With Work Deck Vertically Adjustable Relative To Floor Patents (Class 405/196)
-
Patent number: 12012707Abstract: A method for lifting a payload of an offshore platform is provided. The offshore platform comprises a support structure supporting the payload. The payload includes a main deck and a column directly connected to the support structure, the column supporting the main deck. The method includes coupling a plurality of tension rods to a lower lifting device, having a welding surface weldable to a welding portion of the column and an upper lifting device having a coupling interface such that the plurality of tension rods connect the lower lifting device and the upper lifting device. The plurality of extendable tension rods can extend along a rod direction between the lower lifting device and the upper lifting device to separate the payload from the support structure. At least some of the tension rods of the plurality of tension rods are pre-tensioned to exert a compressive action to the payload.Type: GrantFiled: April 2, 2019Date of Patent: June 18, 2024Assignee: Saipem S.P.AInventor: Vincent George McCarthy
-
Patent number: 11851143Abstract: A mooring system for an Ocean Wave Energy Converters (OWEC) includes multiple structural members such as legs and braces that are linearly extendible and connected using mobile joints, each joint providing two degrees of freedom for rotations about the joint. Mobile joints also attach bottom ends of the legs to mooring points. A jacking system can change lengths of the extensible structural members to adjust depth of the OWEC for operation or for storm safety, to lift the OWEC out of the water for maintenance, or to align the OWEC to an incoming wave direction.Type: GrantFiled: January 14, 2021Date of Patent: December 26, 2023Assignee: Atargis Energy CorporationInventor: Stefan G. Siegel
-
Patent number: 11598063Abstract: A pile guide has a collar with a void therein. A planar flange extends from a side of the collar. A first guide and a second guide form opposing guides constructed and arranged for receiving the planar flange of the pile guide therein. The planar flange is in a slidable relationship within the opposing guides, and the bracket is constructed and arranged for mounting to a dock. The opposing guides pivot relative to the dock during installation and allow pivoting of the pile guide relative to the dock or other mounting. The distance and angle of the collar relative to the dock or other mounting can be adjusted to accommodate for positioning of pile guides due to positioning of piles relative to a dock or other structure.Type: GrantFiled: January 18, 2022Date of Patent: March 7, 2023Inventor: Sean A. Barnes
-
Patent number: 11518484Abstract: A wheel kit for use with a boat lift includes an upper member attachable to the boat lift, and a lower member slidably disposable within the upper member. The lower member contains an axle and a wheel assembly. A braking member includes a base plate with a first side and an opposing second side, a wedge portion outwardly extending from an upper end of the first side, and a tab outwardly extending from a lower end of the first side of the base plate. The braking member slidably disposes upon the axle via an aperture contained within the base plate. When positioning the lower member into the upper member to retract the wheel assembly, the wedge portion of the braking member contacts a closed terminal end of a slot contain within the upper member, outwardly urging the braking member against the wheel assembly to prevent rotation of the wheel assembly.Type: GrantFiled: August 2, 2021Date of Patent: December 6, 2022Assignee: Hewitt Machine & Mfg. Inc.Inventor: Steve C. Uhde
-
Patent number: 11459719Abstract: The dock leveling system is a device to quickly and easily alter the height of the lake dock without necessitating getting into the water. The system can be installed into existing docks, or could potentially be sold with new docks. The system accomplishes the purpose of altering the height of the lake dock by the movement of a lower and upper clamp, each connected to the two foot threaded rod by an angle iron. Using a cordless drill, the top nut can be rotated clockwise or counter-clockwise. Clockwise movement of the top nut brings the two clamps together, raising the dock. Reversely, counter-clockwise movement of the top nut distances the two clamps from each other, lowering the dock frame.Type: GrantFiled: November 4, 2020Date of Patent: October 4, 2022Inventor: Orvin Gedstad
-
Patent number: 11414938Abstract: Drilling installation comprising a cantilever with a drilling floor for performing drilling operations; further comprising an independent operations handling system arranged for handling equipment underneath the drilling floor independent of the drilling operations on the drilling floor, wherein the independent operations handling system comprises a handling element for cooperation with the equipment to be handled, wherein the handling element is extendible underneath the cantilever.Type: GrantFiled: August 17, 2020Date of Patent: August 16, 2022Assignee: GUSTOMSC B.V.Inventors: Josephus Leonardus Aloysius Maria Van Der Hoorn, Naxin Zhang, Mark Cornelius Marinus Franciscus Rommens, Govert Hendrik Teunis Zijderveld
