Deep water drilling with casing
Methods and apparatus are provided to place a conductor pipe and a casing in a subsea environment. In one embodiment, a conductor pipe is jetted or drilled into the subsea floor. Thereafter, a casing drilling assembly comprising a drill casing and a drilling assembly is connected to the drill pipe using a crossover. The drilling assembly urged into the seafloor until a casing latch on the drilling assembly is engaged with a casing profile of the conductor pipe. During drilling, instrumentation in the drilling assembly may be used to measure geophysical data. The measured data may be used to optimize the drilling process. After the drill casing is engaged with the conductor pipe, cementing may be performed to set the drill casing.
This application claims benefit of co-pending U.S. Provisional Patent Application Ser. No. 60/657,221, filed on Feb. 28, 2005, which application is incorporated herein by reference in its entirety.
This application is a continuation-in-part of co-pending U.S. patent application Ser. No. 11/063,459, filed on Feb. 22, 2005, which is a divisional of U.S. patent application Ser. No. 10/331,964, filed on Dec. 30, 2002, now U.S. Pat. No. 6,857,487, which patent and applications are incorporated herein by reference in their entirety.
This application is also a continuation-in-part of co-pending U.S. patent application Ser. No. 10/775,048, filed on Feb. 9, 2004, which application is incorporated herein by reference in its entirety.
BACKGROUND OF THE INVENTION1. Field of the Invention
Embodiments of the present invention generally relate methods and apparatus for drilling a well beneath water. More specifically, embodiments of the present invention relate to methods and apparatus for drilling a deep water well.
2. Description of the Related Art
In well completion operations, a wellbore is formed to access hydrocarbon-bearing formations by the use of drilling. Drilling is accomplished by utilizing a drill bit that is mounted on the end of a drill support member, commonly known as a drill string. To drill within the wellbore to a predetermined depth, the drill string is often rotated by a top drive or rotary table on a surface platform or rig, or by a downhole motor mounted towards the lower end of the drill string. After drilling to a predetermined depth, the drill string and drill bit are removed and a section of casing is lowered into the wellbore. An annular area is thus formed between the string of casing and the formation. The casing string is temporarily hung from the surface of the well. A cementing operation is then conducted in order to fill the annular area with cement. The casing string is cemented into the wellbore by circulating cement into the annular area defined between the outer wall of the casing and the borehole using apparatuses known in the art. The combination of cement and casing strengthens the wellbore and facilitates the isolation of certain areas of the formation behind the casing for the production of hydrocarbons.
It is common to employ more than one string of casing in a wellbore. In this respect, the well is drilled to a first designated depth with a drill bit on a drill string. The drill string is removed. A first string of casing or conductor pipe is then run into the wellbore and set in the drilled out portion of the wellbore, and cement is circulated into the annulus behind the casing string. Next, the well is drilled to a second designated depth, and a second string of casing, or liner, is run into the drilled out portion of the wellbore. The second string is set at a depth such that the upper portion of the second string of casing overlaps the lower portion of the first string of casing. The second liner string may then be fixed, or “hung” off of the existing casing by the use of slips which utilize slip members and cones to frictionally affix the new string of liner in the wellbore. The second casing string is then cemented. This process is typically repeated with additional casing strings until the well has been drilled to total depth. In this manner, wells are typically formed with two or more strings of casing of an ever-decreasing diameter.
In the construction of deep water wells, a conductor pipe is typically installed in the earth prior to the placement of other tubulars. Referring to
The general procedure for drilling the hole below the conductor pipe to install the structural or surface casing is to drill with a BHA on the end of the drill string used to run the conductor pipe in the hole. Surface casing is casing run deep enough to cover most know shallow drilling hazards, yet the casing is typically located above any anticipated commercial hydrocarbon deposits. The BHA will as a minimum consist of a drilling or jetting bit. The BHA may also contain a mud motor, instrumentation for making geophysical measurements, an under reamer, stabilizers, as well as a drill bit or an expandable drill bit.
The hole is normally drilled with sea water or an environmentally friendly drilling fluid, which is also known as “mud”. Sea water or environmentally friendly mud is used because the drilling fluid is allowed to exit into open water at the top of the conductor pipe. This drilling method is generally referred to as riserless drilling (also referred to as the “pump and dump” drilling method). The reason this method is used is because the riser, which is a pipe run from the top of the well at the mud line to the rig, has to be supported at the mud line. In the earlier stages of casing placement, support for the riser is often unavailable. If a riser is in place, the drill string is run inside the riser, thereby forming an annulus between the OD of the drill string and the inside diameter (“ID”) of the riser. The annulus provides a path for the drilling fluid to return to the rig during the drilling process. To get the support required to run the riser, the structural casing and/or the surface casing must be in place first.
