GRAVEL PACKING IN LATERAL WELLBORE
A technique facilitates performance of a treatment application in a lateral wellbore. The technique may be employed in an open lateral wellbore and comprises deploying a completion within the open wellbore wall of the lateral wellbore. A service tool is used in cooperation with the completion to perform a gravel packing or other well treatment operation while maintaining hydrostatic pressure on the open lateral wellbore to prevent collapse of the open lateral wellbore. A variety of features may be incorporated into the completion or used in cooperation with the completion to facilitate the well treatment operation while maintaining the hydrostatic pressure until completion of the desired gravel pack.
The present document is based on and claims priority to U.S. Provisional Application Ser. No. 61/431,715, filed Jan. 11, 2011, incorporated herein by reference.
BACKGROUNDHydrocarbon fluids, e.g. oil and natural gas, are obtained from a subterranean geologic formation by drilling a well that penetrates the hydrocarbon-bearing formation. Once a wellbore is drilled, various forms of well completion components may be installed to control and enhance the efficiency of producing fluids from the subterranean geologic formation. In certain applications, the production of hydrocarbon fluids is enhanced by drilling and completing lateral wellbores extending from a primary wellbore, e.g. a generally vertical wellbore. Various gravel packing operations are employed to create gravel packs around the completions in the lateral wellbores.
SUMMARYIn general, the present disclosure provides a methodology and system for treating, e.g. gravel packing, a lateral wellbore. The methodology and system may be employed in an open hole lateral wellbore and comprise a completion conveyed into the lateral wellbore. A service tool is used in cooperation with the completion to perform the gravel packing or other well treatment operation while maintaining hydrostatic pressure on the open lateral wellbore to prevent collapse of the wellbore. A variety of features may be incorporated into the completion or used in cooperation with the completion to facilitate the well treatment operation while maintaining the hydrostatic pressure until completion of the desired gravel pack.
Certain embodiments will hereafter be described with reference to the accompanying drawings, wherein like reference numerals denote like elements. It should be understood, however, that the accompanying figures illustrate only the various implementations described herein and are not meant to limit the scope of various technologies described herein, and:
In the following description, numerous details are set forth to provide an understanding of some illustrative embodiments of the present disclosure. However, it will be understood by those of ordinary skill in the art that the system and/or methodology may be practiced without these details and that numerous variations or modifications from the described embodiments may be possible.
The disclosure herein generally relates to a system and methodology that facilitate performance of a treatment operation in a lateral wellbore. For example, the system and methodology facilitate gravel packing operations in open hole lateral wellbores. According to an embodiment of the well system, a completion is deployed in a lateral wellbore. Subsequently, a junction is completed and coupled to the completion in the lateral wellbore to form an enclosed flow path from a primary wellbore, e.g. a generally vertical wellbore, to the lateral wellbore. After completing the junction, a service tool may be used to facilitate formation of a gravel pack in the lateral wellbore while maintaining hydrostatic pressure. The hydrostatic pressure is applied through the completion in the lateral wellbore and into contact with the open wellbore wall of the lateral wellbore to maintain the integrity of the lateral wellbore by, for example, preventing collapse. The hydrostatic pressure may be released once the gravel pack is completed.
The completion deployed in the lateral wellbore may comprise an alternate path system which directs gravel slurry, for performing the gravel packing operation, along an alternate flow path outside of the primary flow path extending through the completion. The alternate path system may comprise an alternate path tubing, such as a shunt tube, extending along the completion to a desired discharge location. For example, the gravel slurry may be directed along the alternate path tubing to an annular region surrounding one or more sand screens. In some applications, the entire gravel slurry used to form the gravel pack is directed down through an interior of the junction within the primary internal flow path until directed outwardly to the alternate path tubing via, for example, a shrouded port closure sleeve. Thus, the gravel slurry is completely contained, routed along the alternate path tubing, and discharged at the desired location with respect to the gravel pack.
The alternate path system may be employed when performing the gravel packing operation through the completed junction. However, the alternate path system also may be utilized in other types of applications. For example, the alternate path system may be used to facilitate formation of the desired gravel pack prior to completion of the junction between the primary wellbore and the lateral wellbore.
Depending on the specific parameters of a given well environment and well treatment operation, the components of the well system and the specific methodology may be adjusted. For example, the completion deployed in the lateral wellbore may be run with a variety of suitable packers, such as a packer/disconnect, an external casing packer, a swell packer, or a completion packer. The service tool may be designed to both maintain hydrostatic pressure when performing the gravel pack and to allow for a post job cleaning operation. Many other types of components and tools may be incorporated into the system to facilitate well treatment operations, e.g. gravel packing operations, in single or multiple lateral wellbores.
