Patents by Inventor Mu Wei

Mu Wei has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20250110172
    Abstract: A semiconductor package includes an array of through-substrate-via (TSV) structures comprising a number (O) of TSV structures, wherein the array comprises a number (M) of active TSV structures; a number (N) of contact structures, the contact structures comprising a plurality of pairs configured to receive an input test signal and provide an output test signal, respectively; and a plurality of binary-tree branches, each of the plurality of binary-tree branches electrically coupling a first one of the active TSV structures to a second one of the active TSV structures and a third one of the active TSV structures.
    Type: Application
    Filed: October 2, 2023
    Publication date: April 3, 2025
    Applicant: Taiwan Semiconductor Manufacturing Company, Ltd.
    Inventors: Ying-Chih Hsu, Jui-Cheng Huang, Mu Wei Lee, Wei-Tao Shaw
  • Patent number: 12261436
    Abstract: The invention relates to a method for controlling power generation from a power plant which comprises a plurality of power generating units. The method involves setting a maximal allowed power production for each power generating unit in a selection of one or more power generating units of second priority to a non-zero value, where the maximal allowed power production is determined dependent on whether a first power production gap is greater or less than zero and dependent on a comparison of the first power production gap with a second available power production capability of the selection of the one or more power generating units of the second priority.
    Type: Grant
    Filed: December 16, 2020
    Date of Patent: March 25, 2025
    Assignee: VESTAS WIND SYSTEMS A/S
    Inventors: Mu Wei, Mads Rajczyk Skjelmose
  • Patent number: 12253064
    Abstract: A method for controlling a power output of a power generating unit is disclosed. An accumulated power output of the power generating unit during a predefined time interval is forecasted. An actual power output of the power generating unit is measured during the predefined time interval, and an actual accumulated power output is estimated for the predefined time interval on the basis of the measured actual power output of the power generating unit. A difference between the forecasted accumulated power output and the estimated actual accumulated power output is derived. The power output of the power generating unit is boosted, in the case that the estimated actual accumulated power output is below the forecasted accumulated power output, and the difference between the forecasted accumulated power output and the estimated actual accumulated power output is larger than a predefined threshold value.
    Type: Grant
    Filed: September 14, 2020
    Date of Patent: March 18, 2025
    Assignee: VESTAS WIND SYSTEMS A/S
    Inventors: Jacob Quan Kidmose, Mu Wei, Manas Patankar
  • Patent number: 12132310
    Abstract: Aspects of the present invention relate to a method for controlling a renewable power plant connected to a power network to reduce deviation of a measured frequency of the power network from a target frequency. The method comprises determining a forecasted power gradient over a forecast interval defined between a first time point and a second time point, and, at a third time point during the forecast interval, controlling the power plant to output active power according to a minimum active power level if the measured frequency at the third time point is below the target frequency, controlling the power plant to output active power according to a maximum active power level if the measured frequency at the third time point is above the target frequency. The maximum and minimum active power levels are based on the forecasted power gradient.
    Type: Grant
    Filed: November 25, 2020
    Date of Patent: October 29, 2024
    Assignee: VESTAS WIND SYSTEMS A/S
    Inventors: Manas Patankar, Hugh McKenzie, Mu Wei, Jacob Quan Kidmose
  • Patent number: 12129830
    Abstract: Aspects of the present invention relate to a method for controlling one or more wind turbine generators. The method comprises: receiving a trigger signal, and implementing an active power boost mode during a predetermined time period in response to receiving the trigger signal. The active power boost mode comprises: disregarding further trigger signals; and generating one or more upper active power limits for each of the one or more wind turbine generators, wherein, during at least a first portion of the predetermined time period, the one or more upper active power limits are fixed at an active power boost level that is greater than a nominal active power level of the one or more wind turbine generators.
