PREFABRICATED BUILDING SYSTEM AND METHODS
A method of constructing a building is disclosed, including selecting a standard dimension less than a wide-load trucking permit limit and designing a building on a grid defined by the selected standard dimension. The building includes a plurality of prefabricated elements, wherein each prefabricated element has a width correspond to the selected standard dimension. The plurality of prefabricated elements includes a wall panel, a roof panel, a laterally resistive frame, and a rebar cage. The method includes fabricating each of the plurality of prefabricated elements at a manufacturing plant and transporting the elements by truck to a building site. The method includes constructing intersecting grade beam footings at the building site and pouring a slab between the intersecting grade beam footings. The grade beam footings include the rebar cage and have a uniform width and depth, the grade beam footings and the slab having contiguous upper surfaces.
Latest Blach Construction Company Patents:
This application is a continuation of U.S. patent application Ser. No. 17/392,073 filed Aug. 2, 2021, which is a continuation of U.S. patent application Ser. No. 16/539,964 filed Aug. 13, 2019, which claims priority from U.S. Provisional Patent Application Ser. No. 62/718,310, filed Aug. 13, 2018. The complete disclosures of each application are hereby incorporated by reference in their entireties for all purposes. Also hereby incorporated by reference for all purposes are U.S. Patent Application Publication No. 2018/0305925 and U.S. Patent Application Publication No. 2018/0328034.
BACKGROUNDMany buildings have floor plans that are consistently standardized and replicated throughout the structure, such as student housing or multifamily housing, classroom buildings, and medical office buildings. These types of buildings lend themselves to off-site prefabrication, which may dramatically accelerate on-site construction schedules and improve on-site safety, while simultaneously providing improved quality and precision of materials and reducing costs.
SUMMARYThe present disclosure provides systems, apparatuses, and methods relating to constructing a building including a plurality of prefabricated elements. In some examples, a method of constructing a building may include selecting a standard dimension which is less than a wide-load trucking permit limit and designing a building on a grid defined by the selected standard dimension. The building may include a plurality of prefabricated elements, wherein each prefabricated element has a width corresponding to the selected standard dimension. The plurality of prefabricated elements may include a wall panel, a roof panel, a braced frame, and a rebar cage, among other elements. The method may further include fabricating each of the plurality of prefabricated elements at a manufacturing plant and transporting the plurality of prefabricated elements by truck from the manufacturing plant to a building site. The method may further include constructing intersecting grade beam footings at the building site and pouring a slab between the intersecting grade beam footings. The grade beam footings may include the rebar cage and have a uniform width and depth, the grade beam footings and the slab having contiguous upper surfaces.
In some examples, a method of constructing a building may include prefabricating a braced frame, prefabricating a rebar cage, and transporting the braced frame and the rebar cage to a construction site. The braced frame may include a column component and a diagonal brace component. The method may further include constructing intersecting grade beam footings at the construction site, the grade beam footings having a uniform width and depth and including the rebar cage. The column component of the braced frame may extend into at least one of the grade beam footings.
In some examples, a building assembly may include a foundation and a slab. The foundation may include intersecting grade beam footings having a uniform width and depth. The slab may extend between grade beam footings, wherein the slab and grade beam footings have coplanar upper surfaces.
Features, functions, and advantages may be achieved independently in various examples of the present disclosure, or may be combined in yet other examples, further details of which can be seen with reference to the following description and drawings.
Various aspects and examples of a method of constructing a building, as well as related buildings assemblies, are described below and illustrated in the associated drawings. Unless otherwise specified, a building assembly in accordance with the present teachings, and/or its various components may, but are not required to, contain at least one of the structures, components, functionalities, and/or variations described, illustrated, and/or incorporated herein. Furthermore, unless specifically excluded, the process steps, structures, components, functionalities, and/or variations described, illustrated, and/or incorporated herein in connection with the present teachings may be included in other similar devices and methods, including being interchangeable between disclosed examples. The following description of various examples is merely illustrative in nature and is in no way intended to limit the disclosure, its application, or uses. Additionally, the advantages provided by the examples described below are illustrative in nature and not all examples provide the same advantages or the same degree of advantages.
This Detailed Description includes the following sections, which follow immediately below: (1) Overview; (2) Examples, Components, and Alternatives; (3) Illustrative Combinations and Additional Examples; (4) Advantages, Features, and Benefits; and (5) Conclusion. The Examples, Components, and Alternatives section is further divided into subsections A-C, each of which is labeled accordingly.
OverviewIn general, a method of constructing a building including a plurality of prefabricated elements may include designing the building according to a grid with a selected standard width and prefabricating elements having a width corresponding to the selected standard width.
