METHOD FOR IMPROVING THE STRUCTURAL STABILITY OF AN EXISTING BUILDING CONSTRUCTION
The present invention relates to a method for improving considerably the structural stability of a building construction of already existing reinforced concrete (for example building constructions, schools, hospitals, bridges, etc.).
Currently it is believed that with the current seismic rules, which provide even the thickening of the stirrups of the pillars and beams near the nodes, one is sufficiently protected from earthquakes in the new building constructions and above all one takes care of intervening on the existing building constructions, mainly with wrapping, ringing, stiffening systems and other outside the nodes. It is believed that this safety for all, both new and existing, constructions of reinforced concrete (hereinafter r.c.) is a huge error as it does not take into consideration in a suitable way the structure situation in the dynamic phase thereof determined by the seism.
Upon starting and increasing the seismic pushes, and the corresponding oscillations of the construction, the neutral axis starts entering the section and, when there is the tilting on the right of the construction, the left side of the section, is tensioned whereas the one on the right is compressed. In the subsequent tilting on the left of the construction the situation is reversed and the portion on the right of the section is tensioned whereas the one on the left is compressed. Upon still increasing the horizontal seismic pushes the neutral axis moves more and more towards the edges of the section until going out of them, by causing larger and larger slits on the tensioned portion and higher and higher compressions on the compressed portion. This because in those subsequent oscillation moments the gravity force, and therefore the weight of the pillar section, do not disappear but continue to act. For example, if one consider the instants, the second fractions, wherein the neutral axis, in a section of a pillar with side of cm. 30 with load of 75,000 (75 thousand) Kg., it lies progressively at 2.5 cm.-0.5 cm.-1 mm. from the edge, equal to 75-15-3 cm2., respectively, of compressed concrete (cnr), there is a compression on the cnr respectively of 1,000 Kg/cmq.-5,000 Kg/cmq.-25,000 Kg/cmq.; these compressions are not sustainable whatever system is adopted for increasing the resistance, even a strong thickening of the stirrups. The section is destroyed starting from the outside towards the inside, that is from the edges towards the centre, which is the most resistant one due to the geometrical-physical aspect itself of the section. Then, it is necessary to invert the current tendency of the art and to reinforce even the section centre, taking into consideration the resilience concept. The subsequent reinforcements, from the periphery towards the centre, reduce considerably, among other things, the oscillations (by 30-40%) and consequently the damages even related to the plants, by allowing to continue to benefit from home-property. Currently only the vertical irons are put near the edges so that the irons, on the opposite sides, have the greater distance (the arm) and then they can be exploited in the whole tensile strength thereof. But upon doing that only a contrast, stopping structure is arranged, which is considered stronger than the disruptive capability of the earthquake. Therefore, there is no the adaptation which the living organisms have, for example the trees, which apart from the most external rings have the innermost ones which, during the wing push, cooperate and contribute to reduce the disruptive action of the most external rings and when these gradually cede they take over with whole the resistance capability thereof (ecological resilience).
The problem of improving the structural stability of the building constructions of reinforced concrete, both the existing ones and the new constructions, is then very felt.
SUMMARY OF THE INVENTIONSuch problem is solved by a method according to claim 1, a subject of the present invention is also a building construction of reinforced concrete according to claim 12.
In a first aspect the present invention relates to a method for improving considerably the structural stability of a building construction of already existing reinforced concrete (for example building constructions, schools, hospitals, bridges, etc.) having one or more pillars 3 and one or more beams 4 insisting on said pillars.
Said method comprises the following steps:
performing first of all one or more horizontal drilling according to one or more cross direction to the respective pillar 3 so as to involve the beam(s) 4 insisting on said respective pillar;
inserting a first reinforcement 5 in said first drilling;
casting cementitious filling material, in particular fluidized expanding mortar, inside said first drilling;
performing a second vertical drilling in substantially central position and along the longitudinal axis of said one or more pillars 3;
inserting a second reinforcement 1, in particular a metal cage or tubular structure, in said vertical drilling having a plurality of openings 2 apt to drain off a cementitious filling material from the inside to the outside of said second reinforcement;
casting said cementitious filling material, in particular fluidized expanding mortar, inside said second reinforcement up to a complete filling of said second drilling.
Said first horizontal drillings on the outer faces of the structure of reinforced concrete, at the beams placed at the structural nodes, are finalized to insert a pre-strengthening reinforcement in each beam which will be subjected to a weakening due to the subsequent cut of some irons during the vertical drilling of the pillar; in this way each pre-strengthened beam could “enter in action”, that is settle and begin to load at the same time of the above-mentioned vertical drilling.
The present invention, according to different embodiments, applies both to the existing structures of r.c. and the new constructions.
A second subject of the present invention is a building construction of reinforced concrete having one or more pillars and one or more beams insisting on a respective pillar, wherein said one or more beams comprise a first horizontal reinforcement for the whole longitudinal axis of said beam and wherein said one or more pillars comprise in substantially central position and for the whole longitudinal axis of said pillar a second vertical reinforcement and wherein said second vertical reinforcement has a plurality of openings apt to drain off a cementitious filling material, in particular expanding mortar, from the inside di said reinforcement to the outside di said reinforcement and wherein said second reinforcement is filled with said cementitious material.
Preferred features of the present invention are subject of the depending claims.
Other advantages, together with the features and the use modes of the present invention, will result evident from the following detailed description of some preferred embodiments, shown by way of example and not with limitative purpose, by making reference to the figures of the enclosed drawings.