-
Patent number: 11173987Abstract: An offshore floating structure such as a wind turbine includes a number of improvements. The floating structure can include a chain engaging system configured to prevent any lengthwise movement of a mooring chain. The floating structure can also include a mooring fixture pivotally coupled to the hull to prevent shock loads from being transmitted directly from the mooring line to the hull. The floating structure can also include installation aid structures that provide additional water plane area and/or buoyancy to the structure. The floating structure can also have a hull that is optimized for use as an offshore wind turbine.Type: GrantFiled: December 20, 2016Date of Patent: November 16, 2021Assignee: Atkins Energy, Inc.Inventors: Jun Zou, Ikpoto Udoh
-
Patent number: 10875748Abstract: A marine vessel and a method of operation of such a marine vessel include a crane with a boom including a main boom section and a jib section and a variable length stay mechanism. The lattice boom is movable from a hoisting position into a parking position by a routine including operating the variable length stay mechanism allowing the jib section to fold towards the main boom section. The crane is provided with a fixation device adapted to establish fixation of the jib section relative to the main boom section in a folded position. A boom rest is mounted on the hull. The routine further includes operating the luffing assembly to position the jib member of the folded jib section, fixated to the main boom section, in the parking position onto the boom rest.Type: GrantFiled: November 10, 2017Date of Patent: December 29, 2020Assignee: ITREC B.V.Inventors: Cornelis Martinus Van Veluw, Joop Roodenburg
-
Patent number: 10794032Abstract: A method of and a noise mitigation system for installing a foundation element, in particular a (mono)pile, includes a screen to be placed about a foundation element, in particular a (mono)pile, during driving of the foundation element in an underwater ground formation, to reduce noise input resulting from the driving into the surrounding water, e.g. a river or sea. The method and system comprise a further screen to be deployed about the (first) screen.Type: GrantFiled: December 29, 2015Date of Patent: October 6, 2020Assignee: IHC HOLLAND IE B.V.Inventors: Boudewijn Casper Jung, Henricus Gerardus Andreas Van Vessem
-
Patent number: 10738431Abstract: A connection structure for connecting a seabed anchor to a superstructure for electrical power engineering has a horizontally encircling, vertically extending wall, which bounds a spatial region inside the connection structure. A first connecting section is configured for connection to the superstructure. A second connecting section is configured for connection to the seabed anchor.Type: GrantFiled: February 21, 2019Date of Patent: August 11, 2020Assignee: Siemens AktiengesellschaftInventors: Wolfgang Dallinger, Thorsten Steinhoff
-
Patent number: 10387023Abstract: Techniques and devices to assist an offshore unit in going on location and coming off location. A device may include an interface configured to receive a signal indicative of motions of an offshore unit. The device may also include a memory configured to store a set of values corresponding to acceptable motions of the offshore unit, as well as a processor configured to determine if a measured motion of the offshore unit exceeds at least one value of the set of values and generate an indication that going on location by the offshore unit can be undertaken when the processor determines that the measured motion of the offshore unit is less than or equal to the at least one value.Type: GrantFiled: July 25, 2016Date of Patent: August 20, 2019Assignee: Ensco Services LimitedInventors: Barton D. Grasso, Frank Strachan, Jose H. Vazquez
-
Patent number: 10352010Abstract: A self-installing offshore platform includes a top deck that supports an offshore facility, a column having a top end and a bottom end, the top end connected to the top deck, the column that supports the top deck to maintain the top deck above water in a water body in both the deployed state and the undeployed state of the self-installing offshore platform, a skirt connected to the bottom end of the column, the skirt residing above a floor of the water body in the undeployed state of the self-installing offshore platform and residing on the floor of the water body in the deployed state of the self-installing offshore platform, and a ballastable float positioned between the top deck and the skirt, the ballastable float floating in the water when the self-installing offshore platform transitions from the undeployed state to the deployed state.Type: GrantFiled: February 13, 2017Date of Patent: July 16, 2019Assignee: Saudi Arabian Oil CompanyInventor: Rabih A. Khodr
-
