Control room
Latest BWXT mPower, Inc. Patents:
- Valve assembly with isolation valve vessel
- Integral vessel isolation valve
- Deforming a portion of a nut threaded on a guide tube end plug to lock the nut to a lower end fitting of a nuclear reactor fuel assembly
- Combined mounting/electrical distribution plate for powering internal control rod drive mechanism (CRDM) units of a nuclear reactor
- Nuclear reactor refueling methods and apparatuses
Claims
We claim a control room, as shown and described.
3366415 | January 1968 | Cooper |
D247183 | February 7, 1978 | Cosentino |
5227121 | July 13, 1993 | Scarola et al. |
5271045 | December 14, 1993 | Scarola et al. |
5287666 | February 22, 1994 | Frascaroli et al. |
5906079 | May 25, 1999 | Brickner et al. |
6067762 | May 30, 2000 | Greer et al. |
6076308 | June 20, 2000 | Lyon et al. |
6163740 | December 19, 2000 | Beltracchi |
6276102 | August 21, 2001 | Shipman et al. |
6374548 | April 23, 2002 | Ruedinger et al. |
6415555 | July 9, 2002 | Montague |
6492901 | December 10, 2002 | Ridolfo |
6663267 | December 16, 2003 | Newhouse et al. |
D694427 | November 26, 2013 | Eckert et al. |
8776445 | July 15, 2014 | Jhaveri et al. |
8776446 | July 15, 2014 | Jhaveri et al. |
20020011193 | January 31, 2002 | Beck et al. |
20020026755 | March 7, 2002 | Jones |
20030117440 | June 26, 2003 | Hellyar et al. |
20040082334 | April 29, 2004 | Petrick et al. |
20040103593 | June 3, 2004 | Beasley |
20080035031 | February 14, 2008 | Yamanishi et al. |
20080104571 | May 1, 2008 | Jaeger |
20090000789 | January 1, 2009 | Leuthen et al. |
20090031181 | January 29, 2009 | Yuan et al. |
20090090076 | April 9, 2009 | Abusada et al. |
20090129530 | May 21, 2009 | Reyes et al. |
20090217084 | August 27, 2009 | Ebbert et al. |
20090293388 | December 3, 2009 | Feldpausch et al. |
20100024688 | February 4, 2010 | Kitada et al. |
20100141421 | June 10, 2010 | Lagnelov et al. |
20100188263 | July 29, 2010 | Cornwall et al. |
20110126111 | May 26, 2011 | Gill et al. |
20110200158 | August 18, 2011 | Hyde et al. |
20120305203 | December 6, 2012 | Verbeek et al. |
20120311946 | December 13, 2012 | Liu et al. |
20130129030 | May 23, 2013 | Hanada et al. |
20140116299 | May 1, 2014 | Salehi et al. |
20140261100 | September 18, 2014 | Henriott et al. |
20140285720 | September 25, 2014 | Epstein et al. |
91/06960 | May 1991 | WO |
2011/103652 | September 2011 | WO |
- GE Hitachi Nuclear Energy, ANS 2010 Winter Meeting & Embedded Topical Meetings, PDW #1: Digital Instrumentation & Controls Workshop, Vendor Perspectives—GE Hitachi, by Richard E. Miller, Nov. 7, 2010.
- 2010 ANS Winter Meeting: “Nuclear Process!”; 7th Int'l Topical Meeting on Nuclear Plant Implementation, Control and Human Machine Interface Technologies (NPIC&HMIT 2010), New and Existing Plants I&C Design, Digital Instrumentation and Control Workshop, Las Vegas, NV, Nov. 7, 2010, by Sergey S. Anikanov, PhD, Westinghouse Electric Co.
- Nei, Control Room Staffing for Small Reactors, Sep. 23, 2011.
Type: Grant
Filed: Dec 3, 2012
Date of Patent: Nov 3, 2015
Assignee: BWXT mPower, Inc. (Charlotte, NC)
Inventor: Thomas G. Graham (Lynchburg, VA)
Primary Examiner: Garth Rademaker
Assistant Examiner: Samantha Q Lawrence
Application Number: 29/438,789