The present invention will be described in details hereinafter by making reference to the above-mentioned figures. As shown in the abstract, a first subject of the present invention relates to a method for improving considerably the structural stability of an already existing building construction of reinforced concrete (for example buildings, schools, hospitals, bridges, etc.) having one or more pillars 3 and one or more beams 4 insisting on said pillars.
According to an embodiment a first drilling could be performed in cross direction to the pillar 3 so as to involve the beam 4 insisting on said pillar. For example, a first drilling, a horizontal hole, is performed orthogonally to the face, penetrating the beam 4 preferably for a depth of about 1.5 m. at the central portion of the section of the high beam sustaining the last flooring and another hole at the low beam sustaining the penultimate flooring. Both holes have to cross the pillar and they have to enter the beams. Consequently it is possible even to control the precision of the subsequent vertical hole (second drilling) performed starting from the top of the pillar and, in case, put suitable guides to ease the precision in the continuation of the vertical drilling. In this sense one continues from the top downwards, floor by floor, at first with the horizontal drillings in the beams (first drilling) and then with the vertical drillings in the pillars (second drilling), which act even as control, in the pillar and beam. The corner peripheral pillars are drilled in the same way of the intermediate peripheral pillars with the addition of a further second horizontal drilling, orthogonal to the other face, still at the central portion of the beam (
According to an embodiment in a building construction of reinforced concrete, subjected to the herein described method, each pillar will have the second (vertical) drilling from the top till the irons of the foundation base; said second vertical drilling will be prolonged beyond the foundation, until reaching a more suitable substrate, for those pillars which do not rest on an optimum ground (
As previously described in said second (vertical) drilling a reinforcement 1 will be inserted, arranged orthogonally with respect to the first reinforcements 5. According to an embodiment a “cross-like” structure will be implemented on the intermediate peripheral pillars (
According to an embodiment in the horizontal holes obtained with con said first drilling first reinforcements 5 will be inserted comprising iron bars or threaded bars or metal tubes, preferably with improved adherence. The iron or threaded bars preferably will have a diameter of at least 20 mm; each one will have means for example a “head” nut to be screwed against a metal plate, for example with thickness of 12 mm, arranged like a “L” on two outer sides of the pillar. Upon screwing the nuts, placed at the “head” of the two bars, against the “L”-like metal plate on the outer sides of the pillar, the beams 4 are drawn to the pillar, thus by acting a pre-compression, at first of passive type which will become of active type as soon as the second vertical drilling will be performed, after the cut of some irons in the beam. The drawing of the beams 4 to the pillar 3 is very important to the purpose of avoiding that the pillars (especially the corner ones) during the seism move from the original position thereof due to the lack of a sufficient connection between pillar and beams. The “L”-like plate could even have two plate-fastening bolts near each one of the two outer sides thereof. Said metal plate could be arranged below the filler by covering it with a metal grid whereon, then, the filler is placed. It is underlined that after a possible seism, producing a “releasing” in the pre-compression, the same can be “recorded” and brought again in action as in the initial state.
The embodiment of
In some existing constructions there could be beams 4 particularly deteriorated in the reinforcements thereof; in some cases all beams of the building construction could be deteriorated, therefore it is necessary implementing more radical interventions by inserting first multiple reinforcements: in this case one will intervene on some or on all beams 4 with first horizontal reinforcements 1 crossing the beams of reinforced concrete for the whole length thereof, from a face to the other one of the building construction, on the faces thereof, with a “head” nut”, metal plates with rectangular or “L”-like shape are tightened. Said first horizontal reinforcements 1, according to the case needs, could be irons with minimum diameter 20 mm. or metal pipes with suitable diameter and thickness. For example, in case of a beam 4 with section 30×50 cm four metal pipes with diameter 40 mm. could be used, with a pair of tubes arranged symmetrically in the high portion of the beam and with another pair of pipes arranged in the same way in the low portion of the beam. Each above-described pipe is inserted in a pre-arranged hole with a diameter of 80 mm, so as to have around the metal pipe expanding mortar with thickness of 2 cm. The horizontal metal pipes could be inserted very near (as far as skimming) the pipe or vertical metal reinforcement even obtaining the advantage that the expanding mortar wrapping the tube or vertical reinforcement mixes homogeneously with the mortar wrapping the horizontal pipes.
The method of the present invention according to a preferred embodiment is described hereinafter wherein the intervention on different pillars is implemented gradually: once completed the intervention on a pillar (by inserting for example the pipe or metal cage 5 preferably for the whole height thereof and by inserting the first reinforcements 1 in the beams 4 of all floors and with a final pouring of the expanding mortar for the whole height thereof), one waits for a time of about 24 hours so that the so-treated pillar starts its full static function before intervening on the subsequent pillar. The waiting time, having used an expanding, fluidified and quick-set mortar, could be very short, about 24-48 hours. By working in this sense, during the global treatment of the building construction, only the treated pillar has a reduced static functionality, as during treatment (however in whole safety as the r.c., by rule, “works” at about ⅓ of its total capability), whereas the same after 24-48 hours acquires almost its full static function, function strengthened by the subjected treatment.
