying power production facilities.
Another feature made available by the present invention is the creation of a renewable power exchange 507, which includes units of power that may be traded from power production facilities that use renewable sources of power (solar, wind, hydro, for example). The renewable exchange is based on the principle that if certain power production facilities can reliably predict the amount of power they can produce at any given instant in time, then contractual relationships may be formed and units of power, that are perhaps guaranteed, or even made available by way of options contracts, may be traded in a virtual forum such as in a power exchange for renewable energy sources. The renewable power exchange will be based on the principle that units of power for some given period of time produced by the wind farm, may be predicted with a certain degree of accuracy, based on meteorological data source and prediction tool 513.
This meteorological prediction tool provides a statistical probability indicating the likelihood of the wind farm actually producing the amount of power contracted for a given period of time. Based on this statistical prediction, it is the availability of that information that is reviewable by different market participants at the renewable power exchange bidding on the unit of wind power energy produced by the wind farm at some given period of time.
Due to wind power being “green”, this type of power is highly desirable and financial incentives are sometimes offered by different governments to provide this type of power, or even quotas placed on power providers for providing a certain amount of green power as part of their energy portfolio. By providing units of power that are available for sale, including the statistical likelihood of the reliability of providing that power, market participants in a renewable power exchange 507 may purchase the units of power from wind farm as a forward option. Market participants may include other wind farm operators such as the third party wind farm 517 who seek to increase the likelihood of delivering power for their respective contractual obligations by accumulating more power product resources. Other operators such as thermoelectric plant 515 or hydroelectric plant 511 operators may also purchase the units of wind power and use the control center processor 500 as a mechanism for guaranteeing that the hydroelectric plant 511 or thermoelectric plant 515 can increase its production in the cases when the wind farm in fact has a lull in wind and cannot produce the required amount of wind generated electric power. Likewise, the other operators may purchase from a wind farm operator a surplus of potential energy saved in the wind farm operator's virtual energy storage account. The potential energy assets will tend to accumulate in the wind farm operator's account if the wind turbines experience a greater than predicted amount of wind.
The price that a hydroelectric plant operator (or other type of operator) would be willing to pay would be a function of the level of renewable energy resources they presently have collected, or as a result of their optimization process, predict to have in the future. For example, the price a hydroelectric plant operator would be willing to pay for wind energy would be relatively high if the water reserve at the hydroelectric plant is relatively low or below expectation levels for that particular time during the season. On the other hand, if the hydroelectric plant operator has a larger than expected surplus of water reserve, and may even have to spill some of the water, it is unlikely that that hydroelectric plant operator would be willing to pay much for the power produced at the wind form operations. On the other hand, a thermoelectric plant operator would, on a unit by unit basis, be willing to pay for the green units of wind power in order to meet their governmental regulations. Purchasing units of power from a wind farm operator also saves on fuel, provided that the output levels and cost from the wind farm are sufficient to offset their reserve of fossil fuels.
The distribution generation 1, includes one or a plurality of different types of renewable energy sources. These renewable energy sources include wind, solar and possibly even hydroelectric sources. Since a plurality of different generators are used, the generators connect to a collection in transmission grid that collects the power (which in this embodiment is an HVDC link, which in turn connects to a substation that includes a co-active converter). The co-active converter handles the fluctuating power from the renewable energy sources and primes the power so as to make the output power substantially conform with that required on the power grid. Preferably, there is only one connection between the co-active converter from a single wind farm or multiple wind farms or a hybrid combination of wind farms with other types of renewable energy sources. It should be noted that this collection and transmission grid does not include complicated and expensive energy storage units located at the wind mills' DC voltage link.
The substation may also include an optional prime mover that can operate off of an external source of fuel such as vegetable oil, gas, diesel, or compressed air for example. This prime mover is able to fill the gap between the power that is actually sold, and the power that is available from the wind. The output of the power substation is provided to the power grid, which in the present context includes a transmission and distribution grid. The transmission and distribution grid interconnects both a large scale generation facility that connects with the virtual energy storage device, as well as other large scale generation facilities substations, distribution operations, as well as the loads that receive energy from the different electric power generation facilities.
The system operation management mechanism 602 coordinates with the different power production facilities to place regulations on the amount of power that is provided to the grid. Communications with the power system operation management may also be provided to the renewable energy control center processor 500 for restricting the amount of power that is provided from the renewable energy sources if appropriate. Furthermore, the renewable energy control center processor 500, as well as the power system operation management mechanism 602 that controls an optional feature for performing load shedding, cooperate to manage and balance the power that is actually produced versus the actual demand. Load shedding is achieved by contractual relationships (preferably) with certain customers who have agreed to have their power cut back at times of peak need. A feature of the present invention is that the renewable energy control center processor 500 may also contract, through private contracts, with separate optional load shedding customers who have agreed to have their power level demands fluctuate and diminished purposely when lulls in the wind power are observed. For example, while the virtual energy storage facility is one mechanism for converting the excess power produced by renewable power sources into tangible assets that may be turned into power at a later time (perhaps by increasing the water volume in a hydroelectric plant's reservoir), the load shedding operation in connection with the renewable energy control center processor provides a mechanism for reducing the demand obligations from selected customers who have agreed to have their power cut back in times of lowered output capacity from the wind turbines. Thus, a feature of the present invention is to coordinate periods of oversupply from a renewable energy source by storing power production resources at a virtual energy storage device, and also compensating for output power deficiencies by either requesting that a release from the reserve stored at the virtual energy storage facility produce power to offset the short fall, and/or institute power shedding operations at predetermined customers who have agreed to have their power cut back at times of lowered production capacity.
Hydroelectric generation is somewhat different in that by using reservoirs and dams it is possible to control the amount of preserved fuel source (amount of water) which can be released at a controlled rate. Thus hydroelectric power can be considered to have some components of being both energy limited operation as well as power limited operation, which as identified by the present inventors is actually an opportunity for a shared relationship with other types of renewable energy sources. For example, hydroelectric operators cannot store an infinite amount of water volume, and thus must spill some of the water in the reserve if the supply becomes too great. Accordingly, hydroelectric operators must manage the reserves in a controlled fashion. Since renewable power from wind turbines provides a time-varying amount of power, the present inventors have recognized that cooperation between a hydroelectric operations plant and renewable energy source such as wind turbine farm has significant synergy in that by linking the two facilities one with a relatively short time constant (wind-power) with one having a much longer and predictable time constant (hydroelectric generation), the aggregate enables the optimization of green power use. Furthermore, the combination of electricity from wind power with hydroelectric power provides for a reliable cooperative generation system that enhances the commercial value of the more volatile energy source such as wind power or solar power.
By providing electricity from wind power in this fashion that is not in any way premier power (meaning that the wind power is not of the same quality as other sources of electrical power) places an increased burden on system operators. Moreover, the way wind power is conventionally handled, without an ability to plan in advance for the use of a predetermined amount of wind power, causes the wind power to be another stochastic variable that must be addressed by the system operator at the same time that varying loads are addressed. Thus, the burden on system planners is not only to match the amount of contracted power to meet an instantaneous load, but also to handle a varying amount of power that is applied to the power grid by wind turbine operators. Thus the concern over properly matching, without planned optimization for the amount of power that is produced is suboptimal. As seen in
The output of each AC-to-DC converters is a DC electricity source that is applied to a collection and transmission grid (C&T grid) 1001. A detailed description of how the collection transmission grid is established may be found in the above identified Swedish Patent Application 9904740-9 and thus will not be further discussed herein. With the DC power aggregated and distributed over a HVDC link, the positive and negative lines from this HVDC link are output from the collection and transmission grid 1001 and applied to a premier power facilities 505.