    Type: Grant
    Filed: September 21, 2021
    Date of Patent: October 29, 2024
    Assignee: VESTAS WIND SYSTEMS A/S
    Inventors: Mu Wei, Karthik Krishnan Jamuna, Manas Patankar, Hugh McKenzie, Jacob Quan Kidmose
  • Patent number: 12051907
    Abstract: Controlling a current injected to a power grid from a renewable power plant, in response to a voltage event in the power grid. At least a current at a point of common coupling between the renewable power plant and the power grid is determined and provided to a power plant controller (PPC). The PPC derives individual current setpoint corrections for at least some wind turbines, based on the determined current, and dispatches each derived current setpoint correction to wind turbine controllers of the corresponding wind turbines. The wind turbine controllers control a current output of the respective wind turbines, based on measurements of current and/or voltage at a point of connection between the wind turbine and an internal grid of the renewable power plant, and by taking into account the dispatched current setpoint correction.
    Type: Grant
    Filed: February 3, 2021
    Date of Patent: July 30, 2024
    Assignee: VESTAS WIND SYSTEMS A/S
    Inventors: Dan Wu, Germán Claudio Tarnowski, Torsten Lund, Kouroush Nayebi, Mu Wei, Uffe C Merrild
  • Patent number: 11916392
    Abstract: Embodiments provide for the control of a power plant including several generators by setting a reference frame for the generators with a first and a second axis; measuring a grid demand voltage at the shared connection point; determining active and reactive currents required at the shared connection point based on the grid demand voltage and grid codes; transforming the active and reactive currents required at the shared connection point to the reference frame where the first axis defines a first current set point and the second axis defines a second current set point; and dispatching the first and second current set points to generator controllers associated with each generator. Current set points may be generated for positive/negative frames, direct quadrature frames, real/imaginary frames and may be set evenly for all generators or adjusted per generator.
    Type: Grant
    Filed: August 20, 2019
    Date of Patent: February 27, 2024
    Assignee: VESTAS WIND SYSTEMS A/S
    Inventors: Kouroush Nayebi, Mu Wei, Torsten Lund, Per Lund
  • Publication number: 20240003334
    Abstract: Aspects of the present invention relate to a method for controlling one or more wind turbine generators. The method comprises: receiving a trigger signal, and implementing an active power boost mode during a predetermined time period in response to receiving the trigger signal. The active power boost mode comprises: disregarding further trigger signals; and generating one or more upper active power limits for each of the one or more wind turbine generators, wherein, during at least a first portion of the predetermined time period, the one or more upper active power limits are fixed at an active power boost level that is greater than a nominal active power level of the one or more wind turbine generators.
    Type: Application
    Filed: September 21, 2021
    Publication date: January 4, 2024
    Inventors: Mu WEI, Karthik Krishnan JAMUNA, Manas PATANKAR, Hugh MCKENZIE, Jacob Quan KIDMOSE
  • Patent number: 11694425
    Abstract: Aspects of the present disclosure relate to multi-spectrum visual object recognition. A first image corresponding to visible light and a second image corresponding to invisible light with respect to an object can be obtained. A first contour of the object can be identified based on the first image. A second contour of the object can be identified based on the second image. The first contour of the object and the second contour of the object can be integrated to generate a multi-spectrum contour of the object. The object can be recognized using the multi-spectrum contour of the object.
    Type: Grant
    Filed: May 10, 2021
    Date of Patent: July 4, 2023
    Assignee: International Business Machines Corporation
    Inventors: Yue Lin, Li Cao, Jing Bai, Mu Wei, Bing Qian
  • Publication number: 20230193874
    Abstract: A method is provided for determining a power production capacity of at least one wind turbine connected to a power grid. The method includes receiving, e.g. from a power grid control center, a power production forecast for the at least one wind turbine, and then monitoring an actual grid frequency of the power grid. Based on the actual grid frequency and a nominal grid frequency, a frequency support power reserve is determined.
