Patents by Inventor Yu Kaneko
Yu Kaneko has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Publication number: 20150007178Abstract: A virtual machines management apparatus includes a virtual machine controller, a history storage, and a planning module. The virtual machine controller is configured to migrate virtual machines between plural physical servers. The history storage is configured to store, for each set of first virtual machines that were migrated to a same migration destination physical server parallel in time among the virtual machines migrated, history information. The planning module is configured to determine as to whether it is possible to start migrating a planning target virtual machine to a candidate migration destination physical server at a candidate migration start time based on a residual resource amount of the candidate migration destination physical server, a resource consumption of the planning target virtual machine, a sum of resource consumptions of migration-scheduled virtual machines, and the history information.Type: ApplicationFiled: June 27, 2014Publication date: January 1, 2015Inventors: Yu KANEKO, Shigeo MATSUZAWA, Tomonori MAEGAWA
-
Publication number: 20140336832Abstract: According to one embodiment, there is provided an information issuance system including: a segmentation unit, an information generating unit and a transmitting unit. The segmentation unit segments a plurality of travelling apparatuses existing within a demand-and-supply adjustment district and travelling by use of electric power into first to N-th groups on the basis of a number of the travelling apparatuses. The information generating unit sets first to N-th target periods different from each other with respect to the first to N-th groups and to generate first to N-th requests for requesting the travelling apparatuses to restrain electric charges from being performed during the first to N-th target periods. The transmitting unit respectively transmits the first to N-th requests to the travelling apparatuses belonging to the first to N-th groups before starts of the first to N-th target periods.Type: ApplicationFiled: March 6, 2014Publication date: November 13, 2014Applicant: KABUSHIKI KAISHA TOSHIBAInventors: Yu KANEKO, Shigeo MATSUZAWA
-
Publication number: 20140309799Abstract: According to an embodiment, a request control device includes a receiving unit, a generating unit, and a sending unit. The receiving unit is configured to receive a first electric power control request issued for purpose of controlling electric power usage. The generating unit is configured to generate a second electric power control request, which is different than the first electric power control request, at least using the first electric power control request. The sending unit is configured to send the second electric power control request.Type: ApplicationFiled: March 4, 2014Publication date: October 16, 2014Applicant: KABUSHIKI KAISHA TOSHIBAInventors: Kotaro ISE, Yu Kaneko
-
Publication number: 20140304168Abstract: According to one embodiment, there is provided a data managing apparatus including: a storage, a power consumption acquiring unit, an information generating unit and a sending unit. The storage stores information on an electricity unit price applied to a customer for each of a plurality of periods of time. The power consumption acquiring unit acquires a history of power consumption for the customer, from a meter apparatus of the customer. The information generating unit sums up the power consumption for ones of the periods of time for which same electricity unit price is applied to generate first information indicating an integrated value of the power consumption for each electricity unit price. The sending unit sends the first information to an external system.Type: ApplicationFiled: March 10, 2014Publication date: October 9, 2014Applicant: KABUSHIKI KAISHA TOSHIBAInventors: Yu KANEKO, Kotaro ISE, Shigeo MATSUZAWA
-
Patent number: 8805557Abstract: A control system includes a control device for controlling a plurality of actuators by executing a plurality of functions based sensor values from a plurality of external sensors and a function providing device for providing the control device with the functions to be executed by the control device. The function providing device accepts a program including a plurality of functions from a user device, finds a new function among the functions which has not been received yet and pass the same function to the control device. The control device executes functions passed from the function providing device based on values of the external sensors and controls the actuators by transmitting values of output arguments of the functions to the actuators.Type: GrantFiled: March 12, 2009Date of Patent: August 12, 2014Assignee: Kabushiki Kaisha ToshibaInventors: Yusuke Doi, Yu Kaneko, Tomonori Maegawa, Masahiro Ishiyama
-
Publication number: 20140188695Abstract: An electricity trading system is provided which accomplishes an effect of reducing the risk of electricity tightness even if a large number of consumers participate a trading. The electricity trading system according to an embodiment of the present disclosure includes a bid acceptor accepting bid information containing a bidder ID, a bid sorting processor sorting buying bid information among the bid information accepted by the bid acceptor into multiple groups based on a preference or a bidder kind associated with the bidder ID, and a contracting processor performing a process of making a contract between a buying bid indicated by the buying bid information sorted in a first group among the multiple groups and a selling bid, and a process of making a contract between a non-contracted and left selling bid and a buying bid indicated by the buying bid information sorted in a following group.Type: ApplicationFiled: March 6, 2014Publication date: July 3, 2014Applicant: KABUSHIKI KAISHA TOSHIBAInventors: Tomonori MAEGAWA, Shigeo Matsuzawa, Yu Kaneko, Koichi Shimaoka, Yutaka Iino
-