Design phase 102 may include selecting a standard width of a grid 112. The standard width may be selected according to transportation constraints. For example, the standard width may be selected to be less than a standard trucking permit width limit. For another example, the standard width may be selected to be less than a width of a truck bed of a transportation company or construction company's vehicle fleet.
Design phase 102 may further include designing the building along grid 112. For example, columns may be located at grid-line intersections and beams may be centered along grid lines. The building may be designed to be constructible primarily of prefabricated and/or panelized elements having a width matching the selected standard width. The foundation of the building may also be designed along grid 112. For example, the foundation may include intersecting grade beams extending along the grid lines. Rebar for the footing may be designed for prefabrication as cages.
Where exceptions to the grid size are necessary or desirable, deviations may be designed to allow use of prefabricated elements having a width less than the selected standard width. For example, in designing a room larger than the standard width and less than twice the standard width, two wall panels may be used, each having a width less than the standard width.
Design phase 102 may further include designing the building frame and panelized elements to be constructible without on-site welding. For example, laterally resistive frames of the building may be designed to set into the foundation such that welding of steel drag anchors is not required. For another example, roof and wall panels may be designed for erection at a construction site using connection systems including fasteners and without welding to the building frame or between panels. Such systemic and exhaustive elimination of on-site welding may reduce construction time by weeks or months, resulting in dramatic cost savings.
Design phase 102 may further include designing the building to facilitate incorporation of other prefabricated systems and/or elements. The building design may include both custom prefabricated elements and support for pre-designed systems such as commercially available prefabricated systems. For example, wall panels and/or the building frame may be configured to allow connection of a prefabricated glazing system. For another example, floor plan and foundation designs may be made to accommodate a modular prefabricated elevator assembly.
Once a building design has been developed, the prefabricated elements of the building may be manufactured in prefabrication phase 104. The prefabrication phase may be performed at a factory or manufacturing plant 114. Manufacturing plant 114 may be an indoor facility used for manufacture of building materials and/or components under controlled conditions. Manufacturing plant 114 may provide consistent conditions, oversight, quality control, and automation among other advantages not available when fabricating materials and components in the field. Such advantages may in turn lower production costs and improve quality. Other advantages include eliminating weather conditions such as rain, wind, and heat, which may enhance worker safety and further improve quality. Increased precision and quality in the manufacturing process may in turn increase the overall quality of the constructed building.
Prefabrication phase 104 may be carried out prior to breaking ground at a construction site for the building. Completion of the prefabrication phase prior to assembly phase 108 may ensure that all prefabricated elements are ready when required, eliminate fabrication from the on-site construction schedule, and prevent potential costly delays. In some examples, some or all of prefabrication phase 104 may be performed concurrently with on-site utility and/or preparatory work. Such concurrent work may also eliminate fabrication from the on-site construction schedule and reduce overall construction time.
Transportation phase 106 may include transporting the prefabricated elements to a construction site 116. The prefabricated elements may preferably be transported by truck or other low-cost method. The dimensions of the prefabricated elements, as determined in design phase 102 may allow the prefabricated elements to be transported without special equipment, wide-load permits, or other special arrangements.
Assembly phase 108 may include erecting the prefabricated elements at construction site 116. The prefabricated elements may be configured for erection by fastening together, with minimal to no welding. For example, laterally resistive frames such as braced or moment frames may be configured to set as columns, and roof and wall panels may be configured to bolt to the building frame. Such elimination of welding at construction site 116 and prefabrication of building components may significantly improve construction efficiency and reduce on-site construction time, which may in turn dramatically reduce overall building cost.
Excavation and/or pouring of foundations may be performed prior to assembly phase 108, or as part of the assembly phase. Design of the foundation in phase 102, according to grid 112, may also improve speed and efficiency of construction. The footings may be designed with a consistent width and depth, in a linear or ladder-style layout. Such design may be dug in a single pass and/or with a single bucket, and may require a minimum of maneuvering of excavation equipment. Prefabricated rebar cages may eliminate on-site tying of rebar, and limit worker time in the excavations. The efficient layout of the ladder-style foundation may reduce labor and associated costs, and simplify the rebar system which may reduce both material and labor costs.
Finishing phase 110 may include non-structural work on the building, such as installation of external wall cladding, internal walls, and subcontractor work such as mechanical, electrical, and plumbing (MEP). The finished building may be of any type, including medical, academic, institutional, office, financial, or residential. The building may be single or multi-story and may be configured to comply with local code requirements such as seismic code.
