This invention is an improved method of installing the main subsystems of any Rankine Cycle thermal electric power generating station to reduce the capital cost of constructing the plant, to increase the overall safety of a nuclear reactor installation, and to improve the efficiency and safety of such a power plant. This invention achieves a reduction of the amount of complex and redundant machinery required for operation, and an increase of the withstand pressure of the containment of a nuclear reactor; by installing the primary thermal power source and vapour generators at a significant elevation below the condenser.
This invention relates to thermal electrical power generating station layout for generating stations which employ a Rankine cycle, more specifically for generating stations where the working fluid undergoes a phase change from liquid to vapour at the heat input stage of its cycle.
BACKGROUND OF THE INVENTIONIn current standard thermal electrical power generating stations, the four main subsystems of the plant, 1) the thermal energy source (e.g. a nuclear reactor or fossil fuel fired boiler or other thermal energy source excluding geothermal), 2) the steam/vapour generators, 3) the turbine or other Rankine cycle expander or prime mover and 4) the condensers are all installed at or very near the same elevation relative to each other. Large high-pressure feedwater pumps are employed to supply the condensed working fluid back to the steam/vapour generators after exiting the turbine and condensing. In particular in nuclear power stations the steam generators are the normal means of cooling the reactor; and since cooling of the reactor is critical to its safe operation, these complex and costly feedwater pumps with their attendant systems of valves, main and auxiliary power supplies and controls must be installed with multiple redundancy at every point of potential failure.
Also in current standard nuclear power generating stations, the reactor vessel and its attendant equipment is installed at surface level in a large reinforced containment structure designed to hopefully protect the public from radiation danger in event of a) an operating failure of a reactor system and b) the reactor vessel from being breached by being struck by b) an aircraft in an accident or terrorist event or c) a military weapon launched by hostile groups or d) an attack with an explosive charge. However it is a) not proven and b) highly questionable; whether this type of containment could withstand a direct strike by the largest modern civilian or military aircraft, or the latest of military amour piercing projectiles and missiles.
In current wind turbine installations, fluctuations in wind power available cause the generating capacity of the system to be unreliable and uncontrollable. Also generators for many modern wind turbines are often undersized below the capability of the wind turbine because the frequency of wind speed events cannot economically justify installing a generator sized for peak output capability. Such installations would benefit from an economical auxiliary means of driving the generator during periods of less than optimal wind speed. Also many low-volume or spent petroleum sources are unexploited due to the difficulty or expense of transporting such petroleum to a point of sale. If a wind turbine in combination with a Rankine cycle engine could supply power locally or to a nearby point on a grid, many of these resources could be exploited economically.
Finally many commercial or residential high-rise buildings could benefit significantly by burning their normal heating fuel supplies in a Rankine cycle turbine electrical generating system first, then capturing the exhaust heat from the expander to serve the local heating requirement. Efficient systems such as these can provide up to 75% of normal electrical load of a residential or commercial building and all required heating load from just slightly increased fuel inputs over older heating systems which burn the fuel directly. A simple, efficient and automated CHP system would benefit many occupants of tall buildings.
SUMMARY OF THE INVENTIONIt is an object of the present invention to increase the safety and reliability; and to reduce the capital, maintenance and operating costs of any type of thermal electrical generating station by installing the condenser of a thermal electrical generating station at a significantly higher elevation relative to the steam generator(s) and primary energy source. This difference in elevation enables gravity to reduce or eliminate the need for pumping to supply feedwater to the steam generator(s).
It is another object of the present invention to enhance containment of any nuclear reactor employed to generate a working fluid vapour for supply to a turbine or other Rankine cycle expander generator by installing said reactor in a sealable steel alloy lined containment chamber, said chamber being deep under the surface and preferably excavated into solid stable dry rock in an earthquake-free zone. Said containment chamber to be designed to withstand internal pressures of several MPa without failure of its sealing apertures. Said containment chamber to be further provided with closed circuit convection cooling loops preferably installed as passages behind the alloy lining of the containment chamber surfaces, and said cooling circuit to be capable of maintaining the internal pressure of the containment chamber below the withstand pressure of the aperture seals under any circumstances of reactor failure.
