Optical fiber cable distribution frame
A telecommunication distribution frames comprising a switch connected to an optical fibre of an incoming cable, terminated at a primary flexibility suite, via a secondary flexibility suite, where the primary and secondary flexibility suites include means for routing joined blown fibre tubes within the installation. A continuous blown fibre unit extending through the joined blown fibre tubes. A blown fibre tube flexibility module (14) has a patching panel (11), which may be provided with connectors. Above the panel (11) are a set of bend control vanes or mandrels (24), one for each of the connector sites in the panel. Patching tubes may pass down and out through the aperture (99) at the back of the module.
This invention relates to telecommunications exchange or router installations and to methods of creating connections and re-routing connections in such installations.
A typical telecommunications exchange building houses a large variety and quantity of equipment such as switches, typically on equipment racks, and connected by cables to and from each other and to the external telecommunications network. The trunk parts of telecommunications networks are nowadays commonly all-fibre. Increasingly, optical fibre use extends into the access network, with fibre-to-the kerb, fibre-to-the-cabinet and even fibre-to-the premises. Consequently, virtually all modern telephone exchange installations involve a considerable proportion of fibre circuits rather than wired circuits. Because optical fibre is sensitive both to bend and strain, management of the optical interconnections within an exchange installation is important.
One of the main functions of optical fibre plant within an exchange or router building is to manage and route fibres from a particular set of optical equipment to fibres from, for example, an incoming cable from the external telecommunications network. As optical fibre is deployed more abundantly and more generally in the network, the routing and patching of such fibre, especially within exchanges, is becoming increasingly troublesome. Major problems are the growth in the amount of equipment and the sheer number of connections required. These problems are exacerbated by growth, upgrading and changes within the exchange which result in the need to interconnect new equipment or systems. Although the physical positions of incoming cables rarely change, additional cables may be added and the new equipment or system will almost certainly be in a different physical location from the old, and in any event will typically need moving or different connections to be made.
The current method of fibre routing within exchange buildings is achieved with Optical Flexibility Racks (OFRs), which serve as junction or distribution points allowing cables to be routed within the exchange building. OFRs can carry hundreds of individually spliced fibres but when they are fully populated, as is often the case, there is severe congestion at the OFRs. It is often difficult to identify, locate and isolate individual fibres in such cases when re-routing of the cable path is necessary, making the task both time-consuming and complicated. Another problem resulting from fibre overcrowding is that fibres are routed across each other in close proximity so that the combined weight presses down on fibres located near the base of OFRs, increasing the risk of circuit failure through increased optical loss and even of fibre breakage. This problem becomes even more critical as higher bit rate systems are employed, as these tend to be more sensitive to increases in optical loss.
The installation and maintenance of optical fibre cabling, its routing and supporting structures such as OFRs take up a significant portion of the total cost, time and effort of installing and cabling a telecommunications exchange system. The current methods to interconnect exchange equipment, or to connect an incoming cable to a rack of exchange equipment typically involve several lengths of optical fibre connected end to end either by means of connectors or splices, or a combination thereof. The path taken by the fibre from the incoming cable to an equipment rack could involve a significant number of connections or splices, especially if the destination equipment rack is physically distant from the incoming cable, for example if the equipment sits on a separate floor from the incoming cable within the exchange building.
Such conventional methods are commonly known and described in e.g. Modular Optical Plant for Access Network: Operational Aspects by D. Brewer et. al (Proc. EFOC & N (Technology and Infrastructure) 1995, at pages 164-167).
Problems associated with the existing method of creating fibre paths by using connectors or splices arise from the inherently delicate nature of joining fibre ends, which is time- and cost-consuming in the need for specialist equipment and expertise. Connections and splicing also inevitably involve optical losses regardless of the quality of the joint. Other problems could arise: for example, stored fibre could “run out” either side of the splice, thereby reducing the number of fibre turns and hence the opportunity to re-splice in the future.
In a first aspect, the present invention provides a flexibility suite for routing optical fibres within a telecommunications switch installation, the suite comprising:
a first flexibility point and a second flexibility point, the first flexibility point including a first set of conduits each of the conduits having a first end disposed in a first array and a second end disposed in a second array;
the second flexibility point including a second set of conduits, each of the conduits having a first end disposed in a third array and a second end disposed in a fourth array; the flexibility suite being so arranged as to permit the conduit ends on the second array to be interconnected with conduit ends on the third array by means of tubular interconnects so that, by selecting the conduits whose ends on the second and third arrays are interconnected, a continuous path can be formed between any conduit end in the first array and any conduit end in the fourth array.