In the premier power facility 505 a processor 500 is used to control operations and to control communications between the wind farm facility and premier power facilities 505 and other systems such as priming source No. 15111 or priming source No. 2511N. Likewise communication links (physical or wireless links) may connect to other systems and devices as shown previously in
-
- 1. A frequency converter that operates to convert from between DC to a frequency standard (e.g., 50 Hz or 60 Hz) AC (shown);
- 2. A frequency converter that operates to convert from between variable low-frequency (e.g., 3 Hz to 10 Hz) AC to a frequency standard AC;
- 3. A frequency converter that operates to convert from constant low-frequency AC to a frequency standard AC;
- 4. A rotating converter that supplies reactive and/or active power to frequency standard AC; and
- 5. A power transformer that adapts a voltage level and provides for short circuit level operation, and is preferably a static device (as opposed to a rotating device).
The rotating converters are preferably a rotating electric machine that may act as a reactive compensator and optionally act as an electrical generator driven by a prime mover. By having the prime mover, the rotating converter is able to offer the following advantages:
-
- a. start-up the power grid after a major fault;
- b. partly or wholly add active power (for helping to “prime” the power generated by the wind turbine);
- c. partly or wholly supplying reactive power to the power grid and optionally to the frequency converter so as to prime the electrical power generated by the wind turbine;
- d. reduce the low order harmonic pollution caused by the frequency converter;
- e. support the active AC for the operation of the frequency converter;
- f. release a dependency of the frequency converter's active and reactive control from one another (e.g., stationary, when implemented with thyristors valves, or during fault, based on transistor valves);
- g. symmetrizing the power grid at the AC terminals of the co-active converter;
- h. supply short-circuit power during fault operations.
With regard to the short-circuit power discussed above, the present inventors have recognized that having a sufficient reactive power capability during a time of short circuit fault and/or faults to ground, the co-active converter should have sufficient current capacity to trip a circuit protection device, such as a circuit breaker. Furthermore, with regard to the use of a prime mover, the present inventors have recognized that an additional energy supply capability from a rotating electric machine, driven by a prime mover does two things. First, it enables the supply of a failing energy-compared to prognosticated and sold energy—during normal operations. Second, it supplies energy for, normally rare, state-up procedures, such as a black-grid start. Furthermore, by having a xM (i.e., a rotating converter that is a rotating electric machine, a compensator, connected as a shunt element near a point on common connection to the power grid), as part of the co-active converter, the xM provides an energy storage capability that is useful during faults where the voltage sags and the transferable power capability from wind to grid is temporarily reduced to as low as 5 to 10% of nominal value during a fault time that may last 0.2 seconds (a power grid operator's specified conditions). Finally, the energy storage capability helps to eliminate voltage flicker due to tower shadow and wind gusts during normal operation.
The reactive power in the co-active converter is created in a combination of units: the DC-to-AC converters and the rotating electric machine (i.e. xM). The reactive power may then be transmitted to the AC power grid or held at zero if the utility demand is zero. Net-commutated converters will consume some reactive power provided by the xM, while self-commutated converters can consume or produce some reactive power. The present inventors have observed that, from a dynamics point of view, the self-commutated converter (which uses IGBTs as semiconductor valves) consumes reactive power provided by the xM. On the other hand, net-commutated converters (which use SCRs, thyristors, as power semiconductor valves) have an advantage in that their power semiconductor valves are fewer by a factor of 3 to 30, as compared with self-commutated converters.
Preferably, the xM is a two-winding machine with two sets of AC three-phase windings arranged in the stator and exposed to both AC and DC fields when in operation. While the xM may be a synchronous machine that operates at constant speed, it is preferable to use an adjustable speed machine that may uses brush-less drives or brush-based drives, such as Static Scherbius drives.
A feature of the premier power is that it allows the renewable energy source such as wind power to be afforded the advantages of other types of electrical power generation sources such as hydroelectric power without however the expensive bulk cost for energy storage such as with hydrogen or fuel cells or electric chemical actuator batteries or the like.
The processor 500 serves as a controller to control a mode of operation for the xM. The xM may also operate as a motor for example so as to serve as a sink of reactive power as well, thus the terminology “xM”, referring to either a generator of a motor for example. Whether the output power is partially supplied from the xM or from only the DC to AC inverters, the output power is coupled onto transmission lines as part of the transnational grid. Of course, the connection may also be to feeder lines that connect to the transnational grid. The transmission lines of the transnational grid also include various loads, industrial loads 1005, commercial loads 1007, and sheddable loads 1009, previously discussed.
Due to the physical location of the connection between the premier power facilities 505 and other places on the transnational grid, it may be that the system operator requires that the premier power facilities 505 impart a certain amount of reactive power onto the grid so as to manage the reactive power balance in the grid. Reactive power is closely connected to voltage control, which is applied to ensure satisfactory operation and distribution of electrical power across the grid.
While the DC-to-AC inverters as part of the premier power facilities are shown, it should also be recognized that the inverters may take the form of variable low-frequency AC or constant low-frequency AC output from the collection and transmission grid 101. The frequency with which the inverters operate may be controlled to either operate at 50 Hz or 60 Hz AC, for example.
The components of the co-active converter located between the collection transmission grid 1001 and the AC link to the power grid may include several variations. The various embodiments that form the co-active converter includes at least one static or rotating converter from the following items:
-
- 1. A frequency converter that converts from DC to a standard frequency such as fixed 50 Hz or 60 Hz AC,
- 2. variable low-frequency AC to frequency standard AC,
- 3. frequency converter from constant low-frequency AC to frequency standard AC,
- 4. rotating converter supplying reactive and/or active power to frequency standard AC, or
- 5. a power transformer for voltage adaptation and for adjusting short circuit level where the frequency converter is preferably a static converter while a rotating converter is preferably a rotating electric machine that acts as a reactive compensator and optionally acts as an electric generator driven by a prime mover. The rotating electric machine may be either an AC shunt machine alone or the combination of an AC shunt machine and a series (e.g., connected as a series link in one of the power grid lines connected to the actual substation) AC machine as described in Patent Cooperation Treaty Publication PCT/EP 98/007744, the entire contents of which being incorporated herein by reference.
The rotating electric machine is able to perform the functions of
-
- providing start-up power for the power grid after major faults;
- partly or wholly add active electric power that “primes” the wind power;
- partly or wholly supplying reactive power to the power grid and optionally to the frequency converter which assists in priming the power and reducing the harmonic pollution from the frequency converter itself.
In one mode of operation the processor 500 controls the xM to produce priming energy that is added to the composite output from the various wind turbine devices that feed the collection and transmission grid 101. The co-active converter provides supplementary power to that provided from the wind turbine facility when the processor 500 determines that output from the wind turbine facility is insufficient to maintain the required output voltage or frequency. Visually, this priming energy may be considered to be the equivalent of the cooperation between the hydroelectric power and the premier wind power shown in
Functional features of the co-active converter aside from providing supplemental power also include providing a source of reactive power, suppressing harmonics (perhaps by way of a PWM control for an actively switched inverter), provisions for providing short circuit power in the event of a fault in the transmission grid, steady state symmetry, and optionally providing short term or continuous active power from the prime mover which is preferably adjusted using a power transformer. Other features describing the reactive power control by using a constant frequency machine as a motor or a generator is described in PCT Application PCT/SE 00/00724, filed Apr. 17, 2000, and a rotating system for providing power stabilization is described in PCT/SE 00/00781, filed Apr. 30, 1999, the entire of contents of each of which being incorporated herein by reference.