The surface casing hole is typically drilled to a target depth and then a viscous “pill” made up of weighted and/or thickened fluid is placed in the hole as the drill string is extracted from the hole. The viscous pill is intended to keep any formation or ocean flows from flowing into the drilled hole and to keep the hole from collapsing before the casing is run in the hole. Another purpose of the viscous pill is to keep cement from filling up the rat hole after the surface casing is placed and while it is being cemented in. The rat hole is the difference in depth between the bottom of the casing and the bottom of the hole and is created by drilling deeper than the length of the casing to be run. If cement fills the rat hole, then the next drill string that goes through the cement in the rat hole may core it and the remaining cement, since it is unsupported could fracture and fall in on the drill string, thereby possibly trapping the drill string in the hole.
In some instances, a weighted fluid such as a drilling mud or weighted brine is required to control formation flows of a shallow water flow and/or a shallow gas flow. As an example, if the hole is being drilled at 90 feet per hour and the target depth is 2000 feet, it will take in excess of 22 hours to drill the well, and if the pump rate is 900 gallons per minute during drilling, it will take approximately 1,200,000 gals of weighted fluid to drill the well. Because this occurs during the riserless stage, most of the weighted fluid will be lost to the open water. Due to the cost of weighted fluids, many operators provide the BHA with instrumentation to determine when to switch from sea water to weighted fluid. The primary instrument used is the Pressure While Drilling or “PWD”. The PWD will monitor annular pressure to detect a change in pressure that could indicate the drill bit has penetrated a shallow water or gas flow. When that occurs, the drilling fluid is weighted up and pumped down the drill string to the bit. However, for the fluid to be effective in shutting off the flow, enough weighted fluid must be supplied to fill the hole to a level above the bit for the fluid to have enough hydrostatic head to stop the flow. For a 26″ ID hole with an 8″ OD drill string 25 gallons of fluid per foot is needed to fill the hole. Even with the assistance of PWD, a significant amount of weighted drilling fluid must still be used.
With the conductor pipe at the target depth and the latch released, and the hole drilled for the next casing string the drill string is pulled out of the hole (“POOH”) back to the rig floor and the conductor pipe stays in the hole. The conductor pipe is typically not cemented in place.
With the conductor pipe in place and the hole drilled for the next string of casing, the next step may be to install structural pipe or surface casing. Some wells may require structural pipe ahead of the surface casing. The structural pipe is typically placed in a well to help mitigate a known drilling hazard(s), e.g., shallow water flow, shallow gas flow, and low pore pressure. Wells with these types of drilling hazards tend to fracture when the minimum drilling fluid weight needed to control shallow water flows and/or shallow gas flows is used. Structural pipe may also help support the wellhead.
Running large diameter casing in a predrilled hole presents several challenges. One such challenge arises when the hole has low formation pore pressure. In that instance, running the casing too fast could surge the well, i.e., put excessive pressure on the bore of the well, and cause the bore hole to fracture or break down a surrounding earth formation. Typically, breaking down or fracturing the formation causes the formation to absorb fluid. The normal method of keeping the surge pressures low is to run the casing slowly. On drilling rigs, the extra time needed to run the casing may substantially increase the operating cost.
A need, therefore, exists for apparatus and methods of running casing into the earth below water. There is also a need to quickly drill and case a well, preferably in a single trip.
SUMMARY OF THE INVENTIONMethods and apparatus are provided to place a conductor pipe and a casing in a subsea environment. In at least one embodiment, a conductor pipe is jetted or drilled into the subsea floor. Thereafter, a casing drilling assembly comprising a drill casing and a drilling assembly is connected to the drill pipe using a crossover. The drilling assembly urged into the seafloor until a casing latch on the drilling assembly is engaged with a casing profile of the conductor pipe. During drilling, instrumentation in the drilling assembly may be used to measure geophysical data. The measured data may be used to optimize the drilling process. After the drill casing is engaged with the conductor pipe, cementing may be performed to set the drill casing.
In another embodiment, the conductor pipe and the casing may be placed into the earth as a nested casing strings assembly. A casing latch is used to couple the casing to the conductor pipe. In this respect, the conductor pipe rotated with casing during drilling. After conductor pipe is placed at target depth, the casing is released from the conductor pipe and is drilled further into the earth. In one embodiment, the casing is drilled until a wellhead on the casing is engaged with a wellhead of the conductor pipe. In another embodiment, a collapsible joint is provided on the casing to facilitate the engagement of the casing wellhead with the wellhead of the conductor pipe.
In another embodiment, the conductor pipe and the drill casing are connected together to form a combination string. The conductor pipe and the drill casing are mated at the surface in the same arrangement as their final placement in the hole. In this respect, this embodiment does not require casing latch between the conductor pipe and the drill casing. A drill pipe and a drilling latch may be used to rotate the combination string to drill the hole in which the string will be place. The combination string is cemented in place after the hole is drilled. Preferably, the cement occurs before the drill latch in the drill casing is released. In this case, both the conductor and drill casing will be cemented in place after the hole is drilled and before the drill latch in the drill casing is released.
