Patents by Inventor Charles S. Yeh

Charles S. Yeh has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20100139919
    Abstract: A method associated with the production of hydrocarbons is described. The method includes drilling a wellbore using a drilling fluid, conditioning the drilling fluid, running a production string in the wellbore and gravel packing an interval of the wellbore with a carrier fluid. The production string includes a joint assembly comprising a main body portion having primary and secondary fluid flow paths, wherein the main body portion is attached to a load sleeve assembly at one end and a torque sleeve assembly at the opposite end, the load sleeve assembly having at least one transport conduit and at least one packing conduit disposed therethrough. The main body portion may include a sand control device, a packer, or other well tool for use in a downhole environment.
    Type: Application
    Filed: February 12, 2010
    Publication date: June 10, 2010
    Inventors: Charles S. Yeh, David C. Haeberle, Michael D. Barry, Michael T. Hecker, Ted A. Long
  • Patent number: 7661476
    Abstract: A method associated with the production of hydrocarbons is described. The method includes drilling a wellbore using a drilling fluid, conditioning the drilling fluid, running a production string in the wellbore and gravel packing an interval of the wellbore with a carrier fluid. The production string includes a joint assembly comprising a main body portion having primary and secondary fluid flow paths, wherein the main body portion is attached to a load sleeve assembly at one end and a torque sleeve assembly at the opposite end, the load sleeve assembly having at least one transport conduit and at least one packing conduit disposed therethrough. The main body portion may include a sand control device, a packer, or other well tool for use in a downhole environment.
    Type: Grant
    Filed: November 9, 2007
    Date of Patent: February 16, 2010
    Assignee: ExxonMobil Upstream Research Company
    Inventors: Charles S. Yeh, David C. Haeberle, Michael D. Barry, Michael T. Hecker, Ted A. Long
  • Publication number: 20100032158
    Abstract: A method, system and apparatus associated with the production of hydrocarbons are described. The method includes disposing a plurality of sand control devices having a primary flow path and a secondary flowpath within a wellbore adjacent to a subsurface reservoir. A packer having primary and secondary flow paths is then coupled between two of the sand control devices such that the primary and secondary flow paths of the packer are in fluid flow communication with the primary and secondary flowpaths of the sand control devices. The packer is then set within an interval, which may be an open-hole section of the wellbore. With the packer set, gravel packing of the sand control devices in different intervals may be performed. The interval above the packer may be packed before the interval below the packer. A treatment fluid may then be injected into the wellbore via the secondary flow paths of the packer and sand control devices.
    Type: Application
    Filed: December 15, 2006
    Publication date: February 11, 2010
    Inventors: Bruce A. Dale, Michael D. Barry, Charles S. Yeh, Jon Blacklock, Darren F. Rosenbaum, Michael T. Hecker, David C. Haeberle, Manh V. Phi, Michael J. Siegman, John W. Mohn
  • Publication number: 20100000740
    Abstract: A method of completing a well is described. The well may be a producing well or an injection well. In one embodiment, the method includes identifying technical issues associated with a well; selecting a technology to address each technical issue; defining criteria for each selected technology to determine when to deploy the selected technology in the well, wherein each selected technology remains dormant until the criteria are met; and integrating the technologies into a well completion profile stored in. memory and utilized in the deployment of the technologies into the well. The method provides the ability to proactively address technical issues to reduce workovers and interventions for a well.
    Type: Application
    Filed: January 9, 2007
    Publication date: January 7, 2010
    Inventors: Bruce A. Dale, Scott R. Clingman, Charles S. Yeh, Darren F. Rosenbaum, Marcus Asmann, Janette Mendez-Santiago
  • Publication number: 20090294128
    Abstract: A method, system and apparatus associated with the production of hydrocarbons are described. One apparatus includes a swellable packer element around a primary and a secondary flow path, wherein the packer is configured to block flow in a portion of a wellbore annulus. One method includes disposing sand control devices having shunt tubes and a packer within a wellbore adjacent to a subsurface reservoir. The packer is then set within an interval, which may be an open-hole section of the wellbore. With the packer set, gravel packing of the sand control devices in different intervals may be performed. Then, hydrocarbons are produced from the wellbore by passing hydrocarbons through the sand control devices with the different intervals providing zonal isolation. In some embodiments, intervals may be alternatively packed and plugged, wherein the plugged intervals are not packed. In addition, the method may also include disposing the sand control devices and packer into the wellbore in conditioned drilling fluid.