Patent number: 10329727Abstract: A method of elevating the deck area of a marine platform (e.g., oil and gas well drilling or production platform) utilizes a specially configured sleeve support to support the platform legs so that they can be cut. Once cut, rams or jacks elevate the platform above the cuts. The sleeve support is then connected (e.g., welded) to the platform leg and becomes part of the structural support for the platform. In one embodiment, two sleeves are employed. In another embodiment, the jacks or rams elevate in two stages including a first stage wherein one sleeve elevates and the other sleeve does not elevate and a second stage wherein both sleeves elevate together.Type: GrantFiled: March 26, 2018Date of Patent: June 25, 2019Assignee: VERSABAR, INC.Inventors: Jon Khachaturian, E. John Greeves
-
Patent number: 10315733Abstract: The invention relates to a monohull drillship (1), comprising an elongated hull (2) extending in the length direction (3) of the drillship. Said hull (2) is provided with at least one open moon pool (4) arranged to be located at the waterline (5) during use of the drillship. The drillship (1) is arranged for multiple-activity operations, e.g. simultaneous drilling and casing handling, in such a manner that drilling equipment can be passed through said at least one moon pool (4) at at least two locations (7, 8), i.e. at at least two so-called well centers, which are spaced apart from each other in at least a direction (6) substantially transverse to the length direction (3) of the hull of the drillship.Type: GrantFiled: March 7, 2016Date of Patent: June 11, 2019Assignee: GustoMSC Resources B.V.Inventors: Govert Hendrik Teunis Zijderveld, Sjoerd Maarten Hendriks, Willem Johannes Alain Wassink
-
Patent number: 9914505Abstract: A method for installing a water-submersible platform is disclosed. The method includes lowering the platform in water from a vessel positioned above the platform while spuds connecting the vessel to the platform stabilize the platform during lowering. An assembly of the vessel and platform, and a vessel that is used to connect to the platform is also disclosed.Type: GrantFiled: January 13, 2012Date of Patent: March 13, 2018Assignee: GLOSTEN, INC.Inventors: Charles J. Nordstrom, William L. Moon, III, Benjamin B. Ackers
-
Patent number: 9725864Abstract: A variable-draft barge configured to transfer loads in a body of water, and having a water line which is a function of the draft; the barge having: a hull; an underbody; at least one first chamber located in the hull and floodable selectively to alter the draft of the barge; at least one flood valve located below the water line to flood the first chamber; and a control device configured to selectively open the flood valve to flood the first chamber.Type: GrantFiled: January 24, 2014Date of Patent: August 8, 2017Assignee: SAIPEM S.p.A.Inventors: Kimon Ardavanis, Andrea Oldani, Roberto Faldini
-
Patent number: 9708033Abstract: The assembly includes a one group (40A to 40C) of hydraulic shock absorbers (42), each shock absorber (42) comprising a hydraulic jack comprising a cylinder designed to be supported by the first element (14), and a shock-absorbing member partially received in the cylinder. The shock-absorbing member has a head protruding outside the cylinder, the head being designed to come into contact with the second element during mounting of the second element on the first element (14). The shock-absorbing assembly (17) includes, for each group (40A to 40C) of shock absorbers (42), a fluid accumulator (44) connected to each cylinder of the group of shock absorbers (42), to allow a hydraulic fluid transfer between the different cylinders of the group of shock absorbers (42) during contact between each head and the second element.Type: GrantFiled: October 14, 2013Date of Patent: July 18, 2017Assignee: TECHNIP FRANCEInventor: Didier Bonnemaison
-
Patent number: 9567721Abstract: An offshore wind turbine foundation comprising a platform carrying a support for the wind turbine tower in its central region, and a plurality of leg guides in its peripheral region; and a plurality of legs, each of which may be movable between a raised position for transport and lowered positions for resting on the seabed. Each leg is capable of freely sliding in its guide.Type: GrantFiled: April 3, 2013Date of Patent: February 14, 2017Assignee: DCNSInventor: Jacques Cyrille Moiret
-
Patent number: 9534387Abstract: The invention relates to a structural element. In an embodiment, the structural element includes a stiff, elongate tubular member, wherein an inner surface of the tubular member and side faces enclose a core extending along at least a length of the tubular member, wherein the core is provided with a fluid under pressure. The invention furthermore relates to a method for hoisting a stiff, elongate tubular member.Type: GrantFiled: May 15, 2009Date of Patent: January 3, 2017Assignee: VIZIONZ HOLDING B.V.Inventor: Valentin Zdravkov Anguelov
-
Patent number: 9512678Abstract: A system configured to execute an underwater well drilling program in the bed of a body of water has a jack-up having a floating structure and a drilling installation supported on the floating structure; and an auxiliary floating unit connectable selectively to the jack-up to enable transfer of the jack-up over the body of water, even in very shallow water.Type: GrantFiled: November 23, 2012Date of Patent: December 6, 2016Assignee: SAIPEM S.P.AInventors: Alessandro Valsecchi, Luigi Lanfranchi
-