In yet another embodiment, a method of lining a wellbore comprises positioning a first casing in the wellbore, providing a drilling assembly; lowering the drilling assembly into the first casing; and coupling the second casing to the first casing. Preferably, the drilling assembly includes a second casing; a conveying member; a tubular adapter for coupling the conveying member to the second casing, wherein the tubular adapter is adapted to transfer torque from the conveying member to the second casing; and a drilling member disposed at a lower end of the second casing.
In yet another embodiment, a method for lining a portion of a wellbore comprises rotating a casing assembly into the wellbore while forming the wellbore, the casing assembly comprising an outer casing portion and an inner casing portion wherein the outer and inner casing portions are operatively connected; disabling a connection between the inner casing portion and the outer casing portion; and lowering the inner casing portion relative to the first casing portion.
In yet another embodiment, an apparatus for lining a wellbore comprises a casing; a drilling member disposed at a lower end of the casing; a conveying member; and a tubular adapter for coupling the conveying member to the casing.
In yet another embodiment, a method of lining a wellbore comprises positioning a first casing in the wellbore; providing a drilling assembly having a second casing and a drilling member; forming a wellbore using the drilling assembly; connecting a conveying member having a diameter less than the second casing to the second casing, wherein a tubular adapter is used to couple the conveying member to the second casing; providing a casing hanger on the second casing; and coupling the second casing to the first casing.
BRIEF DESCRIPTION OF THE DRAWINGSSo that the manner in which the above recited features of the present invention can be understood in detail, a more particular description of the invention, briefly summarized above, may be had by reference to embodiments, some of which are illustrated in the appended drawings. It is to be noted, however, that the appended drawings illustrate only typical embodiments of this invention and are therefore not to be considered limiting of its scope, for the invention may admit to other equally effective embodiments.
FIGS. 14A-Q are schematic view of a method of drilling with casing in water depths shallower than the casing being run.
Embodiments of the present invention provide a method of placing casing in the earth beneath the water. In one embodiment, the method involves using casing as part of the drill string. In particular, the method involves drilling with casing in deep water.
In situations where the water depth is deeper than the length of drill casing being run, the drill string may be extended by adding drill pipe. In this respect, a connection crossover is used to connect the smaller diameter drill pipe to the casing. The crossover is adapted to transmit torque, axial, and tensile load from the drill pipe to the casing. The crossover is also adapted to detach from the casing to permit retrieval of the drill pipe and the crossover after the casing is placed at the desired location.
In one embodiment, a drilling latch 120 is used to facilitate the positioning of the drill casing 105 in the previously run conductor pipe 110 and drilling below the conductor pipe 110, as illustrated in
One exemplary drilling latch usable with the embodiment shown in
The operation of the drilling latch 120 shown in
The drill latch 120 is released by setting weight down, which causes the clutch 134 in the drill latch 120 to release from the spline 132. The drill pipe 112 is then rotated thus transmitting the rotation to the locking mandrel 127 to cause it to move up and release the axial keys 128. With the axial keys 128 released, the drill pipe 112 is picked up and the drilling latch 120 disengages from the drilling profile 125 in the drill casing 105. The drill pipe 112, drilling latch 120, and anything below the drilling latch 120, e.g., interstring 150, top of SSR sub assembly, bottom hole assembly, instrumentation, are then pulled out of the hole (“POOH”).
The drilling latch 120 may be released when the casing 105 is supported by the previously run conductor pipe 110. In that respect, the exterior portion of the casing 105 includes a casing latch 170 adapted to engage a casing profile 175 formed on the inner surface of the conductor pipe 110, as shown in
Several advantages may be achieved using the drilling latch 120. First, the drilling latch provide an effective method to run a bottom hole assembly at the bottom of the drill casing that's couple to an interstring and to recover the interstring and the BHA without dropping the drill casing before cementing. Second, the drilling latch allows a rat hole to be created using a drill shoe and thereafter release from the drill casing without having to wait for the cement to set up. Third, the drilling latch provides an efficient method of finding the planned depth of the hole without depending on pipe tally. Fourth, the drilling latch allows the pipe to grow and not shut off on the bottom of the hole during cementing. This is advantageous because in some cementing operations, a casing string will elongate due to the weight of the cement inside the casing, particularly in SSR plug jobs. This elongation may cause the bottom of the drill casing to “jam” into the bottom of the hole and shut off flow and cause a failure.
In another embodiment, the crossover may comprise a liner running tool adapted to run and rotate a liner for drilling or reaming the liner into the hole. An exemplary liner running tool designed for transmitting torque to a casing drill string is disclosed in U.S. Pat. No. 6,241,018, issued to Eriksen, which patent is assigned to the same assignee of the present application and is incorporated herein by reference in its entirety. A running tool suitable for such use is manufactured by Weatherford International and sold under the name “R Running Tool.” Another exemplary liner running tool is disclosed in U.S. Pat. No. 5,425,423, issued to Dobson, et al., which patent is incorporated herein by reference in its entirety. In one embodiment, the running tool includes a mandrel body having a threaded float nut disposed on its lower end to engage a tubular. The running tool also includes a thrusting cap having one or more latch keys disposed thereon which are adapted to engage slots formed on the upper end of the tubular. The thrusting cap is selectively engageable to the mandrel body through a hydraulic assembly and a clutch assembly which is engaged in the run-in position. The hydraulic assembly can be actuated to release the thrusting cap from rotational connection with the mandrel body to allow the threaded float nut to be backed out of the tubular. The clutch assembly is disengaged when the tool is in the weight down position. A torque nut moves down a threaded surface of the thrusting cap to re-engage the thrusting cap and transmit torque imparted by the mandrel body from the drill string to the thrusting cap.