    Type: Application
    Filed: December 15, 2006
    Publication date: December 3, 2009
    Inventors: Bruce A. Dale, Michael D. Barry, Charles S. Yeh, Jon Blacklock, Darren F. Rosenbaum, Michael T. Hecker, David C. Haeberle, Manh V. Phi, Michael J. Siegman
  • Publication number: 20090133874
    Abstract: A method and apparatus associated with the production of hydrocarbons is disclosed. In one embodiment, an apparatus includes a tubular member having a central opening within an internal portion of the tubular member, wherein the central opening allows hydrocarbons to flow through the tubular member. Also, the tubular member includes openings between the central opening and a region external to the tubular member. In addition to the tubular member, at least two adjacent wire segments are disposed around the tubular member. The at least two adjacent wire segments create at least two flow paths to the central opening. Also, the at least two adjacent wire segments form at least two openings configured to prevent particles greater than a specific size from entering the openings in the tubular member.
    Type: Application
    Filed: July 26, 2006
    Publication date: May 28, 2009
    Inventors: Bruce A. Dale, Charles S. Yeh
  • Publication number: 20090120641
    Abstract: Flow control systems and methods for use in hydrocarbon well operations include a tubular and a flow control apparatus. The tubular defines a well annulus and includes an outer member defining a flow conduit. Fluid communication between the well annulus and the flow conduit is provided by permeable portion(s) of the outer member. The flow control apparatus is disposed within the flow conduit and comprises conduit-defining and chamber-defining structural members. The conduit-defining structural member(s) is configured to divide the flow conduit into at least two flow control conduits. The chamber-defining structural member(s) is configured to divide at least one of the at least two flow control conduits into at least two flow control chambers. Each of the flow control chambers has at least one inlet and one outlet, each of which is adapted to allow fluid flow therethrough and to retain particles larger than a predetermined size.
    Type: Application
    Filed: November 3, 2008
    Publication date: May 14, 2009
    Inventors: Charles S. Yeh, Bruce A. Dale, John W. Mohr, Scott R. Clingman
  • Patent number: 7475725
    Abstract: A wellbore apparatus and method for use in a wellbore for completion and production are disclosed. The apparatus comprises an outer permeable material (15) in the wellbore comprising a first basepipe section (11) with at least a portion of the basepipe is perforated (21), the first basepipe is inside the outer permeable material (15) and at least part of the perforated basepipe is designed to be adjacent to a production interval (14), a second basepipe section (10) with at least a portion of the second basepipe is slotted (16), the second basepipe is inside the outer permeable material (15) and above the perforated basepipe section (11) designed to be adjacent to the production interval wherein at least a portion of the slotted basepipe is designed to be adjacent to a non production section of the wellbore. The production completion apparatus may be installed into the wellbore to provide redundancy against well-screen failure.
    Type: Grant
    Filed: October 14, 2004
    Date of Patent: January 13, 2009
    Assignee: ExxonMobil Upstream Research Company
    Inventors: Charles S. Yeh, Bruce A. Dale
  • Patent number: 7464752
    Abstract: A wellbore apparatus and method suitable for either wellbore completions and production. The completion and production apparatus comprises at least one primary flow joint, the primary flow joint comprising at least one three-dimensional surface defining a body capable of fluid flow with at least one permeable surface, and at least one secondary flow joint, the secondary flow joint comprising at least one three-dimensional surface defining a body capable of fluid flow with at least one permeable surface. The method comprises providing a completion and production apparatus comprising at least one primary flow joint and one secondary flow joint wherein multiple fluid flow paths can be provided. The production completion apparatus may be installed into the wellbore to provide at least two flowpaths in the wellbore during well completion, injection and production.
    Type: Grant
    Filed: January 20, 2004
    Date of Patent: December 16, 2008
    Assignee: ExxonMobil Upstream Research Company
    Inventors: Bruce A. Dale, John W. Mohr, Charles S. Yeh
  • Publication number: 20080142227
    Abstract: A method, system and apparatus associated with the production of hydrocarbons are described. The apparatus comprising a joint assembly comprising a main body portion having primary and secondary fluid flow paths, wherein the main body portion is attached to a load sleeve assembly at one end and a torque sleeve assembly at the opposite end. The load sleeve may include at least one transport conduit and at least one packing conduit. The main body portion may include a sand control device, a packer, or other well tool for use in a downhole environment. The joint assembly also includes a coupling assembly having a manifold region in fluid flow communication with the second fluid flow path of the main body portion and facilitating the make-up of first and second joint assemblies with a single connection. The coupling assembly may also include a torque spacer to help control fluid flow relationships.