Such an arrangement facilitates the use of blown fibre in an exchange setting. This arrangement also facilitates the provision of new paths through the re-use of existing partial paths simply by changing the choice of “patches” made between the second and third arrays.
Generally, the second set of conduits will be formed by the bores of double-ended connectors. Similarly, the first set of conduits will often be formed by the bores of double-ended connectors. Preferably the connectors are push-fit connectors which provide a sealing grip about or within the tubes which are used between flexibility suites, to switches or routers and as patch tubes. Such connectors are particularly good at facilitating the rapid commissioning or re-commissioning of tube paths.
In a second aspect, the present invention provides a telecommunications switch or router installation comprising; a telecommunications switch or router connected to an optical fibre of an optical fibre cable which itself is connected to and incoming from an external telecommunications network; a first and at least one second flexibility suite according to the first aspect of the invention; a sub-path being defined through each of the flexibility suites from the first array to the fourth array via an interconnection between the second and third arrays; the fourth array of the first flexibility suite being interconnected with the first array of the or one of the second flexibility suite(s);
a tubular pathway being provided between the fourth array of the second flexibility suite or the last of the second flexibility suites and the switch or router; the other second flexibility suites, if any, being interconnected in series with the first array of each of subsequent second flexibility suite being interconnected with the fourth array of the preceding second flexibility suite by means of a tubular interconnect, so that a substantially continuous path is provided for installation of a blown-fibre member between the first flexibility suite and the switch or router.
In a third aspect the invention provides a method of creating a connection in a telecommunications switch installation, between a telecommunications switch, and an optical fibre of an incoming cable connected to and incoming from a telecommunications network, terminated at a primary flexibility suite, comprising the steps of:
installing lengths of blown fibre tube and joining the ends of the lengths of blown fibre tube to form a path from the primary flexibility suite to the telecommunications switch via a secondary flexibility suite, where the primary and secondary flexibility suites include means for routing joined blown fibre tubes within the installation, and thereafter, installing, by blowing, a continuous blown fibre unit through the path formed by the joined blown fibre tubes, thereby providing an optical path between the telecommunications switch and the optical fibre of the incoming cable.
In a fourth aspect, the present invention provides a method of re-routing an existing connection in a telecommunications switch installation from a connection between a first telecommunications switch and a primary flexibility suite, to create a connection between a second telecommunications switch and the primary flexibility suite comprising the steps of:
breaking the a connection between the first telecommunications switch and the primary flexibility suite at the primary flexibility suite, installing lengths of blown fibre tube and joining the ends of the lengths of blown fibre tube to form a path from the primary flexibility suite to the secondary telecommunications switch via a secondary flexibility suite, where the primary and secondary flexibility suites include means for routing joined blown fibre tubes within the installation, and thereafter, installing, by blowing, a continuous blown fibre unit through the path formed by the joined blown fibre tubes thereby providing an optical path between the second telecommunications switch and the optical fibre of the incoming cable.
Embodiments of the invention will now be described by way of example only with reference to the accompanying drawings in which:
FIGS. 11 to 11D illustrate the use of positive tube bend management in the BFTFMs;
The incoming cable (5) is typically terminated at a cable chamber joint (CCJ) (8) by a splice (10f) to an internal cable (1c). The CCJ is typically located within same building as the equipment rack (2) although this is not necessarily the case. The CCJ represents the “line-side” of the exchange for purposes of fibre routing within the exchange. The equipment rack represents the “equipment-side” for purposes of fibre routing within the exchange.
The internal cable (1c) is spliced at one end to the incoming cable at the CCJ, and the other end to a line-side flexibility point such as an Optical Flexibility Rack (OFR) (4d).