Said second reinforcement in tubular form or metal cage could be inserted in the vertical hole (starting from the top of the building construction) at subsequent tracts, usually long 3 m, screwed or welded according to the following procedure. The first tract is let down into the hole by stopping the upper end with a scarf; the upper end of the first tract of pipe or cage is screwed or welded with the lower end of the second tract of reinforcement and therefore the second tract is let down too, by stopping the upper end with a scarf too; the third tract of pipe or cage is welded or screwed thereto and one proceeds in this sense until inserting the metal reinforcement for the whole weight of the pillar (as far as reaching the lower reinforcement of the foundation or beyond that).
The horizontal bar connecting the pillar to the beam (in case of intermediate peripheral pillar) or to the beams (in case of corner pillar) are inserted starting from the last floor and as far as the first flooring, and acting the precompression. Then, one proceeds in the same way by descending from an upper flooring to the lower one, as far as the first flooring.
Then one passes to the second vertical drilling, to the insertion of the metal reinforcement and of the expanding cementitious mortar.
By acting in this way, the cut of the irons of the beams on the pillar with the second vertical drilling to insert at the centre of the pillar the second reinforcement 1 in the whole height does not cause any damage to the structure, as pre-strengthened and pre-compressed in advance, whereas the insertion of the second reinforcement 1 allows it to acquire earthquake-resistant and collapse-resistant features at a level that otherwise could not be reached.
According to an embodiment and by making reference to the main drawing in
According to an embodiment the metal reinforcement 1 will have a greater thickness in the lowest portion thereof of the building construction, for example for a height of 70 cm above the foundation. For a building construction with considerable height it could be further provide that the several tracts of the metal reinforcement 1 have different thickness and diameter in the height. For example a thickness of 5 mm in the lowest portion; thickness 3 mm. in the intermediate one and a thickness of 2 mm. in the highest portion with telescopic insertion.
According to an embodiment the second reinforcement 1, tube or cage, will be inserted for the whole length of the pillar 3, by screwing or welding several tracts from top to bottom for the height of the construction, by paying attention to make the screwed or welded portion to reach the intermediate height between two floorings, that is where the moment is equal to zero.
According to an embodiment said second reinforcement 1 along its circumference, preferably at each inter-floor, comprises one or more openings 2, for example four holes with diameter of about 4 cm; said openings have the function of draining off the cementitious material, from the inside of the reinforcement to the outside of the reinforcement.
Making the cementitious material to drain off from the inside to the outside of the reinforcement has the purpose of making the cementitious material to compenetrate inside the tubular reinforcement with the one of the cylindrical gap between the pipe and the performed drilling and, therefore, even with the inner surface. The openings 2 along the circumference preferably will be arranged staggered in height one with respect to the other one.
By way of example if the drilling in the pillar is 12 cm and said second reinforcement 5b in form of metal tube inside thereof is 8 cm, the four openings 2 will be placed two at a diameter (AB) and the other two at the diameter orthogonal to the first one (CD), but at a height higher or lower than 20 cm with respect to the height of the inter-floor. The two openings on the diameter AB (horizontal with respect to who observes the figure) have to be higher (or lower) than 10 cm with respect to the intermediate height of the floor; the two openings on the diameter orthogonal to the first one (CD) have to be lower (or higher) than 10 cm of the intermediate height of the floor.
Therefore, if for example the height of the floor is about 3 m, the two openings on the diameter AB will be at the height of mt. 1.50+0.10=1.60 mt.; whereas the two openings on the diameter CD will be at the height of mt. 1.50−0.10 needed resistance=1.40 mt.
The horizontal and vertical drillings will have to be performed exclusively with continuous core boring in the beams and in the pillars, at the centre of their section, as such drilling technique does not damage the structures, especially the precarious ones, contrary to other techniques, such as, for example, the roto-percussion. The vertical drillings in the pillars start at the top and continue as far as the foundation base to insert therein said second reinforcement 5. In case the ground immediately below the foundation of the building construction does not have a sufficient consistency, the drilling (and consequently the insertion of the reinforcement 5 of
The pillars of the reinforced concrete constructions, whereon the vertical drillings will be performed, to insert therein said second reinforcements, could be inner or peripheral pillars. The peripheral pillars, in turn, could be corner pillars or intermediate pillars. In
At the current state of art the resistance to the earthquakes of the new building constructions in r.c. is given by the conventional reinforcement or even by an always equal “central structure-reinforcement at the crossing between pillars and beams”, as height and position. Therefore, there is not a reinforced central core in the pillars and in the beams in r.c., variable with their position in the body of the building construction, with the heights at the several floors and with the corresponding stresses.
Therefore, it is not possible having all possible reinforcements designated in
The pillar with the “VARIABLE REINFORCED CENTRAL CORE” has the following reinforcements as REPORTED in
-
- the outer reinforcement: conventional reinforcement;
- the reinforcement of the central core;
- the iron or the barycentric reinforcement.
The reinforcement of the central core can have reduced height, about 70 cm. below the flooring (that is at the head of the pillar) and about 70 cm. above the flooring or above the foundation beam (that is at the foot of the pillar); or it can be at whole height.
In the first case it corresponds to the earthquake-resistant system already existing in the art (“small pillar-kernel”) and reported above; in the second case it corresponds to what even provided by the present industrial invention.
The barycentric reinforcement or the barycentric iron are not provided in the earthquake-resistant system reported above, but possible ones are provided in the present industrial invention.
The reinforcements of the reinforced central core in the pillars are variable with the position of the pillar themselves in the body of the building construction, with the heights at the several floors and with the corresponding stresses.
The possible position of the pillars in a building construction is designated in
-
- corner peripheral pillars (1,3,7,9);
- not corner peripheral pillars (2,4,6,8);
- (central) internal pillars (5).