Patent number: 8751660Abstract: According to one embodiment, a load distribution apparatus includes a receiving unit, an acquisition unit, an estimation unit, and a selection unit. The receiving unit is configured to receive a program of an energy saving service from a service provider. The acquisition unit is configured to acquire an external information related to the energy saving service. The estimation unit is configured to estimate a resource consumption of respective computer resources of a plurality of servers to execute the program based on the external information. The selection unit is configured to select at least one server to be provided with the program from the plurality of servers based on the resource consumption.Type: GrantFiled: June 1, 2012Date of Patent: June 10, 2014Assignee: Kabushiki Kaisha ToshibaInventors: Yu Kaneko, Shigeo Matsuzawa
-
Patent number: 8719848Abstract: According to an embodiment, an information processing device offering various APIs stores, for every application program, a WSDL file which indicates definition information of an API which is permitted to be used by an application program, and developer information which specifies a developer of an application program. The information processing device releases to an application program a WSDL file corresponding to the application program, receives, through a web service, a request that is a request for use of a first API, determines whether or not the definition information of the first API is indicated in a first WSDL file corresponding to the first application program, and determines whether or not the first WSDL file is leaked, using developer information.Type: GrantFiled: September 1, 2011Date of Patent: May 6, 2014Assignee: Kabushiki Kaisha ToshibaInventors: Yu Kaneko, Shigeo Matsuzawa
-
Publication number: 20140114614Abstract: According to some embodiments, there is provided a remote monitoring system including a plurality of communication apparatuses and a remote monitoring apparatus communicating with the communication apparatuses via a network, the communication apparatuses each managing at least one facility device. The remote monitoring apparatus includes a schedule creator, a transmitter and a receiver. The schedule creator creates event data transmitting schedules for the communication apparatuses based on a total bandwidth usable for communication with the communication apparatuses, each event data transmitting schedule indicating a time at which event data occurring in the facility device corresponding to the communication apparatus is allowed to be transmitted. The transmitter transmits the event data transmitting schedules to the communication apparatuses. The receiver receives event data messages each including the event data from the communication apparatuses.Type: ApplicationFiled: September 26, 2013Publication date: April 24, 2014Applicant: KABUSHIKI KAISHA TOSHIBAInventors: Toshio Ito, Yu Kaneko
-
Publication number: 20140108833Abstract: A power information providing apparatus provides a content including power information. The apparatus includes an access result calculator, an energy saving result calculator, and a content type determining module. The access result calculator is configured to calculate a frequency of use of the power information providing apparatus. The energy saving result calculator is configured to calculate a value of a power consumption reduction result. The content type determining module is configured to select a type of the content based on the frequency of use calculated by the access result calculator and the value of the power consumption reduction result calculated by the energy saving result calculator.Type: ApplicationFiled: August 22, 2013Publication date: April 17, 2014Applicant: KABUSHIKI KAISHA TOSHIBAInventors: Yu Kaneko, Tomonori Maegawa, Shigeo Matsuzawa
-
Publication number: 20140046836Abstract: According to some embodiments, there is provided an information communication system including: an information transmitting unit and an information receiving unit. The information transmitting unit transmits first information specifying a power price to a terminal device of a power consumer. The information receiving unit receives second information indicating whether the power consumer has recognized the first information from the terminal device or a different terminal device of the power consumer.Type: ApplicationFiled: June 17, 2013Publication date: February 13, 2014Inventors: Yu KANEKO, Shigeo MATSUZAWA, Tomonori MAEGAWA
-
Patent number: 8588247Abstract: A relay device is provided that includes a reception unit and a transmission unit. The reception unit receives a startup packet including a magic packet, a MAC address of controllable equipment, and a first ID for starting up the controllable equipment. The transmission unit transmits a first electric signal indicating the first ID to all link-downed Ethernet ports.Type: GrantFiled: September 17, 2009Date of Patent: November 19, 2013Assignee: Kabushiki Kaisha ToshibaInventors: Yu Kaneko, Masahiro Ishiyama, Takeshi Ishihara, Yusuke Doi, Nobuhiko Sugasawa, Keisuke Mera, Koji Ogura
-
Publication number: 20130173066Abstract: According to an embodiment, a smoothing device includes an acquiring unit, a determining unit, and selecting unit. The acquiring unit acquires weather information of a plurality of operation areas. A facility device that performs environmental control according to a control value resulting from operation based on the weather information is installed in each of the operation areas. The determining unit determines whether or not an amount of change in weather exceeds a predetermined first threshold in each of the operation areas. The selecting unit selects at least one first operation area that is an operation area in which the amount of change exceeds the first threshold as a halt area for which the operation of the control value used by the facility device installed in the first operation area is halted when the number of first operation areas exceeds a predetermined second threshold.Type: ApplicationFiled: December 17, 2012Publication date: July 4, 2013Applicant: KABUSHIKI KAISHA TOSHIBAInventors: Yu Kaneko, Shigeo Matsuzawa
-
Publication number: 20130173067Abstract: According to an embodiment, a smoothing device includes a predicting unit, a calculating unit, and a control unit. The predicting unit predicts a calculation load of operation at a first time slot on the basis of weather prediction information of operation areas in which facility devices that perform environmental control according to control values resulting from the operation based on weather information are installed. The calculating unit calculates a calculation load of operation at a second time slot earlier than the first time slot on the basis of the weather information of the operation areas. The control unit controls an executing device that executes the operation so that part of the operation to be executed at the first time slot is executed at the second time slot.Type: ApplicationFiled: December 19, 2012Publication date: July 4, 2013Applicant: KABUSHIKI KAISHA TOSHIBAInventors: Yu Kaneko, Shigeo Matsuzawa