For any embodiment of the present invention, let x be a fractional positive factor which may range from 0 to 1 and is selected to compensate for head loss due to friction in the working fluid and vapour piping circuit at rated flow, and let y be a positive or negative factor selected to alter the delivered working fluid pressure to the vapour generators sufficiently to allow either a relatively low power booster pump system and/or a flow reducing control valve system to safely and accurately control the actual volume of working fluid delivered to the vapour generator(s).
For any embodiment of the present invention, by installing the primary heat source and its vapour generator(s) at an elevation significantly lower than the system vapour condenser (e.g. deep in underground chambers excavated from solid stable rock, on the side of a mountain at the base, or in the basement of a tall building etc.) at a level (1+x+y) meters below the condenser for each 10.1 KPa_g*(density ratio of working fluid vapour divided by density of working fluid liquid feed) of operating pressure required to feed the vapour generators with Condensate, gravitational acceleration will return the Condensate to the vapour generator(s) at the required pressure to properly charge said vapour generator(s) automatically, reducing or eliminating the costly high pressure, high power consumption and high maintenance cost feedwater pumping systems. The design of the vapour consumer (e.g. the turbine or other Rankine cycle expander generator of a power plant) is then altered to be slightly smaller (and less costly to build) to compensate for altered vapour pressure and temperature conditions either at the inlet if it is at the (higher) condenser level or if it is the condenser, or at the outlet if it is at the (lower) level of the vapour generator(s). The amount of capacity reduction is calculated 1) for a steam turbine or other Rankine cycle expander-generator set as a) pumping losses due to the level difference between the vapour generators and the turbine or other Rankine cycle expander inlet, calculated for a steam circuit; in MPa as (the density ratio in kg/m sup 3 of the vapour generator inlet fluid vs. the riser inlet vapour); plus b) conduction, radiation and friction losses in the relatively long vapour risers connecting the vapour generator(s) to the turbine or other Rankine cycle expander or condenser. The amount of capacity reduction is calculated as a) pumping losses due to the level difference between the steam generator(s) and the turbine or other Rankine cycle expander inlet, calculated in MPa as
-
- plus b) conduction, radiation and friction losses in the relatively long high pressure circuit connecting the steam generator to the turbine or other Rankine cycle expander.
In particular as the pumping loss calculation might be applied to a CANDU 6 PHWR installed at 485 m below the turbine and operating its secondary working fluid circuit at 4.7 MPa and 262 Degrees C., the pumping losses a) will be 0.126 MPa, which is 2.58% of the thermal power of the reactor, perhaps as low as 0.77% of electrical output, assuming approximately 30% thermal efficiency of the turbine/generator set. Losses b) will depend on engineering choices for pipe layout, length, quality, size, and insulation quality. The turbine/generator set is then designed slightly smaller (and less costly) to compensate for reduced supply steam pressure and temperature from the high pressure riser(s). Unfortunately actual losses will be somewhat larger than this calculation since there is no reduction in the heat of vapourization of the working fluid using this plan, but the elimination of the parasitic power draw of the feedwater pumps also returns a large part of this. This plus the reduction in capital costs and increased safety of the reactor installation will more than compensate.
DESCRIPTION OF THE DRAWINGSOn all figures, similar parts are referenced by the same reference number.
In drawings which illustrate embodiments of the invention,
In accordance with a first preferred embodiment of the present invention illustrated in
The preferred embodiment of the present invention illustrated in
i) Increased security and pressure withstand capability of the containment due to the reactor being installed deep under solid stable rock 17. Provided reasonable access security is maintained it is invulnerable to most acts of terror and to failure due to aircraft accidents etc.
ii) Passive high-pressure containment emergency cooling provided by cooling water fed by gravity from the surface reservoir 10 into tubes 3 connecting to coolant loops embedded into the grout behind the steel lining of the underground containment, which then naturally vent the resulting steam by a continuous return line to a condenser/filter system (not showed) at the surface. The same or a similar cooling circuit will be used during normal operation to manage the operating temperature of the containment in a closed pumped coolant circuit. Coolant intake tubes 3 would logically not pass directly from the bottom of the reservoir to the underground heat exchangers but include a siphon loop at the surface, to ensure no flow via the drilled passages in which the pipes are installed. Suitable small emergency powered priming pumps or raised storage are then used for priming the siphon.