Based upon the above-mentioned position of the pillars in a building construction there are the following different stresses at the horizontal forces:
-
- the corner peripheral pillars are those more stressed by the horizontal forces;
- the not corner peripheral pillars are less stressed than the first ones;
- the (inner) central pillars are the less stressed ones.
And therefore, consequently and in conformity with the present industrial invention, with the variable reinforced central core the corner peripheral pillars will be those more reinforced; the not corner peripheral pillars will be less reinforced of the previous ones; the central pillars will be the less reinforced ones.
The reinforcements of the reinforced central core in the pillars are variable even with the heights at the several floors and, therefore, with the corresponding stresses which, obviously, are higher at the low floors and lower at the high floors, that is they decrease from the low floors to the high floors.
-
- conventional reinforcement; reinforced central core at whole height; reinforcement in the centre of gravity of the central core.
The medium floors can be reinforced with:
-
- conventional reinforcement; reinforced central core at whole height; iron in barycentric position.
The high floors can be reinforced with:
-
- conventional reinforcement; reinforced central core not at whole height but only at the head and foot of the pillars (about 70 cm. above is under the flooring); in case barycentric iron.
Pillars and Other Structures in r.c. with Several Reinforced Central Nuclei.
- conventional reinforcement; reinforced central core not at whole height but only at the head and foot of the pillars (about 70 cm. above is under the flooring); in case barycentric iron.
The “variable reinforced central core”, so as described above, is the base element of the present industrial invention, but it can be repeated proportionally to the sizes and the shapes of the structures in r.c. themselves.
-
- pillars in r.c. with two reinforced central nuclei (
FIG. 12a ); pillars or walls in r.c. with three or more reinforced central nuclei (FIG. 12b ).FIG. 12c shows a mast for bridges or analogous structure with several reinforced central nuclei. The reinforced central nuclei are mainly positioned in the corners and they have a “L”-like configuration.
- pillars in r.c. with two reinforced central nuclei (
The shown examples are indicative, and not exhaustive, as the reinforced central nuclei which will be suitably positioned in the structures in r.c., will depend upon the size and the shapes of the several structures in r.c. themselves.
The Variable Reinforced Central Core Approaches the Neutral Axis to the Geometrical Centre of Gravity of the Section
Let's consider
-
- the pillar cm 30×30 without earthquake-resistant system with theoretical last moment Mu=KN 101.00 and Fu=KN 67.33;
- the pillar cm 30×30 equipped with the earthquake-resistant device with theoretical last moment Mu=N 136.10 e Fu=kN 90.73.
As it can be seen from
More precisely, in the first section it is cm 6.9 from the edge; in the second section it is cm 9.1 from the edge and that is it is more shifted towards the centre by 2.2.
By calculating the two areas and by comparing them there is the fact that this involves the increase by 31% of the cross portion subjected to compression: that is with the earthquake-resistant device a reduction in the compression of the concrete per cmq is obtained. There are very serious consequences: cracks and detachment of the concrete cover with greater stresses; bending of the irons due to the peak load with greater stresses etc.; that is there is an increase in the resistance by 31%.
It is obvious that the presence of an additional iron (or reinforcement) in the centre of gravity (
From the comparison between the two diagrams it results very clear that the presence of the reinforced central core reduces the compression, above all on the edge wherein it is more dangerous, as the possible destruction of the concrete cover would bring the reinforcement bars to peak load.
The Reinforcement of the Central Core Reduces the Tension on the Peripheral Irons by Dissipating it in a not Destructive Way.
The conventional reinforcement, with the irons on the periphery of the section, has been provided in this way because the capability of the irons of resisting to traction can be exploited at most on the edges, with the greater distance between the irons arranged on the opposite sides and that is with the greater arm in case of resistant moment with tensioned area and compressed area of the section.
However in this way, it is believed, there is not obtained the best adapting to the horizontal stresses.
If one observes the shape of the trunks and the branches of the trees it can be seen, in a circular section of a trunk or a branch, that there are several concentric rings starting from the outer bark and ending into the central kernel, which is the innermost portion.
If the tree had concentrated its own entire resistance on the most external ring, with the more violent stresses of the wind it would happen, during collision, that the tree branch would win, with its outer ring strengthened at maximum (analogously to what happens with the current state of art) or the wind would win, by overcoming the resistance thereof and breaking it.
On the contrary, the trees, in the millions of years of adaptation on the earth, have shaped and structured with several subsequent defence lines: the concentric rings.
Therefore, under the strongest push of the wind, the most external ring absorbs most part of the stress, whereas the remaining stress is absorbed by the subsequent rings, as second, third, etc. defence line, as far as the most barycentric ring (ecological resilience).
In this way the most external ring is stressed less.
It is believed that with the “VARIABLE REINFORCED CENTRAL CORE” the structures in r.c. can be equipped with analogous adaptability to the horizontal stresses which have the trees to the wind pushes. An experience made by the inventors confirms this. By referring to
Then, growing weights are put, that is metal washers inserted on a vertical iron placed on the balance rod beyond the neutral axis. Several times the following has happened: if the resistance to the balance rod lowering at the weight is left to the spring only at the conventional outer reinforcement, the lowering, and then the corresponding rotation, is much more marked; if to resist to the lowering tilting, even the springs at the reinforcement of the central core and of the barycentric iron are made to intervene, the lowering and the rotation reduce by more than 40%.
