Patents Assigned to Peri GmbH
-
Patent number: 10907364Abstract: A ceiling table for a partial formwork of a concrete ceiling. The ceiling table has at least one formwork element, in particular multiple formwork elements, which can be assembled on a lower frame of the ceiling table in a nondestructive manner and which can be disassembled from the lower frame. The ceiling table has a support skeleton on which at least one formwork element, in particular multiple formwork elements, is/are arranged. The support skeleton can have multiple braces which can be connected together and separated from one another in a nondestructive manner. The support skeleton preferably has a pair of main supports, in particular parallel running main supports, on which a pair of edge supports and at least one central support that is arranged between the edge supports are arranged. The edge supports and the central support run preferably parallel to one another.Type: GrantFiled: March 6, 2017Date of Patent: February 2, 2021Assignee: PERI GmbHInventor: Werner Schneider
-
Patent number: 10865575Abstract: A bracket scaffold for arrangement on a curved surface of a structure includes a first securing element arranged on the structure. The bracket scaffold has an end-side first coupling element which is, in particular in a limited manner, pivotably arranged on a first carrier of the bracket scaffold. A rotation axis of the first coupling element preferably intersects with the support location of the first coupling element on the first securing element. The pivot radius of the first coupling element describes in particular a concave pivot arc on the first carrier. The rotation axis is located from the first guide preferably in the direction of the free end of the first coupling element. Extension torques in the articulation, which is formed by the first guide, are minimized by the bracket scaffold being pulled away from the structure.Type: GrantFiled: October 13, 2017Date of Patent: December 15, 2020Assignee: PERI GMBHInventor: Josef Schmid
-
Patent number: 10787826Abstract: A support head and a ceiling support. The support head in particular has a plate-shaped design and has multiple guide tabs. The guide tabs are arranged or provided in such a way that a formwork element is secured on the support head so as to prevent shifting, preferably at various positions. The support head has widely opened first guide tabs that are situated opposite from less widely opened guide tabs. This asymmetry of the support head allows the support head to be situated close to a wall corner, while at the same time the formwork element can be easily fastened.Type: GrantFiled: November 29, 2016Date of Patent: September 29, 2020Assignee: PERI GMBHInventor: Werner Schneider
-
Patent number: 10718121Abstract: A ceiling table for a partial formwork of a concrete ceiling. The ceiling table has at least one formwork element, in particular multiple formwork elements, which can be assembled on a lower frame of the ceiling table in a nondestructive manner and which can be disassembled from the lower frame. The ceiling table has a support skeleton on which at least one formwork element, in particular multiple formwork elements, is/are arranged. The support skeleton can have multiple braces which can be connected together and separated from one another in a nondestructive manner. The support skeleton preferably has a pair of main supports, in particular parallel running main supports, on which a pair of edge supports and at least one central support that is arranged between the edge supports are arranged. The edge supports and the central support run preferably parallel to one another.Type: GrantFiled: March 6, 2017Date of Patent: July 21, 2020Assignee: Peri GmbHInventor: Werner Schneider
-
Patent number: 10640994Abstract: A formwork part having a compensation element with two transverse supports connected to a longitudinal support. An outer support is movably situated on the transverse supports. A center support may be detachably fastened to the transverse supports. The longitudinal support, the outer support, and/or the center support have/has, preferably at both ends, at least one support head receptacle, in particular formed as a connecting protrusion, in particular at least two support head receptacles, preferably formed as connecting protrusions. The connecting protrusions may be hooked into ceiling supports of the ceiling formwork. The ceiling formwork includes such a formwork part and a formwork element. The formwork element has at least one support head receptacle, in particular formed as a connecting protrusion, which may be hooked into the ceiling support of the ceiling formwork. The ceiling formwork may include the ceiling support, and the ceiling formwork may have a dual support.Type: GrantFiled: November 29, 2016Date of Patent: May 5, 2020Assignee: PERI GMBHInventor: Werner Schneider
-