Referring to
In the preferred embodiment, the wellhead is modified with a collar to facilitate the transmission of torque and axial forces from the casing to the drill pipe. In one embodiment, the collar includes a spline to allow rotation and a recess in the inner diameter that will catch a collet or locking dogs to allow transmission of the axial load from the wellhead to the drill pipe.
An alternative crossover may comprise a drilling and/or fishing spear. An exemplary spear suitable for use with embodiments of the present invention is disclosed in U.S. Patent Application Publication No. 2005/0269105, filed by Pietras, which application is incorporated herein by reference in its entirety.
In another embodiment, a drill pipe crossover designed to engage to the ID and/or the OD of the wellhead is used to carry the casing into a predrilled hole. The drill pipe crossover is adapted to transmit torque to the casing. In one embodiment, the crossover comprises a threaded crossover having one end adapted to threadedly engage the drill casing and another adapted to threadedly engage the drill pipe. This threaded crossover has been referred to as a swedge, an adapter, and a “water bushing.” In use, the wellhead crossover is rotated by the drill pipe, thereby rotating the casing to extend the wellbore.
Bottom Hole Drilling Assembly Options
Referring back to
Alternatively, the wellbore may be drilled using a bottom hole assembly located at the lower end of the casing having at least a drill bit. In one embodiment, the drill bit may comprise a pilot bit, an underreamer, and/or reamer shoe. The under reamer may be any device capable of enlarging the hole to a diameter great than the casing diameter, for example, expandable bits. An exemplary expandable bit is disclosed in U.S. Pat. No. 6,953,096, issued to Gledhill, which patent is incorporated herein by reference in its entirety. The bottom hole assembly may also include a mud motor and directional steering equipment such as a bent housing motor, a bent casing joint steering system, an eccentric casing joint, a dynamic steering system, a surface telemetry directed steering system, and a 3D rotary steerable system. The bottom hole assembly may further include instrumentation capable of taking geophysical measurements such as annulus pressure and temperature, making physical measurements in real time, and sending these measurements to the surface using methods such as mud pulse telemetry. These components of the bottom hole assembly may be located below the distillate end of the drill casing or inside the casing. Preferably, these components, unless they are an integral part of the drill casing, should be able to pass through the ID of the drill casing. Exemplary configurations of a bottom hole assembly are disclosed in U.S. Patent Application Publication No. 2004/0221997, filed by Giroux et al., which application is incorporated herein by reference in its entirety.
Cementing Options
At least two cementing options exist when using a drill shoe. In the first option, a subsurface release (SSR) plug assembly 250, 350 may be installed below the crossover 220, 320 between the drill pipe and the drill casing, as illustrated in
As shown in
Another feature of the interstring 150 is a pressure and volume balance length compensator 165. The length compensator 165 allows the interstring 150 to stab-in properly and takes up any excessive length between the stab-in point and the place where the drilling latch 120 attaches to the drill casing 105. The fact the length compensator 165 is both pressure and volume balanced means any change in internal and/or external pressure will not shorten or extend the interstring 150. Such a length compensator is shown and described in United States Patent Application No. 2004/0112603 and U.S. Pat. No. 3,329,221, which are incorporated herein by reference in their entirety.
Use of the interstring 150 provides several benefits. First, because the interstring 150 has a smaller diameter, the interstring 150 allows for quick transport of fluids from the surface to the drill shoe 115. Use of the interstring 150 this simulates drilling with drill pipe. Thus, if a mud weight change is necessary, then pumping the mud down an interstring 150 is the quickest way to the bottom of the hole. Second, the interstring 150 reduces the volume of mud needed because the volume of mud in the ID of the interstring 150 is typically much less than that needed in the ID of a drill casing string 105 without the interstring 150. This should not be confused with the benefit of using drill casing 105 to reduce the volume of mud needed on the outside of the pipe, thereby reducing the total amount of mud needed on location to control the well. Also, leaving the casing 105 in the hole and cementing in one trip eliminates the need for a kill pill mixture to control the well after the hole is drilled and the drill pipe POOH and before the casing 105 is run. The interstring 150 reduces the amount of cement needed and the length of time it takes to cement a well. Third, the interstring 150 allows for instrumentation using current technology near the bottom of the string that can send real time readings back to the surface so the operator can make decisions as the well is being drilled.