With regard to providing supplemental grid protection systems, one technique is to provide a system that is able to make use of time stamped quantities, as well as quantities derived therefrom as a base for protection decisions. This may be accomplished with a protection system that uses at least three system protection terminals that are introduced as suitable locations in the electric power system. The system protection terminals are interconnected by a communication system, using substantially dedicated communications resources. At least two of the system protection terminals are equipped to collect measurement signals associated with characteristics of the power system at that particular location. The measurements preferably include complex AC quantities and stability indicators. The signals are processed and data related to the measurements are spread on the dedicated communication resource to the other system protection terminals. At least two of the terminals are equipped to evaluate the condition of the local part of the power network and if necessary provide control signals to the power system units.. The evaluation is based on selected parts of the data available on the communication resource, locally available data and/or externally entered data. The system protection terminals include memory for storing data and so the data provides a near history of system information as well as the older measurements. Each system protection terminal has access to at least two communication links of the communications system. Each system protection terminal includes a processor and communication mechanism, as well as a local database. This technique is described more fully in commonly owned, co-pending U.S. patent application Ser. No. (TBD), entitled “System Protection Scheme”, filed in the US on Aug. 31, 2000, and also filed in Sweden on May 31, 2000 as application no. 0002050-3, each application having inventors Löf and Gertmar in common with the present document (with the addition of Karlsson in the US application and Swedish application), the entire contents of which being incorporated herein by reference.
Power system analysis and protection have always developed interactively. Since the beginning of the electrification era, equipment protection has been very important, in order not to destroy the components in the power system in case of faults. Today the electric supply is so important to the entire society and the cost of interruptions so high that large efforts have to be made in order to keep up the electric power supply and mitigate wide area disturbances. Protective actions might therefore have to be taken, even in situations where no power system equipment is subject to be immediately damaged. One therefore often distinguishes between unit or equipment protection on one side and system protection on the other side. System Protection Scheme (SPS) is the common name used when the focus for the protection is on the power system supply capability rather than on a specific equipment. SPS was earlier the acronym for Special Protection Scheme, also known as Remedial Action Scheme (RAS), with basically the same meaning as System Protection Scheme is today. The word special is nowadays replaced by system, since it is more relevant to describe this type of protection.
A System Protection Scheme (SPS) or Remedial Action Scheme (RAS) is designed to detect abnormal system conditions and take predetermined, corrective action (other than the isolation of faulted elements) to preserve system integrity and provide acceptable system performance. SPS actions, include among others, changes in load (e.g. load shedding), generation, or system configuration to maintain system stability, acceptable voltages or power flows. SPS are preferably local equipment co-ordinated by overall system studies. Many SPS, however, rely on system-wide communication.
Transmission devices designed to provide dynamic control of electric system behaviour, which typically involve feedback control mechanisms using power electronics to achieve the desired electric system dynamic response, during normal operation conditions, must not be considered as SPS but instead as transmission control devices. Examples of such equipment and devices include: static var compensators, power system stabilisers, active or reactive power flow controllers and reactive power compensation. The word control means continuous action during normal conditions on the controlled equipment. Emergency control involves other control actions, (usually included in the main controller, but out of operation under normal situations), that handle the operation in abnormal situations. Shift of control mode from normal operation to emergency control can be classified as an SPS, e.g. normal HVDC control to Emergency Power Control for fast power change.
The processor of
The processor system 301 may also include special purpose logic devices (e.g., application specific integrated circuits (ASICs)) or configurable logic devices (e.g, simple programmable logic devices (SPLDs), complex programmable logic devices (CPLDs), or re-programmable field programmable gate arrays (FPGAs)). Other removable media devices (e.g., a compact disc, a tape, and a removable magneto-optical media) or fixed, high density media drives, may be added to the system 301 using an appropriate device bus (e.g., a small system interface (SCSI) bus, an enhanced integrated device electronics (IDE) bus, or an ultra-direct memory access (DMA) bus). The system 301 may additionally include a compact disc reader, a compact disc reader-writer unit, or a compact disc juke box, each of which may be connected to the same device bus or another device bus.
The processor system 500 may be coupled via the bus 303 to a display 313, such as a cathode ray tube (CRT) or liquid crystal display (LCD) or the like, for displaying information to a system user. The display 313 may be controlled by a display or graphics card. The processor system 301 includes input devices, such as a keyboard or keypad 315 and a cursor control 317, for communicating information and command selections to the processor 305. The cursor control 317, for example, is a mouse, a trackball, or cursor direction keys for communicating direction information and command selections to the processor 305 and for controlling cursor movement on the display 313. In addition, a printer may provide printed listings of the data structures or any other data stored and/or generated by the processor 500.
The processor 500 performs a portion or all of the processing steps of the invention in response to the processor 305 executing one or more sequences of one or more instructions contained in a memory, such as the main memory 307. Such instructions may be read into the main memory 307 from another computer-readable medium, such as a storage device 311. One or more processors in a multi-processing arrangement may also be employed to execute the sequences of instructions contained in the main memory 307. In alternative embodiments, hard-wired circuitry may be used in place of or in combination with software instructions. Thus, embodiments are not limited to any specific combination of hardware circuitry and software.
As stated above, the processor 500 includes at least one computer readable medium or memory programmed according to the teachings of the invention and for containing data structures, tables, records, or other data described herein. Stored on any one or on a combination of computer readable media, the present invention includes software for controlling the processor 500, for driving a device or devices for implementing the invention, and for enabling the processor 500 to interact with a human user. Such software may include, but is not limited to, device drivers, operating systems, development tools, and applications software. Such computer readable media further includes the computer program product of the present invention for performing all or a portion (if processing is distributed) of the processing performed in implementing the invention.
The processor 500 is also configured to perform an investment management function. In one instance, the processor 500 serves as a mutual fund portfolio management mechanism that keeps track of contributions (money or potential energy assets) from different investors, that have a monetary value. The processor 500 then assigns shares to the respective investors based on the amount of their contributions. With the pooled contributions, the processor 500 then purchases a portfolio of power units, for delivery at different times. Power units purchased on behalf of the mutual fund may be offered for sale on the renewable exchange, or via bilateral contracts with other purchasers. Whether purchased prior to a delivery date, or delivered to the power grid at the appropriate delivery date, the processor 500 keeps track of remuneration received in return for relinquishing ownership of the power unit or delivering the power unit to the power grid. Subsequently, the processor 500 distributes the remuneration among the outstanding shares, such that each share has a market value thereof adjusted based on the revenue received from the sale or delivery of the power unit. Calculation of factors such as profits, losses, and tax liability from a portfolio or group of funds is known, for example, from U.S. Pat. No. 5,193,056, the content of which is incorporated herein by reference.
The processor 500 may also be used as a mechanism for helping to manage an investment portfolio of renewable power production facilities. As in the case above, where power units are bought and sold/delivered, investors also provide contributions and are assigned shares. However, the assets that are purchased are not power units, but rather the renewable power production facilities themselves. The capital acquired from the contributions is used to purchase a predetermined number of renewable power production facilities, and to operate the facilities. Power units produced from the renewable power production units are sold, stored in a virtual energy storage facility, or delivered as part of a delivery contract. Remuneration received for the power units is distributed (apportioned) amongst the outstanding shares.
The computer code devices of the present invention may be any interpreted or executable code mechanism, including but not limited to scripts, interpretable programs, dynamic link libraries, Java or other object oriented classes, and complete executable programs. Moreover, parts of the processing of the present invention may be distributed for better performance, reliability, and/or cost.
The term “computer readable medium” as used herein refers to any medium that participates in providing instructions to the processor 305 for execution. A computer readable medium may take many forms, including but not limited to, non-volatile media, volatile media, and transmission media. Non-volatile media includes, for example, optical, magnetic disks, and magneto-optical disks, such as the storage device 311. Volatile media includes dynamic memory, such as the main memory 307. Transmission media includes coaxial cables, copper wire and fiber optics, including the wires that comprise the bus 303. Transmission media may also take the form of acoustic or light waves, such as those generated during radio wave and infrared data communications.