Once the building has been completed, the building design may be modified and re-used. For example, a university with campuses in multiple cities may follow method 100 for efficient and high-quality construction of a classroom building in a first location. Returning to design phase 102, the original building design may be modified to comply with regulations specific to a new city. For example, seismic tolerance may be increased, the standard width of grid 112 may be slightly adjusted according to a more restrictive trucking permit width limit, or classroom sizes may be altered to comply with local code requirements. Such re-design may be a significant saving in time and cost over a new design for each campus, while allowing flexibility to adapt to constraints specific to each building.
Similarly, a basic floorplan configuration may be useful for different types of buildings, for example, schools, hospitals, or hotels, subject to purpose-specific finishing detail variations. Structural redundancy may also result in reduction of engineering and architectural costs.
Examples, Components, and AlternativesThe following sections describe selected aspects of exemplary methods of constructing a building including a plurality of prefabricated elements as well as related systems and/or assemblies. The examples in these sections are intended for illustration and should not be interpreted as limiting the entire scope of the present disclosure. Each section may include one or more distinct examples, and/or contextual or related information, function, and/or structure.
A. Illustrative BuildingAs shown in
Building 200 further includes a prefabricated staircase system 209, a prefabricated glazing system, and a modular elevator assembly. The frame of building 200 may be designed to allow lifting of staircase system 209 and/or the modular elevator assembly through the roof. The modular elevator, prefabricated off-site, may be thereby installed in as little as one day.
As shown in
Foundation 202 is composed of intersecting grade beam footings 218. The grade beams each lie along a grid line of grid 214. Grade beams 218 vary in length, but each grade beam 218 has the same width and depth. This may simplify excavation required for construction of foundation 202. For example, each grade beam may have a width between three feet and four feet and a depth between two and three feet. Such dimensions may enable use of a typical excavation bucket. The interconnected grade beams may improve structural integrity and resist uplift, which may lead to a more economical and robust lateral system as compared to conventional spread footings.
Foundation 202 includes a first grade beam 220, a second grade beam 221, and a third grade beam 223 spanning between the first and second grade beams.
Each grade beam of foundation 202 includes a prefabricated rebar cage, and each cage has the same height and width. The length of the rebar cage varies to match the length of the grade beam. The spacing of stirrups 226 varies depending on the structural steel connections to the respective grade beam. Rebar cage 222 includes evenly spaced stirrups 226, because only individual columns 210 are set into first grade beam 220. As shown in
Referring again to
Slab 238 and grade beam 221 each have a planar upper surface 240. Upper surface 240 of grade beam 221 is coplanar and contiguous with upper surface 240 of slab 238. Rebar cage 230 of grade beam 221 extends through both lower portion 234 and upper portion 236 of the grade beam. In effect, the rebar of the grade beam extends into the slab. Slab 238 is thereby mobilized as part of foundation 202. This structural functionality of the slab may eliminate the need for structural steel drag anchors, which may in turn streamline construction and eliminate associated on-site welding.
Braced frame 205 also extends into upper portion 236 of grade beam 221, as shown more clearly in
When forming grade beam 221, templates for anchor bolts 244 may be positioned when rebar cage 230 is set into the excavation for the grade beam. Before the second pour is made, the templates may be replaced with anchor bolts 244, base plate 242 may be connected to the anchor bolts, and braced frame 205 may be erected and bolted to the base plate. Once braced frame 205 is set, the second pour may be made over the bolted connection.
To allow placement of base plate 242 and setting of braced frame 205, those stirrups 226 of rebar cage 230 proximate the braced frame may include a separable cap section 246. The cap section may be wired onto rebar cage 230 for transportation and then released when base plate 242 is installed. Once braced frame 205 is set, cap section 246 may be replaced to complete stirrup 226 prior to the second concrete pour.
An individual unbraced column 210 may be similarly erected (see
In typical foundations, building frame members may be bolted at the top of a grade beam footing, outside of the footing. A significant portion of the loads may therefore be transferred through the bolts, requiring larger bolts, a greater number of bolts, and/or drag anchors to accommodate the loads. In the present example, encasement of the bases of the lateral resisting elements allows forces from seismic, wind, and other load sources to be transferred directly from the building frame to the slab in bearing, and from the slab to the foundation through shear enabled by the shear dowels. This may eliminate the need for additional steel fabrications to perform the load transfer function.
In other words, embedding laterally resistive frames and columns directly into the grade beams may improve transfer of forces between the structural steel frame and the foundation of the building. Together with the mobilization of the slab as part of the foundation, this structure may provide a highly effective foundation while reducing wasted concrete, simplifying excavation, and reducing construction time.
Laterally resistive frames 204 of the building may include braced frames, moment frames, and/or any equivalently effective laterally resisting system. Irrespective of the frame type, each laterally resistive frame may be fully prefabricated in the shop or factory, and may not require any on-site welding during erection.
