Patents by Inventor Krishnanjan Gubba Ravikumar

Krishnanjan Gubba Ravikumar has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20170108542
    Abstract: The present application discloses systems and methods to determine loss of at least one electric power transmission line in an electric power transmission system. In various embodiments, a system consistent with the present disclosure may include an electrical parameter monitoring subsystem configured to receive electrical parameter measurements and to determine a change of the electrical measurements. An analysis subsystem may determine whether a change in the electrical measurements is indicative of loss of at least one transmission line and may calculate a number of transmission lines lost based on the change. In some embodiments, a remedial action subsystem may be configured to implement a remedial action in response to loss of at least one transmission line. The number of transmission lines lost may be determined based on an angle difference ratio and a power ratio between two buses in electrical transmission system.
    Type: Application
    Filed: December 29, 2016
    Publication date: April 20, 2017
    Applicant: Schweitzer Engineering Laboratories, Inc.
    Inventors: Krishnanjan Gubba Ravikumar, Ashish Upreti, Bharath Nayak, Yusuf Zafer Korkmaz
  • Patent number: 9568516
    Abstract: The present application discloses systems and methods to determine loss of at least one electric power transmission line in an electric power transmission system. In various embodiments, a system consistent with the present disclosure may include an electrical parameter monitoring subsystem configured to receive electrical parameter measurements and to determine a change of the electrical measurements. An analysis subsystem may determine whether a change in the electrical measurements is indicative of loss of at least one transmission line and may calculate a number of transmission lines lost based on the change. In some embodiments, a remedial action subsystem may be configured to implement a remedial action in response to loss of at least one transmission line. The number of transmission lines lost may be determined based on an angle difference ratio and a power ratio between two buses in electrical transmission system.
    Type: Grant
    Filed: September 23, 2014
    Date of Patent: February 14, 2017
    Assignee: Schweitzer Engineering Laboratories, Inc.
    Inventors: Krishnanjan Gubba Ravikumar, Ashish Upreti, Bharath Nayak, Yusuf Zafer Korkmaz
  • Publication number: 20160246666
    Abstract: Disclosed herein are methods for detecting and correcting a fault induced delayed voltage recovery event in an electric power transmission and distribution system. In some embodiments, a fault detection subsystem may receive an indication of a fault in the electric power transmission and distribution system. The system may also include a load analysis subsystem to analyze a plurality of loads supplied by the electric power system and to generate an estimated response of the loads. A fault analysis subsystem may analyze a plurality of factors relating to the fault and to determine a probability of the fault generating a fault induced delayed voltage recovery event. A control system may then implement a control strategy within a control window following the fault based on the probability of the fault generating a fault induced delayed voltage recovery event and the estimated response of the at least one load.
    Type: Application
    Filed: February 23, 2015
    Publication date: August 25, 2016
    Inventors: Krishnanjan Gubba Ravikumar, Scott M. Manson
  • Publication number: 20160084893
    Abstract: The present application discloses systems and methods to determine loss of at least one electric power transmission line in an electric power transmission system. In various embodiments, a system consistent with the present disclosure may include an electrical parameter monitoring subsystem configured to receive electrical parameter measurements and to determine a change of the electrical measurements. An analysis subsystem may determine whether a change in the electrical measurements is indicative of loss of at least one transmission line and may calculate a number of transmission lines lost based on the change. In some embodiments, a remedial action subsystem may be configured to implement a remedial action in response to loss of at least one transmission line. The number of transmission lines lost may be determined based on an angle difference ratio and a power ratio between two buses in electrical transmission system.
    Type: Application
    Filed: September 23, 2014
    Publication date: March 24, 2016
    Inventors: Krishnanjan Gubba Ravikumar, Ashish Upreti, Bharath Nayak, Yusuf Zafer Korkmaz