Therefore the most external spring (that is the outer iron of the conventional reinforcement) is relieved by 40% at least of the total stress; 40% absorbed by the spring at the reinforcement of the central core and by the spring at the barycentric iron. This happens in the same way in which the rings subsequent to the most external one of a tree's branch absorb a portion of the wind push.
This is visible even graphically in
-
- the area going from the irons of the central core up to the outer limit of the section (tensioning area considered absorbed by the irons of the conventional reinforcement) is about 60% of the total tension area of the tensioned portion;
- the tension area going from the irons of the central core up to the neutral axis (tension are considered absorbed by the irons of the central core and by the barycentric iron) is about 40% of the total tension area of the tensioned portion.
This calculation has been made by default as it is to be considered that a portion of the tension area going from the irons of the central core up to the outer limit of the section—precisely that very near to the irons of the central core—is absorbed by these irons themselves, whereas in the above calculation it has assigned to the outer irons.
This means that with the reinforcement of the central core and with the barycentric iron at least 40% of the total tensile stress is absorbed, by taking it away from the outer irons which are tension-stressed less by the same percentage.
The dissipation of this 40% of total tensile stress is made in not destructive way as it is much below the admitted one.
On the other hand, the experiments made by the applicants have demonstrated that the central core has remained always integer, with vertical irons and stirrups at their place and with the concrete which, during collision, reacted with a metal sound to demonstrate the inner compactness.
Hereinafter the lengthening of the duration of the structures in r.c. according to some embodiments of the present invention is described in details hereinafter.
At the current state of art there are not systems to lengthen globally and radically the duration (nominal life) of the structures in r.c., but in most cases local interventions are made for stopping up the already occurred most superficial damages, such as for example interventions with anti-rust paints, or deeper ones, such as interventions with bandages and/or encirclements of the damages, or deteriorated portions, or other.
According to the system of the present invention the damages or deteriorated portions can be replaced, in the irons and in the concrete (hereinafter cnr), so that the structure in r.c. can return to the level of initial resistance or even upper level.
For this reason the presence of a reinforced central core, in the pillars and in the beams, is required guaranteeing even a temporary resistance in absence of the outer reinforcement. Thus, there is the renewal of the outer portions as it happens in all living organisms.
The living organisms are able to renew the most external portions in direct contact with the outer environment, with its stimuli and stresses, with its aggressiveness etc. by keeping more protected and integral the central core allowing them to renew.
The replacement of the damaged and deteriorated portions in most cases can take place at the foot of a pillar in r.c. at the level of the foundations; at the head and at the foot of a pillar at the level of the several floorings; at the head of a pillar at the level of the covering floorings; in the beams it can take place at the crossing between beams and pillars (structural node).
Duration of the Reinforced ConcreteWith the system for the r.c. renewal proposed with the present invention the duration of the same will lengthen very much. The rust, due to the water succeeding to reach the reinforcement irons of the pillars and of the beams, once the concrete cover with the thickness provided by the existing rule has deteriorated, shortens the duration of the current r.c. At the current state of art, in particular with the recent existing patent device (small pillar-kernel), there is a protecting concrete cover 3 to 5 times bigger than the usual one and therefore there is a corresponding lengthening in the duration of the structures in r.c.; furthermore, the presence of small pillar-kernel intervenes as resolution and as guarantee against planning and/or manufacturing errors. There is further the advantage of being able to replace (with a local intervention, without any damage as the resistance of the pillar and of the beams in r.c. is guaranteed by the reinforced central portion which has remained wholly integral) the tract of deteriorated outer peripheral irons, by redeveloping the pillar and the beam. Thus, by re-developing all deteriorated pillars and beams of a building construction, it is possible to recover the building construction itself by bringing it back to the initial, or even better, resistance conditions.
The Main Factors Threatening the Duration of the Structures in r.c.The main factors threatening the duration of the structures in r.c. are the following ones:
-
- 1) environment aggressiveness;
- 2) little violent earthquakes determining in the bearing structures not visible and little visible cracks and microlesions, which constitute weakness points in the resistance of the structure itself for future earthquakes;
- 3) violent earthquakes;
- 4) action of electromagnetic fields.
Environment Aggressiveness
A cnr, under ideal conditions, correctly packaged and laid, must have a Ph (Ph measures the acidity) comprised between 13 and 14, it must not be porous and must be impermeable. A so-made cnr is able to maintain unaltered the reinforcement steel for a not defined time, that is without limits. These ideal conditions can be obtained, in the central portion of the pillars and of the beams, with the presence of a reinforced central core thereabout one will speak hereinafter. In the current reality the concrete is subjected to the environment aggressiveness.
The main causes contributing to create an aggressive environment for the reinforcement irons of the structures in r.c. are the following:
-
- a) humidity, rising by capillarity above all to the underground and basement floors;
- b) cracks, bringing directly in contact the reinforcements with oxygen of air and water;
- c) the heat of a confined environment, such as for example in a basement wherein the inner temperature is higher than the temperature outside the building construction and there are contemporarily humidity and water, which by evaporating deposits on the coldest areas that is the lowest portions of the pillars;
- d) the exposure to the atmospherical agents of the pillars and of the peripheral beams of a building construction, or the pillars and the beams of the arcades.