Flexibility points serve various functions, mainly as a junction or distribution point to allow a user to select and connect a point to any other point within the exchange e.g. from any piece of exchange equipment to any other piece of equipment, or from/to an incoming cable. Flexibility points also provide an interface between the typically high fibre count incoming cable and internal cables (which may be single-fibre or may contain many fibres), terminate incoming fibres onto splice trays for safe storage, provide easy access to each individual fibre and serve as testing points. We are however for present purposes interested only in their ability to connect line-side fibre to equipment-side fibre. Typically, at least two flexibility points are used together, more usually in side-by-side pairs, to facilitate the routing of fibres within the exchange—one on the line-side and one on the equipment-side. Such groupings of flexibility points are within this patent called flexibility suites. For the avoidance of doubt, “flexibility points” and “flexibility suites” in this discussion are generic references to OFRs and OFR suites for fibre cables, and to Blown Fibre Tube Flexibility Modules (BFTFMs) and BFTFM suites (discussed below in connection with
OFR suites (4a and 4b, 4c and 4d) allow fibres terminated in line-side flexibility points and equipment-side flexibility points to be spliced to each other on a splice tray dedicated to a fibre or pair of fibres. Fibre jumpers (3a, 3b) are spliced between the pair of OFRs which typically make up a suite. Another fibre cable (1b) connects an equipment-side OFR (4c) to the next line-side OFR (4b). The first OFR suite (comprising 4c and 4d) in
The prior art shown
In the installation shown in
The incoming cable (5) is terminated at a first line-side OFR (4) in the usual way as described in connection with
As an alternative to the configuration of the primary flexibility suite described above, the primary flexibility suite could also comprise two BFTFMs (as opposed to an OFR and a BFTFM). The main function of the OFR in the primary flexibility suite is to receive the incoming cable (5), which could comprise up to e.g. 144 fibres, and provide a break out point for the individual fibres of that cable. It is possible for the individual fibres of the incoming cable to be broken out at, for example, a CCJ (8), or at any point between the CCJ and the primary flexibility suite. It would not however normally be desirable so to do, as this would mean bringing up to e.g. 144 individual fibres to the primary flexibility suite for treatment. For the purposes of this description therefore, the primary flexibility suite will be discussed as being an OFR-BFTFM pair although it should be understood that this is not the only arrangement possible.
The BFTs (16a, 16b) in this embodiment are installed between one equipment-side BFTFM to the next line-side BFTFM along the path to the equipment rack. The path is completed by installing BF patch tubes (17a, 17b) within the flexibility suites (14c and 4, 14a and 14b), so that a completed BFT path is created between the OFR (4) and the equipment rack, ready to receive a blown fibre unit (BFU). BFU is then installed by blowing from one or other end of the path, i.e. from the equipment rack (2) or from the first OFR (4).
In a preferred version of the invention, EPFU (Enhanced Performance Fibre Unit) as generally described in EP-B-052170 is used. The BFT or duct used as patch tubes typically has an internal bore diameter in the range 1.5 to 5 mm, more usually between 2.0 and 4 mm, especially 2.5 to 3.5 mm. A particularly preferred bore diameter is 2.5 mm, and a tube with this bore size can conveniently be made to have an outer diameter of 4 mm. Of course, the use of circular internal cross sections is not essential, nor is the use of circular external cross sections although these will often be used. Generally, the fibre unit to be used will contain only a single fibre, but there will be occasions where higher fibre counts will be used. Often fibre units can be made more stable if they contain an even number of fibres, for example 2-fibre, 4-fibre, 8-fibre, but odd-fibre counts can of course be used. The use of fibre units with multiple fibres may, for example, be useful where the multiple fibres are to be terminated at the same destination rack and/or where they serve the same customer.
By way of example, if the scenario involves the CCJ (8) being located in the basement, the primary flexibility suite (4) on the ground floor and the equipment rack (2) on the first floor, the installation could involve the following steps:
- 1. Install the CCJ (8).
- 2. Terminate the incoming cable (5) on the CCJ.
- 3. Install an internal cable (1) between the CCJ and the OFR of the primary flexibility suite (4)
- 4. At the CCJ splice all fibres from incoming cable (5) to the internal cable (1).
- 5. Terminate all the fibres from the internal cable (1) on the OFR (4).
- 6. Install BFT (16b) from the equipment side of the BFTFM (14c) in the primary flexibility suite to the line-side BFTFM (14b) on first floor.
- 7. Install BFT (16a) from the equipment rack (2) on the first floor to the equipment side of the first floor BFTFM (14a).
- 8. Patch the BFT path at the flexibility suites using BF patch tubes (17a, 17b), typically cut to length on site. “Patch tubes” are generally short lengths of tube to provide a “patch” between a BFT on the equipment side of the BFTFM to a BFT on the line side of the BFTFM.
- 9. Install the BFU. Blowing will usually be carried out from either the equipment rack (2) or from the OFR (4), although blowing out from some intermediate point may also be possible.
- 10. At the OFR splice the internal cable (1) to the installed BFU.