All elements of the braced frame are fabricated and assembled prior to shipping to the building site. That is, vertical members 248, diagonal braces 254, central beam 250, and upper beam 252 are all fabricated and welded together to complete braced frame 203. Such prefabrication of braced frame 203 may eliminate on-site welding, improving quality of the braced frame and dramatically reducing installation time in the field. As compared to a traditional braced frame field assembled and field welded from prefabricated pieces, braced frame 203 may be erected in under an hour instead of over the course of multiple days. The braced frame may be described as setting like a column.
Braced frame 203 has a width 256. The width is selected to match standard spacing 216 of grid 214 of building 200, see
All elements of the moment frame are fabricated and assembled prior to shipping to the building site. That is, vertical members 248, central beam 250, and upper beam 252 are all fabricated and welded together to complete moment frame 207. Such prefabrication of the moment frame may eliminate on-site welding, improving quality of the moment frame and dramatically reducing installation time in the field. As compared to a traditional moment frame, field assembled and field welded from prefabricated pieces, moment frame 207 may be erected in under an hour instead of over the course of multiple days. The moment frame may be described as setting like a column.
Moment frame 207 has a width 256. The width is selected to match standard spacing 216 of grid 214 of building 200, as shown in
Braced frame 203 and moment frame 207 may be smaller than typical laterally resistive frames. Building 200 may accordingly include a greater number of laterally resistive frames to achieve an equivalent structural strength. However, the smaller size of braced frame 203 and moment frame 207 may reduce the number of bolts required at the base plate, and not require drag anchors. The greater number of braced frames in the building may provide additional redundancy, and an improved structure. Braced frame 203 may also be positioned to take advantage of the continuity of the interconnected grade beams of the building foundation.
Wall panels 206 may be any modular wall panel assembly and/or a prefabricated modular wall structure, including glazing panels. In the present example, wall panels 206 are balloon-framed light-gauge exterior wall panels. The wall panels may be prefabricated up to a thermal break, for instance the wall panels may include sheathing and/or insulation material. Each wall panel 206 includes a plurality of parallel studs 266 and two elongate members 268. The parallel studs may be described as defining a primary wall plane of the panel. The elongate members, which may be referred to as strongbacks, collect the studs for attachment to the building frame.
Each wall panel 206 is connected to the building frame by a connection system 270. Any appropriate connection system may be used, including a system such as is described in U.S. Patent Publication No. 2018/0305925. Each wall panel may be secured to the building frame while allowing relative motion between the building frame and wall panel. The building frame may be able to move within attached wall panels in both a horizontal and a vertical direction, as required by building code. In other words, relative movement between the wall panel and the building frame may be permitted parallel to the plane of the wall panels, but prevented perpendicular to the plane of the wall panels.
Each wall panel 206 has a width 272. The width is selected to match standard spacing 216 of grid 214 of building 200, see
In some examples, dimensions of wall panels 206 may be multiples or fractions of standard spacing 216, to conform to deviations in grid 214. Multiple wall panels may be interchangeable and have matching dimensions, each panel may be sized and configured appropriate to a specific position, and/or any combination thereof.
Panel frame 26, as shown in
All welding of lateral members 276, transverse members 278, and/or additional structural members may be performed in the shop or factory, prior to transport of panel frame 26 to the construction site. The roof panels may also be configured to fasten to the building frame without welding, as described further below. As a consequence, the only welding required during erection of the building roof may be minimal welding of decking to a load collecting beam, to form a structural diaphragm. Such drastic reduction of welding during roof construction may reduce construction time and cost, as well as improving worker safety by limiting time spent on the roof. Accelerating the roof installation may also allow the interior of the building to be shielded from weather earlier in the construction process.
A length of lateral members 276 is selected to correspond to the distance spanned by the roof panel. A length of the transverse members 278 is selected such that an overall width 280 of roof panel 208 matches standard spacing 216 of grid 214 of building 200, see
In some examples, dimensions of roof panel 208 may be multiples or fractions of standard spacing 216, to conform to deviations in grid 214. Multiple roof panels may be interchangeable and have matching dimensions, each panel may be sized and configured appropriate to a specific position, and/or any combination thereof.
Roof panel 208 is connected to the building frame by a connection system. Any appropriate connection system may be used, including a system such as is described in U.S. Patent Publication No. 2018/0328034. Columns, braced frames, and/or beams of building 200 may be prefabricated to include a protruding structure having one or more apertures. As shown in
Plates 257 of braced frame 203 and moment frame 207 are angled relative to vertical members 248 of the frames, and are each configured to support the weight of the roof panel. In general, contact between a protruding structure of a prefabricated building frame member and a roof panel may prevent motion of the roof panel resulting from gravitational forces. A plurality of roof panels and frame members may be connected together by fastener assemblies to form the roof of the building. Each roof panel may be connected to the building frame and to one or more adjacent roof panels.