It is important underlying the phenomenon of the concrete “carbonation”. The steel, dipped in an alkaline solution (the concrete is slightly alkaline), with ph higher than 11.5, is covered with an oxide patina. Subsequently, in a moderately aggressive environment, such as the hot-humid one of a basement floor, a corrosive process begins which starts from the micro-cracks of the surface layer, it extends over the whole surface and continues even deeply with speed of about 0.6 mm/year. The peripheral pillars and beams of a building construction and the pillars and beams of the arcades can come more easily in contact with rain water, which carries several pathogenic agent for the concrete: oxygen (O2), carbon dioxide (CO2), chlorine, (Cl), etc.
These agents, especially the carbon dioxide, brought in solution by the water can change the Ph, by lowering it at about 9, and causing the phenomenon of the “carbonation”, with the formation of calcium carbonate. The water, with the presence of oxygen, attacks and destroys the surface patina and it starts the corrosive process: the steel desquamates, with decrease in the section and in the adherence capability, it increases in volume and expels the concrete cover, thus increasing even more its contact with air and water, by continuing in this way the degrading process.
Little Violent Earthquakes
The little violent earthquakes (and even the frequent earth tremors only detected by the instruments) can determine in the bearing structures in r.c. visible, little visible or invisible micro-cracks which constitute weakness points for the future earthquakes. Furthermore, these micro-cracks make easier the environment aggressiveness: contact with water, with carbon dioxide, etc.
Violent Earthquakes
It is known that, when there is a so strong earthquake to damage seriously or to destruct even the structures in r.c., it can be seen that a pillar is damaged above all at the head and at the foot (that is in its portions in contact or nearer to the beams of the floors and the foundation beams). When an earthquake of high intensity occurs, the pillars are damaged above all at the “head” and at the “foot” (that is in the portions nearer to the floorings), whereas they remain almost integral in the central portion. During the stresses of the building construction, determined by a seism, at the “head” of each pillar below each flooring and at the “foot” of each pillar above the foundation and above each flooring there is this destruction: the concrete cover breaks due to the excessive pressure on the edges; the exposed irons become “peak-loaded” and assume the characteristic corrugated aspect (the thickening of the stirrups, provided by the current rules, improves the resistance but it does not solve the problem radically). The irons of the beams are no more connected to the irons of the pillar as these have come out from their seats and the beams sustain in precarious way only as if they had rested on the pillar destructed on the edges. As the seismic oscillations continue, the beams detach from the pillar and the floorings fall down. It does not solve the problem and it cannot solve it for what underlined hereinafter. Let's analyse a pillar in a static situation (absence of seismic stresses) and in a dynamic situation determined by the horizontal seismic pushes; more precisely let's consider the section at the foot of the pillar at the fastening to the foundation beams. In the static situation, without horizontal seismic stresses, the section is all compressed and the neutral axis is at the infinite. When the seismic pushes and the corresponding oscillations of the building construction begin and increase from one side to the other one, the neutral axis starts to enter the section and therefore, when the building construction tilts on the right, the left side of the section, with respect to the neutral axis, is tensioned whereas the right one is compressed. In the subsequent tilting on the left of the building construction the situation inverts and therefore the right portion of the section with respect to the neutral axis is now tensioned whereas the left one is compressed. Upon still increasing the horizontal seismic pushes, the neutral axis moves more and more, alternatively, first of all towards the right edge of the section (by increasing the tensioned portion on the left with respect to the neutral axis and by reducing the compressed portion on the right) and then towards the left edge of the section (by increasing the tensioned portion on the right and reducing the compressed portion on the left). In one considers the instants, the second fractions, wherein the neutral axis, in a section of a pillar with side of cm. 30 with load of 75,000 (75 thousand) Kg., it is progressively at 2.5 cm.-0.5 cm.-1 mm. from the edge, equal to 75-15-3 square centimetres (that is cmq), respectively, of compressed concrete, there is a compression on the concrete of 1,000 Kg/cmq.-5,000 Kg/cmq.-25,000 Kg/cmq., respectively; these compressions cannot be supported whatever is the adopted resistance-increasing system. The section is destructed starting from outside towards inside, that is from the edges towards the centre, which is the one resisting more due a geometrical-physical fact in itself of the section. Therefore, there will be the fact that the concrete cover breaks and consequently the same loads, during stresses, will burden for a second fraction on an area corresponding to the thickness of the vertical irons with the stirrups wrapping them. No matter how thick the stirrups can be arranged, the high entity of these loads will move them and the irons will be bent due to the peak load. The destructive process will move from the edges towards the inside of the section. And this has been demonstrated even by the destruction mode observed during the performance of monotonic and cyclic experimental tests, on comparison models implemented according to the building rules existing in Italy, one thereof equipped with the patent device, at the Department of Structures for Engineering and Architecture of the University “Federico II” in Naples.
First of all, during the horizontal pushes here and there, due to traction one noted:
-
- in the model according to the current seismic law, parallel horizontal cracks, delimiting strips, larger ones on the edges with respect to the centre and low;
- in the model even equipped with the patent device, parallel horizontal cracks less marked and higher due to the presence of the reinforced central core.
With the following oscillations, the loads compressed these subsequent strips, already cracked in height, and the pressure on the edges at first made some scales of concrete on the outer faces to detach due to pressure which, for an instant, upon moving outside the neutral axis, burdened only on portion of the concrete cover. In the end, it resulted that the model according to the current seismic law remained destructed on the edges by losing its resistance capability whereas the one equipped with the patent system, even if it subjected the same peripheral destruction, but with an increase by about 30% of the stress, maintained perfectly integral the central core giving the possibility of reconstructing the destructed portion and recovering the structure. In conclusion, the thickening of the stirrups improves the situation but it can never solve the problem radically. On the contrary, the presence of the patent device solve such drawback as there is a concrete cover which is three to five times bigger, that is a concrete cover from 7.5 cm. to 12.5 cm.