Common forms of computer readable media include, for example, hard disks, floppy disks, tape, magneto-optical disks, PROMs (EPROM, EEPROM, Flash EPROM), DRAM, SRAM, SDRAM, or any other magnetic medium, compact disks (e.g., CD-ROM), or any other optical medium, punch cards, paper tape, or other physical medium with patterns of holes, a carrier wave, carrierless transmissions, or any other medium from which a system can read.
Various forms of computer readable media may be involved in providing one or more sequences of one or more instructions to the processor 305 for execution. For example, the instructions may initially be carried on a magnetic disk of a remote computer. The remote computer can load the instructions for implementing all or a portion of the present invention remotely into a dynamic memory and send the instructions over a telephone line using a modem. A modem local to system 301 may receive the data on the telephone line and use an infrared transmitter to convert the data to an infrared signal. An infrared detector coupled to the bus 303 can receive the data carried in the infrared signal and place the data on the bus 303. The bus 303 carries the data to the main memory 307, from which the processor 305 retrieves and executes the instructions. The instructions received by the main memory 307 may optionally be stored on a storage device 311 either before or after execution by the processor 305.
The processor 500 also includes a communication interface 319 coupled to the bus 303. The communications interface 319 provides a two-way data communication coupling to a network link 321 that is connected to a communications network 323 such as a local network (LAN) or personal area network (PAN) 323. For example, the communication interface 319 may be a network interface card to attach to any packet switched enabled personal area network (PAN) 323. As another example, the communication interface 319 may be an asymmetrical digital subscriber line (ADSL) card, an integrated services digital network (ISDN) card, or a modem to provide a data communication connection to a corresponding type of communications line. The communications interface 319 may also include the hardware to provide a two-way wireless communications coupling other than a wireless coupling, or a hardwired coupling to the network link 321.
The network link 321 typically provides data communication through one or more networks to other data devices. For example, the network link 321 may provide a connection through a LAN to a host computer 325 or to data equipment operated by a service provider, which provides data communication services through an IP (Internet Protocol) network 327. Moreover, the network link 321 may provide a connection through a PAN 323 to a control device 353 facility that communicates with an electrical energy production facility 352 that provides power to the grid 357. The LAN/PAN communications network 323 and IP network 327 both use electrical, electromagnetic or optical signals that carry digital data streams. The signals through the various networks and the signals on the network link 321 and through the communication interface 319, which carry the digital data to and from the processor 500, are exemplary forms of carrier waves transporting the information. The processor 500 can transmit notifications and receive data, including program code, through the network(s), the network link 321 and the communication interface 319.
The processor 500 in the premier power facilities 505 thus controls the priming energy source, which is the prime mover and the xM in the example shown in
The renewable power exchange is hosted on a secure Internet link, where a web interface is provided by the processor 500 addressing a URL over the Internet to the renewable power exchange web connection. The connection between the processor 500 and renewable power exchange 507, is known, as is described on pages 1-40, and 122-166 of Gralla, P., “How the Internet Works”, Que, August 1999, ISBN 0-7897-2132-5, the entire contents of which being incorporated herein by reference. Furthermore, the link may be a secure link such as by way of a virtual private network and also may use encryption schemes so as to verify and authenticate different users who are authorized to use the system. Various safeguarding techniques including the use of fire walls, cryptography such as RSA cryptography and the like is found in pages 270-304 of Gralla. An operator of the processor 500 may receive continual bid streams from the renewable power exchange 507, by the renewable power exchange website downloading Java, Java Script or ActiveX files to the processor, so as to provide active content to the operator when considering bid and offer prices for particular renewable power units that are for sale. Furthermore, in one embodiment the processor 500 updates its message as shown in
The data structure shown in
The process proceeds to step S2009 which provides power to the voltage compensation mechanism from the power release device which includes either the xM, compressed air system (CAES), battery, fuel cell, hydro or some other combustible fuel source. The process then proceeds to step S2011 where a determination is made regarding whether auxiliary power is still required. If the response to the inquiry in step S2011 is affirmative, the process returns to step S2009 where additional power is released. If the response to the inquiry in step S2011 is negative, the process proceeds to step S2013 where the process implemented in step S2007 or S2009 is removed so that all the power is provided by the wind turbine generation unit. Subsequently the process ends.
If the response to the inquiry in step S2003 is negative, the process proceeds to step S2015 where a determination is made regarding whether a fault is detected in the power grid. If the response to the inquiry in step S2015 is negative, the process returns to step S2003. However, if the response to the inquiry in step S2015 is affirmative, the process proceeds to step S2017 where the premier power facility produces a sufficient short circuit power to the grid connection so as to provide sufficient current to trip a circuit breaker, thus disconnecting the structure from the power grid and preventing any damage. After step S2017, the process returns to step S2003.
After the wind turbine operator has contacted the existing power provider, the process proceeds to step S2111 where the existing power provider proposed restrictions and conditions on when the provider of the wind generated power can demand a release of “virtually stored” energy. The reason why the existing power provider would pose restrictions on the release of this energy is that the existing power provider has made its own optimization plan for reserved energy sources for release at predetermined times during the year. For example, an existing power provider would in all likelihood not be willing to allow a wind turbine operator to withdraw the last 10% of the hydro reserve if the existing power provider had unforeseen unforecasted and unplanned water reserves at that particular time during the year.
After step S2111 the process then proceeds to step S2113 where an inquiry is made regarding whether the existing power provider and the operator of the wind turbine facility reach agreement. If the response to the inquiry in step S2113 is negative, the process proceeds to step S2115 where the wind turbine operator finds an alternative power provider to serve as a virtual energy storage facility. Once agreement is reached, the process ends.
If the response to the inquiry in step S2113 is affirmative, the process proceeds to step S2117 where the wind turbine generated power is applied to the grid and a corresponding amount of power from existing power provider is not generated at that particular time. Rather, the potential or chemical energy stored in a virtual energy storage plant for generating power at a later time is preserved, which in the case of the hydroelectric plant, would mean that the water that would otherwise be used to generate a predetermined amount of power would not be used to turn a hydro turbine. After step S2117, the process proceeds to step S2119 where the wind generated power provider directs an existing power provider to convert the virtual energy stored on behalf of the provider of the wind power into electrical energy. The process then proceeds to step S2121 where the existing power provider releases the virtual energy so as to produce requisite power for meeting the wind turbine operator's energy requirements, and then the process ends.
On the other hand, if this response to the inquiry in step S2215 is affirmative, the process proceeds to step S2217 where the existing power provider or agent actually delivers the power to the grid and then in step S2219 debits the wind generated power provider's account held in memory and subsequently the process ends.
Subsequently the process proceeds to step S2309 where the wind turbine operator, by way of the processor, controls an actuation of supplementing the power generated by the wind turbine device by using short-term energy from a compressed air storage device and/or with a xM device having a prime mover so as to provide short-term stability. The process then proceeds to step S2311, where for a longer term usage the power from the wind turbine operation is supplemented in a longer duration using virtual energy storage that has been accumulated on behalf of the wind turbine operator. Alternatively, the wind turbine operator may contract for purchasing power from a virtual energy storage facility without having included an existing account with that service provider, but rather just purchases the power so as to supplement the wind turbine generated power. The process then proceeds to step S2113 where the power provided from the premier power provider is supplied to the grid, and perhaps as supplemented by the virtual energy storage facility. Subsequently in step S2315 the amount of power that is provided to the grid from the wind storage generation facility is measured and reported so that an accurate accounting may be made of the energy. Subsequently, the process ends.