When a bottom hole assembly is used below the casing 105, a preferred method is to retrieve the drill pipe 112 to drill casing crossover, and retrieve the interstring 150 and the BHA before cementing the drill casing 105 in place. This requires that the drill casing 105 be hung off in previously run pipe or casing 110 before releasing the crossover from the drill casing 105 and retrieving the interstring 150. Although a liner hanger may be used, a preferable arrangement includes use of the non-rotating casing latch 170 run on the outside of the drill casing 105. See
With the interstring 150 out of the way, a drillable packer 260 is set with wire line or drill pipe 262 near the bottom of the drill casing 105. In one embodiment, the drill pipe 262 may include a stinger 264 for attachment to the drillable packer 260. Cement is then pumped through the drillable packer 260 and to the annulus behind the drill casing 105. See
Alternatively, a liner top system with a SSR type plug set may be used for cementing. The plugs are launched by pumping or dropping darts or balls down the drill pipe. The top plug may be the single direction cementing plug described in U.S. Patent Application Publication No. 2004/0251025 or U.S. Patent Application Publication No. 2004/0251025, which applications are incorporated herein by reference in their entirety. In
Instrument Float Collar
Referring now to
Methods of Drilling with Casing in Deep Water
Method 1
After the conductor pipe 110 is placed at target depth, embodiments of the present invention may be used to install casing. In one embodiment, the casing 105 is equipped with a drilling assembly 115 and is connected to the drill pipe 112 through the drilling latch 120, as illustrated in
Method 2
Another method of drilling with casing in deep water uses a nested casing strings assembly, as shown in
A collapsible joint 490 is provided on the drill casing 405 to facilitate the engagement of the high pressure wellhead 402 with the low pressure wellhead 403. In the event that the advancement of the drill casing 405 is stop before engagement of the wellheads 402, 403, the collapsible joint 490 may be activated to reduce the length of the drill casing 405, thereby allowing the high pressure wellhead 402 to land in the low pressure wellhead 403. An exemplary collapsible joint is disclosed in U.S. Pat. No. 6,899,186, issued to Galloway et al., which patent is incorporated herein by reference in its entirety. In one embodiment, the collapsible joint 490 comprises a joint coupling an upper casing portion 491 to a lower casing portion 492 of the drill casing 405, as shown in
In addition to axially securing the casing portions, the locking mechanism 497 may include a mechanism for a mechanical torque connection. Referring to
In another embodiment, another suitable extendable joint is the retractable joint disclosed in U.S. patent application Ser. No. 11/343,148, filed on Jan. 30, 2006 by Jordan et al., entitled “Retractable Joint and Cementing Shoe for Use in Completing a Wellbore,” which application is incorporated herein by reference in its entirety. Advantageously, use of the retractable joint during drilling would eliminate the need to form a rat hole.
Referring now to
A pressure port 485 having an extrudable ball seat is positioned on the interstring 450 and is adapted to control the release of the drill casing 405 from the conductor pipe 410. A ball may be dropped into the extrudable ball seat to close the pressure port 485, thereby increasing the pressure in the drill casing 405 to cause the casing latch 470 to disengage from the casing profile 475. Preferably, the extrudable ball seat is adapted to allow other larger balls and/or dart to pass.
In operation, the nested casing strings 405, 410 are rotated together to drill the conductor pipe 410 and the drill casing 405 into the earth. When the target depth for the conductor pipe 410 is reached, a ball is dropped into the pressure port to pressurize the drill casing 405. The increase in pressure causes the casing latch 470 to disengage from the casing profile 475, as shown in
Method 3
In another embodiment, the conductor pipe and the drill casing are connected together to form a combination string. The conductor pipe and the drill casing are mated at the surface in the same arrangement as their final placement in the hole. In this respect, this embodiment does not require casing latch between the conductor pipe and the drill casing. A drill pipe and a drilling latch may be used to rotate the combination string to drill the hole in which the string will be place. The combination string is cemented in place after the hole is drilled. Preferably, the cement occurs before the drill latch in the drill casing is released. In this case, both the conductor and drill casing will be cemented in place after the hole is drilled and before the drill latch in the drill casing is released.
Method of Drilling with Casing in Water Depths Shallower than the Casing Being Run
Embodiments of the present invention also provides a method of drilling the casing to depth and setting the casing near the mud line or in previously run casing in situations where the actual water depth is less than the casing length being run. FIGS. 14A-O show a preferred embodiment of drilling with casing to set the casing. It is preferred that drilling with casing from the rig floor 701 is used until the full length of casing has been run. In
Once the design length of drill casing 700 has been run at the rig floor 701, the drill casing 700 is crossed over to drill pipe 740. In this respect, any of the crossovers as discussed above may be used. In
The drill casing 700 is drilled deeper by using drill pipe 740 until the target depth 735 is reached, as illustrated in
Although this method is described for use in a situation where the casing length is longer than the water depth, it is contemplated that the method may also be used where the casing length is shorter than the water depth. In operation, after the casing has been pulled clear of the hole, the casing may be directed back into the hole using a remote operated vehicle (“ROV”), sensors such as sonic or a remote camera located on or in the drill casing near or on or in the drill shoe, or by trial and error in stabbing the casing. Additionally, this method may be used with a nudging bit or a bent casing joint if the drill casing is to be drilled directionally.