Therefore, with a concrete cover, respectively of cm. 7.5 and cm. 12.5, the compressed area thereabout it is spoken in the mentioned example of a pillar of cm. 30×cm. 50, with the “small pillar-kernel”, it will be still cm. 30×cm. 7.5=225 cm2, and cm. 30×cm. 12.5=375 cm2, therefore much bigger than cm. 30×cm. 2.5=75 cm2 of the above-mentioned example. The resistance to compression of the concrete, in the seismic areas, usually is limited to ⅓ of what really inserted in the sizing structural calculation (as usually the results of squashing on small cubes of concrete show, enclosed to the structural test certificates). Therefore, the patent device is able to sustain by itself the total weight sustained before by the pillar, even if it is subjected to a compression approaching the squashing limit. Then, with the patent device there are, in words, also the following advantages:
-
- to prevent that the beams go out of the pillar and fall down from the floorings (by avoiding dangers to people, etc.);
- the safety is thus guaranteed even when the structure, due to the seism violence, has loosen its elastic state and it has entered the plastic one;
- the structure is further guaranteed from possible planning and manufacturing defects;
- after the earthquake (with the reinforced central core which has maintained the beams still on the pillar), the destructed portions of the pillar itself, that is foot and head, can be reconstructed; in this way the advantage of recovering the building construction is obtained, apart from having saved human lives.
Action of Electromagnetic Field
The electromagnetic fields contribute to make aggressive the environment against the structures in r.c. But the proposed earthquake-resistant system, with the reinforced central structure, has the advantage that the peripheral outer reinforcement (as provided by the rules), constituted by longitudinal irons and by stirrups wrapping them, behave like a Faraday cage wrapping the central reinforcement(s) and protecting it/them from the action of the electromagnetic fields.
Additional Advantages Acting on the Lengthening of the r.c.:
another great advantage of the central reinforcement, apart form that against the earthquakes, is given by the lengthening of the r.c. duration against the environment aggressiveness. It gives the possibility of renewing indefinitely the outer reinforcements whereas the central core remains integral both from the earthquakes and the environment aggressiveness: it then allows the “renewal” of the r.c. One of the questions which is currently asked, after about 150 years as from the advent of the r.c., is the duration in time of the r.c. itself. Usually a nominal life of about 50 years is assigned to the common structures, whereas about 100 years is designated as nominal life of the public and strategic civil structures.
With the present invention there is the possibility of lengthening the duration of r.c. for an indefinite period of time, as described hereinafter. As said above:
-
- a) the duration of the structures in r.c. is threatened by: violent earthquakes, few violent earthquakes and earth tremors (causing weakening points), environment aggressiveness and actions of the electromagnetic fields.
- b) A concrete, under ideal conditions, can maintain unaltered the reinforcement steel for an indefinite period of time.
- c) The reinforced central core is under these ideal conditions as it has a protection of the concrete cover from 3 to 5 times bigger.
The reinforced central core, apart from remaining integral, is sized so as to be able to sustain temporarily the total weight of the whole pillar and it allows, then, to be able to repair the outer reinforcements damaged or destructed by the earthquake or destructed in time by the aggressive action of the environment and even by the negative action produced by the electromagnetic fields.
This action of regeneration (renewal) can be obtained in imitation of what occurs in nature, for example in a tree trunk or in a living organism, wherein the most external portions, more in contact with the environment, renew and they do it until their central core remains integral and protected by the outer casing. The prerequisite to make this to occur is the presence of the reinforced central core in the pillars and beams of the structures in r.c.
The structures in r.c. can be:
-
- d) new structures to be implemented, wherein the reinforced central core is inserted during the implementation of the structure itself.
- e) already existing structures in r.c., with recent or farer implementation, wherein the reinforced central core can be inserted;
- f) already existing structures in r.c. which have subjected violent earthquake tremors, then already very damaged, but not yet fallen down even if to be demolished (as the existing rules provide the removal and the demolition after losing resistance by 20%), which can be repaired and recovered and subsequently equipped with the reinforced central core to be inserted compulsorily after the occurred repair of the damaged portions.
The repair of the portions damaged by the seism at the fastening of the foot of the pillar to the foundation is the one described hereinafter, which can be the same of the one to replace, in figure, the irons of the peripheral reinforcement, damaged both by the aggressiveness of the outer agents and by the negative action produced by the electromagnetic fields.
Repair of the Damaged Portions
The substantial difference between a normal repair and a repair make based upon the present invention lies in the fact that a normal repair can be only external as it cannot affect and further reduce the resistance of the already damaged and compromized structure,
On the contrary, a repair according to the present invention starts from the fact that inside the structure there is a central core which has remained integral and able to replace temporarily the structure in its entirety and therefore the repair can be made as far as the depth considered necessary so as to be able to bring the destructed portion back to the initial resistance state and then to the radical renewal, to its “revival”.
The interventions for repairing the damaged portions can be performed in the following cases:
-
- 2) fastening of the pillar to the foundation beam.
FIG. 15a (current situation) andFIG. 15b (repair). - 3) fastening of the pillar to the beams at the level of the inter-floor floorings.