-
Publication number: 20130085582Abstract: According to one embodiment, a service execution apparatus controls facility devices in a group. The group includes a plurality of calculation areas. At least one facility device is installed in each calculation area. The service execution apparatus includes a calculation unit and a control unit. The calculation unit is configured to calculate a control value to control a selected facility device installed in one of calculation areas in the group, using weather information relating to the one of calculation areas. The control unit is configured to control other facility devices installed in the calculation areas of the group, based on the control value for the selected facility device.Type: ApplicationFiled: July 20, 2012Publication date: April 4, 2013Inventors: Yu KANEKO, Shigeo Matsuzawa
-
Publication number: 20130080356Abstract: According to one embodiment, an environment provider storage stores a plurality of account methods corresponding to environment providers providing service execution environments. Each account method is a method for calculating a usage fee for each service execution environment. A resource consumption storage stores a plurality of resource consumptions corresponding to run modes. Each run mode is an operation pattern for each service execution environment to execute the service. Each resource consumption is a consumption of resources of the service execution environment while executing the service in each run mode. A calculation unit calculates usage fees based on combinations of one of the account methods corresponding to the environment providers and one of the resource consumptions corresponding to the run modes. An integrated operation unit selects at least one combination of a selected environment provider and a selected run mode, based on the usage fees calculated by the calculation unit.Type: ApplicationFiled: June 29, 2012Publication date: March 28, 2013Inventors: Yu Kaneko, Tomonori Maegawa, Shigeo Matsuzawa
-
Patent number: 8378779Abstract: An apparatus communicating with a gateway apparatus on a control system network for facility equipment, via an information system network, includes a unit which stores not less than one piece of virtual point information defining a virtual point combined with not less than one piece of facility equipment, a user authentication unit which performs user authentication for a user associated with a client, a unit which receives a request for control on one virtual point from the client, a unit which creates a remote control command for the facility equipment associated with the request based on the virtual point information when the request has been received and the user authentication has succeeded, and a unit which transmit the remote control command to the gateway via the information system network when tenant authentication for a tenant associated with the agent apparatus which is performed by the gateway has succeeded.Type: GrantFiled: March 12, 2009Date of Patent: February 19, 2013Assignee: Kabushiki Kaisha ToshibaInventors: Tomonori Maegawa, Yu Kaneko, Yusuke Doi, Masahiro Ishiyama
-
Publication number: 20120311158Abstract: According to one embodiment, a load distribution apparatus includes a receiving unit, an acquisition unit, an estimation unit, and a selection unit. The receiving unit is configured to receive a program of an energy saving service from a service provider. The acquisition unit is configured to acquire an external information related to the energy saving service. The estimation unit is configured to estimate a resource consumption of respective computer resources of a plurality of servers to execute the program based on the external information. The selection unit is configured to select at least one server to be provided with the program from the plurality of servers based on the resource consumption.Type: ApplicationFiled: June 1, 2012Publication date: December 6, 2012Inventors: Yu KANEKO, Shigeo Matsuzawa
-
Publication number: 20120254350Abstract: A building-facility information storage stores data sizes of process data to be collected from building-side communicating devices. A schedule generating unit generates a collection schedule of the process data from the building-side communicating devices so that, in a collection period including a plurality of unit periods continuous in terms of time, a first communication load representing a total data volume received from the building-side communicating devices per unit period and second communication loads each representing a data volume transmitted from each of the building-side communicating devices per unit period are balanced among the unit periods. A network communicating unit collects the process data from the building-side communicating devices in accordance with the collection schedule.Type: ApplicationFiled: December 23, 2011Publication date: October 4, 2012Inventors: Toshio Ito, Yu Kaneko, Shigeo Matsuzawa
-
Publication number: 20120233203Abstract: Certain embodiments provide a Web server, which is provided with a request reception unit for receiving a picture request including a picture ID for identifying a picture from a browser, and an information collection unit for finding the point ID corresponding to the picture ID included in the picture display request, and collecting the value of the point identified by the point ID from an IP controller. The information collection unit calculates the predictive starting time at which the value of the point is collected before the next picture display request is made from the current time, the collection time and the previous picture display request. The information collection unit collects the value of a point from the IP controller at the predictive starting time.Type: ApplicationFiled: March 16, 2012Publication date: September 13, 2012Applicant: KABUSHIKI KAISHA TOSHIBAInventors: Yu Kaneko, Tomonori Maegawa, Shigeo Matsuzawa, Kotaro Ise