Various modifications or enhancements of the methods and apparatus disclosed herein are contemplated. To that end, the drilling methods and systems described in this disclosure are usable with multiple drilling practices using a mobile offshore drilling unit (“MODU”). The drilling methods may be used in a batch setting system where a number of wells are to be drilled from a single template. Further, the drilling systems allow the drilling of the conductor, structural, and/or surface casing on all or selected slots of the template prior to the installation of the permanent drilling structure such as a tension leg platform. Also, because the drilling will be carried out riserless, moving a BOP and riser pipe between holes is not required to set the conductor-structural-surface pipe. Further, use of batch drilling and pre-setting the conductor pipe prior to the installation of the permanent drill structure may reduce the specified weight capacity of the structure and the drilling equipment used to complete the wells.
The drilling methods for the drill casing disclosed herein are also usable with subsequent drilling systems used on MODU, such as mud line BOP with low pressure riser pipe to the surface or mud line shut-off disconnect, such as Cameron's ESG or Geoprober Shut-off System as disclosed in U.S. Pat. No. 6,367,554 and surface BOP.
The drilling methods disclosed herein are applicable to dual gradient drilling systems. An exemplary dual gradient drilling system is disclosed in U.S. Patent Application filed on Feb. 28, 2006 by Hannegan, et al., entitled “Dual Gradient Riserless Drilling System,” which application is incorporated herein by reference in its entirety.
The drilling methods disclosed herein are usable on fixed and jack up drilling platforms.
The drilling methods disclosed herein are applicable to a satellite well as well as an exploratory well. The drilling methods may be used on either offshore or onshore wells.
The drilling methods disclosed herein may be used to drill deeper than the surface casing, such as drilling in a liner and/or drilling in a long string.
The drilling methods disclosed herein may be used with expandable casing. Using an interstring will allow the pipe to be expanded with a cone and/or roller expander system while the interstring is retrieved from the casing.
The drilling methods disclosed herein may be used with an apparatus for controlling a subsea borehole fluid pressure to position a conductor casing below the midline. Such an apparatus is disclosed in U.S. Pat. No. 6,138,774, issued to Bourgoyne, Jr. et al., which patent is incorporated by reference herein in its entirety. In one embodiment, the apparatus includes a pump for moving a fluid through a tubular into a borehole. The fluid, before being pumped, exerts a pressure less than the pore pressure of an abnormal pore pressure environment. The fluid in the borehole is then pressurized by the pump to at least a borehole pressure equal to or greater than the pore pressure of an abnormal pore pressure environment. A pressure housing assembly allows for the drilling of a borehole below the conductor casing into an abnormal pore pressure environment while maintaining the pressurized fluid between a borehole pressure equal to or greater than the pore pressure of the abnormal pore pressure environment, and below the fracture pressure of the borehole in the abnormal pore pressure environment.
Methods and apparatus are provided to place a conductor pipe and a casing in a subsea environment. In one embodiment, a conductor pipe is jetted or drilled into the subsea floor. Thereafter, a casing drilling assembly comprising a drill casing and a drilling assembly is connected to the drill pipe using a crossover. The drilling assembly urged into the seafloor until a casing latch on the drilling assembly is engaged with a casing profile of the conductor pipe. During drilling, instrumentation in the drilling assembly may be used to measure geophysical data. The measured data may be used to optimize the drilling process. After the drill casing is engaged with the conductor pipe, cementing may be performed to set the drill casing.
In another embodiment, the conductor pipe and the casing may be placed into the earth as a nested casing strings assembly. A casing latch is used to couple the casing to the conductor pipe. In this respect, the conductor pipe rotated with casing during drilling. After conductor pipe is placed at target depth, the casing is released from the conductor pipe and is drilled further into the earth. In one embodiment, the casing is drilled until a wellhead on the casing is engaged with a wellhead of the conductor pipe. In another embodiment, a collapsible joint is provided on the casing to facilitate the engagement of the casing wellhead with the wellhead of the conductor pipe.
In yet another embodiment, the conductor pipe and the drill casing are connected together to form a combination string. The conductor pipe and the drill casing are mated at the surface in the same arrangement as their final placement in the hole. In this respect, this embodiment does not require casing latch between the conductor pipe and the drill casing. A drill pipe and a drilling latch may be used to rotate the combination string to drill the hole in which the string will be place. The combination string is cemented in place after the hole is drilled. Preferably, the cement occurs before the drill latch in the drill casing is released. Placed in the hole, to drill the hole insert the combination string In this case both the conductor and drill casing will be cemented in place after the hole is drilled and before the drill latch in the drill casing is released.
In yet another embodiment, a method of lining a wellbore comprises positioning a first casing in the wellbore, providing a drilling assembly; lowering the drilling assembly into the first casing; and coupling the second casing to the first casing. Preferably, the drilling assembly includes a second casing; a conveying member; a tubular adapter for coupling the conveying member to the second casing, wherein the tubular adapter is adapted to transfer torque from the conveying member to the second casing; and a drilling member disposed at a lower end of the second casing.