Supports 286 are preinstalled on selected structural members of the building frame. During design of the building, a common MEP pathway may be designated. That is, a common pathway may be defined throughout the building for MEP infrastructure. Supports 286 may be positioned along the designated pathway to facilitate installation of such infrastructure.
The selected structural members of the building frame may arrive at the building site with supports 286 already attached. The supports may be welded or otherwise connected to the structural members during off-site fabrication of the structural members. Such preinstallation may reduce on-site welding and speed construction.
Providing MEP installers with a method for connecting the infrastructure to the building structure may also minimize the need for additional in-field connections to the structure and accelerate the installation process. Providing MEP installers with a designated pathway may increase consistency through the building and facilitate future maintenance and renovation. For example, the MEP pathway may be designed such that demising walls have no conduit and plumbing through the floor, with the pathway extending through the ceiling into walls to maximize future flexibility.
Each guard rail panel is fastened to floor beam 262 and/or stair assembly 288 by one or more adjustable brackets 291. An illustrative guard rail panel 289 is shown in
Adjustable bracket 291 has an L-shape, and in some examples may include an angle iron. Multiple slots 295 extend through bracket 291 to accept bolt assemblies 296. A first leg of the bracket is bolted to a vertical member of frame 292 of the guard rail panel, and a second leg of the bracket is bolted to floor beam 262. Slots 295 may be elongate, to allow adjustment of guard rail panel relative to floor beam 262. In some examples, slots on the first leg may be elongate in a vertical direction and slots on the second leg may be elongate in a horizontal direction. Such adjustment may allow a top level of adjacent guard rail panels to be aligned, facilitate precise spacing between panels, and provide simple and easy panel installation.
B. Illustrative Method of Constructing a BuildingThis section describes steps of an illustrative method 300 for constructing a building; see
At step 310, method 300 includes selecting a standard dimension. The standard dimension may be selected according to transportation constraints. For example, the standard dimension may be selected to be less than a standard trucking permit width limit. The standard dimension may also be selected to allow gaps to be provided between prefabricated elements. This may allow for production variation of the prefabricated elements and/or clearance loss between the prefabricated elements during erection. The standard spacing may also be selected according to design constraints of the building, such as a desired classroom size.
Step 312 of the method includes designing a building on a grid of the selected standard dimension. Foundations, structural elements, and design elements may be laid out according to the grid. For example, the foundation may include interconnecting grade beam footings, each grade beam extending along a line of the grid. For another example, columns may be located at grid intersections and braced frames may be located along grid lines.
Designing the building may also include designing a plurality of prefabricated elements. For example, the building design may include panelized walls and roof, pre-welded braced frames, and pre-tied rebar cages. Each prefabricated element may be designed to have a width corresponding to the selected standard dimension, such that all prefabricated elements are transportable by standard means. A majority of the prefabricated elements may have a standard width less than the selected standard dimension by a gap width. For example, a standard prefabricated element width may be ten feet with a gap width of one eighth inch, corresponding to a selected standard dimension of ten feet and one eight inch. For another example, a standard prefabricated element width may be eleven feet, eleven and three quarter inches with a gap width of one quarter inch, corresponding to a selected standard dimension of twelve feet.
In some examples, designing the building may include designating an MEP pathway for use by installers during construction of the building. The MEP pathway may be located to provide ease of maintenance and flexibility in adaptation or renovation of the building.
Some exceptions to the grid may be allowed in the building design, for instance for features such as a building end condition, elevator shaft, and/or oversize common space. Where exceptions to the grid are included, the building may be designed such that individual prefabricated elements used in the associated construction may still be equal to or less than the selected standard dimension.
Step 314 of the method includes prefabricating building components, including at least a braced frame, a wall panel, a roof panel, and a rebar cage. The step may further include prefabricating a plurality of each building component and/or other building components. Step 314 may be performed at a manufacturing plant, factory, or other facility appropriate for high quality manufacture of building materials under controlled conditions. Step 314 may not be performed at or adjacent a building site, for instance in a temporary structure erected for the duration of construction.
Prefabricating the building components may include performing all necessary welding, such that the building components can be assembled and/or erected without on-site welding. The prefabricated building components may be configured for bolting or fastening into place, and may be designed to reduce the number of bolts required to install each component.
Step 316 includes transporting the prefabricated components to a building site. The prefabricated components may be prefabricated in step 314 prior to beginning construction at a building site. The prefabricated components may be stored until required, and then step 316 may be performed. Transporting the prefabricated components may include trucking the components and/or transporting the components by any effective means. The prefabricated components may be configured to allow transportation under a standard trucking permit and/or by any desirable or cost effective transportation method.