In step S2407 an inquiry is made regarding whether the electrical power as monitored is greater than, less than, or equal to a predicted amount of electrical power. If the response to the inquiry in step S2407 is equal the process returns to step S2405 as part of a control loop. However, if the response to the inquiry in step S2407 indicates that the electrical power is above or below a predetermined electric power level, the process continues to step S2409 where a control message is sent to the alternative energy production facility. An inquiry is made in step S2411 so as to identify whether the shortfall or surplus is within the production dynamic range of the alternative energy production facility. For example, it may be that the requested amount of power from the wind turbine production facility is greater than that which can be produced by the alternative energy production facility. If the shortfall or surplus is not within the production range, then the process proceeds to step S2413 where a second control signal is sent to yet another facility so as to offset the residual surplus, or shortfall, that was outside the production range of the alternative energy production facility. Subsequently, the process proceeds to step S2415, which is also the next process step if the inquiry in step S2411 is determined to be affirmative. In step S2415 the amount of energy production is adjusted so as to offset the shortfall/surplus from the wind turbine energy production facility and then the process for the control loop is repeated in step S2417.
In order to implement the control loop in the process of
It should be noted that the process employed in
Once the notice message is formed, the process proceeds to step S2605 when an inquiry is made regarding whether a bidding exchange process will be used for selling the unit of power. If the response to the inquiry is negative, the process proceeds to step S2621 where a third party allocates a budgeted amount of power from another source if the wind turbine has a shortfall so as to compensate for the shortfall from that wind power facility. The process then proceeds to step S2623 where an inquiry is made regarding whether the budgeted amount of power is legally accessible by the third party. If the response to the inquiry is negative, the process proceeds to step 2607 as will be discussed below. However, if the response to the inquiry in step S2623 is affirmative, the process proceeds to step S2617 where the unit of wind turbine generated electric power is resold as a “guaranteed” power unit. The “guaranteed” power unit is a hybrid unit of power that at least includes wind generated electric power that if is insufficient at the time of delivery, is supplemented with a contractual obligation for energy to be supplied from another power production facility. The process then proceeds to step S2619 where the required unit of power is delivered at a designated time before the process ends.
If the response to the inquiry in step S2605 is affirmative, the process proceeds to step S2607 where the control center processor 500 generates a statistical indicator regarding a likelihood that the power output from the wind turbine facility will be deliverable at the appointed time. This statistical indicator is included in a message having data fields like that shown in
In step S2707, either the option price or a cost of a futures contract for an alternative source of power is identified during the particular times when the wind power is to be delivered to the grid. The option price and the futures contract are identified in case the wind turbine is not driven with sufficient speed so as to create the wind power needed to provide the unit of power originally obligated. The process then proceeds to step S2709 where a message is transmitted for display to an operator that presents the offer and expected wind. power unit with the statistical confidence measure in the renewable exchange forum, which in the present embodiment is a website, although it should be recognized that other forums may be used as well, including a secure network of computers linked to one another with a defined protocol for exchanging bid and ask prices on units of power. After step S2709, the process proceeds to step S2713 where an inquiry is made regarding whether there has been a request for the expected value of wind power. If the response to the inquiry in step S2713 is affirmative, the process proceeds to step S2715 where the expected value is sent to the requester and then the process proceeds to step S2711, which is the same step that would be performed if the response to the inquiry in step S2713 is negative.
In step S2711 options for different amounts of power from alternative power sources are presented for purchase. The process then proceeds to step S2717 where an inquiry is made regarding whether a bid has been made on the wind power unit. If the response is negative, the process ends. On the other hand, if the response to the inquiry in step S2717 is affirmative, the process proceeds to step S2719 where another inquiry is made regarding whether there has been a purchase of one of related options. If the response to the inquiry is negative, the process ends. On the other hand, if the response to the inquiry in step S2719 is affirmative, the process proceeds to step S2721 where another inquiry is made regarding whether the operator wishes to resell the wind power unit with an option associated therewith. If the response to the inquiry is negative, the process ends. On the other hand if the response to the inquiry in step S2721 is affirmative, the process proceeds to step S2723 where a message is sent to the power exchange broker indicating that there is a guaranteed power unit including both wind generated power backed-up by power from an alternative energy production facility.
On the other hand, if the inquiry in step S2805 is negative, the process proceeds to step S2819 where an inquiry is made regarding whether the energy that is available for another affiliated power generation resource exists. If the response is affirmative, a message coordination is made with the affiliate so as to make up for the shortfall using internal accounting measures and then the process ends. On the other hand if the response to the inquiry in step S2819 is negative, the process proceeds to step S2821 where another inquiry is made regarding whether offers are available for a needed amount of power. If the response to the inquiry in step S2821 indicates that there is an offer available for the needed amount of power, the process proceeds to step S2825 where the sufficient amount of energy in the predetermined amount of denominations is purchased so as to meet the shortfall. The process then proceeds to step S2827 and subsequently S2829, which were previously discussed. However, if the response to the inquiry in step S2821 is negative, the process proceeds to step S2817 where an increase in the bid is made until sufficient energy denominations are satisfied to meet the obligations. Subsequently, the process proceeds to steps S2827 and S2829 as previously discussed before the process ends.
After the costs are estimated in step S3103, the process proceeds to step S3105 where a particular wind power unit is purchased along with an option so as to guarantee the adequacy of the power provided by the unit of power that is based at least in part on the wind turbine power production facility. The process then proceeds to step S3107 where the unit of power is sold on the power exchange as a guaranteed unit, such as that which is offered by way of a fossil fuel electrical power production facility. The process then proceeds to step S3107 where the power is delivered from the wind turbine via predetermined transmission and distribution assets. Subsequently, in step S3109 the transfer fees are remitted with a reporting message from the seller of the power unit or a delegated power to a treasury function of the respective transmission and distribution assets that were actually used. Subsequently the process ends.
The tools for forecasting wind speed (or another energy source, such as ocean current) employ Multivariate data analysis, and/or neural networks and/or Fuzzy Control methods and mechanisms.
After assessing the risks associated with purchasing the wind power unit, the process proceeds to step S3209 where an inquiry is made regarding whether shares were actually purchased. If the response to the inquiry is negative, the process ends. However if the response to the inquiry in step S3209 is affirmative, the process proceeds to step S3211 where the investor/broker remits a payment and the investor's/broker's account is subsequently debited. The process then proceeds to step S3213 where the unit of power which is now “guaranteed” by way of an option for purchasing power sold on the power exchange. The process then proceeds to step S3215 where brokerage fees and fixed fees are subtracted from the purchase price and then in step S3217 the profit or loss is distributed on a per share basis to the respective shareholders and subsequently the process ends.
For longer term predictions, on the order of hours, days and up to a week in advance numerical prediction and dynamic meteorology techniques as well as meso-scale meteorological modeling forms the basis for extraction of wind data for wind power prediction. A typical prediction length of 5 days may limit this range, corresponding to a typical lifetime of a mid-latitude atmospheric motion system. These techniques are described e.g. in Haltiner G., “Numerical Prediction and Dynamic Meteorology”, sec. ed., John Wiley & Sons, as well as Pielke R., “Mesoscale Meteorological Modeling”, Harcourt Brace Jovanovich, Academic Press, 1984, the entire contents of which being incorporated herein by reference. Wind prediction output from these modeling techniques may be used for something other than the spot-type trading which is more appropriate for regression or nowcasting or even dynamic ganged control between a wind power facility and a hydroelectric plant for example. By having this mid-term meteorological forecast data regarding expected wind energy, actors who participate in a power exchange are able to predict with some degree of accuracy the level of risk/reward that the actor is engaged in when entering bilateral transactions for “power units,” (i.e., specific amounts of energy that are traded, purchased, sold, stored etc. as a power unit).