Patent number: 9487944Abstract: A jack-up conical structure having a generally cone shape. The wide base and narrow upper section enhance stability of the structure during floatation, transport, elevation, anchoring, and drilling. The wide base along with a buoyant portion provide a large water line area which enhances stability of the structure during floatation and transit and while sections of the structure elevate and lower. The wide base also has shear resistance portion that prevents lateral sliding, especially in ice infested waters. A central shaft is disposed in a vertical orientation to the structure and facilitates movement throughout. A conical upper portion moves along the central shaft relative to the conical base. A drilling portion moves on racks of grooves inside the central shaft and performs drilling operations. Numerous chambers, cranes, and helipad support drilling and habitation on the structure.Type: GrantFiled: December 22, 2014Date of Patent: November 8, 2016Inventor: Muhammad Amzad Ali
-
Patent number: 9457875Abstract: A floating type self-lifting drilling platform includes a main deck, a floating cushion, pile legs, a lifting mechanism and a mooring system. The area and thickness of the floating cushionare both greater than those of the main deck, the middle part is provided with a moon pool, and the inner part is partitioned into multiple cabins; there are three pile legs, the pile legs are truss structures, the bottom part of each of the pile legs is rigidly connected with the floating cushion, and the main deck lifts vertically along the pile legs through the lifting mechanism and is fixed at a preset height; each pile leg includes upper and lower hollow sealing bodies; the water line is located in the height range of the upper section during the operation and positioned through the mooring system.Type: GrantFiled: December 29, 2015Date of Patent: October 4, 2016Assignee: Graduate School at Shenzhen, Tsinghua UniversityInventors: Xiangyuan Zheng, Daoyi Chen, Han Yu
-
Patent number: 9234326Abstract: A base frame for an offshore platform and a method for installing such a base frame includes a self-floating lower building structure having a stable trim, at least one tank in the lower building structure which is dimensioned such that the lower building structure sinks when the tank is flooded, mechanism for flooding at least one tank, and a mechanism for bearing piles in upright standing arrangement on the lower building structure. The method builds a base frame, transports the base frame to the sea in a self-floating manner and floods the base frame until it is on the sea floor and then anchors the base frame to the sea floor with piles.Type: GrantFiled: January 14, 2013Date of Patent: January 12, 2016Assignee: NORDIC YARDS HOLDING GMBHInventors: Thomas Bollmohr, Constantin Hagemeister, Matthias Linnemann, Helge Mokros, Frank Mönnig
-
Patent number: 9039332Abstract: Facilities for offshore liquefied natural gas (LNG) floating storage with jack-up platform regasification unit, the facilities including: a jack-up unit comprising legs which have bottom part to be fixable to a sea bed and top part to be exposed to a surface of water, and a hull to be movable up and down with respect to the legs; a storage unit moored at the jack-up unit providing a space for storing LNG; a regasification unit as a module which regasifies the LNG supplied from the storage unit, installed on a top portion of the jack-up unit, separable from the jack-up unit; a utility unit comprising a power source and a sea water pump to supply power and sea water to the regasification unit; and a piping unit comprising unloading pipe for connecting the regasification unit and the storage unit and supplying pipe for carrying natural gas gasified by the regasification unit.Type: GrantFiled: December 19, 2011Date of Patent: May 26, 2015Assignee: Samsung C&T CorporationInventors: Ki Ho Moon, Kwang Ho Wi, Seong Min Yang, Ho Joon Shin, Su Hyuk An, Kil Hong Kim, Heon Joong Jung, Jae Hyuk Jang, Chul Jin Moon, Jae Heon Lee, Hyun Sang Cho, Sung Uk Lee
-
Patent number: 9010266Abstract: An underwater-above water accommodation is adapted for human occupancy under water, above or on the surface of water and comprises an underwater accommodation (1) and above water accommodation (2) slidably mounted on preferably three, vertical legs (3, 4, 5). At least one vertical shaft (23) is fixed to the underwater accommodation (1), contains a lift (26) and stairs (28) inside and is slidably mounted in a sleeve (24) fixed to the above water accommodation (2). The underwater accommodation (1) has a pressure shell (12), in the lower part of which a first ballast tank (29) is located; the above water accommodation (2) has a structure (13), in the lower part of which a second ballast tank (30) is attached. At the sliding joint with the vertical legs (3, 4, 5) the underwater accommodation (1) has built-in sliding joint bushings (9, 10, 11) tightly linked to the pressure shell (12). At the sliding joint with vertical legs (3, 4, 5) the structure (13) is fixed to the sliding joint bushings (14, 15, 16).Type: GrantFiled: September 2, 2011Date of Patent: April 21, 2015Assignee: Deep Ocean Technology SP. Z.O.O.Inventors: Lech Adam Rowiński, Jacek Ireneusz Zdrojewski
-