Referring generally to
In
In the example illustrated, completion 22 comprises a packer 34 which may be an open hole packer designed to seal off the lateral wellbore section extending from the packer 34 to the toe of the lateral wellbore 26. By way of example, packer 34 may comprise an external casing packer, a swell packer, a completion packer or another packer suitable for the desired application, e.g. an open hole application. Completion 22 also may comprise a variety of other components, such as a sand screen 36 or a plurality of sand screens 36. The completion 22 also may comprise a polished bore receptacle 38 or other suitable device for receiving the service tool as described in greater detail below. A set down collar 40 also may be used in cooperation with the polished bore receptacle 38. Various other components, such as a flapper valve or other type of fluid loss device 42, may be further incorporated into the completion 22.
In the specific example illustrated, completion 22 is designed to route gravel slurry through an alternate path system 44. By way of example, the alternate path system 44 may comprise an alternate path tubing 46, e.g. at least one shunt tube 48, positioned to deliver gravel slurry to a discharge location 50. The alternate path tubing 46 discharges the gravel slurry at the discharge location 50 to create the desired gravel pack in the annulus around, for example, sand screens 36. According to an example of the present technique, the gravel slurry is directed downhole along a main flow path 52 which extends into the interior of completion 22. As explained in greater detail below, the gravel slurry may be directed through a work string and service tool deployed within the main flow path 52 and coupled with the completion 22. In such an application, the work string and the service tool contain the gravel slurry within main flow path 52 until discharged to the exterior of the main flow path 52, e.g. to the alternate path system 44. In this embodiment, a director device 54 works in cooperation with the service tool to direct gravel slurry into the alternate path tubing 46. During the gravel packing or other servicing operation, the gravel slurry may be directed along the main flow path 52 while remaining fully enclosed within the work string and service tool until the gravel slurry is directed into the alternate path tubing 46 for delivery to the discharge location 50. This enables control and containment of 100% of the gravel slurry used in forming the desired gravel pack around completion 22. By way of example, the director device 54 may comprise a shrouded port closure sleeve 56.
In the example illustrated, a whipstock 58 or other suitable device may be used to facilitate formation of the lateral wellbore 26. The whipstock 58 also may be used to facilitate other completion activities, such as completion of a junction used to couple the completion 22 with an intermediate completion in the region of transition between the primary wellbore 28 and the lateral wellbore 26. The whipstock 58 may be designed as a retrievable component to enable access to possible additional lateral wellbores disposed beneath the illustrated lateral wellbore 26.
Referring generally to
Following placement of the intermediate completion 66, a service tool 72 is run downhole on a work string 74, as illustrated in
Service tool 72 may be designed with a variety of components and features to facilitate performance of a desired well treatment operation. In the example illustrated, the service tool 72 is designed to facilitate a gravel packing operation and comprises a crossover port body 78 located to direct the gravel slurry out of the service tool 72, into the shrouded port closure sleeve 56, and then into the alternate path tubing 46 for delivery to the discharge location 50. By way of further example, the service tool 72 may comprise one or more flow control valves 80, a service tool collet 82, a fluid loss device 84, and suitable seals 86 for forming a seal with the surrounding polished bore receptacle 38. However, these components are described and illustrated to provide examples of components that may be included in the service tool 72, and other embodiments of the service tool may comprise additional, alternate, and/or modified components to facilitate the desired well treatment operation. The service tool 72 and completion 22 also may be used to perform a post gravel pack cleaning operation.
In
In this example, all of the gravel slurry is discharged through the alternate path tubing 46 to create a gravel pack 90, as illustrated in
Once the service tool 72 is withdrawn, an upper completion 92 may be delivered down through primary wellbore 28 for engagement with intermediate completion 66, as illustrated in
In some applications, the ability to complete junction 60 and then to perform the gravel packing operation while maintaining hydrostatic pressure greatly facilitates formation of the desired gravel pack 90. In these applications, the alternate path system 44 may be employed to deliver the gravel slurry, however other gravel slurry delivery systems also may be employed to direct the gravel slurry to a desired location along completion 22. The alternate path system 44 also may be used in a variety of applications to facilitate the gravel packing operation. In some of these applications, the alternate path system 44 is used to contain and deliver 100% of the gravel slurry for a controlled discharge of all of the gravel slurry when forming gravel pack 90. The alternate path system 44 may be used in applications which perform the gravel packing operation after completing junction 60 or prior to completing junction 60.