Even longer term prediction includes also synoptic scale numerical prediction and climatological statistical analysis performed on the order of weeks or even seasons. Such modeling prediction services are available from e.g. the European Center for Medium-Range Weather Forecast (ECMWF), the National Weather Service operated by NOAA in USA, and similar national and international organizations. Having this meteorological data enables operators of renewable energy resources to handle the power produced therefrom in a more fungible way that in the past. For example, renewable operators, based on the meteorological forecast, may opt to sell units of energy in advance by borrowing the energy asset from the virtual energy storage facility during the week, and then reliably “replenish” the energy supply over the weekend when low-load periods are routinely observed.
The renewable energy control center processor 500 shown in
The objective analysis tools include available meteorological numerical analysis tools in combination with wind energy siting tools. Preferable output of the numerical nowcasting tools is a three-dimensional time series of data at intervals of minutes. Predictions of available wind power is obtained from this data by trend fitting using data from the geographic upwind area, data from several time intervals, as well as combined with the influence of the local characteristics as described by atmospheric boundary layer physics. Electric power production is calculated from predicted wind speed and direction as described above including effects of wakes from nearby turbines. Predictive skill may be enhanced by combining observational data and measured electric power output through MVDA or Neural Network and Fuzzy Logic methodologies. For medium range forecasts on the order of hours to days, the methods are based on post-processing output from meteorological synoptic and meso-scale numerical forecast models. Methods include a combination of discrete output data on wind speed and direction from numerical forecast models combined with meso-scale objective analysis tools. This is performed by national meteorological centers as part of their operations. The three-dimensional time series output of these numerical models may be post-processed as described above to include wake effects of nearby turbines to obtain available wind power at a site, including consideration of wake effects of nearby turbines. For long range forecasts, a week or longer, for example, statistics on wind speed and direction are used to produce probabilities of available wind power for a given geographic area. Statistics are based on data from the meteorological observation network and sensors mounted on wind turbines. This data may be combined with past numerical forecasting results to fill gaps in the observation network.
The renewable energy control center processor 500 shown in
The control processor 500 in
Each of the actors providing meteorological data services 513 in
As opposed to conventional systems and methods, selected features of the present invention that characterize aspects of the invention include the following:
There is a commerce-based entity like a power exchange to deal with wind power as “green power” with a distinguished value.
There is an identity associated with the wind power-based units of electrical power transferred from a predetermined number of wind farms to other power grid facilities, like consumers or energy storage units or the like, thus identifying wind power as “green power” with a distinguished value.
There is an economic-based mechanism, such as a data processing system for managing a financial services configuration of a portfolio established as a partnership between stakeholders.
There is a method and mechanism for prognosticating the wind energy output, based on meteorological forecasting and data analysis techniques as well as improving the forecast with signals from local sensors not only to deal with wind power as “green power” with a distinguished value but enabling “green power” to become equally commercially competitive with other power sources at this time.
There is one connection (preferably), “the co-active converter”, from “a predetermined number of wind farms”, via a C&T grid” to “the power grid.”
Obviously, numerous modifications and variations of the present invention are possible in light of the above teachings. From the above description, it will be apparent that the invention disclosed herein provides novel and advantageous methods and mechanisms to operate and control wind turbines, wind farms and their co-operation with the electrical power grid and its stakeholders aiming at long-term business operations. For example, some aspects of the priming procedure can be performed in various ways equivalent to those disclosed herein, including transmission, upon a direct request between two stakeholders, i.e., outside the power exchange, point-to-point, of wind power-based units of electrical power to a storage facility that may be embodied as so called “pumped hydro” or other energy storage facilities. Similar priming procedures can be performed on other renewables, such as solar electric power where hydro might be accompanied or substituted by gases that hold energy. Those gases might be not only a simple source, such as air, which is compressed but also a more complicated source like hydrogen which is produced by hydrolysis from temporarily available surplus electrical power and which is burned in a gas turbine used as a prime mover, all to stay within “renewables” regime. LNG, liquid natural gas, is of course a strategic option to complement “renewables” to form another type of “hybrid,” but still with fairly low environmental impact due to its low carbon content, or more precise low CO2 per kWh. It is therefore to be understood that within the scope of the appended claims, the invention may be practiced otherwise than as specifically described herein.
Claims
1. A control processor for facilitating application of AC power from a renewable energy power production facility to a power grid, comprising:
- an I/O device configured to receive data from the renewable energy power production facility regarding an amount of power to be delivered by said renewable energy power production facility to said power grid, said I/O device including a communication port configured to transfer to a remote facility an indication regarding said amount of power;
- a memory configured to hold computer readable instructions therein;
- a processor configured to execute said computer readable instructions so as to implement, a power monitoring mechanism configured to monitor said amount of power, a message forming mechanism configured to include said indication in a coordination message that is sent through said I/O device to said remote facility regarding the amount of AC power applied by said renewable energy power production facility to said power grid.
2. The control processor of claim 1, wherein the renewable energy power production facility is a wind turbine power generation facility and said I/O device is configured to receive said data from the wind turbine power generation facility.
3. The control processor of claim 2, wherein said remote facility is another AC power generation facility and said another AC power generation facility is configured to adjust a power output thereof at a time that coincides with when said amount of power is delivered by said wind turbine power generation facility.
4. The control processor of claim 3, wherein said indication in said coordination message corresponds with AC power that is delivered contemporaneously to said power grid.
5. The control processor of claim 3, wherein:
- said indication in said coordination message corresponds with AC power that is to be delivered at a predetermined future time; and
- said message forming mechanism is configured to include in said coordination message said predetermined future time so that said another AC power generation facility is informed as to when to adjust the power output thereof so as to offset at least one of a surplus and a shortfall from said renewable energy power production facility relative to a predetermined amount.
6. The control processor of claim 3, wherein said I/O device is configured to receive a reply message from said another AC power generation facility confirming that the another AC power generation facility will adjust a power output thereof so as to offset at least one of a surplus and a shortfall of power applied to said power grid by said wind turbine power generation facility relative to a predetermined amount.
7. The control processor of claim 3, wherein said another AC power generation facility is a hydroelectric AC power generation facility.
8. The control processor of claim 2, wherein said remote facility is a renewable exchange, in which units of power from renewable power generation facilities are exchanged as fungible power units.
9. The control processor of claim 1, wherein said renewable exchange is a computer-based facility that is configured to receive said coordination message as a digital message.
10. The control processor of claim 9, wherein said message forming mechanism is configured to prepare said digital message as at least one of an e-mail message, a dedicated control signal, a TCP/IP formatted message, an asynchronous transfer mode (ATM) message, and a simple network management protocol (SNMP) message.
11. The control processor of claim 9, wherein said message forming mechanism is configured to prepare said digital message as a portion of an Internet web page.
12. The control processor of claim 11, wherein said message is downloaded in response to at least one of a Java and an ActiveX program-initiated process implemented on at least one of said processor and another processor at said remote facility.
13. The control processor of claim 2, wherein:
- said I/O device is configured to receive meteorological data from a remote source;
- said computer readable instructions when executed by the processor implement a wind forecasting mechanism, said wind forecasting mechanism configured to provide a statistical indication of an amount of wind expected at a predetermined future time when said power is to be delivered from the wind turbine facility to the power grid; and
- said processor is configured to determine an expected amount of power from said wind turbine power generation facility at said predetermined future time.
14. The control processor of claim 13, wherein:
- said predetermined future time is less than 2 minutes, and said message formatting message is configured to include at least one of said statistical indication and said expected amount of power in said coordination message.
15. The processor of claim 14, wherein said remote facility is a power exchange and said amount of power is made available for sale on a Spot market.
16. The processor of claim 14, wherein:
- said remote facility is at least one of a compressed gas-based storage facility, a fossil fuel plant and a hydroelectric power generation facility; and
- said coordination message is sent to said remote facility in preparation for adjusting an output therefrom.