Patent number: 10465398Abstract: A climbing device is proposed having at least one climbing rail (14) for adjusting and/or climbing a scaffolding and/or a formwork and/or a platform, at least one climbing shoe (15, 16) being arranged on the climbing rail (14), at least one hydraulic cylinder (2) comprising at least one drive piston (10), arranged in a cylinder housing (12), and having a hydraulic fluid being provided for raising the climbing shoe (15, 16) and/or the climbing rail (14) and/or the scaffolding and/or the formwork and/or the platform, which at least partially avoids or at least reduces the disadvantages of the prior art. According to the invention this is achieved in that the hydraulic cylinder (2) is embodied as a hydraulic unit (1), the hydraulic unit (1) comprising at least one hydraulic tank (5) for storing hydraulic fluid, an electric motor (3) and a hydraulic pump (4) driven by the electric motor (3) for pressurizing the hydraulic fluid.Type: GrantFiled: December 20, 2017Date of Patent: November 5, 2019Assignee: PERI GmbHInventors: Robert Herzog, Matthias Tries
-
Patent number: 10407926Abstract: A sealing plug has an elastic sleeve of thimble-like basic shape. A wound-up band of the sealing plug is inserted in the sleeve. The number of windings or turns of the band can be reduced by rotating the inner end of the band, wherein the outside diameter of the band, and hence the outside diameter of the elastic sleeve, widens. The band can be inserted in pretensioned state into the sleeve and can slacken after insertion into an anchor hole. The band can be expanded in the anchor hole beyond the slackened state of the band. The sealing plug further has a latching mechanism, which prevents back-rotation of the expanded sleeve. The sealing plug enables a radial expansion, and hence a sealing of anchor holes of different diameter, without shortening of the axial sealing surface of the sleeve.Type: GrantFiled: May 30, 2017Date of Patent: September 10, 2019Assignee: PERI GMBHInventors: Philip Endriss, Matthias Konrad
-
Patent number: 10385575Abstract: The invention is directed to a method for the construction of an industrial plant, in particular a petroleum refinery, by means of scaffolding units, each of which will be assembled from individual scaffolding components, comprising the following steps: Providing a 3D-construction plan in which building structures of the industrial plant are recorded; Drawing of scaffolding units to be used for the construction of the industrial plant in the 3D construction plan of the industrial plant including modifying of the 3D construction plan with respect to at least one building structure of the industrial plant for use of a predetermined scaffolding unit; Building of the industrial plant according to the modified construction plan and by use of the scaffolding units drawn in the 3D construction plan. The method according to the invention, allows for a significant reduction of scaffolding costs incurred during the construction of any industrial plant.Type: GrantFiled: March 15, 2016Date of Patent: August 20, 2019Assignee: PERI GMBHInventors: Giovanni Grassa, Rod Skelton, Dave Lawrence
-
Patent number: 10331806Abstract: A method for providing and assembling scaffolding units, each of which will be assembled from individual scaffolding components (of a scaffolding system) for constructing an industrial plant, in particular a petroleum refinery, comprising the following steps: Providing a 3D construction plan of the industrial plant; Constructing schedule for the industrial plant in order of occurrence, Selecting and drawing of scaffolding units to be used in the individual sections or phases of construction of the industrial plant in the 3D construction plan; Specifying the erection time required to erect the scaffolding unit; Specifying the dismantling time required to dismantle unit; Dividing the construction schedule into time intervals; Calculating for every single time interval, while taking into consideration the erection and dismantling times of the scaffolding units, the respective number of scaffolding components of identical design which are used simultaneously; Determining the maximum number of scaffolding compoType: GrantFiled: March 15, 2016Date of Patent: June 25, 2019Assignee: PERI GMBHInventors: Giovanni Grassa, Rod Skelton, Dave Lawrence
-
Patent number: 10190326Abstract: A facade scaffold includes an inner pole, an outer pole and a scaffold cross-bar between the inner and outer poles. A hollow pole portion of the inner pole has a first receiving through-aperture for a coupling for the attachment of a scaffold holder. A maximum distance between the first receiving through-aperture and a top side of the scaffold cross-bar is no more than 300 mm. The first receiving through-aperture is arranged below the top side of the scaffold cross-bar, or is realized above the top side of the scaffold cross-bar as a first elongated hole. The longitudinal axis of the first elongated hole is aligned parallel to the pole longitudinal axis of the hollow pole portion. The invention simplifies and accelerates the operation of assembling a scaffold holder on a scaffold and for a two-pole scaffold holder allows a passage height under the scaffold holder to be increased.Type: GrantFiled: November 26, 2017Date of Patent: January 29, 2019Assignee: PERI GMBHInventor: Erzad Mikic