- 11. At the equipment rack splice the pigtails from the equipment rack (2) to the installed BFU (of course if the equipment pigtails are connectorised—i.e. have connectors, then it is useful for the BFU to be pre-connectorised, so that the connector(s) of the BFU(s) can be coupled to those of the pigtails).
It will be clear to the skilled person that a major advantage of using a single unbroken length of blown fibre unit to interconnect optical equipment to the external network, is the removal of lossy splices and/or connectors. Their removal also eliminates these known reliability weak points. In the basic arrangement described in this
It can be seen that yet another advantage of the invention is flexibility in re-routing and user-friendliness, compared to conventional techniques requiring installation of heavy cables.
In
- 1. Route the incoming cable (5) from cable chamber to the OFR of the primary flexibility suite (4).
- 2. Terminate all fibres of the incoming cable (5) on the OFR (4). Install BFT (16a) from the equipment side of the ground floor BFTFM (14c) of the primary flexibility suite to the line-side BFTFM (14b) on first floor.
- 3. Install BFT from the equipment rack (2) to the equipment side of the first floor BFTFM (14a).
- 4. Provide a BFT path through all BFTFMs using BF patch tubes (17a, 17b), typically cut to length on site.
- 5. Install BFU. Blowing will generally be carried out from either the equipment rack or from the first OFR.
- 6. At the OFR splice the incoming cable (5) to the installed BFU.
- 7. At the equipment rack splice pigtails from the equipment rack (2) to the installed BFU or, if connectorised, join the connectors of the BFU to those of the pigtails.
The arrangement in
- 1. Route the incoming cable (5) from cable chamber to the OFR (4) of the primary flexibility suite.
- 2. Terminate all fibres of the incoming cable on the OFR (4).
- 3. Install BFT (16b) from the equipment side of ground floor BFTFM of the primary flexibility suite (14c) to the line-side BFTFM on first floor (14b).
- 4. Install BFT (16a) from the equipment rack (2) to the equipment side of the first floor BFTFM (14a).
- 5. Patch a BFT path through all BFTFMs using BF patch tubes (17a, 17b), usually cut to length on site.
- 6. Install pre-connectorised BFU by blowing from the equipment rack of the switch or router.
- 7. At the OFR splice the incoming cable (5) to the BFU.
Preferably a BFTFM occupies about the same area and space as an existing OFR or other generic flexibility rack currently used in exchanges, for ease of replacement. In the UK in the exchanges of British Telecommunications plc therefore, it is anticipated that BFTFMs will be approximately 1000 cm wide, 400 cm deep and 830 cm tall. This build of BFTFMs is expected to be stacked up three modules high each on the line- and equipment sides, as shown in
As noted briefly above, it is preferable that BFTFMs incorporate positive tube bend management (e.g. the mandrels 24) for optimised BFU installation. Further discussion of this technique is provided below in the discussion of
The drawing on the right in
The patch panels of the pair of BFTFMs (such as 14a and 14b in
The schematic diagram on the left in
The paths of the patching tubes (17) can be traced between the different levels of BFTFMs in the figure.
Installing the Primary Flexibility Suite (4 and 14c of
- 1. Install the OFR (the rear covers have been removed in the drawing for clarity) (4). Install the incoming cables (5) and terminate their fibres on splice trays, preferably single-circuit. Cables can enter either from above or below.
- 2. Install one BFTFM (14c) adjacent to the rear of the OFR. Each BFTFM can typically accommodate 384 individual BF tubes, the equivalent of 4×96 fibre cables. A second and third BFTFM can be added to the flexibility suite to accommodate typically 1152 individual BF tubes.
- 3. Install the vertical cable tray (20), the mandrel adapter (22) and the internal bend mandrel (24). The mandrels positively manage the fibre tube bend to prevent over-bending. In this instance the cable routes upwards.
Installing Subsequent Secondary Flexibility Suite (e.g. 14a and 14b ofFIG. 3 ) - 4. Install vertical cable tray (26), support-frame uprights (28) and frame strap (30) on exchange floor.
- 5. Add the outer bend mandrel (32) and the line-side BFTFM (14b).
- 6. Install a second vertical cable tray (26), equipment-side BFTFM (14a), mandrel adapter and internal bend mandrel.
The secondary flexibility suite is now ready to accept BF tubing. The installation shown can accommodate up to 384 BF patch tubes.