Patent number: 8992126Abstract: A method of estimating the environmental force acting on a supported jack-up vessel is described. The vessel is positioned in a force determination position and the strain on at least one support leg of the jack-up vessel is measured while a first thrust is applied to the vessel. A second thrust is applied to the vessel while the vessel is maintained in the force determination position. The variation in the strain in the at least one support leg is monitored as the second thrust is applied and the strain is used to calculate an estimate of the environmental force acting on the vessel. The method allows a dynamic positioning (DP) system of the jack-up vessel to determine a suitable thrust to apply to the vessel as the support legs of the vessel are raised. By applying this suitable thrust the position of the vessel can be maintained when the vessel transitions from being supported by the support legs to being supported by water.Type: GrantFiled: October 25, 2011Date of Patent: March 31, 2015Assignee: GE Energy Power Conversion Technology Ltd.Inventor: Richard Ian Stephens
-
Patent number: 8967914Abstract: The present invention provides a riser protection structure being suitable to be employed in a Jackup rig. The riser protection structure comprises a plurality of piles, an upper module, wherein the upper module comprises a main protection tubing for receiving a riser, a plurality of sleeves to be installed over the plurality of piles, and a connecting network; wherein the plurality of sleeves are disposed around the main protection tubing; and wherein the main protection tubing and the plurality of sleeves are connected together by the connecting network, and a lower module, wherein the lower module comprises a plurality of tubular guides for guiding and later fixing the piles and a connecting structure, wherein the plurality of piles are securely disposed into the seabed for providing the requisite support for the upper and lower modules when they are assembled.Type: GrantFiled: February 15, 2013Date of Patent: March 3, 2015Assignees: Keppel Offshore & Marine Technology Centre, Pte Ltd/ConocoPhillips CompanyInventors: Kok Seng Foo, Michael John Perry, Quah Chin Kau Matthew, Cynthia Wang, Randall Scott Shafer, Peter Noble, Dominic P. Berta
-
Patent number: 8956081Abstract: An ice worthy jack-up rig that may extend the drilling season in shallow water off shore Arctic or ice prone locations. The rig would work like a conventional jack-up rig while in open water with the hull jacked up out of the water. However, in the event of ice conditions, the legs are held in place by cans embedded in the sea floor to resist lateral movement of the rig and the hull is lowered into the water into an ice defensive configuration. The hull is specifically shaped with an ice-bending surface to bend and break up ice that comes in contact with the hull while in the ice defensive configuration.Type: GrantFiled: October 21, 2011Date of Patent: February 17, 2015Assignee: ConocoPhillips CompanyInventors: Peter G. Noble, Randall S. Shafer, Dominique P. Berta
-
Publication number: 20150034383Abstract: An offshore system with a rig and a cantilever having a rigid cantilever structure with an operational end. The rig is provided with a first support rail which extends along a side of the deck supporting structure. Travelling and swivelling assemblies are arranged between the first support rail and the cantilever beams. The rig is provided with one or more second support rails that extend over the deck in a direction transverse to the first support rail. The system has a cantilever inner end carrier device travels over and engages on said one or more second support rails. This device is connected via a vertical pivot axis swivel to a connector part of the rigid cantilever structure at or near its inner end to provide a rotation axis at a fixed location relative to the structure for the rotational motion of the cantilever, the cantilever inner end carrier device holding the cantilever inner end relative to the deck.Type: ApplicationFiled: February 27, 2013Publication date: February 5, 2015Inventors: Joop Roodenburg, Diederick Bernardus Wijning
-
Publication number: 20150023737Abstract: A system and method for accommodating normal, or larger than normal, support footings for the legs of an offshore jack-up rig, with the support footings now to be known as spud cans, and an improved hull design to accommodate legs with attachable spud cans, along with a method of mounting said spud cans by submerging them, lowering each jack-up leg down on the designated spud can and locking the two units in together.Type: ApplicationFiled: July 18, 2014Publication date: January 22, 2015Applicant: A.P. MØLLER - MÆRSK A/SInventor: Morten NORDERUD-POULSEN
-
Publication number: 20150010363Abstract: A frame comprises a base and at least four legs, wherein said base is positionable along said legs, so that said base may be moved from a first position wherein said base is above a water surface when supported by said legs, to a second position wherein said base is transportable on the deck of a surface vessel.Type: ApplicationFiled: September 25, 2014Publication date: January 8, 2015Inventor: Andrew Johnson
-