-
Patent number: 10077567Abstract: A method and a device for producing an outer pipe of a telescope-like support, for reasons of weight and stability, is produced from a standardized zinc-coated steel pipe having a large outer diameter and a small wall thickness. Also included is the telescope-like support and the outer pipe which is contained therein. A pipe portion of the outer pipe is expanded in the method with a punch and subsequently tapered to the original outer diameter again with a ring. A reinforcement of the pipe portion and a calibration of the outer diameter of the pipe portion are thereby achieved. An outer thread can be rolled on the pipe portion.Type: GrantFiled: October 2, 2015Date of Patent: September 18, 2018Assignee: PERI GMBHInventors: Juergen Andree, Rudolf Specht
-
Patent number: 9926711Abstract: A G-hook for the mutual releasable connection of two prop portions of a telescopic construction prop has a pin and a hoop. The pin and the hoop are different, separate parts which are rotationally rigidly connected to one another, meaning the pin cannot rotate relative to the hoop because they are rigidly fixed to one another. The pin has a force introduction portion with a surface which is curved regionally and a force removal portion which is diametrically opposite the force introduction portion and whose surface is formed substantially planar.Type: GrantFiled: June 19, 2014Date of Patent: March 27, 2018Assignee: PERI GMBHInventors: Wilfried Haeberle, Rudolf Specht
-
Patent number: 9920541Abstract: A scaffolding pipe of a structural scaffolding system extends from a first axial pipe end to an opposing second axial pipe end. A receiving portion is provided on the first axial pipe end and an insertion portion is provided on the second axial pipe end. The insertion portion has a reduced cross-section compared with the receiving portion and terminates with a radial shoulder which forms a support face. The receiving portion inner diameter is greater than the insertion portion outer diameter. The receiving portion at the first axial pipe end has one positioning groove which is interrupted or continuous in a peripheral direction which reduces the inner diameter of the receiving portion and which defines the minimum inner diameter of the receiving portion. A pipe wall of the scaffolding pipe has at the first axial pipe end a maximum wall thickness greater than the otherwise smaller wall thickness.Type: GrantFiled: January 19, 2016Date of Patent: March 20, 2018Assignee: PERI GmbHInventors: Frank Erath, Christian Leder, Rudolf Specht
-
Publication number: 20170292279Abstract: The invention relates to a scaffolding arrangement with a scaffolding assembled from individual scaffolding components for internal construction or maintenance work within a coker drum standing upright on the ground and which has a lower end portion with a cross-section which tapers in the direction of the longitudinal axis of the drum towards a closable opening at the lower end of the coker drum, the scaffolding comprising: a support section with several support posts each having a lower and an upper end, the support posts, with their lower ends being supported outside of the coker drum on the ground and each of them, through the opening provided on the lower end of the coker, extending in a vertical direction into the coker drum, wherein the support section comprises several support posts spaced from one another, a support frame comprising a plurality of support beams which are detachably connected to one another, the support frame being attached to and supported by said support section, a first workingType: ApplicationFiled: April 8, 2016Publication date: October 12, 2017Applicant: Peri GmbHInventors: Manuel Fischer, Lothar Stärk
-
Patent number: 9470005Abstract: A panel formwork T-shaped arrangement has panel formwork elements 61, 62 directly bordering an intermediate panel formwork compensation element 53. The associated formlinings 61a, 53a, 62a are in one plane. These formlinings 61a, 53a, 62a delimit on one side the continuous wall 84 of the T-shaped intersection to be produced. The three components 61, 53, 62 are engaged from behind by a crossbar 85 for mechanical stabilization. The two formlinings 55a, 57a delimit on both sides the abutting wall 86 of the T-shaped intersection to be produced. The lateral outer edges 12 and 17 of the inner limb 56 and the panel formwork element 61 are aligned with respect to each other at the edge plane R. The outer edges 78 and 81 of the inner limb 58 and the panel formwork element 62 are also aligned with respect to each other at the edge plane R?.Type: GrantFiled: December 21, 2012Date of Patent: October 18, 2016Assignee: Peri GmbHInventor: Artur Schwoerer