In yet another embodiment, a method for lining a portion of a wellbore comprises rotating a casing assembly into the wellbore while forming the wellbore, the casing assembly comprising an outer casing portion and an inner casing portion wherein the outer and inner casing portions are operatively connected; disabling a connection between the inner casing portion and the outer casing portion; and lowering the inner casing portion relative to the first casing portion.
In yet another embodiment, an apparatus for lining a wellbore comprises a casing; a drilling member disposed at a lower end of the casing; a conveying member; and a tubular adapter for coupling the conveying member to the casing.
In yet another embodiment, a method of lining a wellbore comprises positioning a first casing in the wellbore; providing a drilling assembly having a second casing and a drilling member; forming a wellbore using the drilling assembly; connecting a conveying member having a diameter less than the second casing to the second casing, wherein a tubular adapter is used to couple the conveying member to the second casing; providing a casing hanger on the second casing; and coupling the second casing to the first casing.
In one or more embodiments described herein, the conveying member comprises drill pipe.
In one or more embodiments described herein, the tubular adapter comprises a crossover.
In one or more embodiments described herein, the tubular adapter comprises a tubular running tool.
In one or more embodiments described herein, the tubular adapter comprises a latch disposed on the conveying member, the latch engageable with a profile formed on the second casing.
In one or more embodiments described herein, the tubular adapter comprises an internal tubular gripping member.
In one or more embodiments described herein, the tubular adapter comprises threaded crossover.
In one or more embodiments described herein, the conveying member is released from the second casing.
In one or more embodiments described herein, the conveying member is retrieved.
In one or more embodiments described herein, the second casing is cemented.
In one or more embodiments described herein, a collapsible joint to reduce a length of the second casing is used.
In one or more embodiments described herein, the first casing includes a first wellhead and the second casing includes a second wellhead, wherein the second wellhead is adapted to seat in the first wellhead.
In one or more embodiments described herein, the conveying member is coupled to a top drive.
In one or more embodiments described herein, the drilling member comprises a drill shoe.
In one or more embodiments described herein, the drilling member comprises a drill bit and an underreamer.
In one or more embodiments described herein, an interstring coupled to the tubular adapter and the drilling member is provided.
In one or more embodiments described herein, a length compensator is used to change a length of the interstring.
In one or more embodiments described herein, plug/ball receiving member is provided.
In one or more embodiments described herein, cement bypass valve is provided.
In one or more embodiments described herein, a MWD unit is provided.
In one or more embodiments described herein, a memory gage and an inclination gage are provided.
In one or more embodiments described herein, an instrument float collar is provided.
In one or more embodiments described herein, the instrument float collar comprises one or more sensors for measuring geophysical parameters.
In one or more embodiments described herein, one or more cementing plugs are provided.
In one or more embodiments described herein, an apparatus for controlling a subsea borehole fluid pressure to position a conductor casing below the midline is provided.
In one or more embodiments described herein, a drilling fluid is changed in response to the measured one or more geophysical parameters.
In one or more embodiments described herein, the tubular adapter comprises a spiral joint.
In one or more embodiments described herein, the tubular adapter comprises a spiral joint.
In one or more embodiments described herein, a motor for rotating the drilling member is provided.
While the foregoing is directed to embodiments of the present invention, other and further embodiments of the invention may be devised without departing from the basic scope thereof, and the scope thereof is determined by the claims that follow.
Claims
1. A method of lining a wellbore, comprising:
- positioning a first casing in the wellbore;
- providing a drilling assembly having: a second casing; a conveying member having a diameter less than the second casing; a tubular adapter for coupling the conveying member to the second casing, wherein the tubular adapter is adapted to transfer torque from the conveying member to the second casing; and a drilling member disposed at a lower end of the second casing;
- lowering the drilling assembly into the first casing; and
- coupling the second casing to the first casing.
2. The method of claim 1, wherein the conveying member comprises drill pipe.
3. The method of claim 1, further comprising cementing the second casing.
4. The method of claim 1, wherein the tubular adapter comprises a tubular running tool.
5. The method of claim 1, wherein the tubular adapter comprises a latch disposed on the conveying member, the latch engageable with a profile formed on the second casing.
6. The method of claim 1, wherein the tubular adapter comprises an internal tubular gripping member.
7. The method of claim 1, wherein the tubular adapter comprises crossover.
8. The method of claim 1, further comprising releasing the conveying member from the second casing.
9. The method of claim 8, further comprising retrieving the conveying member.
10. The method of claim 1, further comprising providing a wellhead on the first casing and a casing hanger on the second casing, wherein the casing hanger is adapted to seat in the wellhead.
11. The method of claim 1, further comprising providing a collapsible joint to reduce a length of the second casing.
12. The method of claim 11, further comprising providing a first wellhead on the first casing and a second wellhead on the second casing, wherein the casing hanger is adapted to seat in the wellhead.