Step 318 includes constructing a foundation, including the rebar cage. The rebar cage may be used in a grade beam footing, of a plurality of intersecting grade beams. Step 318 may be performed according to method 400 as described below.
Step 320 of method 300 includes erecting a steel building frame, including the braced frame. The building frame may be set into the foundation, as part of step 318. Erecting the building frame may further include bolting together structural steel members such as columns, floor and roof beams, and/or roof trusses. The building may be designed to limit or avoid welding during erection of the building frame.
Step 322 of the method includes bolting the wall panel to the building frame, and step 324 includes bolting the roof panel to the building frame. Each step may be performed according to the connection system of the respective panel. For example, step 322 may be performed according to the method described in U.S. Patent Publication No. 2018/0305925 and step 324 may be performed according to the method described in U.S. Patent Publication No. 2018/0328034.
In some examples, step 300 may further include finishing of the building. For instance, the method may include installation of floor decking and pouring of a concrete second floor. The method may include installation of interior walls, cladding of exterior walls, roofing, MEP, fire systems, and/or any desirable additional building construction.
C. Illustrative Method of Constructing a FoundationThis section describes steps of an illustrative method 400 for constructing a foundation; see
At step 410, the method includes laying out and excavating interconnected linear grade beam footings. The grade beams may each have the same width and depth, and may be limited to a depth which does not require shoring. During excavation of a trench for a grade beam, an excavator may be positioned at a first end of the trench and move down the line of the trench to a second end of the trench with a minimum of maneuvering. The trench may be dug with a single bucket.
Step 412 of method 400 includes placing and connecting prefabricated rebar cages. One or more rebar cage including lateral bars and stirrups may be prefabricated for each grade beam footing. Once the trench for the grade beam footing has been excavated, the prefabricated cage or cages may be placed into the trench. Multiple prefabricated cages within a grade beam may be connected. Similarly, where grade beams intersect and at corners, the prefabricated cages may be connected.
The foundation may be designed such that connections between rebar cages occur at points of minimum stress, allowing connections between the prefabricated rebar cages to be achieved by doweling together the cages with small bars of limited length. For example, #6 bars or smaller may be used. All dowels for the connections may be straight. The dowels needed to connect the rebar cages may be included with the prefabricated rebar cages. For example, the dowels may be wired into the cages during prefabrication and then released after the cages have been placed in the trench. Step 412 may further include positioning bolt templates.
Step 414 includes pouring a first layer of concrete. The first pour of concrete may form half, two thirds or more of the grade beam footings. In some examples, the first pour of concrete may extend up to the top of the excavated trench for the grade beam footings. The first pour of concrete may not fully cover the rebar installed in step 412. That is the rebar cages may extend above the first layer of concrete.
Step 416 includes installing base plates. Bolt templates placed in step 414 may be replaced by anchor bolts, and the base plate secured to the anchor bolts. The base plates may be positioned directly on top of the first layer of concrete and/or above the level of the first layer of concrete.
At step 418, method 400 includes fastening braced frames and columns to the base plates. The braced frames may be fully prefabricated and configured to set as columns. That is, no welding of the braced frames may be required. Each braced frame may be of a sufficiently small size to allow setting without drag anchors. The size of the braced frames may also reduce the number of bolts required to set a braced frame and the size of the base plates.
Step 420 of the method includes constructing forms for a floor slab. The forms may extend up from the soil level to the desired height of the top of the slab. The forms may extend at least above the level of the rebar cages of the grade beams.
Step 422 of the method includes pouring a second layer of concrete. The concrete may be poured into the forms constructed in step 420, to form a floor slab and complete the grade beam footings. The concrete may be poured over the base plates and bases of erected braced frames and columns, encasing the base plates and ends of the erected structures in the second layer of concrete. The building frame may be thereby directly embedded into the building foundation, providing a more reliable transfer of forces.
The second layer of concrete may form both the floor slab and a top portion of the grade beams, such that the slab and the grade beams are contiguous, with coplanar upper surfaces. The rebar cages of the grade beam footings may also extend up into the second layer of concrete, which may mobilize the slab as part of the foundation.
Method 400 may allow quick and efficient construction of a foundation. The linear design of the grade beam footings, pre-tied rebar cages, pre-assembled braced frames, and two-pour system may allow the trenches to be dug quickly, rebar to be installed quickly, and concrete poured quickly. The method may therefore be overall faster, more efficient and less susceptible to weather. Method 400 may also result in a more economical and robust foundation with improved structural integrity.
