BRIDGE APPROACH AND ABUTMENT CONSTRUCTION AND METHOD
A bridge approach, abutment construction and road widening technique and method using tilt-up panels and lightweight concrete fill is disclosed. A bridge approach ramp is constructed using tilt-up panels, initially supported using tilt form braces, to from a retaining wall perimeter, and subsequently filling the interior with sequential pours of lightweight concrete. The present invention advances the art of bridge construction by providing an improved bridge approach structure that is capable of rapid construction and provides an improved and cost effective structure as compared with prior art teachings.
This application claims the benefit of provisional U.S. Patent Application Ser. No. 61/220,297, filed on Jun. 25, 2009.
STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENTN/A
COPYRIGHT NOTICEA portion of the disclosure of this patent document contains material that is subject to copyright protection. The copyright owner has no objection to the facsimile reproduction by anyone of the patent document or patent disclosure as it appears in the Patent and Trademark Office patent file or records, but otherwise reserves all copyrights rights whatsoever.
BACKGROUND OF THE INVENTION1. Field of the Invention
The present invention relates generally to the construction of road bridges and more particularly to the construction of bridge abutments and approaches.
2. Description of the Background Art
Bridges have become a necessity in today's industrial age to span valleys, rivers, roadways in order to make transportation more efficient. Most small-spanned bridges are constructed of either precast concrete or concrete that is poured on site. Typically concrete bridges involve abutments constructed using load bearing columns on both sides of a span. The bridge deck is then laid horizontally across the span, the weight of which is supported by the columns. The side walls of the abutments and the bridge approaches are typically constructed of concrete slabs which are either driven into the ground using pilings or stabilized using a large footing. Alternate construction methods include temporary wire walls, sheet piling, embankment, cast-in-place (cip), or mechanically stabilized earth (mes). The side walls of the abutments support the vertical load of the bridge deck as well as the lateral load of the earth which is retained on one side of the wall. A problem which is often encountered by this arrangement is that the load bearing walls must be very thick, require a large footing, or in rare circumstances, must be driven deep into the ground in order to support and hold back the large lateral load of the earthen fill. These requirements increase exponentially as the height of the wall increases.
Retaining wall structures are often used along the bridge approach. The walls are often comprised of a large slabs or precast blocks which are stacked vertically. Earthen fill is then loaded behind the wall until the desired height of the roadway is reached. Common types of these retaining walls include gravity walls, piling walls, cantilever walls, and anchored walls. The following U.S. Patents disclose the use of facing blocks which are vertically stacked to construct the wall: U.S. Pat. Nos. 3,981,038; 4,045,965; 5,131,791; 5,178,493; and Published U.S. Patent Application 2002/0031406. In U.S. Pat. No. 5,131,791 the blocks are designed so that they can be interlocked with each other. In US APP 2002/0031406 the blocks are affixed to each other using reinforcement steel. A common characteristic in all of these inventions is that the backfill behind the walls, which provides a support surface for the roadway, is earthen fill. The backfill is usually an aggregate of soil and gravel which causes it to exert a large lateral earth pressure on the wall. Often referred to as the active and passive pressure on the wall, these forces increase significantly in relation to the density and angle of friction of the backfill material.
Tilt-up construction, sometimes referred to as tilt-wall construction, is well known in the art for use in constructing buildings. Tilt-up construction generally involves the pre-casting of modular elements (i.e. walls, columns, structural supports, etc.) then raising the element vertically (e.g. by upward tilting) into place using a crane. Once raised the elements, such as walls, are braced to the ground using a tilt-form brace so as to be able to stand freely. Modular elements are attached to other modular elements to form a desired structural configuration. Tilt-up construction is relatively inexpensive and less time consuming when compared to other building construction methods. However, tilt-up construction has been largely limited to in application to building construction because the design of the tilt wall slab only allows it to support a large vertical load and a relatively small lateral load.