Installing BF Tubing
- 7. The butt of the BF tube (16) is cut level with the edge of the BFTFM (14). Each tube contained is routed over the plastic tube mandrels so that its bend radius is controlled. Tubes are then cut to length and plugged into the push-fit bulkhead fittings which are in turn located into the appropriate hole in the patch panel.
- 8. An illustration of interface with the vertical cable tray—upwards.
- 9. An illustration of interface with the vertical cable tray—downwards.
We turn now to
This characteristic of optical fibre is a particular problem in large telecommunications exchanges. By way of example, British Telecommunications plc has to date more than 4,000 exchanges throughout the United Kingdom, of which some 200 serve over 20,000 customers each. The largest exchanges have multiple floors, hundreds of equipment racks and a very high number of fibre and copper cables routed around and throughout the exchange building. As time progresses, the exchange becomes more heavily populated and changes to equipment, customer needs etc., necessitate re-routing and re-termination of cables. It has been found that the routes taken by cables, if uncontrolled, may impair the performance of the optical fibre. For example, if a jumper cable is re-used it will have to be cut and re-connected—very often it may be too short to reach easily between the two sides and may have to be stretched tight thus compromising minimum bend radius dimensions, as shown in
Tube bend management apparatus can take the form of curved guides or mandrels—(e.g. 24 in
The tube connector is shown unfixed from the rest of the patching unit and further detailed in
When installed on the BFTFM, the patching units form a matrix on the patching panel (11) allowing a user to create a tubular path between two BFTFMs, and thus in the broader context of the exchange, to form part of the tubular path between the incoming cable (5) and the destination equipment rack (2). Another view of this embodiment of the patching unit is shown in
Although the foregoing discussion concerns mainly a connection created by the invention between an equipment rack and an incoming cable connecting the exchange to the external telecommunications network, the skilled person would easily recognise that the invention can be deployed with similar effects or advantages to connect any other originating point to any destination point within or outside of the exchange. Furthermore, while the specific description is made in the context of telecommunication exchange buildings, it would be clear that the invention can have applications in any other environment where blown fibre technology according to the invention can be used in place of conventional connectorised and/or spliced optical fibre or current BFT management practices. In particular, the invention may be used in a Local Area Network (LAN) environment.
The skilled person would also appreciate that the invention is not limited to use in a new set-up ready to be cabled, nor to one which is already cabled in a manner as described herein. The inventive aspect concerning re-routing of optical paths, in particular, can be applied even in a conventional installation, to gradually migrate the inventive method into such convention set-ups. The benefits of using the invention can be realised even in such applications.
Claims
1. A flexibility suite for routing optical fibres within a telecommunications switch installation, the suite comprising:
- a first flexibility point and a second flexibility point, the first flexibility point including a first set of conduits each of the conduits having a first end disposed in a first array and a second end disposed in a second array;
- the second flexibility point including a second set of conduits, each of the conduits having a first end disposed in a third array and a second end disposed in a fourth array;
- the flexibility suite being so arranged as to permit the conduit ends on the second array to be interconnected with conduit ends on the third array by means of tubular interconnects so that, by selecting the conduits whose ends on the second and third arrays are interconnected, a continuous path can be formed between any conduit end in the first array and any conduit end in the fourth array.
2. A flexibility suite as claimed in claim 1 wherein said tubular interconnects are present and interconnect conduit ends on the second and third arrays, and wherein means are provided to control the paths taken by the tubular interconnects.
3. A flexibility suite as claimed in claim 1, wherein each of the conduit ends on the second, third and fourth arrays is provided with a connector for connection of the respective conduit end to a tubular interconnect.
4. A flexibility suite as claimed in claim 3, wherein each connector of the third array is provided by one end of a double-ended connector, the other end of each connector providing the corresponding connector of the fourth array, the bores of the connectors providing the conduits of the second set.
5. A flexibility suite as claimed in claim 3, wherein each of the conduit ends of the first array are also provided with a connector for connection of the respective conduit end to a tubular interconnect.
6. A flexibility suite as claimed in claim 5 wherein each connector of the second array is provided by one end of a double-ended connector, the other end of the connector providing the corresponding connector of the first array, the bores of the connectors providing the conduits of the first set.
7. A flexibility suite as claimed in claim 1, wherein the bores of the conduits and the tubular interconnects are between 1.5 and 5 millimetres in diameter.
8. A flexibility suite as claimed in claim 7, wherein the bores are between 2 and 4 millimetres in diameter.
9. A flexibility suite as claimed in claim 1, wherein the second and third arrays or the first and fourth arrays are arranged side by side.