Patent number: 8926223Abstract: A floatable building foundation comprises a steel beam support frame platform with buoyancy provided by underlying pontoons and/or foam billets. Vertical movement of the platform in response to a storm surge is constrained by cuboidal column guides at the four corners. Each of the column guides comprises two tiers of square roller frames, within each of which is an I-beam engaged between the flanges on either side by two rollers supported on horizontal axes. The orientations of the I-beams and rollers alternate orthogonally at each corner of the platform, so that torques generated by uneven buoyancy are suppressed and do not result in jamming of the platform as it rises.Type: GrantFiled: October 16, 2013Date of Patent: January 6, 2015Inventors: Philip DeStefano, John Bianco, Robert Caruso
-
Patent number: 8915677Abstract: A jack-up rig for offshore operations comprises a hull. In addition, the rig comprises a support leg moveably coupled to the hull. The support leg has a central axis, an upper end, and a lower end opposite the upper end. Further, the support leg is adapted to be axially raised and lowered relative to the hull. The rig also comprises a ballast tank movably coupled to the support leg. The ballast tank is adapted to be axially raised and lowered relative to the support leg and the hull.Type: GrantFiled: March 18, 2011Date of Patent: December 23, 2014Assignee: National Oilwell Varco, L.P.Inventor: Maria Lenders
-
Patent number: 8911179Abstract: The invention relates to a jack-up rig. The inventive rig would work like a conventional jack-up rig while in open water with the hull jacked up out of the water. However, in the event of ice conditions, the hull is lowered into the water into an ice defensive configuration. The hull is specifically shaped with a lower portion that is an ice-bending surface to bend and break up ice that comes in contact with the hull while in the ice defensive configuration. Furthermore, the jack-up rig comprises at least two derricks.Type: GrantFiled: February 14, 2012Date of Patent: December 16, 2014Assignees: ConocoPhillips Company, Keppel Offshore & Marine TechnologyInventors: Peter G. Noble, Randall S. Shafer, Dominique P. Berta, Yew Yuen Chow, Tak On Cheung, Kok Seng Foo, Chin Kau Quah, Cynthia Wang
-
Patent number: 8899880Abstract: The present invention provides a structure-assisted Jackup system comprising a Jackup drilling unit with a main deck structure and a plurality of legs movably coupled with the main deck structure, one or more support base structures disposed on seabed, and a plurality of movable supports, wherein each of the plurality of movable supports is securely coupled with either the main deck structure or one or more support base structure. The present invention also provides a process for assembling the structure-assisted Jackup system.Type: GrantFiled: January 28, 2013Date of Patent: December 2, 2014Assignee: Keppel Offshore & Marine Technology Centre Pte LtdInventors: Kok Seng Foo, Michael John Perry, Matthew Chin Kau Quah, Cynthia Wang, Tak On Cheung, Randall Scott Shafer, Peter Noble
-
Patent number: 8899879Abstract: A structure-supported Jackup system comprising a Jackup drilling unit with a main deck structure and a plurality of legs movably coupled with the main deck structure, two or more support base structures disposed on seabed, and a plurality of movable supports, wherein each of the plurality of movable supports is securely coupled with either the main deck structure or one of the two or more support base structure.Type: GrantFiled: January 28, 2013Date of Patent: December 2, 2014Assignee: Keppel Offshore & Marine Technology Centre Pte LtdInventors: Kok Seng Foo, Michael John Perry, Matthew Chin Kau Quah, Cynthia Wang, Tak On Cheung, Randall Scott Shafer, Peter Noble
-
Patent number: 8870497Abstract: The invention relates to an ice worthy jack-up rig with a conical piled monopod working together to drill wells and produce hydrocarbons in ice prone locations. The inventive rig would work like a conventional jack-up rig while in open water with the hull jacked up out of the water. However, in the event of ice conditions, the legs are held in place by cans embedded in the sea floor to resist lateral movement of the rig. Both the hull and conical piled monopod are shaped with ice-bending surfaces to bend and break up ice that comes into contact.Type: GrantFiled: October 21, 2011Date of Patent: October 28, 2014Assignee: ConocoPhillips CompanyInventors: Randall S. Shafer, Peter G. Noble, Ravi P. Aurora, Thomas E. Ramsey, Ted H. Westerman, Dominique P. Berta
-
Publication number: 20140308080Abstract: A system and method of drilling oil and gas wells in arctic or other environments having adverse conditions. A marine hydrocarbon operations structure may comprise a caisson body having a top surface which defines an opening and a shaft positioned within the opening. The shaft has an engagement member positioned on the external surface of the shaft. A lower jack house system is constructed and arranged to change the vertical position of the shaft through interaction with the engagement member. An operations platform supported by the shaft.Type: ApplicationFiled: March 18, 2014Publication date: October 16, 2014Inventors: Adel H. Younan, Jed M. Hamilton, Jean M. Audibert, Yew Choong Patrick Lee