    Type: Application
    Filed: November 9, 2007
    Publication date: June 19, 2008
    Inventors: Charles S. Yeh, David C. Haeberle, Michael D. Barry, Michael T. Hecker, Jon Blacklock, Ted A. Long, Hans Brekken, Arthur H. Dybevik, Lars Faret, Ole Sveinung Kvernstuen, Terje Moen, Knut H. Nesland, Kjartan Roaldsnes
  • Publication number: 20080128129
    Abstract: A method associated with the production of hydrocarbons is described. The method includes drilling a wellbore using a drilling fluid, conditioning the drilling fluid, running a production string in the wellbore and gravel packing an interval of the wellbore with a carrier fluid. The production string includes a joint assembly comprising a main body portion having primary and secondary fluid flow paths, wherein the main body portion is attached to a load sleeve assembly at one end and a torque sleeve assembly at the opposite end, the load sleeve assembly having at least one transport conduit and at least one packing conduit disposed therethrough. The main body portion may include a sand control device, a packer, or other well tool for use in a downhole environment.
    Type: Application
    Filed: November 9, 2007
    Publication date: June 5, 2008
    Inventors: Charles S. Yeh, David C. Haeberle, Michael D. Barry, Michael T. Hecker, Ted A. Long
  • Patent number: 5492176
    Abstract: A method for plugging a zone of a subterranean formation to block flow therethrough. A specific plugging solution comprised of an allyl monomer and an initiator is injected into the zone where it is allowed to set at an elevated temperature to harden and form a flow-blocking solid. The allyl monomer is an allyl ester selected from the group of diallyl orthophthalate, diallyl isophthalate, diallyl terephthalate, diallyl benzenephosphonate, diethylene glycol bis(allyl carbonate) and other known allyl monomers and the initiator is preferably a peroxy compound (e.g. benzoyl peroxide, diisopropyl peroxydicarbonate, etc.) or an azo compound (e.g. 4,4'-azobis(4-cyanovaleric acid). A diluent such as an alcohol (e.g. isopropyl alcohol or isobutyl alcohol) or a mutual solvent (e.g. ethylene glycol monobutyl ether, diacetin, triacetin, acetone, etc.) and a coupling agent (e.g. an organofunctional silane) may be added if needed.
    Type: Grant
    Filed: December 1, 1994
    Date of Patent: February 20, 1996
    Assignee: Mobil Oil Corporation
    Inventors: Charles S. Yeh, E. Thomas Strom, Larry L. Cox
  • Patent number: 5492177
    Abstract: A method for consolidating a subterranean formation to control the production of particulates therefrom. A specific consolidating solution comprised of an allyl monomer and an initiator is injected into the formation where it is allowed to set at an elevated temperature to harden and form a permeable, consolidated mass. The allyl monomer is an allyl ester selected from the group of diallyl orthophthalate, diallyl isophthalate, diallyl terephthalate, diallyl benzenephosphonate, diethylene glycol bis (allyl carbonate) and other known allyl monomers and the initiator is preferably a peroxy compound (e.g. benzoyl peroxide, diisopropyl peroxydicarbonate, etc.) or an azo compound (e.g. 4,4'-azobis(4-cyanovaleric acid). A diluent such as an alcohol (e.g. isopropyl alcohol or isobutyl alcohol) or a mutual solvent (e.g. ethylene glycol monobutyl ether, diacetin, triacetin, acetone, etc.) and a coupling agent (e.g. an organofunctional silane) may be added if needed.
    Type: Grant
    Filed: December 1, 1994
    Date of Patent: February 20, 1996
    Assignee: Mobil Oil Corporation
    Inventors: Charles S. Yeh, E. Thomas Strom, Larry L. Cox
  • Patent number: 5435389
    Abstract: A cement for forming a gravel pack in a washed-out interval is provided where a borehole penetrates an unconsolidated or loosely consolidated oil or gas reservoir which is likely to introduce substantial amounts of sand into the borehole. After perforating the borehole's casing at a washed-out interval of the formation, sand is introduced into the interval. Afterwards, an aqueous silicate solution is injected into said interval. Next, a spacer volume of a water-immiscible hydrocarbonaceous liquid is introduced into the interval. Thereafter, a water-miscible organic solvent containing an alkylpolysilicate is injected into the interval. A permeability retaining silica cement is formed in the interval thereby making a gravel pack. Injection of the aqueous silicate and organic solvent containing an alkylpolysilicate is continued until the interval has been consolidated by the silica cement to an extent sufficient to exclude sand and formation fines.