Illustrative Combinations and Additional ExamplesThis section describes additional aspects and features of buildings and methods of constructing a building, presented without limitation as a series of paragraphs, some or all of which may be alphanumerically designated for clarity and efficiency. Each of these paragraphs can be combined with one or more other paragraphs, and/or with disclosure from elsewhere in this application, including the materials incorporated by reference in the Cross-References, in any suitable manner. Some of the paragraphs below expressly refer to and further limit other paragraphs, providing without limitation examples of some of the suitable combinations.
A0. A method of constructing a building, including:
-
- selecting a standard dimension which is less than a wide-load trucking permit limit,
- designing a building on a grid defined by the selected standard dimension, the building including a plurality of prefabricated elements, wherein each prefabricated element has a width corresponding to the selected standard dimension, and the plurality of prefabricated elements includes:
- a wall panel including a plurality of vertical studs connected to a strongback and a sheathing material,
- a roof panel including a first pair of parallel structural members, a second pair of parallel structural members extending between the first pair of parallel structural members, and a decking material,
- a braced frame, and
- a rebar cage,
- fabricating each of the plurality of prefabricated elements at a manufacturing plant;
- transporting the plurality of prefabricated elements by truck from the manufacturing plant to a building site,
- constructing intersecting grade beam footings at the building site, the grade beam footings having a uniform width and depth and including the rebar cage, and,
- pouring a slab between the intersecting grade beam footings, wherein the grade beam footings and slab have contiguous coplanar upper surfaces.
A1. The method of A0, wherein the constructing step includes:
-
- pouring a first layer of concrete over the rebar cage,
- installing a plate on top of the first layer,
- fastening the braced frame to the plate, and
- pouring a second layer of concrete over the plate.
A2. The method of A0 or A1, further comprising:
-
- erecting and bolting together pre-welded components, including the braced frame, to form a steel building frame.
A3. The method of A2, further comprising:
-
- bolting the wall panel to the steel building frame.
A4. The method of A2 or A3, further comprising:
-
- bolting the roof panel to the steel building frame.
A5. The method of any of A0-A4, wherein the standard dimension is less than 11 feet.
A6. The method of any of A1-A5, wherein the rebar cage includes a stirrup that extends into the second layer of concrete.
A7. The method of any of A1-A6, wherein the second layer of concrete is contiguous with the slab.
B0. A method of constructing a building, comprising:
-
- prefabricating a braced frame including a column component and a diagonal brace component,
- prefabricating a rebar cage,
- transporting the braced frame and the rebar cage to a construction site,
- constructing intersecting grade beam footings at the construction site, the grade beam footings having a uniform width and depth and including the rebar cage, wherein the column component of the braced frame extends into at least one of the grade beam footings.
B1. The method of B0, further comprising:
-
- pouring a concrete slab at the same height as the grade beam footings.
B2. The method of B0 or B1, wherein the constructing step includes:
-
- pouring a first layer of concrete over the rebar cage,
- installing a plate on top of the first layer,
- fastening the braced frame to the plate, and
- pouring a second layer of concrete over the plate.
B3. The method of any of B0-B2, further comprising:
-
- erecting and bolting together pre-welded components, including the braced frame, to form a steel building frame.
B4. The method of B3, further comprising:
-
- bolting a panelized wall component to the steel building frame.
B5. The method of B3 or B4, further comprising:
-
- bolting a panelized roof component to the steel building frame.
C0. A building assembly, comprising: a foundation including intersecting grade beam footings having a uniform width and depth, and
-
- a slab extending between grade beam footings, wherein the slab and grade beam footings have coplanar upper surfaces.
C1. The building assembly of C0, wherein the grade beam footings and the slab are contiguous.
C2. The building assembly of C0 or C1, wherein the grade beam footings include prefabricated rebar cages.
C3. The building assembly of C2, wherein the grade beam footings include a first layer of concrete and a second layer of concrete, the rebar cages extending into the second layer of concrete.
C4. The building assembly of C3, further comprising:
-
- a prefabricated braced frame including a column component and a diagonal brace component, the column component extending into the second layer of concrete in the grade beam footings.
C5. The building assembly of C4, wherein the column component of the braced frame is connected to a plate sandwiched between the first and second layers of concrete in the grade beam footings.
C6. The building assembly of any of C0-C5, wherein the entire foundation has the same depth.
D0. A building, comprising:
-
- linear footings laid out on a grid and including prefabricated linear rebar cages and grade beams, wherein the top of the grade beam is at approximately the top of the footing slab;
- prefabricated structural steel braced frames having a width of 10 feet or smaller, embedded directly into the grade beams;
- prefabricated wall panels having a width of 10 feet or smaller, with strongback connections to the building;
- prefabricated roof panels having a width of 10 feet or smaller, with permanent fall protection points; and
- a designated common Mechanical Electrical and Plumbing (MEP) pathway with points of connection for MEP infrastructure.
