Patent number: 12366679
Abstract: Disclosed are a method and a device for identifying full-section excavation parameters of large-section tunnel with broken surrounding rock, capable of solving the problem of inaccurate arrangement of blasting hole points in tunnel excavation engineering, and including the following steps: establishing a three-dimensional finite element model based on a blasting section design of a tunnel; performing a simulation with the three-dimensional finite element model based on blasting design parameters to obtain blasting quality parameters; selecting a group closest to a preset quality parameter from multiple groups of the blasting design parameters as target blasting design parameters, wherein the preset quality parameter is an acceptance grade standard of the tunnel; obtaining first thermal imaging information of a first hot spot of a surface to be blasted; calibrating actual hole spacing parameters based on the first thermal imaging information and the target blasting design parameters.
Type:
Grant
Filed:
October 11, 2024
Date of Patent:
July 22, 2025
Assignees:
China Railway Eleventh Bureau Group Co., Ltd, Wuhan University of Technology, China Railway Eleventh Bureau Group Fourth Engineering Co., Ltd., Wujiu Railway Passenger Dedicated Line Hubei Co., Ltd, Southwest Jiaotong University, China Railway Seventh Group Co., Ltd., Wuhan Institute of Geotechnical Mechanics, Chinese Academy of Sciences, China Railway Southwest Scientific Research Institute Co., Ltd
Inventors:
Jun Gao, Zhongyi Zhang, Xiao Lin, Xiaowei Zuo, Kaiwen Liu, Ming Zhang, Bin Zhou, Feng Wang, Yuxin Gao, Huiling Xue, Ling Wang, Zhengyi Wang, Xiaokai Wen, Yongtai Wang, Dan Xu, Ke Chen, Tenghui Xu, Zhiguo Liu, Yongguo Qi, Geng Chen, Songzhen Li, Junlei Zhou, Juntao Kang, Chunfeng Meng, Dongsheng Xu, Linyue Gao