    Type: Grant
    Filed: May 18, 1993
    Date of Patent: July 25, 1995
    Assignee: Mobil Oil Corporation
    Inventors: Paul Shu, Lloyd G. Jones, E. Thomas Strom, Charles S. Yeh
  • Patent number: 5222556
    Abstract: A method for gravel packing perforations in a wellbore where an acid is directed into the perforations so as to dissolve formation fines in channels contained in said perforations. The acid is of a strength sufficient to dissolve said fines. After the fines are dissolved, a sand consolidation agent is introduced into the perforations before the channels can be filled with formation fines. The consolidation agent remains in the perforations for a time sufficient to form a cement in situ which cement has permeability retentive characteristics. The cement forms pores of a size sufficient to exclude formation fines from the wellbore. Thereafter, a substantially fines free hydrocarbonaceous fluid is produced from the wellbore.
    Type: Grant
    Filed: December 19, 1991
    Date of Patent: June 29, 1993
    Assignee: Mobil Oil Corporation
    Inventors: William P. Donlon, Lloyd G. Jones, Charles S. Yeh, E. Thomas Strom
  • Patent number: 5211235
    Abstract: A method for forming a gravel pack in a washed-out interval is provided where a borehole penetrates an unconsolidated or loosely consolidated oil or gas reservoir which is likely to introduce substantial amounts of sand into the borehole. After perforating the borehole's casing at a washed-out interval of the formation, sand is introduced into the interval. Afterwards, an aqueous silicate solution is injected into said interval. Next, a spacer volume of a water-immiscible hydrocarbonaceous liquid is introduced into the interval. Thereafter, a water-miscible organic solvent containing an alkylpolysilicate is injected into the interval. A permeability retaining silica cement is formed in the interval thereby making a gravel pack. Injection of the aqueous silicate and organic solvent containing an alkylpolysilicate is continued until the interval has been consolidated by the silica cement to an extent sufficient to exclude sand and formation fines.
    Type: Grant
    Filed: December 19, 1991
    Date of Patent: May 18, 1993
    Assignee: Mobil Oil Corporation
    Inventors: Paul Shu, Lloyd G. Jones, E. Thomas Strom, Charles S. Yeh
  • Patent number: 5209296
    Abstract: A method for producing substantially sand or fines free hydrocarbonaceous fluids from a wellbore which is initially gravel packed. Thereafter, an acid is directed into the wellbore so as to dissolve formation fines in channels contained in perforations communicating with a productive interval of the formation. The acid is of a strength sufficient to dissolve said fines. After the fines are dissolved, a sand consolidation agent is introduced into the perforations before the channels can be filled with formation fines. The consolidation agent remains in the perforations for a time sufficient to form a cement in situ which cement has permeability retentive characteristics. The cement forms pores of a size sufficient to exclude formation fines from the wellbore.
    Type: Grant
    Filed: September 11, 1992
    Date of Patent: May 11, 1993
    Assignee: Mobil Oil Corporation
    Inventors: William P. Donlon, Lloyd G. Jones, E. Thomas Strom, Charles S. Yeh
  • Patent number: 5113935
    Abstract: Apparatus for gravel packing a wellbore interval having shunt means (i.e. conduits) on the external surface of a sand screen which can selectively deliver a gravel slurry to different levels of the interval during operation. The shunt means is comprised of a variety of differently configured, perforated conduits and/or arrangements of these conduits.
    Type: Grant
    Filed: May 1, 1991
    Date of Patent: May 19, 1992
    Assignee: Mobil Oil Corporation
    Inventors: Lloyd G. Jones, Charles S. Yeh
  • Patent number: 5082052
    Abstract: A sand screen is positioned in a well adjacent an oil or gas reservoir to be produced. At least one conduit is in juxtaposition with the sand screen and has passageways at selected intervals to establish fluid communication between the conduit and the annulus of the well surrounding the sand screen. A gravel packing slurry is injected down the well to form a gravel pack in the annulus. Actuatable devices associated with the conduit passageways control fluid flow between the conduit and annulus so that if the gravel portion of the slurry forms a bridge in the annulus, thereby blocking slurry flow through the annulus, the slurry will be diverted from the annulus into the conduit through one or more of the passageways in the conduit above the bridge, downward through the conduit and out through one or more passageways in the conduit into the annulus below the bridge to continue the forming of the gravel pack in the annulus.
    Type: Grant
    Filed: January 31, 1991
    Date of Patent: January 21, 1992
    Assignee: Mobil Oil Corporation
    Inventors: Lloyd G. Jones, Charles S. Yeh, Christopher V. Chow
  • Patent number: 5076359
    Abstract: A method for gravel packing perforations against homogeneous or heterogeneous reservoir formations utilizing a shear-thickening or dilatant fluid as the carrier medium of gravel. Use of this fluid provides for rheological behavior which improves both transporting and packing efficiencies/uniformities.
    Type: Grant
    Filed: August 29, 1990
    Date of Patent: December 31, 1991
    Assignee: Mobil Oil Corporation
    Inventor: Charles S. Yeh