    Type: Application
    Filed: May 5, 2021
    Publication date: June 22, 2023
    Inventors: Mu Wei, Thair Mahmoud, Jacob Quan Kidmose, Manas Patankar, Hugh McKenzie, Antonio Martinez
  • Patent number: 11635059
    Abstract: Methods and apparatus for reducing peak power consumption of a grid connected power plant having a plurality of wind turbines. In response to determining that a power production value of the power plant is below a power threshold, one method includes: after a first time delay of a first group of one or more wind turbines, control the first group to operate in a power saving mode for a predefined first power saving period; and after a first time delay of a second group of one or more other wind turbines, control the second group to operate in the power saving mode for a predefined second power saving period. The first time delay of the first group is less than the first time delay of the second group and the power saving mode inhibits a power consuming activity for the wind turbines operating in the power saving mode.
    Type: Grant
    Filed: August 16, 2021
    Date of Patent: April 25, 2023
    Assignee: VESTAS WIND SYSTEMS A/S
    Inventors: Mu Wei, Vinu Vijayan, Eric German, Brian Dial-Lapcewich
  • Patent number: 11631976
    Abstract: Harmonics of a power output of a power plant at a point of common coupling between the power plant and a utility grid, wherein the power plant comprises a plurality of energy production units. The method comprises determining an electrical characteristic at the point of common coupling; determining the electrical characteristic at an output terminal of each of the energy production units and dispatching a control signal to at least one of the energy production units to control the electrical characteristic at an output terminal of the respective energy production units. The control signal is based on the measurement of the electrical characteristic at the point of common coupling and arranged for damping the harmonic of the power output of the power plant at the point of common coupling, wherein the control signal is determined on the basis of a predetermined prioritizing sequence of said electrical characteristic.
    Type: Grant
    Filed: November 20, 2018
    Date of Patent: April 18, 2023
    Assignee: VESTAS WIND SYSTEMS A/S
    Inventors: Mu Wei, Dan Wu
  • Publication number: 20230089279
    Abstract: Controlling a current injected to a power grid from a renewable power plant, in response to a voltage event in the power grid At least a current at a point of common coupling between the renewable power plant and the power grid is determined and provided to a power plant controller (PPC). The power PPC derives individual current setpoint corrections for at least some wind turbines, based on the determined current, and dispatches each derived current setpoint correction to wind turbine controllers of the corresponding wind turbines. The wind turbine controllers control a current output of the respective wind turbines, based on measurements of current and/or voltage at a point of connection between the wind turbine and an internal grid of the renewable power plant, and by taking into account the dispatched current setpoint correction .
    Type: Application
    Filed: February 3, 2021
    Publication date: March 23, 2023
    Inventors: Dan WU, Germán TARNOWSKI, Torsten LUND, Kouroush NAYEBI, Mu WEI, Uffe C. MERRILD
  • Publication number: 20230059875
    Abstract: Aspects of the present invention relate to a method of controlling a renewable power plant comprising a plurality of renewable power generators electrically connected by a local network and configured to supply active power to a main network. The method comprises: in response to receiving a signal requesting substantially zero active power supply to the main network: categorizing a generator as power-supplying, and the remaining generators as power-consuming; operating the power-consuming generators to generate no active power and to have their auxiliary systems draw power from the local network; and operating the power-supplying generator to supply active power to the local network such that the plant supplies substantially zero active power to the main network.
    Type: Application
    Filed: January 19, 2021
    Publication date: February 23, 2023
    Inventors: Arne BARON, Mu WEI, Nils PELZER, Ulf CLAUSEN, Henrik MØLLER, Kasper ZINCK, Kent TANGE, Martin Møller SØRENSEN, Rui WU
  • Publication number: 20230052726
    Abstract: Methods and apparatus for reducing peak power consumption of a grid connected power plant having a plurality of wind turbines. In response to determining that a power production value of the power plant is below a power threshold, one method includes: after a first time delay of a first group of one or more wind turbines, control the first group to operate in a power saving mode for a predefined first power saving period; and after a first time delay of a second group of one or more other wind turbines, control the second group to operate in the power saving mode for a predefined second power saving period. The first time delay of the first group is less than the first time delay of the second group and the power saving mode inhibits a power consuming activity for the wind turbines operating in the power saving mode.
