Patents by Inventor Robert D. Turney
Robert D. Turney has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Patent number: 10580097Abstract: A cascaded model predictive control system includes an inner controller and an outer controller. The outer controller determines an amount of power to defer from a predicted power usage to optimize a total cost of power usage. A power setpoint is calculated based on a difference between the predicted power usage and the amount of power to defer. The inner controller determines an operating setpoint for building equipment in order to achieve the power setpoint.Type: GrantFiled: November 9, 2017Date of Patent: March 3, 2020Assignee: Johnson Controls Technology CompanyInventors: Robert D. Turney, Michael J. Wenzel
-
Patent number: 10571146Abstract: An air handling unit (AHU) or rooftop unit (RTU) in a building HVAC system includes one or more powered components, a battery, and a predictive controller. The powered components include a fan configured to generate a supply airstream provided to one or more building zones. The battery is configured to store electric energy and discharge the stored electric energy for use in powering the powered components. The predictive controller is configured to optimize a predictive cost function to determine an optimal amount of electric energy to purchase from an energy grid and an optimal amount of electric energy to store in the battery or discharge from the battery for use in powering the powered components at each time step of an optimization period.Type: GrantFiled: April 26, 2018Date of Patent: February 25, 2020Assignee: Johnson Controls Technology CompanyInventors: Robert D. Turney, Nishith R. Patel
-
Patent number: 10564612Abstract: A model predictive control system is used to optimize energy cost in a variable refrigerant flow (VRF) system. The VRF system includes an outdoor subsystem and a plurality of indoor subsystems. The model predictive control system includes a high-level model predictive controller (MPC) and a plurality of low-level indoor MPCs. The high-level MPC performs a high-level optimization to generate an optimal indoor subsystem load profile for each of the plurality of indoor subsystems. The optimal indoor subsystem load profiles optimize energy cost. Each of the low-level indoor MPCs performs a low-level optimization to generate optimal indoor setpoints for one or more indoor VRF units of the corresponding indoor subsystem. The indoor setpoints can include temperature setpoints and/or refrigerant flow setpoints for the indoor VRF units.Type: GrantFiled: June 28, 2017Date of Patent: February 18, 2020Assignee: Johnson Controls Technology CompanyInventors: Nishith R. Patel, Matthew J. Ellis, Michael J. Wenzel, Robert D. Turney, Brett M. Lenhardt
-
Publication number: 20200041966Abstract: A heating, ventilation, or air conditioning (HVAC) system for a building includes a plurality of indoor subsystems, a high-level controller, and a plurality of low-level controllers. Each indoor subsystem includes one or more indoor units configured to provide heating or cooling to one or more building spaces. The high-level controller is configured to generate a plurality of indoor subsystem energy targets, each indoor subsystem energy target corresponding to one of the plurality of indoor subsystems and generated based on a thermal capacitance of one or more building spaces to which heating or cooling is provided by the corresponding indoor subsystem.Type: ApplicationFiled: October 14, 2019Publication date: February 6, 2020Applicant: Johnson Controls Technology CompanyInventors: Nishith R. Patel, Matthew J. Ellis, Michael J. Wenzel, Robert D. Turney, Brett M. Lenhardt
-
Publication number: 20200041158Abstract: A thermostat for a building zone includes at least one of a model predictive controller and an equipment controller. The model predictive controller is configured to obtain a cost function that accounts for a cost of operating HVAC equipment during each of a plurality of time steps, use a predictive model to predict a temperature of the building zone during each of the plurality of time steps, and generate temperature setpoints for the building zone for each of the plurality of time steps by optimizing the cost function subject to a constraint on the predicted temperature. The equipment controller is configured to receive the temperature setpoints generated by the model predictive controller and drive the temperature of the building zone toward the temperature setpoints during each of the plurality of time steps by operating the HVAC equipment to provide heating or cooling to the building zone.Type: ApplicationFiled: October 10, 2019Publication date: February 6, 2020Applicant: Johnson Controls Technology CompanyInventors: Robert D. Turney, Matthew J. Ellis, Michael J. Wenzel, Mohammad N. ELBSAT, Juan Esteban Tapiero Bernal, Brennan H. Fentzlaff
-
