Publication number: 20220349379Abstract: A method for controlling a power output of a power generating unit is disclosed. An accumulated power output of the power generating unit during a predefined time interval is forecasted. An actual power output of the power generating unit is measured during the predefined time interval, and an actual accumulated power output is estimated for the predefined time interval on the basis of the measured actual power output of the power generating unit. A difference between the forecasted accumulated power output and the estimated actual accumulated power output is derived. The power output of the power generating unit is boosted, in the case that the estimated actual accumulated power output is below the forecasted accumulated power output, and the difference between the forecasted accumulated power output and the estimated actual accumulated power output is larger than a predefined threshold value.Type: ApplicationFiled: September 14, 2020Publication date: November 3, 2022Inventors: Jacob Quan KIDMOSE, MU WEI, Manas PATANKAR
-
Patent number: 11454215Abstract: The present invention relates to a method for releasing a requested amount of power from a power facility to an associated power grid, the method comprising the steps of providing a release signal as to when the requested amount of power is to be released from the power facility to the associated power grid, ramping up the power generation of the power facility, and releasing the requested amount of power to the associated power grid in accordance with the release signal, wherein at least part of an excess power generated during ramping up is dissipated and/or stored in suitable power handling modules. The present invention also relates to a power facility controller being capable for performing this method.Type: GrantFiled: October 2, 2018Date of Patent: September 27, 2022Assignee: VESTAS WIND SYSTEMS A/SInventors: Mu Wei, Kouroush Nayebi, Torsten Lund
-
Patent number: 11421654Abstract: The present invention relates to a method for controlling a wind power plant, WPP, comprising a plurality of wind turbine generators, WTGs, connected to an electrical grid, the method comprising: setting a plant power reference (Ptotal) according to an electrical value of the electrical grid; determining an inertia delta power reference (IRdeltaP) required for the WPP to meet a power demand in response to a change in the electrical value; adding the inertia delta power reference and the plant power reference (Ptotal) to form a power reference (Ptotalref); deriving an overboost reference (PrefOB) as the difference between the power reference (Ptotalref) and an available power value; dispatching the power reference (Ptotalref) to each wind turbine generator; dispatching the overboost reference (PrefOB) to each wind turbine generator. The invention also relates to a wind power plant control system and a wind power plant comprising a control system.Type: GrantFiled: December 20, 2016Date of Patent: August 23, 2022Assignee: VESTAS WIND SYSTEMS A/SInventors: Jorge Martinez Garcia, Kouroush Nayebi, Dumitru-Mihai Valcan, Mu Wei
-
Publication number: 20220082085Abstract: The invention relates to a method for determining power set points of a power plant comprising a plurality of power generating units with at least one wind turbine generator. The determination of the power set points are based on a prioritization of the power generating units, where the power generating units are prioritized with respect to individual power levels or fatigue levels obtained for the power generating units. The prioritization is adjusted so that the adjusted prioritization depends both on the power and fatigue levels.Type: ApplicationFiled: December 11, 2019Publication date: March 17, 2022Inventors: Mu WEI, Karthik KRISHNAN JAMUNA, Jacob Quan KIDMOSE, Søren Sønderbo ANDERSEN, Søren KAPPELGAARD
-
Patent number: 11271403Abstract: A method for preparing a wind power facility for a transition from a first mode of operation to a second mode of operation includes the steps of specifying a set of operational parameters to be applied by the wind power facility in connection with the second mode of operation, said specified set of operational parameters being available for the wind power facility in response to a provided transition triggering signal, and providing the transition triggering signal and applying the specified set of operational parameters in the wind power facility in response thereto, wherein a subset of the specified set of operational parameters is applied in each of a plurality of wind turbine generators in response to the provided transition triggering signal. The first mode of operation may involve a normal mode of operation whereas the second mode of operation may involve an island mode of operation.Type: GrantFiled: October 2, 2018Date of Patent: March 8, 2022Assignee: VESTAS WIND SYSTEMS A/SInventors: Mu Wei, Torsten Lund, Kouroush Nayebi
-
Patent number: 11174840Abstract: A wind power plant supplies power to a utility grid in accordance with an active power reference, where the wind power plant comprises a plurality of wind turbine generators and a power plant controller arranged to send an active power set point to the wind turbine controller of each of the plurality of wind turbine generators.Type: GrantFiled: July 5, 2017Date of Patent: November 16, 2021Assignee: VESTAS WIND SYSTEMS A/SInventors: Steve Jessen, Søren Kappelgaard, Jacob Barsøe Kjærgaard, Kouroush Nayebi, Mads Rajczyk Skjelmose, Mu Wei
-
Patent number: 11053917Abstract: A method and control arrangement are disclosed for controlling power output of a wind power plant (WPP) including a plurality of wind turbine generators (WTGs). The method includes determining that overboosting is required for the WPP to meet a power demand at the WPP, and determining, for at least a first WTG of the plurality of WTGs, a corresponding amount of overboost capacity. The method further includes generating, based on the determined amount of overboost capacity, control signals causing the first WTG to increase its power output through overboosting to thereby fulfill at least a portion of the power demand.Type: GrantFiled: May 23, 2016Date of Patent: July 6, 2021Assignee: VESTAS WIND SYSTEMS A/SInventors: Kouroush Nayebi, Mu Wei, Dumitru-Mihai Valcan, Jesper Sandberg Thomsen