-
Patent number: 8851799Abstract: A jack-up rig while in open water operates with the hull jacked up out of the water. However, in the event of ice conditions, the legs are held in place by cans embedded in the sea floor to resist lateral movement of the rig and the hull is lowered into the water into an ice defensive configuration. The hull is specifically shaped with an ice-bending surface to bend and break up ice that comes in contact with the hull while in the ice defensive configuration.Type: GrantFiled: October 21, 2011Date of Patent: October 7, 2014Assignee: ConocoPhillips CompanyInventors: Peter G. Noble, Randall S. Shafer, Dominique P. Berta
-
Publication number: 20140248090Abstract: Process for installing an offshore tower, comprising: a) manufacturing a foundation comprising a block (1, 1?), manufacturing at least one superposition section of a shaft (7), and manufacturing a base section (25) of a shaft; b) applying said base section to said foundation block (starting unit) to assume the relative position for the installed condition, applying said superposition sections to said starting unit in a multi-layered configuration, and applying lifting means to said foundation block and/or said base section; c) moving said starting unit up to the installation point; d) introducing ballast in said foundation block so that said starting unit sinks until resting on the bottom of the body of water; e) actuating said lifting means to expand said sections into the installed condition; f) between step a) and c), placing said foundation block or starting unit in the body of water of the installation point.Type: ApplicationFiled: October 18, 2012Publication date: September 4, 2014Applicant: SEA WIND TOWERS, S.L.Inventors: Miguel Angel Fernandez Gomez, Jose Emilio Jimeno Chueca
-
Patent number: 8807875Abstract: The invention relates to an ice worthy jack-up rig with a conical piled monopod working together to drill wells and produce hydrocarbons in ice prone locations. The inventive rig would work like a conventional jack-up rig while in open water with the hull jacked up out of the water. However, in the event of ice conditions, the legs are held in place by cans embedded in the sea floor to resist lateral movement of the rig and in sockets attached to the conical piled monopod. Both the hull and conical piled monopod are shaped with ice-bending surfaces to bend and break up ice that comes into contact.Type: GrantFiled: October 21, 2011Date of Patent: August 19, 2014Assignee: ConocoPhillips CompanyInventors: Randall S. Shafer, Peter G. Noble, Ravi P. Aurora, Thomas E. Ramsey, Ted H. Westerman, Dominique P. Berta
-
Patent number: 8801333Abstract: A system operates like a conventional jack-up rig while in open water with the hull jacked up out of the water. However, in the event of ice conditions, the legs are held in place by cans embedded in the sea floor to resist lateral movement of the rig and the hull is lowered into the water into an ice defensive configuration. The hull is specifically shaped with an ice-bending surface to bend and break up ice that comes in contact with the hull while in the ice defensive configuration.Type: GrantFiled: October 21, 2011Date of Patent: August 12, 2014Assignee: ConocoPhillips CompanyInventors: Peter G. Noble, Randall S. Shafer, Dominique P. Berta, Michael B. Winfree
-
Publication number: 20140205383Abstract: The invention relates generally to a method for supporting non-buoyant offshore drilling units that are anchored to the sea floor and are subject to heavy lateral loads. Specifically, tension tendons are attached to piled foundations to prevent jack-ups from being overturned by the loads. Tension can also be applied to the tendons to provide additional hold down forces to the offshore units.Type: ApplicationFiled: January 14, 2014Publication date: July 24, 2014Applicant: CONOCOPHILLIPS COMPANYInventors: Peter NOBLE, Randall Scott SHAFER
-
Patent number: 8747026Abstract: An installation vessel for installing an offshore structure, the installation vessel comprising a hull and a plurality of legs, each leg comprising vertical chords and cross braces, the hull having a plurality of leg openings each configured for passage of a leg therethrough, each leg opening having a number of jack-cases for supporting pinions thereon, each pinion being configured for rotatably engaging a rack disposed on a chord of the leg to move the leg relative to the hull, each jack-case comprising a number of guides for guiding passage of the leg through the leg opening, each guide comprising a plurality of angled surfaces configured for sliding engagement with a corresponding plurality of surfaces of a rack, each of the plurality of angled surfaces comprising a wear plate.Type: GrantFiled: August 31, 2011Date of Patent: June 10, 2014Assignee: Keppel Offshore & Marine Technology Centre Pte LtdInventors: Chin Kau Quah, Kok Seng Foo, Cheng Choong Chan
-