The specific configuration of well system 20 and completion 22 may vary depending on the parameters of a given application. Additionally, the junction 60, director device 54, alternate path system 44, and other components of the system may be formed in a variety of configurations and from a variety of materials suitable for a selected operation and environment. Also, various types of service tools 72 and work strings 74 may be used to deliver gravel slurry or other treatment fluids down to completion 22 through main flow path 52.
Furthermore, several types of intermediate completions and upper completions may be employed depending on the specifics of a given treatment application and/or production application. Additional completions also may be employed in additional lateral wellbores. Each of the additional lateral wellbores may be gravel packed or otherwise treated as described above. For example, the gravel packing of each additional lateral wellbore can be conducted by completing the corresponding junction and then forming the gravel pack while maintaining hydrostatic pressure. The alternate flow path system also can be employed with each corresponding completion located in the additional lateral wellbores.
Although only a few embodiments of the system and methodology have been described in detail above, those of ordinary skill in the art will readily appreciate that many modifications are possible without materially departing from the teachings of this disclosure. Accordingly, such modifications are intended to be included within the scope of this disclosure as defined in the claims.
Claims
1. A method of treating a well, comprising:
- completing a junction and connecting the junction with a completion located in an open hole lateral wellbore;
- deploying a service tool into the completion; and
- after completing the junction, using the service tool to perform a gravel packing operation in the open hole lateral wellbore while maintaining hydrostatic pressure in the open hole lateral wellbore to prevent collapse of the open hole lateral wellbore.
2. The method as recited in claim 1, further comprising performing the gravel packing operation through an alternate path tubing separate from a main flow path of the completion.
3. The method as recited in claim 2, wherein performing comprises directing a gravel slurry along an enclosed path within an interior of the junction and out into the alternate path tubing for delivery to a desired discharge location.
4. The method as recited in claim 2, wherein performing comprises directing a gravel slurry along an enclosed path within an interior of the junction and out into the alternate path tubing in the form on at least one shunt tube.
5. The method as recited in claim 1, further comprising releasing the hydrostatic pressure after completing the gravel pack operation.
6. The method as recited in claim 1, further comprising maintaining sand exclusion within the junction.
7. The method as recited in claim 3, wherein directing comprises using a shrouded port closure sleeve to direct the gravel slurry into the alternate path tubing.
8. The method as recited in claim 1, further comprising using the service tool to perform a post gravel pack cleaning operation in the open hole lateral wellbore.
9. A well system, comprising:
- a completion with a sand screen, a shrouded port closure sleeve, an alternate path tubing extending from the shrouded port closure sleeve to the sand screen, and a packer, the completion enabling hydrostatic pressure to be maintained on the formation when the completion is placed in a lateral wellbore;
- a junction which may be completed and joined with the completion to enclose a primary flow path between an intermediate completion in a generally vertical wellbore and the completion in the lateral wellbore; and
- a service tool selectively engaged with the completion in a manner able to maintain the hydrostatic pressure while a gravel slurry is delivered along the primary flow path within the junction and the completion to form a gravel pack.
10. The well system as recited in claim 9, wherein the alternate path tubing comprises at least one shunt tube.
11. The well system as recited in claim 9, wherein the packer comprises an external casing packer.
12. The well system as recited in claim 9, wherein the packer comprises a swell packer.
13. The well system is recited in claim 9, wherein the packer comprises a completion packer.
14. The system as recited in claim 9, further comprising a disconnect sub coupling the completion to the junction.
15. A method, comprising:
- providing a completion with a sand screen and a packer which seals against open wellbore wall of a lateral wellbore;
- running the completion downhole into the lateral wellbore;
- engaging a service tool with the completion;
- performing a gravel packing operation to create a gravel pack around the completion via the service tool by routing a gravel slurry from the service tool and out to an alternate path tubing separate from a main flow path of the completion; and
- maintaining hydrostatic pressure via the completion and the service tool during the gravel packing operation.
16. The method as recited in claim 15, further comprising maintaining open hole stability in the lateral wellbore.
17. The method as recited in claim 15, further comprising performing a post gravel pack cleaning operation.
18. The method as recited in claim 15, further comprising completing a junction prior to performing the gravel packing operation.
19. The method as recited in claim 15, further comprising completing a junction after performing the gravel packing operation.
20. The method as recited in claim 15, wherein performing the gravel packing operation comprises delivering gravel through the alternate path tubing in the form of at least one shunt tube.
Type: Application
Filed: Dec 5, 2011
Publication Date: Jul 12, 2012
Inventors: Wesley Ryan Atkinson (Katy, TX), Clay E. Bryant (Rosharon, TX), Sidney Jasek (Pearland, TX)
Application Number: 13/310,843
International Classification: E21B 43/04 (20060101);