-
Publication number: 20210199090Abstract: The present invention relates to a method for releasing a requested amount of power from a power facility to an associated power grid, the method comprising the steps of providing a release signal as to when the requested amount of power is to be released from the power facility to the associated power grid, ramping up the power generation of the power facility, and releasing the requested amount of power to the associated power grid in accordance with the release signal, wherein at least part of an excess power generated during ramping up is dissipated and/or stored in suitable power handling modules. The present invention also relates to a power facility controller being capable for performing this method.Type: ApplicationFiled: October 2, 2018Publication date: July 1, 2021Inventors: Mu WEI, Kouroush NAYEBI, Torsten LUND
-
Patent number: 11025064Abstract: A wind power plant system comprising: a plurality of wind turbine generators each having a corresponding generator controller, and a power plant controller for controlling the power generated by the wind power plant system; wherein at least some of the plurality of generator controllers are each configured to: generate a model that indicates the thermal capacity of one or more components of the wind turbine generator, determine power capacity data from the model, said data relating to: at least one reactive power supply level and a corresponding time limit for which that reactive power supply level may be maintained, and transmit to the power plant controller the determined power capacity data, wherein the power plant controller is operable to receive the power capacity data from the plurality of generator controllers and to transmit respective power references to the plurality of generator controllers to control the power generated by the wind power plant system.Type: GrantFiled: November 24, 2017Date of Patent: June 1, 2021Assignee: VESTAS WIND SYSTEMS A/SInventors: Ciprian Biris, Manoj Gupta, Henrik Møller, Kouroush Nayebi, Janakiraman Sivasankaran, Mu Wei, Hans Kristian Bjørn
-
Patent number: 10968890Abstract: A method and associated control arrangement are disclosed for controlling a power output of a wind power plant (WPP) according to a predetermined power ramp rate limit, the WPP comprising a plurality of wind turbine generators (WTGs). The method comprises receiving a first signal indicating that a first WTG is in a ready state to begin producing power. The method further comprises, upon determining that, responsive to the received first signal, beginning power production of the first WTG at a predetermined default power ramp rate would cause the power output of the WPP to exceed the power ramp rate limit, controlling power production of the first WTG using at least one of: a first delay, a power ramp rate reference less than the default power ramp rate, and a power reference less than a nominal power output of the first WTG.Type: GrantFiled: November 25, 2016Date of Patent: April 6, 2021Assignee: VESTAS WIND SYSTEMS A/SInventors: Mu Wei, Martin Ansbjerg Kjær, Kouroush Nayebi, Jesper Sandberg Thomsen, Eik Herbsleb
-
Publication number: 20210098992Abstract: The present invention relates to a state machine for controlling a wind power plant (WPP), comprising at least one wind turbine connected to an electrical grid, the state machine is adapted to, receive a plant power reference (P_total) according to at least one electrical value of the electrical grid, manage a plurality of control modes and output signals, in relation to the plurality of control modes, select within the control modes, according to controller inputs and contingency at that moment in time, transfer the corresponding control values to a power controller, and dispatch a power reference to each of the at least one wind turbines according to the selected control mode. The invention also relates to a control system arranged to control power output of a wind power plant (WPP), comprising at least one wind turbine connected to an electrical grid, and the control system having a state machine.Type: ApplicationFiled: April 9, 2018Publication date: April 1, 2021Inventors: Rodrigo GARCIA, Naveen Kumar BOGGARPU, Jorge Martinez GARCIA, Kouroush NAYEBI, Mu WEI, Dumitru-Mihai VALCAN, Henrik MØLLER, Jacob Barsøe KJÆRGAARD
-
Patent number: 10923918Abstract: The invention relates to a method for controlling injection and absorption of reactive power in a wind power plant (WPP). In addition to wind turbine generators (WTG), the wind power plant comprises reactive power regulating devices, such as MSU and STATCOM devices. The reactive power regulating devices are controlled by wind power plant controller so that the combined amount of reactive power produced by the wind turbine generators and the reactive power regulating devices satisfies a desired amount of reactive power. In case of communication fault between the power plant controller and one of the reactive power regulating devices, the power plant controller is reconfigured so as to compensate the capability of the reactive power regulating device to inject or absorb the amount of reactive power.Type: GrantFiled: November 4, 2014Date of Patent: February 16, 2021Assignee: VESTAS WIND SYSTEMS A/SInventors: Jorge Martinez Garcia, Rasmus Lærke, Henrik B. Møller, Kouroush Nayebi, Athanasios Rokofyllos, Mu Wei
-
Patent number: 10903659Abstract: The invention relates to a method for correcting deviations of power produced by a power plant which includes at least one wind turbine generator and possibly other types of power generating units. The power deviations, i.e. deviations from a power reference for the power plant, are determined as energy errors. The invention addresses solutions for determining and compensating the energy errors.Type: GrantFiled: May 16, 2018Date of Patent: January 26, 2021Assignee: VESTAS WIND SYSTEMS A/SInventors: Mu Wei, Kouroush Nayebi, Søren Kappelgaard