13. The method of claim 12, further comprising activating the collapsible joint to reduce the length of the second casing, thereby seating the second wellhead in the first wellhead.
14. The method of claim 1, wherein lowering the drilling assembly comprises rotating the second casing and the conveying member.
15. The method of claim 1, wherein coupling the second casing to the first casing comprises providing the second casing with a casing latch and the first casing with a latch receiving member and engaging the casing latch to the latch receiving member.
16. The method of claim 15, wherein the latch receiving member comprises a latch profile.
17. The method of claim 15, wherein the casing latch is adapted to allow rotation of the second casing without rotating the first casing.
18. The method of claim 1, further comprising measuring one or more geophysical parameters while drilling.
19. The method of claim 18, further comprising changing a drilling fluid in response to the measured one or more geophysical parameters.
20. The method of claim 1, wherein positioning the first casing comprises drilling the wellbore to receive the first casing while maintaining a pressurized fluid between a wellbore pressure equal to or greater than the pore pressure and below the fracture pressure of the wellbore.
21. The method of claim 1, wherein positioning the first casing and lowering the drilling assembly is performed simultaneously.
22. A method for lining a portion of a wellbore, comprising:
- rotating a casing assembly into the wellbore while forming the wellbore, the casing assembly comprising an outer casing portion and an inner casing portion wherein the outer and inner casing portions are operatively connected;
- disabling a connection between the inner casing portion and the outer casing portion; and
- lowering the inner casing portion relative to the first casing portion.
23. The method of claim 22, wherein the casing assembly further comprises a drill pipe coupled to the inner casing portion.
24. The method of claim 23, wherein the drill pipe is releasably coupled to the inner casing portion.
25. An apparatus for lining a wellbore, comprising:
- a casing;
- a drilling member disposed at a lower end of the casing;
- a conveying member having a diameter less than the casing; and
- a tubular adapter for coupling the conveying member to the casing.
26. The apparatus of claim 25, wherein the tubular adapter comprises a crossover.
27. The apparatus of claim 25, wherein the tubular adapter comprises a tubular running tool.
28. The apparatus of claim 25, wherein the tubular adapter comprises a latch disposed on the conveying member, the latch engageable with a profile formed on the second casing.
29. The apparatus of claim 25, wherein the tubular adapter comprises an internal tubular gripping member.
30. The apparatus of claim 25, wherein the drilling member comprises an underreamer.
31. The apparatus of claim 25, wherein the conveying member comprises drill pipe.
32. The apparatus of claim 25, wherein the conveying member is coupled to a top drive.
33. The apparatus of claim 25, further comprising a collapsible joint to reduce a length of the casing.
34. The apparatus of claim 33, wherein the casing further comprises a wellhead adapted to seat in a wellhead of a second casing.
35. The apparatus of claim 25, wherein the drilling member comprises a drill shoe.
36. The apparatus of claim 25, wherein the drilling member comprises a drill bit.
37. The apparatus of claim 25, further comprising an interstring coupled to the tubular adapter and the drilling member.
38. The apparatus of claim 25, further comprising a length compensator.
39. The apparatus of claim 25, further comprising a plug/ball receiving member.
40. The apparatus of claim 25, further comprising a cement bypass valve.
41. The apparatus of claim 25, further comprising a MWD unit.
42. The apparatus of claim 25, further comprising a memory and an inclination gage.
43. The apparatus of claim 25, further comprising an instrument float collar.
44. The apparatus of claim 43, wherein the instrument float collar comprises one or more sensors for measuring geophysical parameters.
45. The apparatus of claim 25, further comprising cementing plugs.
46. The apparatus of claim 25, further comprising an outer casing.
47. The apparatus of claim 46, further comprising a casing latch coupling the casing to the outer casing.
48. The apparatus of claim 47, wherein the outer casing is rotatable with the casing and the drilling member.
49. The apparatus of claim 46, further comprising an apparatus for controlling a subsea borehole fluid pressure to position a conductor casing below the midline.
50. The apparatus of claim 25, wherein the tubular adapter comprises a spiral joint.
51. The apparatus of claim 25, further comprising a motor for rotating the drilling member.
52. A method of lining a wellbore, comprising:
- positioning a first casing in the wellbore;
- providing a drilling assembly having a second casing and a drilling member;
- forming a wellbore using the drilling assembly;
- connecting a conveying member having a diameter less than the second casing to the second casing, wherein a tubular adapter is used to couple the conveying member to the second casing;
- providing a casing hanger on the second casing; and
- coupling the second casing to the first casing.
Type: Application
Filed: Feb 28, 2006
Publication Date: Jun 10, 2010
Patent Grant number: 7938201
Inventors: Richard Giroux (Cypress, TX), Doug Reid (Canning Vale), Albert Odell (Kingwood, TX), Gregory Galloway (Conroe, TX), Mark Murray (Sugar Land, TX)
Application Number: 11/363,817
International Classification: E21B 7/20 (20060101);