10. A flexibility suite as claimed in claim 9, wherein the side-by-side arrays are provided on two panels distinct from each other.
11. A telecommunications switch or router installation comprising;
- a telecommunications switch or router;
- a first and at least one second flexibility suite according to claim 1;
- a sub-path being defined through each of the flexibility suites from the first array to the fourth array via an interconnection between the second and third arrays;
- the fourth array of the first flexibility suite being interconnected with the first array of the or one of the second flexibility suite (s);
- a tubular pathway being provided between the fourth array of the second flexibility suite or the last of the second flexibility suites and the switch or router;
- the other second flexibility suites, if any, being interconnected in series with the first array of each of subsequent second flexibility suite being interconnected with the fourth array of the preceding second flexibility suite by means of a tubular interconnect, so that a substantially continuous path is provided for installation of a blown-fibre member between the first flexibility suite and the switch or router; wherein the switch or router is optically connected, via an optical fibre of a continuous blown-fibre member which extends along said substantially continuous path, to an optical fibre of an optical fibre cable which enters the installation from an external telecommunications network.
12. An installation as claimed in claim 11, wherein the optical fibre of the blown-fibre member is spliced to the fibre of the incoming cable.
13. An installation as claimed in claim 11, wherein the optical fibre of the blown-fibre member is spliced to a fibre of a cable or fibre unit which is within the optical path between the incoming cable and the blown-fibre member.
14. An installation according to claim 11, including a plurality of secondary flexibility suites.
15. An installation according to claim 11, wherein a plurality of telecommunications switches are connected, via the primary and secondary flexibility suites, to optical fibres of several incoming cables.
16. An installation according to claim 11, including bend control means to control the bend radius of the blown fibre tube.
17. A method of creating a connection in a telecommunications switch or router installation, between a telecommunications switch or router, and an optical fibre of an incoming cable connected to and incoming from a telecommunications network, comprising the steps of:
- installing lengths of blown fibre tube and joining the ends of the lengths of blown fibre tube to form a path from a primary flexibility suite to the telecommunications switch via a secondary flexibility suite, where the primary and secondary flexibility suites include means for routing joined blown fibre tubes within the installation, and thereafter, installing, by blowing, a continuous blown fibre unit through the path formed by the joined blown fibre tubes, to provide an optical path between the telecommunications switch and the optical fibre of the incoming cable.
18. A method of re-routing an existing connection in a telecommunications switch or router installation from a connection between a first telecommunications switch or router and a primary flexibility suite, to create a connection between a second telecommunications switch or router and the primary flexibility suite, comprising the steps of:
- breaking the connection between the first telecommunications switch and the primary flexibility suite, joining the ends of lengths of blown fibre tube to form a path from the primary flexibility suite to the secondary telecommunications switch via a secondary flexibility suite, where the primary and secondary flexibility suites include means for routing joined blown fibre tubes within the installation, and thereafter, installing, by blowing, a continuous blown fibre unit through the path formed by the joined blown fibre tubes thereby providing an optical path between the second telecommunications switch or router and the optical fibre of the incoming cable.
19. A method according to claim 17, wherein the primary flexibility suite includes a line-side optical flexibility point and an equipment-side blown fibre tube flexibility point located in proximity to each other, and the secondary flexibility suite includes a line-side blown fibre flexibility point and an equipment-side blown fibre flexibility point located in proximity to each other, wherein the path from the primary flexibility suite to the telecommunications switch is formed by installing a blown fibre tube from the equipment-side blown fibre flexibility point in the primary flexibility suite to the line-side blown fibre flexibility point in the secondary flexibility suite, installing a blown fibre tube from the equipment-side blown fibre flexibility point in the secondary flexibility suite to the telecommunications switch, and interconnecting the line-side flexibility point to the equipment-side flexibility point in flexibility suite.
20. A method according to claim 17, wherein the continuous blown fibre unit is installed by blowing from an equipment rack housing the telecommunications switch.
21. A method according to claim 17 wherein the continuous blown fibre unit is pre-connectorised.
22. A method according to claim 17 wherein the continuous blown fibre unit is installed by blowing from the line-side optical flexibility point of the primary flexibility suite.
Type: Application
Filed: Mar 31, 2004
Publication Date: Aug 24, 2006
Inventors: Philip Barker (Ipswich), John Kerry (Ipswich), Christopher Taylor (Cheltenham)
Application Number: 10/550,794
International Classification: G02B 6/00 (20060101);