    Type: Application
    Filed: August 16, 2021
    Publication date: February 16, 2023
    Inventors: Mu WEI, Vinu Vijayan, Eric German, Brian Dial-Lapcewich
  • Publication number: 20230006443
    Abstract: Aspects of the present invention relate to a method for controlling a renewable power plant connected to a power network to reduce deviation of a measured frequency of the power network from a target frequency. The method comprises determining a forecasted power gradient over a forecast interval defined between a first time point and a second time point, and, at a third time point during the forecast interval, controlling the power plant to output active power according to a minimum active power level if the measured frequency at the third time point is below the target frequency, controlling the power plant to output active power according to a maximum active power level if the measured frequency at the third time point is above the target frequency. The maximum and minimum active power levels are based on the forecasted power gradient.
    Type: Application
    Filed: November 25, 2020
    Publication date: January 5, 2023
    Inventors: Manas Patankar, Hugh MeKenzie, Mu Wei, Jacob Quan Kidmose
  • Patent number: 11536251
    Abstract: The invention relates to a method for determining power set points of a power plant comprising a plurality of power generating units with at least one wind turbine generator. The determination of the power set points are based on a prioritization of the power generating units, where the power generating units are prioritized with respect to individual power levels or fatigue levels obtained for the power generating units. The prioritization is adjusted so that the adjusted prioritization depends both on the power and fatigue levels.
    Type: Grant
    Filed: December 11, 2019
    Date of Patent: December 27, 2022
    Assignee: VESTAS WIND SYSTEMS A/S
    Inventors: Mu Wei, Karthik Krishnan Jamuna, Jacob Quan Kidmose, Søren Sønderbo Andersen, Søren Kappelgaard
  • Publication number: 20220393477
    Abstract: According to embodiments described herein control of the auxiliary power system in a hybrid power plant is provided by determining a grid-draw threshold from an external power grid; monitoring power consumption for powered systems of the hybrid power plant; monitoring power generation of the hybrid power plant; discharging an alternative power source of one or more of an Energy Storage System (ESS) and an auxiliary generator in response to the power consumption exceeding the grid-draw threshold; and implementing prediction algorithms for power generation of the hybrid power plant and the power consumption. Accordingly, a source of power is managed between several alternative sources and the external power grid to meet plant operator defined criteria when maintaining power in various wind speed conditions.
    Type: Application
    Filed: September 14, 2020
    Publication date: December 8, 2022
    Inventors: CHUNYANG ZHAO, Mu WEI
  • Publication number: 20220385065
    Abstract: The invention relates to a method for controlling power generation from a power plant which comprises a plurality of power generating units. The method involves setting a maximal allowed power production for each power generating unit in a selection of one or more power generating units of second priority to a non-zero value, where the maximal allowed power production is determined dependent on whether a first power production gap is greater or less than zero and dependent on a comparison of the first power production gap with a second available power production capability of the selection of the one or more power generating units of the second priority.
    Type: Application
    Filed: December 16, 2020
    Publication date: December 1, 2022
    Inventors: Mu WEI, Mads Rajczyk SKJELMOSE
  • Publication number: 20220358320
    Abstract: Aspects of the present disclosure relate to multi-spectrum visual object recognition. A first image corresponding to visible light and a second image corresponding to invisible light with respect to an object can be obtained. A first contour of the object can be identified based on the first image. A second contour of the object can be identified based on the second image. The first contour of the object and the second contour of the object can be integrated to generate a multi-spectrum contour of the object. The object can be recognized using the multi-spectrum contour of the object.
    Type: Application
    Filed: May 10, 2021
    Publication date: November 10, 2022
    Inventors: Yue Lin, Li Cao, Jing Bai, Mu Wei, Bing Qian