iii) Passive high-pressure reactor emergency cooling provided by cooling water fed by gravity from the surface into a purpose designed emergency heat exchanger installed within or near the underground containment, which then naturally returns the resulting steam by a continuous return line to a condenser/filter system (not showed) at the surface.
iv) Greater public protection from radiation hazard by installing massive emergency sealing door(s) 5 on any access drifts and risers communicating with the containment, which in a complete emergency failure such as a breach of the reactor vessel during operation, would close with sufficient force to cut and seal any pipes in their path, allowing time to e.g. fill the containment with a reaction poison such as borosilicate sand or borated water, gadolinium poisoned water, or to pour the entire excavation behind or below the emergency sealing door(s) full of treated concrete to completely block any possible release of contaminants, without loosing the capital invested in the turbine or other Rankine cycle expander/generator set.
iv) Possibly licensing could be obtained for planned “decommission in place” of the reactor vessel and its machinery (and possibly the spent fuel) at the end of their design life by completely sealing off or backfilling the entire underground excavation after all installed systems are decommissioned.
In accordance with a second preferred embodiment of the present invention illustrated in
In accordance with a third preferred embodiment of the present invention illustrated in
In accordance with a fourth preferred embodiment of the present invention illustrated in
Claims
1) A Rankine cycle electrical generating plant having a significant vertical separation of the turbine condenser above the vapor generator to enable gravity to provide all or a significant part of the working fluid pressure required to supply condensed liquid working fluid to the vapor generator system.
2) A Rankine cycle electrical generating plant as in claim 1 where the said vertical separation is provided in whole or in part by surface terrain, either natural or artificial.
3) A Rankine cycle electrical generating plant as in claim 1 where the said vertical separation is provided in whole or in part by an underground excavation or a natural cavern.
4) A Rankine cycle electrical generating plant as in claim 1 where the said vertical separation is provided in whole or in part by a structure rising above local surface elevation.
5) A passive primary or secondary emergency cooling system for a nuclear reactor as in claim 2 which exploits the said vertical separation of claim 2 to allow gravity to pressurize a heat exchanger system within or in thermally conductive contact with a reactor containment vessel
- from a large reservoir of emergency coolant;
- said reservoir located at a significant elevation above the reactor/steam generator installation and having the coolant return as either liquid or vapour by a sealed pipe system to an emergency condenser and capture system installed near the coolant reservoir level.
6) A passive primary or secondary emergency cooling system for a nuclear reactor as in claim 3 which exploits the said vertical separation of claim 3 to allow gravity to pressurize a heat exchanger system within or in thermally conductive contact with a reactor containment vessel
- from a large reservoir of emergency coolant;
- said reservoir located at a significant elevation above the reactor/steam generator installation and having the coolant return as either liquid or vapour by a sealed pipe system to an emergency condenser and capture system installed near the coolant reservoir level.
7) A containment of a nuclear reactor having the containment functionality enhanced by being installed in a sealable excavation deep underground below the condenser system, with said containment excavation being designed to exploit the mass of the large vertical column of rock and earth above it to increase its capacity for containing pressure and therefore contaminants in the event of an emergency and to resist breaching for any reason of the containment.
8) A passive emergency cooling system for a nuclear reactor as in claim 2 or claim 3 which employs the said vertical separation of claim 2 or claim 3 to allow gravity to pressurize an isolated passive emergency high pressure cooling heat exchanger system installed near the level of the reactor and thermally connected to the reactor primary circuit, from a sufficient reservoir of emergency cooling water located at a significant elevation above the reactor installation and having the coolant return as vapour by a sealed pipe system to an emergency condenser and capture system installed at the coolant reservoir level.
9) A passive emergency cooling system for a CANDU heavy water nuclear reactor as in claim 2 or claim 3 which employs the said vertical separation of claim 2 or claim 3 to allow gravity to pressurize an isolated passive emergency high pressure cooling heat exchanger system installed near the level of the reactor and thermally connected to the reactor moderator fluid, from a sufficient reservoir of emergency cooling water located at a significant elevation above the reactor installation and having the coolant return as vapour by a sealed pipe system to an emergency condenser and capture system installed at the coolant reservoir level.
Type: Application
Filed: Sep 8, 2003
Publication Date: Mar 10, 2005
Inventor: Len Gould (Brampton)
Application Number: 10/656,102