Publication number: 20140147214Abstract: The present invention provides a structure-supported. Jackup system comprising a Jackup drilling unit with a main deck structure and a plurality of legs movably coupled with the main deck structure, two or more support base structures disposed on seabed, and a plurality of movable supports, wherein each of the plurality of movable supports is securely coupled with either the main deck structure or one of the two or more support base structure. The present invention also provides a process for assembling the structure-supported Jackup system.Type: ApplicationFiled: January 28, 2013Publication date: May 29, 2014Inventors: Kok Seng FOO, Michael John Perry, Matthew Chin Kau Quah, Cynthia Wang, Tak On Cheung, Randall Scott Shafer, Peter Noble
-
Publication number: 20140147216Abstract: A method of estimating the environmental force acting on a supported jack-up vessel is described. The vessel is positioned in a force determination position and the strain on at least one support leg of the jack-up vessel is measured while a first thrust is applied to the vessel. A second thrust is applied to the vessel whilst the vessel is maintained in the force determination position. The variation in the strain in the at least one support leg is monitored as the second thrust is applied and the strain is used to calculate an estimate of the environmental force acting on the vessel. The method allows a dynamic positioning (DP) system of the jack-up vessel to determine a suitable thrust to apply to the vessel as the support legs of the vessel are raised. By applying this suitable thrust the position of the vessel can be maintained when the vessel transitions from being supported by the support legs to being supported by water.Type: ApplicationFiled: October 25, 2011Publication date: May 29, 2014Applicant: GE ENERGY POWER CONVERSION TECHNOLOGY LTD.Inventor: Richard Ian Stephens
-
Publication number: 20140147215Abstract: The present invention provides a structure-assisted Jackup system comprising a Jackup drilling unit with a main deck structure and a plurality of legs movably coupled with the main deck structure, one or more support base structures disposed on seabed, and a plurality of movable supports, wherein each of the plurality of movable supports is securely coupled with either the main deck structure or one or more support base structure. The present invention also provides a process for assembling the structure-assisted Jackup system.Type: ApplicationFiled: January 28, 2013Publication date: May 29, 2014Inventors: Kok Seng FOO, Michael John Perry, Matthew Chin Kau Quah, Cynthia Wang, Tak On Cheung, Randall Scott Shafer, Peter Noble
-
Patent number: 8708604Abstract: The present invention provides a system and method that keeps a barge and grillage system on the barge in compression with a topsides supported by the grillage system during the transport, while providing a quick release system between the barge, grillage system, and topsides during an installation procedure that transfers the topsides to an offshore platform. The quick release system can be in tension to apply a compressive force between the grillage system and the topsides until the quick release system is released.Type: GrantFiled: September 20, 2011Date of Patent: April 29, 2014Assignee: Technip FranceInventors: Michael Y. H. Luo, David N. Edelson, Steven Barras, Kostas F. Lambrakos, Anil K. Sablok
-
Patent number: 8689881Abstract: An offshore unit includes a hull and/or a deck frame, a mat attached to at least one connecting leg or a spud can attached to each of at least one connecting leg or lower hull attached to at least one connecting means. A wellhead deck is removably attached to the hull and/or deck frame and a sub-sea clamp in conjunction with a caisson or a sub-sea conductor frame is removably attached to the mat or to the at least one connecting leg, where a spud can is attached to each of the at least one connecting leg, or to the lower hull. The offshore unit is relocatable and is a platform or a rig capable of performing drilling, production, construction, accommodation, hook-up and commissioning or a combination of any of these functions thereof. The offshore unit is a self-elevating mobile platform or submersible platform or semi-submersible platform.Type: GrantFiled: March 1, 2013Date of Patent: April 8, 2014Assignee: Kingtime International LimitedInventors: Nagendran C. Nadarajah, Renata Anita De Raj, Mahendran Sippiah
-
Publication number: 20140086690Abstract: The present invention provides an the ice resistant Jackup leg that comprises a plurality of chords, a plurality of plate structures, wherein the chords and plate structures are alternatively positioned so that the plate structures connect the chords to form the peripheral structure of the ice resistant Jackup leg, a plurality of longitudinal stiffeners, wherein the longitudinal stiffeners are disposed onto the inner surface of the plate structures for stiffening the plate structures, and a plurality of traverse web frames or girders, wherein the traverse web frames or girders are disposed onto the inner surface of the plate structures for supporting the plurality of longitudinal stiffeners. The present invention also provides an ice resistant Jackup platform employing the ice resistant Jackup leg.Type: ApplicationFiled: September 22, 2013Publication date: March 27, 2014Inventors: Kok Seng Foo, Michael John Perry, Cynthia Wang, Matthew Quah Chin Kau, Randall Scott Shafer, Peter Noble