Publication number: 20200041965Abstract: A building HVAC system includes an airside system having a plurality of airside subsystems, a high-level controller, and a plurality of low-level airside controllers. Each airside subsystem includes airside HVAC equipment configured to provide heating or cooling to one or more building spaces. The high-level controller is configured to generate a plurality of airside subsystem energy targets, each airside subsystem energy target corresponding to one of the plurality of airside subsystems and generated based on a thermal capacitance of the one or more building spaces to which heating or cooling is provided by the corresponding airside subsystem. Each low-level airside controller corresponds to one of the airside subsystems and is configured to control the airside HVAC equipment of the corresponding airside subsystem in accordance with the airside subsystem energy target for the corresponding airside subsystem.Type: ApplicationFiled: October 14, 2019Publication date: February 6, 2020Applicant: Johnson Controls Technology CompanyInventors: Nishith R. Patel, Robert D. Turney, Matthew J. Ellis
-
Publication number: 20200025402Abstract: A system includes a plurality of thermostats corresponding to a plurality of HVAC systems that serve a plurality of spaces and a computing system communicable with the plurality of thermostats via a network. The computing system is configured to, for each space of the plurality of spaces, obtain a set of training data relating to thermal behavior of the space, identify a model of thermal behavior of the space based on the set of training data, perform a model predictive control process using the model of thermal behavior of the space to obtain a temperature setpoint for the space, and provide the temperature setpoint to the thermostat corresponding to the HVAC system serving the space. The plurality of thermostats are configured to control the plurality of HVAC systems in accordance with the temperature setpoints.Type: ApplicationFiled: September 30, 2019Publication date: January 23, 2020Inventors: Kerry M. Bell, Bridget E. Kapler, Alan S. Schwegler, Leyla Mousavi, Kierstyn R. Robbins, Robert D. Turney, Matthew J. Ellis, Michael J. Wenzel, Mohammad N. ElBsat, Juan Esteban Tapiero Bernal, Brennan H. Fentzlaff
-
Publication number: 20200011562Abstract: A variable refrigerant flow (VRF) system for a building. The VRF system includes at least one outdoor VRF unit configured to heat or cool a refrigerant for use in heating or cooling the building. The at least one outdoor VRF unit includes a sub-cooler and a bypass expansion valve configured to control a flow of the refrigerant through the sub-cooler and an extremum-seeking controller configured to generate a sub-cooling temperature setpoint for the at least one outdoor VRF unit. The extremum-seeking controller is configured to determine a total power consumption of the at least one outdoor VRF unit, generate a sub-cooling temperature setpoint for the at least one outdoor VRF unit using an extremum-seeking control technique that drives the total power consumption toward an extremum, and use the sub-cooling temperature setpoint to operate the at least one outdoor VRF unit.Type: ApplicationFiled: July 6, 2018Publication date: January 9, 2020Applicant: Johnson Controls Technology CompanyInventors: Robert D. Turney, Liming Yang, Yunrui Wang, Yasutaka Yoshida, Kazumoto Urata
-
Publication number: 20200011561Abstract: A variable refrigerant flow (VRF) system for a building includes a plurality of outdoor VRF units configured to heat or cool a refrigerant for use in heating or cooling the building and an extremum-seeking controller. The extremum-seeking controller is configured to determine a total power consumption of the plurality of outdoor VRF units, generate a pressure setpoint for the plurality of outdoor VRF units using an extremum-seeking control technique that drives the total power consumption toward an extremum, and use the pressure setpoint to operate the plurality of outdoor VRF units.Type: ApplicationFiled: July 6, 2018Publication date: January 9, 2020Inventors: Robert D. Turney, Liming Yang, Yunrui Wang, Yasutaka Yoshida, Kazumoto Urata, Timothy I. Salsbury, John M. House
-
Patent number: 10495337Abstract: A thermostat for a building zone includes at least one of a model predictive controller and an equipment controller. The model predictive controller is configured to obtain a cost function that accounts for a cost of operating HVAC equipment during each of a plurality of time steps, use a predictive model to predict a temperature of the building zone during each of the plurality of time steps, and generate temperature setpoints for the building zone for each of the plurality of time steps by optimizing the cost function subject to a constraint on the predicted temperature. The equipment controller is configured to receive the temperature setpoints generated by the model predictive controller and drive the temperature of the building zone toward the temperature setpoints during each of the plurality of time steps by operating the HVAC equipment to provide heating or cooling to the building zone.Type: GrantFiled: November 9, 2018Date of Patent: December 3, 2019Assignee: Johnson Controls Technology CompanyInventors: Robert D. Turney, Matthew J. Ellis, Michael J. Wenzel, Mohammad N. ElBsat, Juan Esteban Tapiero Bernal, Brennan H. Fentzlaff
-