17. The control processor of claim 13, wherein:
- said predetermined future time is less than 5 days and greater than 2 minutes, and said message formatting mechanism is configured to include at least one of said statistical indication and said expected amount of power in said coordination message; and
- said remote facility is a power exchange and said amount of power is made available for sale on a competitively bid market.
18. The control processor of claim 13, wherein:
- said predetermined future time is greater than 5 days, and said message formatting mechanism is configured to include at least one of said statistical indication and said expected amount of power in said coordination message; and
- said remote facility is a power exchange and said amount of power is made available for sale on a competitively bid market.
19. The control processor of claim 18, wherein:
- said predetermined future time is greater than 5 days, and said message formatting mechanism is configured to include at least one of said statistical indication and said expected amount of power in said coordination message; and
- said processor being configured to coordinate with a virtual energy storage facility to place the amount of power on an account of the wind turbine wind production facility and prevent a sale of said amount of power in said competitively bid market if a price for said amount of power is below a predetermined threshold.
20. The control processor of claim 2, wherein:
- said I/O device is configured to receive meteorological data from a remote source;
- said computer readable instructions when executed by the processor implement a wind forecasting mechanism, said wind forecasting mechanism being configured to provide a statistical indication of an amount of wind expected at a predetermined future time when said power is to be delivered from the wind turbine facility to the power grid; and
- said remote facility includes a processor configured to determine an expected amount of power from said wind turbine power generation facility at said predetermined future time.
21. The control processor of claim 20, wherein:
- said predetermined future time is less than 2 minutes, and said message formatting message is configured to include said statistical indication in said coordination message.
22. The processor of claim 21, wherein said remote facility is a power exchange and said amount of power is made available for sale on a Spot market.
23. The processor of claim 21, wherein said remote facility is a hydroelectric power generation facility and said coordination message is sent to said hydroelectric power generation facility in preparation for adjusting an output therefrom.
24. The control processor of claim 20, wherein:
- said predetermined future time is less than 5 days and greater than 2 minutes, and said message formatting mechanism is configured to include said statistical indication in said coordination message; and
- said remote facility is a power exchange and said amount of power is made available for sale on a competitively bid market.
25. The control processor of claim 20, wherein:
- said predetermined future time is greater than 5 days, and said message formatting mechanism is configured to include said statistical indication in said coordination message; and
- said remote facility is a power exchange and said amount of power is made available for sale on a competitively bid market.
26. The control processor of claim 25, wherein:
- said predetermined future time is greater than 5 days, and said message formatting mechanism is configured to include said statistical indication in said coordination message; and
- said processor being configured to coordinate with a virtual energy storage facility to place the amount of power on an account of the wind turbine power production facility and prevent a sale of said amount of power in said competitively bid market if a price for said amount of power is below a predetermined threshold.
27. The control processor of claim 1, wherein:
- the remote facility has an agreement with the renewable energy power production facility to adjust a power output from the remote facility by a predetermined amount in response to the coordination message indicating that the power amount from the renewable energy power production facility is above or below a predetermined threshold by the predetermined amount; and
- at least one of the processor and the remote facility being configured to keep a virtual energy storage account of energy held on account of the renewable energy power production facility, and credit or debit the account by the predetermined amount.
28. The control processor of claim 1, wherein:
- the renewable energy power production facility is a wind turbine power generation facility; and
- the another AC power generation facility includes at least one of a hydroelectric power plant and a fossil fuel plant.
29. The control processor of claim 28, wherein:
- the another AC power generation plant is one of a predetermined group of power production facilities that includes an energy-limited power production facility and a power-limited power production facility.
30. The control processor of claim 28, wherein after the another AC power production facility is determined, said processor is configured to determine whether transmission rights exist for delivering power over a transmission grid that interconnects said renewable energy power production facility and said another AC power generation facility when providing the amount of power to the power grid on behalf of the another AC power production facility.
31. The control processor of claim 28, wherein the processor is configured to prepare a reporting message to a system operator, informing the system operator of the wind turbine power generation facility having either produced another amount of power on behalf of the another AC power production facility or had the another AC power production facility provide the another amount of power to the power grid on behalf of an obligation of the wind turbine power generation facility.
32. The control proocessor of claim 31, wherein said processor is configured to report to said system operator that the another AC power production facility is entitled to a predetermined amount of credit for having produced green power, when the wind turbine power generation facility produces power in excess of the obligation and the another AC power production facility thus limits a power output therefrom by a corresponding amount.
33. The processor of claim 28, wherein said processor is configured to implement an accounting mechanism that is configured to keep track of deposits and withdrawals from the virtual energy storage account.
34. The processor of claim 33, wherein said accounting mechanism is configured to reflect a credit assigned to said wind turbine power production facility for making a monetary purchase of energy stored by the another AC power production facility.
35. The processor of claim 33, wherein said accounting mechanism is configured to reflect a debit to said wind turbine power production facility for accepting a monetary payment for an amount of energy held by the another AC power production facility on behalf of the wind turbine power production facility.
36. The processor of claim 33, wherein said accounting mechanism is configured to keep track of virtual energy storage accounts for a plurality of renewable energy power providers.
37. A computer program product containing computer readable instructions that when executed on a processor facilitate application of AC power from a renewable energy power production facility to a power grid, comprising:
- a power monitoring mechanism configured to monitor an amount of premier power produced by the renewable power production facility,
- a message forming mechanism configured to include an indication in a coordination message sent to a remote facility regarding an amount of AC power applied by said renewable energy power production facility to said power grid; and
- a message communications mechanism configured to send said coordination mechanism to said remote facility.
38. The computer program product of claim 37, wherein the renewable energy power production facility is a wind turbine power generation facility
39. The computer program product of claim 38, wherein said remote facility is another AC power generation facility and said another AC power generation facility is configured to adjust a power output thereof at a time that coincides with when said amount of power is delivered by said wind turbine power generation facility.
40. The computer program product of claim 39, wherein said indication in said coordination message corresponds with AC power that is delivered contemporaneously to said power grid.
41. The computer program product of claim 39, wherein:
- said indication in said coordination message corresponds with AC power that is to be delivered at a predetermined future time; and
- said message forming mechanism is configured to include in said coordination message said predetermined future time so said another AC power generation facility is informed as to when to adjust the power output thereof so as to compensate for either a surplus or shortfall from said renewable energy power production facility relative to a predetermined amount.
42. The computer program product of claim 39, wherein said message communications mechanism is configured to receive a reply message from said another AC power generation facility confirming that the another AC power generation facility will adjust a power output therefrom so as to offset at least one of a surplus and shortfall of power applied to said power grid by said wind turbine power generation facility relative to a predetermined amount.
43. The computer program product of claim 37, wherein said remote facility includes a computer that is configured to receive said coordination message as a digital message.
44. The computer program product of claim 43, wherein said message forming mechanism is configured to prepare said digital message as at least one of an e-mail message, a dedicated control signal, a TCP/IP formatted message, an asynchronous transfer mode (ATM) message, and a simple network management protocol (SNMP) message.
45. The computer program product of claim 43, wherein said message forming mechanism is configured to prepare said digital message as a portion of an Internet web page.
46. The computer program product of claim 45, wherein said message is downloaded in response to at least one of a Java and ActiveX program initiated process implemented on at least one of said processor and a processor at said remote facility.
47. The computer program product of claim 38, further comprising:
- a wind forecasting mechanism configured to provide a statistical indication of an amount of wind expected at a predetermined future time when said power is to be delivered from the wind turbine facility to the power grid; and
- a mechanism for determining an expected amount of power from said wind turbine power generation facility at said predetermined future time.
48. The computer program product of claim 38, wherein said wind forecasting mechanism receives meteorological forecast data from a remote source.