The different examples of the construction methods and buildings described herein provide several advantages over known solutions for constructing a building. For example, illustrative examples described herein dramatically reduce construction time and improve on site construction efficiency.
Additionally, and among other benefits, illustrative examples described herein allow improved precision in fabrication of building materials, resulting in higher overall building quality and improved safety.
Additionally, and among other benefits, illustrative examples described herein reduce and/or eliminate field welding, which shortens the on-site construction timeline and lowers costs.
Additionally, and among other benefits, illustrative examples described herein provide efficient foundations with improved structural integrity.
Additionally, and among other benefits, illustrative examples described herein increase building frame redundancy and therefore improve structural integrity.
Additionally, and among other benefits, illustrative examples described herein facilitate incorporation of pre-designed and/or commercially available prefabricated elements and/or systems.
No known system or device can perform these functions, particularly for such a wide range of building designs. The illustrative examples described herein are particularly useful for building with standardized floor plans. However, not all exampled described herein provide the same advantages or the same degree of advantage.
CONCLUSIONThe disclosure set forth above may encompass multiple distinct examples with independent utility. Although each of these has been disclosed in its preferred form(s), the specific examples thereof as disclosed and illustrated herein are not to be considered in a limiting sense, because numerous variations are possible. To the extent that section headings are used within this disclosure, such headings are for organizational purposes only. The subject matter of the disclosure includes all novel and nonobvious combinations and subcombinations of the various elements, features, functions, and/or properties disclosed herein. The following claims particularly point out certain combinations and subcombinations regarded as novel and nonobvious. Other combinations and subcombinations of features, functions, elements, and/or properties may be claimed in applications claiming priority from this or a related application. Such claims, whether broader, narrower, equal, or different in scope to the original claims, also are regarded as included within the subject matter of the present disclosure.
Claims
1. A method of constructing a building, including:
- selecting a standard dimension,
- designing a building on a grid defined by the selected standard dimension, the building including a plurality of prefabricated elements, wherein each prefabricated element has a width corresponding to the selected standard dimension, and the plurality of prefabricated elements includes rebar cages
- fabricating each of the plurality of prefabricated elements at a manufacturing plant;
- transporting the plurality of prefabricated elements by truck from the manufacturing plant to a building site,
- constructing intersecting grade beam footings at the building site, the grade beam footings having a uniform width and depth and including the rebar cages, and,
- pouring a slab between the intersecting grade beam footings, wherein the grade beam footings and slab have contiguous coplanar upper surfaces, and the rebar cages extend into the slab.
2. The method of claim 1, wherein the constructing step includes:
- pouring a first layer of concrete over one of the rebar cages,
- installing a plate on top of the first layer,
- fastening a laterally resistive frame to the plate, and
- pouring a second layer of concrete over the plate.
3. The method of claim 2, wherein the rebar cage includes a stirrup that extends into the second layer of concrete.
4. The method of claim 2, further comprising:
- erecting and bolting together pre-welded components, including the laterally resistive frame, to form a steel building frame.
5. The method of claim 4, further comprising:
- bolting a wall panel to the steel building frame.
6. The method of claim 4, further comprising:
- bolting a roof panel to the steel building frame.
7. The method of claim 1, wherein the standard dimension is less than 11 feet.
8. A building assembly, comprising:
- a foundation including intersecting grade beam footings having a uniform width and depth, wherein the grade beam footings include a first layer of concrete and a second layer of concrete,
- a steel building frame including columns and laterally resistive frames,
- wherein each column is located at an intersection of the grade beam footings, and each laterally resistive frame extends between two grid intersections.
9. A building assembly, comprising:
- a foundation including intersecting grade beam footings having a uniform width and depth, wherein the grade beam footings include an upper layer of concrete and a lower layer of concrete,
- a base plate sandwiched between the upper and lower layers of concrete,
- anchor bolts extending from below the foundation, up through the lower layer of concrete, to connect to the base plate,
- a laterally resistive frame extending into the upper layer of concrete, and bolted to the base plate.
Type: Application
Filed: Nov 20, 2023
Publication Date: Oct 17, 2024
Applicants: Blach Construction Company (San Jose, CA), Gregory P. Luth & Associates, Inc. (Santa Clara, CA), Quattrocchi Kwok Architects (Santa Rosa, CA)
Inventors: Gino R. Cecchetto, SR. (Woodside, CA), Gregory P. Luth (San Jose, CA), Aaron R. Jobson (Santa Rosa, CA)
Application Number: 18/515,022