TROLLEY FOR INSERTION AND EXTRACTION PLANTS OF STRINGS OF DRILL PIPES IN PRODUCTION WELLS OF HYDROCARBONS IN GENERAL AND PLANT EQUIPPED WITH SAID TROLLEY
A trolley for transferring pipe stands (8) between the tower (1) and pipe rack (4) of a plant for the insertion and extraction of strings of drill pipes in production wells of hydrocarbons in general, wherein said trolley comprises a movable slide (21), relating to the same trolley (10), between a boost direction (F2) of said pipe stands (8) towards the tower (1) and a pulling direction (F1) of the same pipe stands (8) from the tower (1) towards the pipe rack (4) of said plant. With respect to known trolleys used in plants for the insertion and extraction of pipes in production wells of hydrocarbons in general, that according to the present invention offers the advantage of operating exclusively by gravity in transporting pipe stands, whose weight serves for maintaining their correct transfer position.
The present invention relates to a trolley for insertion and extraction plants of strings of drill pipes in production wells of hydrocarbons in general.
The field of the invention relates to the production of gaseous or liquid hydrocarbons in general, extracted from the respective wells using strings of pipes (“tubing”) suitably assembled, connecting the single pipes with a head/tail coupling until the length necessary for reaching the production area or reservoir has been covered.
This type of processing envisages the cyclic insertion and extraction of strings of pipes from the production well by means of a work-over rig, in order to allow both ordinary maintenance interventions and also for restoring the production activity. These insertion operations of drill strings are effected by connecting or joining single pipes having a standard length of about 9 m, with a threaded head-to-tail coupling. In the extraction phase of the strings, the same pipes, however, are disconnected or separated from each other in correspondence with the same threaded couplings.
Consequently, the extraction and insertion movements of the strings must be interrupted, at every interval of 9 meters of pipe, for the time necessary for unscrewing and screwing the threaded connection couplings between adjacent pipes. These interruptions, however, are undesired as they negatively affect the production recovery, causing additional operational costs and loss of production. In the known art described above, the time necessary for transferring the single 9 meter drill pipes from the pipe rack to the work-over rig also contributes to increasing the interruption times of the production activity of the well.
In order to overcome these drawbacks, plants are known in which at least two single pipes are reciprocally joined, with a head-tail coupling, outside the rig. In this way, longer pipe stands are obtained with respect to standard stands, which allows the dead times of the extraction unit to be reduced ((Aaron Sinnott: “Taking tubulars offline—Reprinted from Oilfield Technology”—30 Sep. 2013, XP055207318).
In moving pipe stands composed of two or more pipes having a standard length, the problem arises, however, of availing of a suitable transportation trolley, which is suitable for moving and supporting pipes having a greater length and weight with respect to standard values.
The main objective of the present invention is therefore to provide a trolley for insertion and extraction plants of strings of drill pipes in production wells of hydrocarbons in general, wherein the above-mentioned trolley is suitable for transferring the mentioned pipe stands from and towards the pipe rack and work-over rig.
This and other objectives are achieved by means of the trolley and plant of claims 1 and 7 respectively. Preferred embodiments of the invention can be found in the remaining claims.
With respect to known trolleys used in plants for the insertion and extraction of pipes in production wells of hydrocarbons in general, that according to the present invention offers the advantage of allowing the safe movement of pipe stands having greater lengths and weights with respect to those used in this type of application.
The trolley of the invention also offers the advantage of operating exclusively by gravity in the transportation of pipe stands, whose weight serves for maintaining their correct position during the transfer.
This solves the problem of safely and simply moving pipe stands from and towards the plant, without the help of complex hydraulic systems for holding them in the correct transfer position.
These and other objectives, advantages and characteristics appear evident from the following description of a preferred embodiment of the trolley and plant of the invention, illustrated, for non-limiting purposes, in the figures of the enclosed drawings.
In the same:
As illustrated in
In the example illustrated, the mentioned stand 8 is obtained by the coupling of two pipes 3a and 3b in correspondence with the connection 22 of
After assembling the pipes 3a and 3b on the pipe rack 4, the stand 8 thus obtained is hoisted, by means of the travelling block 2, onto the rig floor 6, so that it can be coupled with the stand 9 already in the well (
According to the invention, in order to facilitate the transfer of the stands 8 from and towards the rig floor 6, at least one trolley 10 is advantageously used, that can be moved by means of a chain 11 (
The management of the plant of the previous figures can be effected according to the scheme of
The trolley 10 of the invention, as represented in
The trolley 10 is equipped with the slide 21 of
The slide 21 also comprises a plate 26, destined for receiving the thrust of the tool joint 31 of the pipe stand 8 during their transportation towards the tower 1. The same slide 21 of the trolley 10 is, in turn, slidingly supported above a corresponding guiding channel 35 (
As better illustrated in
In the boost phase towards the tower 1 of the pipe stand 8, in the direction of the arrow F2 of
In the contrary movement of the slide 21, arrow F1 of
Claims
1. A trolley for transferring pipe stands (8) between the tower (1) and pipe rack (4) of a plant for the insertion and extraction of strings of drill pipes in production wells of hydrocarbons in general, characterized in that it comprises a movable slide (21), relating to the above-mentioned trolley (10), between a boost direction (F2) of the above-mentioned pipe stands (8) towards the tower (1) and a pulling direction (F1) of the same pipe stands (8) from the tower (1) towards the pipe rack (4) of said plant.
2. The trolley according to claim 1, characterized in that said slide (21) comprises a supporting base (22) of said pipe stands (8).
3. The trolley according to claim 2, characterized in that said slide (21) comprises an engagement fork (23) with said pipe stands (8), said fork (23) being removably assembled inside a corresponding seat (25) of said base (22).
4. The trolley according to claim 3, characterized in that it also comprises a carter (12) having side slots (28), said slide (21) also comprising a transversal pin (27) passing through said slots (28) and sliding in the direction of said arrows (F1,F2).
5. The trolley according to claim 4, characterized in that it comprises a fixed opposing shoulder (30) for a thrust spring (29) of said plate (26).
6. The trolley according to claim 5, characterized in that it comprises sliding rolls (32).
7. A work-over rig for the insertion and extraction of strings of drill pipes in production wells of hydrocarbons, comprising a tower (1), a rig floor (6) and a pipe rack (4) for pipe stands (8) obtained from the assembly of at least two single pipes (3a,3b) having a standard length, effected prior to the transfer of the same pipe stands (8) to said tower (1), characterized in that it is equipped with a trolley (10) according to claim 1.
8. The plant according to claim 7, characterized in that it comprises a supporting guide (13) for sliding rails (33) of the trolley (10) in correspondence with its rolls (32), a channel (35) also being envisaged for guiding said base (22).
9. The plant according to claim 8, characterized in that said assembly of at least two single pipes (3a,3b) is effected on the above-mentioned pipe rack (4), the stand (8) thus obtained being hoisted on said rig floor (6) and being subsequently coupled with the stand (9) already inserted in the well.
10. A management system of the plant according to claim 1, characterized in that it comprises a servo-station (19) of at least one work-over rig (16,17,18), the same station (19) effecting the assembly and disassembly of said stands (8) outside the at least one rig (16,17,18).
Type: Application
Filed: Dec 14, 2015
Publication Date: Dec 14, 2017
Inventor: Hussein Aly Mohamed Abdalla BERIS (Cairo)
Application Number: 15/537,822