-
Publication number: 20160292311Abstract: The present invention relates to a method for providing and assembling scaffolding units, each of which will be assembled from individual scaffolding components (of a scaffolding system) for constructing an industrial plant, in particular a petroleum refinery, comprising the following steps: a) Providing a 3D construction plan of the industrial plant; b) Providing a construction schedule for the industrial plant in order of occurrence, depicting the individual sections/phases of construction of the industrial plant to be realized simultaneously and/or successively; c) Selecting and drawing of scaffolding units to be used in the individual sections or phases of construction of the industrial plant in the 3D construction plan; d) Specifying the erection time required to erect the respective scaffolding unit; e) Specifying the dismantling time required to dismantle the respective scaffolding unit; f) Dividing the construction schedule into time intervals; g) Calculating for every single time interval, while takType: ApplicationFiled: March 15, 2016Publication date: October 6, 2016Applicant: Peri GmbHInventors: Giovanni Grassa, Rod Skelton, Dave Lawrence
-
Publication number: 20160292310Abstract: The invention is directed to a method for the construction of an industrial plant, in particular a petroleum refinery, by means of scaffolding units, each of which will be assembled from individual scaffolding components, comprising the following steps: Providing a 3D-construction plan in which building structures of the industrial plant are recorded; Drawing of scaffolding units to be used for the construction of the industrial plant in the 3D construction plan of the industrial plant including modifying of the 3D construction plan with respect to at least one building structure of the industrial plant for use of a predetermined scaffolding unit; Building of the industrial plant according to the modified construction plan and by use of the scaffolding units drawn in the 3D construction plan. The method according to the invention, allows for a significant reduction of scaffolding costs incurred during the construction of any industrial plant.Type: ApplicationFiled: March 15, 2016Publication date: October 6, 2016Applicant: Peri GmbHInventors: Giovanni Grassa, Rod Skelton, Dave Lawrence
-
Patent number: 9316007Abstract: The invention relates to industrial scaffolding comprising vertical supports, which can be interconnected by means of horizontal bars. Plates, which extend on a horizontal plane, can be hooked onto the bars to create an accessible working surface. When the plates are fitted, edge areas of the latter overhang the base body of the plates in such a way that a bar running parallel to an edge area is partially covered by said edge area.Type: GrantFiled: October 11, 2005Date of Patent: April 19, 2016Assignee: PERI GMBHInventor: Artur Schwörer
-
Patent number: 9303418Abstract: A self-climbing formwork has a stationary climbing shoe (18) structured for attachment to a wall anchor point and a climbing cylinder (10) having a lower end directly contacting the climbing shoe (18) to form a hinge, the hinge defining a pivoting movement of the climbing cylinder (10) relative to the climbing shoe (18). A support (30) is provided on an upper end of the climbing cylinder (10), the support (30) having a protrusion defining a U-shaped recess. A climbing rail (22) is structured to be held in position by the climbing shoe (18) relative to the anchor point and guided along the wall through cooperation with the climbing shoe (18). Upon extension of the climbing cylinder (10), the support (30) engages beneath an upper engagement point (24?, 24?) of the climbing rail (22) at the U-shaped recess to urge the climbing rail (22) in an upward direction.Type: GrantFiled: December 22, 2014Date of Patent: April 5, 2016Assignee: Peri GmbHInventor: Artur Schwoerer
-
Patent number: 9279261Abstract: A method for manufacturing a formwork element 10 for concrete structures, uses a formwork element having a base body 12 of hollow profile construction with an outer side 14 designed as a form lining. The base body 12 is formed by at least two interlocking sub-segments which are permanently connected to one another at their interlocking edge areas. The sub-segments, such as edge segment and intermediate segment 16, 18, which are advantageously produced through extrusion, are hooked to one another to form an inseparable unit in the connected state.Type: GrantFiled: July 30, 2014Date of Patent: March 8, 2016Assignee: Peri GmbHInventors: Werner Schneider, Andreas Meyer