Abstract: A water-resistant mine bulkhead or seal is provided in which two walls are constructed across the mine entry. One of the walls is constructed in layers. After a lower portion of the layered wall is erected, a first layer of gravel is provided between the walls. The gravel is then saturated with a binding material such as a polyurethane composition so that the binding material fills the voids between the gravel particles. Additional layers of gravel subsequently saturated with the binding material are provided until the gravel layer is equal in height to the lower portion of the layered wall. The layered wall is then further erected and the process continues until the layered wall is completely constructed and the binding material-saturated filler material emplaces the mine roof. Finally, the exposed surface of the exposed wall is coated with a sealant. Alternatively, the binding material and filler material can be pre-mixed and injected into the space between the two walls.
Abstract: A mine ventilation structure for installation at the intersection of first and second passageways in a mine. The ventilation structure defines a first passage communicating with the first passageway and a second passage communicating with the second passageway. The ventilation structure includes a pair of generally parallel, spaced-apart side walls defining the side walls of the first passage, and a plurality of elongate deck panels extending between the side walls and forming the roof of one of the first and second passages and the floor of the other of the first and second passages. Each deck panel is a sheet metal panel generally of inverted channel shape in transverse cross section, having an upper web and side flanges extending down from the upper web at opposite sides of the web. Tie bars hold the deck panels together in fixed side-by-side relation with the side flanges of the panels closely adjacent one another so that the webs of the panels form a substantially continuous surface.
Type:
Grant
Filed:
June 14, 1993
Date of Patent:
November 14, 1995
Assignee:
Jack Kennedy Metal Products and Buildings, Inc.
Abstract: A mine seal is provided in which two walls are constructed across the mine entry. One of the walls is constructed in layers. After a lower portion of the layered wall is erected, a first layer of gravel is provided between the walls. The gravel is then saturated with a binding material such as a polyurethane composition so that the binding material fills the voids between the gravel particles. Additional layers of gravel subsequently saturated with the binding material are provided until the gravel layer is equal in height to the lower portion of the layered wall. The layered wall is then further erected and the process continues until the layered wall is completely constructed and the binding material-saturated filler material emplaces the mine roof. Finally, the exposed surface of the exposed wall is coated with a sealant. Alternatively, the binding material and filler material can be pre-mixed and injected into the space between the two walls.