49. The computer program product of claim 37, further comprising:
- a mechanism for keeping a virtual energy storage account of energy held on account of the renewable energy power production facility, and credit or debit the account by a predetermined amount, wherein
- the remote facility has an agreement with the renewable energy power production facility to adjust a power output from the remote facility by the predetermined amount in response to the coordination message indicating that the power amount from the renewable energy power production facility is above or below a predetermined threshold by the predetermined amount.
50. The computer program product of claim 37, wherein:
- the renewable energy power production facility is a wind turbine power generation facility; and
- the another AC power generation facility includes at least one of a hydroelectric power plant and a fossil fuel plant.
51. The computer program product of claim 50, wherein:
- the another AC power generation plant is one of a predetermined group of power production facilities that includes an energy-limited power production facility and a power-limited power production facility.
52. The computer program product of claim 50, wherein after the another AC power production facility is determined, said computer program product is configured to determine whether transmission rights exist between said renewable power production facility and said another AC power generation facility over a transmission grid when providing the amount of power to the power grid on behalf of the another AC power production facility.
53. The computer program product of claim 50, further comprising a mechanism for sending a reporting message to a system operator, informing the system operator of the wind turbine power generation facility having either produced another amount of power on behalf of the another AC power production facility or having the another AC power production facility provide the another amount of power to the power grid on behalf of an obligation made by the wind turbine power generation facility.
54. The computer program product of claim 53, wherein said processor is configured to report to said system operator that the another AC power production facility is entitled to a predetermined amount of credit for having produced green power, when the wind turbine power generation facility produces power in excess of the obligation made and the another AC power production facility thus limits a power output therefrom by a corresponding amount.
55. The computer program product of claim 50, further comprising an accounting mechanism that is configured to keep track of deposits and withdrawals from the virtual energy storage account.
56. The computer program product of claim 55, wherein said accounting mechanism is configured to reflect a credit assigned to said wind turbine power generation facility for making a monetary purchase of energy stored by the another AC power production facility.
57. The computer program product of claim 55, wherein said accounting mechanism is configured to reflect a debit to said wind turbine power generation facility for accepting a monetary payment for an amount of energy held by the another AC power production facility on behalf of the wind turbine power production facility.
58. The computer program product of claim 55, wherein said accounting mechanism is configured to keep track of virtual energy storage accounts for a plurality of renewable energy power providers.
59. A system for facilitating application of AC power from a renewable energy power production facility to a power grid, comprising:
- the renewable energy power production facility configured to produce an amount of electrical power at a time variable frequency that is not compatible with a power grid;
- a converter connected between said renewable energy power production facility and the power grid and configured to convert said amount of electrical power from the renewable energy power production facility to premier power that is compatible with a frequency and operational requirement of the power grid such that an output from said converter may be applied directly to the power grid;
- a control processor including, a communication port configured to transfer to a remote facility an indication regarding an amount of premier power produced by said converter, a memory configured to hold computer readable instructions, a processor configured to execute said computer readable instructions so as to implement, a power monitoring mechanism configured to monitor said amount of premier power, a message forming mechanism configured to include said indication in a coordination message that is sent through a communication link to said remote facility regarding the amount of premier power available to apply to said power grid.
60. The system of claim 59, wherein said converter being a co-active converter that includes a DC-to-AC converter configured to receive the amount of electrical power from the renewable energy power production facility, where said amount of electrical power is at a direct current, and convert the amount of electrical power to AC;
- a rotating converter; and
- a power transformer connected between the rotating converter and the power grid.
61. The system of claim 60, wherein said rotating converter includes at least one of
- a static converter and a rotating converter configured to convert from DC to a frequency standard,
- a frequency converter configured to convert from a variable low-frequency AC to a frequency standard,
- a frequency converter configured to convert from a constant low-frequency AC to a frequency standard,
- a rotating converter configured to supply at least one of reactive power and active power to a frequency standard, and
- a power transformer configured to provide a voltage adaptation for adjusting a short circuit output capacity of the renewable energy power production facility.
62. The system of claim 61, wherein said rotating converter is configured to provide at least one of
- a start-up operation of the power grid after a major fault,
- a source of active power so as to provide a priming operation for the amount of electrical power from the renewable energy power production facility,
- a source of reactive power to the power grid at a predetermined quantity,
- a suppressor of low order harmonics from the DC-to-AC converter,
- a source of active AC voltage support for the DC-to-AC converter,
- a separation of active power control and reactive power control, and
- a supply of short-circuit power during faults operations of the power grid.
63. The system of claim 60, wherein said rotating converter is a two-winding machine having two sets of AC three-phase windings arranged in a stator of the rotating converter and being exposed to AC and DC fields when in operation.
64. The system of claim 60, wherein said rotating converter is a constant speed synchronous machine with a winding arranged in a rotor.
65. The system of claim 64, wherein said winding of said rotating converter is a DC winding.
66. The system of claim 60, wherein said rotating converter being an adjustable speed asynchronous machine having at least one of brush-less drives and brush-based drives.
67. The system of claim 66, wherein said brush-based drives being a Static Scherbius drive.
68. The system of claim 60, wherein said rotating converter is configured to withstand a large voltage sag in voltage provided by said renewable energy power production facility without tripping a breaker connected to the power grid.
69. The system of claim 60, wherein said rotating converter being configured to provide a moment of inertia that is available as a short term storage facility for wind energy used to produce said renewable energy power production facility during a period of wind lull.
70. The system of claim 60, wherein said co-active converter further comprises a prime mover configured to provide an alternative power source to said rotating converter.
71. The system of claim 70, wherein said prime mover being fed from fossil fuel.
72. The system of claim 70, wherein said prime mover being fed by at least one of vegetable oil and a compressed gas-based storage facility.
73. The system of claim 60, wherein said power transformer being a three-winding, three-phase transformer.
74. The system of claim 59, further comprising said communication link configured to convey said coordination message to said remote facility, wherein
- said remote facility being another AC power generation facility configured to adjust a power output thereof at a time that coincides with when said premier power is delivered to said power grid by said converter.
75. The system of claim 74, wherein:
- said remote facility has an agreement with the renewable energy power production facility to adjust a power output from the remote facility by a predetermined amount in response to the coordination message indicating that the premier power from the converter has an energy measured over an effective time period being above or below a predetermined threshold by the predetermined amount; and
- at least one of the processor and the remote facility being configured to keep a virtual energy storage account of energy held on account of the renewable energy power production facility and credit or debit the account by the predetermined amount, said converter being a co-active converter.
76. The system of claim 75, wherein said processor is configured to implement an accounting mechanism that is configured to keep track of deposits and withdrawals from said virtual energy storage account made by said renewable energy power production facility.
77. The system of claim 76, wherein said accounting mechanism is configured to reflect a credit assigned to said renewable energy power production facility for making a monetary purchase of energy stored by the remote facility.
78. The system of claim 76, wherein said accounting mechanism is configured to reflect a debit to said renewable energy power production facility for accepting a monetary payment for an amount of energy held by the remote facility on behalf of the renewable energy power production facility.
79. The system of claim 76, wherein:
- said accounting mechanism is configured to keep track of virtual energy storage accounts for a plurality of renewable energy power production facilities; and
- said system further comprising a collection and transmission grid interconnecting the renewable energy power production facility, and a plurality of other renewable energy power production facilities to the co-active converter such that energy provided by the renewable energy power production facility in the plurality of renewable energy power production facilities provides a cumulative power to said co-active converter.
80. The system of claim 79, wherein an output of said collection and transmission grid being provided to a high voltage DC link.
Type: Application
Filed: Jan 31, 2005
Publication Date: Jun 16, 2005
Applicant: ABB AB (Vasteras)
Inventors: Per-Anders Lof (Vallingby), Lars Gustaf Gertmar (Vasteras), Lars Anders Andren (Orsundsbro)
Application Number: 11/045,313