-
Publication number: 20200395760Abstract: A method for preparing a wind power facility for a transition from a first mode of operation to a second mode of operation includes the steps of specifying a set of operational parameters to be applied by the wind power facility in connection with the second mode of operation, said specified set of operational parameters being available for the wind power facility in response to a provided transition triggering signal, and providing the transition triggering signal and applying the specified set of operational parameters in the wind power facility in response thereto, wherein a subset of the specified set of operational parameters is applied in each of a plurality of wind turbine generators in response to the provided transition triggering signal. The first mode of operation may involve a normal mode of operation whereas the second mode of operation may involve an island mode of operation.Type: ApplicationFiled: October 2, 2018Publication date: December 17, 2020Inventors: Mu WEI, Torsten LUND, Kouroush NAYEBI
-
Publication number: 20200350763Abstract: Harmonics of a power output of a power plant at a point of common coupling between the power plant and a utility grid, wherein the power plant comprises a plurality of energy production units. The method comprises determining an electrical characteristic at the point of common coupling; determining the electrical characteristic at an output terminal of each of the energy production units and dispatching a control signal to at least one of the energy production units to control the electrical characteristic at an output terminal of the respective energy production units. The control signal is based on the measurement of the electrical characteristic at the point of common coupling and arranged for damping the harmonic of the power output of the power plant at the point of common coupling, wherein the control signal is determined on the basis of a predetermined prioritizing sequence of said electrical characteristic.Type: ApplicationFiled: November 20, 2018Publication date: November 5, 2020Inventors: Mu WEI, Dan WU
-
Publication number: 20200169093Abstract: The invention relates to a method for correcting deviations of power produced by a power plant which includes at least one wind turbine generator and possibly other types of power generating units. The power deviations, i.e. deviations from a power reference for the power plant, are determined as energy errors. The invention addresses solutions for determining and compensating the energy errors.Type: ApplicationFiled: May 16, 2018Publication date: May 28, 2020Inventors: Mu WEI, Kouroush NAYEBI, Søren KAPPELGAARD
-
Publication number: 20200076193Abstract: A wind power plant system comprising: a plurality of wind turbine generators each having a corresponding generator controller, and a power plant controller for controlling the power generated by the wind power plant system; wherein at least some of the plurality of generator controllers are each configured to: generate a model that indicates the thermal capacity of one or more components of the wind turbine generator, determine power capacity data from the model, said data relating to: at least one reactive power supply level and a corresponding time limit for which that reactive power supply level may be maintained, and transmit to the power plant controller the determined power capacity data, wherein the power plant controller is operable to receive the power capacity data from the plurality of generator controllers and to transmit respective power references to the plurality of generator controllers to control the power generated by the wind power plant system.Type: ApplicationFiled: November 24, 2017Publication date: March 5, 2020Inventors: Ciprian BIRIS, Manoj GUPTA, Henrik MØLLER, Kouroush NAYEBI, Janakiraman SIVASANKARAN, Mu WEI, Hans Kristian BJØRN
-
Patent number: 10539118Abstract: A wind power plant has a plurality of wind turbine generators and a power plant controller arranged to communicate with the plurality of wind turbines generators. Each wind turbine generator has a controller arranged to control an active power output in its respective wind turbine generator according to an active power set point received from the wind power plant controller. A change in the active power reference changes the active power set point for each wind turbine generator by a weighting factor.Type: GrantFiled: July 5, 2017Date of Patent: January 21, 2020Assignee: VESTAS WIND SYSTMENS A/SInventors: Steve Jessen, Søren Kappelgaard, Jacob Barsøe Kjærgaard, Kouroush Nayebi, Mads Rajczyk Skjelmose, Mu Wei
-
Publication number: 20190338756Abstract: A wind power plant which supplies power to a utility grid in accordance with an active power reference, where the wind power plant comprises a plurality of wind turbine generators and a power plant controller arranged to send an active power set point to the wind turbine controller of each of the plurality of wind turbine generators.Type: ApplicationFiled: July 5, 2017Publication date: November 7, 2019Applicant: Vestas Wind Systems A/SInventors: Steve JESSEN, Søren KAPPELGAARD, Jacob Barsøe KJÆRGAARD, Kouroush NAYEBI, Mads Rajczyk SKJELMOSE, Mu WEI
-
Publication number: 20190162166Abstract: A wind power plant has a plurality of wind turbine generators and a power plant controller arranged to communicate with the plurality of wind turbines generators. Each wind turbine generator has a controller arranged to control an active power output in its respective wind turbine generator according to an active power set point received from the wind power plant controller. A change in the active power reference changes the active power set point for each wind turbine generator by a weighting factor.Type: ApplicationFiled: July 5, 2017Publication date: May 30, 2019Applicant: VESTAS WIND SYSTEMS A/SInventors: Steve JESSEN, Søren KAPPELGAARD, Jacob Barsøe KJÆRGAARD, Kouroush NAYEBI, Mads Rajczyk SKJELMOSE, Mu WEI