Publication number: 20190354071Abstract: A method includes operating equipment to affect a variable state or condition of a space and determining a set of learned weights for a neural network by modeling an estimated cost of operating the equipment over a plurality of simulated scenarios. Each simulated scenario includes simulated measurements relating to the space. The neural network is configured to generate simulated control dispatches for the equipment based on the simulated measurements. The method also includes configuring the neural network for online control by applying the set of learned weights, applying actual measurements relating to the space to the neural network to generate a control dispatch for the equipment, and controlling the equipment in accordance with the control dispatch.Type: ApplicationFiled: May 16, 2019Publication date: November 21, 2019Applicant: Johnson Controls Technology CompanyInventors: Robert D. Turney, Henry O. Marcy, V
-
Publication number: 20190338977Abstract: A building management system includes HVAC equipment operable to affect an indoor air temperature of a building, a system manager configured to obtain a cost function that characterizes a cost of operating the HVAC equipment, obtain a dataset relating to the building, determine a current state of the building by applying the dataset to a neural network, select a temperature bound associated with the current state, augment the cost function to include a penalty term that increases the cost when the indoor air temperature violates the temperature bound, and determine a temperature setpoint for each of a plurality of time steps in the future time period. The temperature setpoints achieve a target value of the cost function over the future time period. The building management system also includes a controller configured to operate the HVAC equipment to drive the indoor air temperature towards the temperature setpoint.Type: ApplicationFiled: May 6, 2019Publication date: November 7, 2019Applicant: Johnson Controls Technology CompanyInventors: Robert D. Turney, Jiaqi Li
-
Publication number: 20190338973Abstract: A building cooling system includes a controller and a cooling device operable to affect indoor air temperature of a building. The controller is configured to obtain a cost function that characterizes a cost of operating the cooling device over a future time period, obtain a dataset relating to the building, determine a current state of the building by applying the dataset to a neural network, select a temperature bound associated with the current state, augment the cost function to include a penalty term that increases the cost when the indoor air temperature violates the temperature bound, and determine a temperature setpoint for each of a plurality of time steps in the future time period. The temperature setpoints achieve a target value of the cost function over the future time period. The controller is configured to control the cooling device to drive the indoor air temperature towards the temperature setpoint.Type: ApplicationFiled: May 6, 2019Publication date: November 7, 2019Applicant: Johnson Controls Technology CompanyInventors: Robert D. Turney, Henry O. Marcy, V, Zhizhong Pang
-
Publication number: 20190338974Abstract: A controller for maintaining occupant comfort in a space of a building. The controller includes processors and non-transitory computer-readable media storing instructions that, when executed by the processors, cause the processors to perform operations. The operations include obtaining building data and obtaining occupant comfort data. The operations include generating an occupant comfort model relating the building data to a level of occupant comfort within the space based on the building data and the occupant comfort data. The operations include generating time-varying comfort constraint for an environmental condition of the space using the occupant comfort model and include performing a cost optimization of a cost function of operating building equipment over a time duration to determine a setpoint for the building equipment. The operations include operating the building equipment based on the setpoint to affect the variable state or condition of the space.Type: ApplicationFiled: May 7, 2019Publication date: November 7, 2019Applicant: Johnson Controls Technology CompanyInventors: Robert D. Turney, Mohammad N. ElBsat, Matthew J. Ellis, Anas W. I. Alanqar, Michael J. Wenzel
-
Publication number: 20190325368Abstract: A model predictive maintenance (MPM) system for building equipment. The MPM system includes an equipment controller configured to operate the building equipment to affect a variable state or condition in a building. The MPM system includes an operational cost predictor configured to predict a cost of operating the building equipment over a duration of an optimization period. The MPM system includes a budget manager configured to generate one or more budget constraints. The MPM system includes an objective function optimizer configured to optimize an objective function subject to the one or more budget constraints to determine a maintenance and replacement schedule for the building equipment. The objective function includes maintenance and replacement costs of the building equipment and the predicted cost of operating the building equipment.Type: ApplicationFiled: June 28, 2019Publication date: October 24, 2019Inventors: ROBERT D. TURNEY, SUDHI R. SINHA, MICHAEL J. WENZEL, MOHAMMAD N. ELBSAT
-