FIG. 16a (current state) andFIG. 16b (repair). - 4) fastening of the pillar to the beam at the level of the covering floor.
FIG. 17a (current state) andFIG. 17b (repair). - 5) fastening of the beams to the pillars.
FIG. 18a (current state) andFIG. 18b (repair). - 6) fastening of the pillar to the foundation beam in case of structure damaged by the earthquake not equipped with the small pillar-kernel.
FIG. 19a (current state),FIG. 19b (repair) andFIG. 19c (insertion of the small pillar-kernel).
- 2) fastening of the pillar to the foundation beam.
According to an embodiment wherein the building construction has the irreparable damages by corrosion of the structural reinforcements (beams and pillars), then the intervention system will be the following: the central structure-reinforcement is inserted inside the pillars as already described; previous suitable drillings, adequately pretensioned strands, are inserted in the beams, instead of the threaded bars, going to one face to the other one by englobing suitable contrast outer structures with self-tightening “heads” positioned on metal plates. Expanding mortar will be injected in the hole so that the pretensioning is uniform for the whole length of the beam. At the sides of the central structure-reinforcement a pair of suitably sized pretensioned strands will be inserted. They will be used eve to improve the stiffness of the floor. The so-implemented strands are suitable to absorb wholly the horizontal forces generated by the seism. In the present description and in some figures the vertical reinforcement 1 or second reinforcement is designated even with the terms reinforced central core or small pillar-kernel.
Claims
1. A method for improving the structural stability of an existing building construction of reinforced concrete having one or more pillars and one or more beams comprising the following steps:
- a) performing a first horizontal drilling according to a cross direction to said pillar so as to involve the beam insisting on said respective pillar;
- b) inserting a first reinforcement in said first drilling;
- c) casting cementitious filling material, in particular fluidized expanding mortar, inside said first drilling;
- d) performing a second vertical drilling in substantially central position and along the longitudinal axis of said one or more pillars;
- e) inserting a second reinforcement in said vertical drilling having a plurality of openings apt to make a cementitious filling material to flow from inside towards outside of said second reinforcement.
- f) casting said cementitious filling material, in particular fluidized expanding mortar, inside said second reinforcement until the complete filling-up of said second drilling.
2. The method according to claim 1 wherein said second reinforcement comprises a metal pipe or a metal cage.
3. The method according to claim 1, wherein said horizontal and vertical drillings are performed with continuous core boring at the centre of the section of said one or more pillars and said one or more beams.
4. The method according to claim 1, wherein said second drilling is performed for the whole longitudinal size of said one or more pillars.
5. The method according to claim 1 wherein said second reinforcement is inserted for the whole longitudinal size of said first drilling.
6. The method according to claim 1 wherein said openings are distributed along the entire first reinforcement, preferably arranged staggered to each other.
7. The method according to claim 1, wherein said first reinforcement comprises a threaded bar, an iron bar or a metal tube.
8. The method according to claim 1, wherein said first reinforcement is inserted for the whole longitudinal size of said beam.
9. The method according to claim 1, wherein a drawing of said beam to said pillar is performed by fastening means placed at the head of said beam.
10. The method according to claim 1 wherein said one or more pillars are an intermediate peripheral pillar and/or a corner peripheral pillar and/or an internal pillar.
11. The method according to claim 1 wherein in the step a) one or more horizontal drillings are performed, so as to involve said beams positioned at the structural nodes of said construction.
12. A building construction of reinforced concrete having one or more pillars and one or more beams insisting on a respective pillar, wherein said one or more beams comprise a first horizontal reinforcement for the whole longitudinal axis of said beam and wherein said one or more pillars comprise in substantially central position and for the whole longitudinal axis of said pillar a second vertical reinforcement, and wherein said second vertical reinforcement has a plurality of openings apt to drain off a cementitious filling material, in particular expanding mortar, from the inside di said reinforcement to the outside of said reinforcement and wherein said second reinforcement is filled with said cementitious material.
13. The building construction according to claim 12 wherein said first reinforcement comprises pre-stressed strands or a threaded bar with a diameter of at least 20 mm.
14. The building construction according to claim 12 wherein said second reinforcement comprises a metal pipe or a metal cage.
15. The building construction according to claim 12 comprising fastening means.
16. The building construction according to claim 15 wherein said fastening means comprises a nut and a metal plate screwed so that said beam are drawn to the pillar.
17. The building construction according to claim 12 wherein said one or more pillars are an intermediate peripheral pillar and/or a corner peripheral pillar and/or an internal pillar.
18. The building construction according to claim 12 wherein said second vertical reinforcement is extended into the subsoil below the foundations of said pillar.
19. The building construction according to claim 12 wherein said second vertical reinforcement is extended into the subsoil below the foundations of said pillar.
20. The building construction according to claim 19 wherein said second vertical reinforcement is extended into the subsoil for at least 70 cm to the foot of the pillar and for at least 70 at the head of said pillar.
21. The building construction according to claim 12 wherein said beam inserted in said first vertical reinforcement is a flooring beam with bearing or connecting thickness.
22. The building construction according to claim 12 wherein said beam sustains the covering flooring or inter-floor.
23. The building construction according to claim 12 wherein said pillar comprises two, three or more vertical reinforcements.
Type: Application
Filed: Oct 31, 2014
Publication Date: Sep 1, 2016
Inventors: Mario MARTINA (VIbo Valentia), Enzo MORELLI (Vibo Valentia), Michele MICELI (Vibo Valentia)
Application Number: 15/032,893