Publication number: 20190311332Abstract: A model predictive maintenance system for building equipment including an equipment controller to operate the building equipment to affect a variable state or condition in a building. The system includes an operational cost predictor to predict a cost of operating the building equipment over a duration of an optimization period, a maintenance cost predictor to predict a cost of performing maintenance on the building equipment, and a cost incentive manager to determine whether any cost incentives are available and, in response to a determination that cost incentives are available, identify the cost incentives. The system includes an objective function optimizer to optimize an objective function to predict a total cost associated with the building equipment over the duration of the optimization period. The objective function includes the predicted cost of operating the building equipment, the predicted cost of performing maintenance on the building equipment, and, if available, the cost incentives.Type: ApplicationFiled: June 21, 2019Publication date: October 10, 2019Inventors: Robert D. TURNEY, Sudhi R. SINHA, Masayuki NONAKA, Zhizhong PANG, Yoshiko WATANABE, Mohammad N. ELBSAT, Michael J. WENZEL
-
Publication number: 20190295034Abstract: An automatic parts resupply system for building equipment including a model predictive maintenance system configured to determine a service time at which to perform service on the building equipment by performing a predictive optimization of a total cost of operating and servicing the building equipment over a time period. The service time is a decision variable in the predictive optimization. The automatic parts resupply system includes a resupply manager. The resupply manager is configured to generate a parts resupply order for the building equipment based on a result of the predictive optimization. The resupply manager is configured to determine a transmission time at which to transmit the parts resupply order to a parts supplier. The resupply manager is configured to transmit the parts resupply order to the parts supplier at the transmission time.Type: ApplicationFiled: June 12, 2019Publication date: September 26, 2019Applicant: Johnson Controls Technology CompanyInventors: Michael J. Wenzel, Mohammad N. ElBsat, Yasutaka Yoshida, Mori Hayato, Robert D. Turney
-
Publication number: 20190271978Abstract: An automatic work order generation system for model predictive maintenance (MPM) of building equipment including an MPM system including an equipment controller to operate the building equipment to affect an environmental condition of a building. The MPM system can perform a predictive optimization to determine a service time at which to service the building equipment. The automatic work order generation system includes an equipment service scheduler that can determine whether any service providers are available to perform equipment service within a predetermined time range of the service time. In response to determining that service providers are available to perform the equipment service, the equipment service scheduler can select a service provider and an appointment time based on one or more service provider attributes. The equipment service scheduler can generate a service work order and transmit the service work order to the service provider to schedule a service appointment.Type: ApplicationFiled: May 21, 2019Publication date: September 5, 2019Applicant: Johnson Controls Technology CompanyInventors: Mohammad N. ElBsat, Michael J. Wenzel, Zhigang Wu, Yasutaka Yoshida, Robert D. Turney, Liming Yang
-
Publication number: 20190235453Abstract: A variable refrigerant flow (VRF) system for a building includes an outdoor VRF unit, a plurality of indoor VRF units, a battery, and a predictive VRF controller. The outdoor VRF unit includes powered VRF components configured to apply heating or cooling to a refrigerant. The indoor VRF units are configured to use the heated or cooled refrigerant to provide heating or cooling to a plurality of building zones. The battery is configured to store electric energy and discharge the stored electric energy for use in powering the powered VRF components. The predictive VRF controller is configured to optimize a predictive cost function to determine an optimal amount of electric energy to purchase from an energy grid and an optimal amount of electric energy to store in the battery or discharge from the battery for use in powering the powered VRF components at each time step of an optimization period.Type: ApplicationFiled: June 29, 2017Publication date: August 1, 2019Inventors: Robert D. TURNEY, Nishith R. PATEL
-
Publication number: 20190217739Abstract: A building optimization system includes charging and discharging a battery of a battery power vehicle. The building optimization system includes a charging system configured to cause the battery of the battery powered vehicle to charge or discharge. The building optimization system also includes an optimization controller including a processing circuit. The processing circuit is configured to receive charging constraints for the battery powered vehicle, determine whether to charge discharge the battery of the battery powered vehicle based on the charging constraints, and cause the charging system to charge or discharge the battery of the battery powered vehicle based on the optimization.Type: ApplicationFiled: January 11, 2019Publication date: July 18, 2019Applicant: Johnson Controls Technology CompanyInventors: Sudhi R. Sinha, Youngchoon Park, Robert D. Turney