Accordingly, there exists the need for bridge components which require minimal construction time and effort without compromising strength. In addition, there exists the need for a bridge abutment, approach ramp, and bridge widening construction technique that is stronger and more durable than conventional abutments, approaches or widening. It is, therefore, to the effective resolution of the aforementioned problems and shortcomings of the prior art that the present invention is directed. In view of the bridge abutments and approaches and methods of construction of said components in existence at the time of the present invention, it was not obvious to those persons of ordinary skill in the pertinent art as to how the identified needs could be fulfilled in an advantageous manner. The instant invention addresses this unfulfilled need in the prior art by providing a bridge approach and abutment structure as disclosed herein.
SUMMARY OF THE INVENTIONThe present invention is directed to a bridge approach and abutment construction and method using tilt-up panels and lightweight concrete fill. In accordance with the present invention a bridge approach ramp is constructed using tilt-up panels, initially supported using tilt form braces, to from a retaining wall perimeter, and subsequently filling the interior thereof with sequentially poured layers of lightweight concrete. The present invention advances the art of bridge construction by providing an improved bridge approach structure that is capable of rapid construction and provides an improved and cost effective structure as compared with prior art teachings.
Accordingly, it is an object of this invention to provide a method of constructing a bridge approach and abutment structure using modular tilt-up elements.
Another aspect of the present invention is to provide a method of constructing a bridge approach and abutment structure using modular tilt-up elements and a lightweight concrete fill.
It is also an object of this invention to provide an easy and less time-consuming method for producing a bridge approach and abutment.
It is also an object of this invention to provide a bridge abutment and approach that allows for a reduction in materials, the use of heavy equipment, reduction in carbon emissions, traffic, exposure, and construction time, thereby significantly reducing related costs.
Preferred embodiments of the invention will now be described in further detail. Other features, aspects, and advantages of the present invention will become better understood with regard to the following detailed description and accompanying drawings (which are not to scale) where:
A better understanding of the invention will be obtained from the following detailed description of the preferred embodiments taken in conjunction with the drawings and the attached claims.
DETAILED DESCRIPTION OF THE INVENTIONWith reference now to the drawings,
With reference to
As illustrated in
A tie back slab 28 comprising regular concrete (e.g. not EF) may be poured between pilings affixed to each tilt-wall panel 12 to secure the tilt-wall into place horizontally using the friction created by the layers once they have been poured and allowed to harden. The tie back slab 28 may be of varying dimensions and may be affixed to the tilt-wall 12 using steel reinforcement bars 29 embedded in the slab and affixed to the panel wall 12. Furthermore, additional, vertically spaced tie back slabs may be used on each tilt-wall panel depending on the height of the panel. In the preferred embodiment, the tie back slab is approximately 4.0 inches thick, and is secured to the tilt-wall panels using #4 imperial bar size steel reinforcement dowels 29. Furthermore, a precast cap 30 may be affixed to the top of the tilt-wall panel 12. Precast cap 30 may be of similar specifications to the concrete mixture which makes up the tilt-wall panels 12.
A further advantage of using EF as fill material formed by sequential pours in 3.0 ft. lifts, results from the resulting layered structure. More particularly, there are often utility lines, pipes, conduits, etc. (hereinafter “utilities”), generally referenced as 40 installed within the approach and abutment structure. The use of EF to form a layered fill structure allows for the locating of utilities in one or more predetermined layers. The present invention contemplates the use of a colored dye mixed with the EF to from a uniquely colored layer within the approach/abutment structure for the purpose of identifying the presence of utilities within such layer.
While the present disclosure may be susceptible to embodiment in different forms, the drawings show, and herein will be described in detail, embodiments with the understanding that the present description is to be considered an exemplification of the principles of the disclosure and is not intended to be exhaustive or to limit the disclosure to the details of construction and the arrangements of components set forth in the following description or illustrated in the drawings. It is expressly noted that the constructions and methods disclosed herein are particularly suited for the construction of bridge approaches and abutment structures, but also suitable for bridge widening and road widening projects. Accordingly, the constructions and methods may be employed equivalently in road widening projects wherein wing walls are fabricated without an abutment or bridge span, in bridge widening projects, or any other civil engineering construction wherein a retaining wall and back fill system are desired. Thus, any reference to bridge approach and/or abutment in the claims shall include as an equivalent, road widening constructions and bridge widening constructions.
The instant invention has been shown and described herein in what is considered to be the most practical and preferred embodiment. It is recognized, however, that departures may be made therefrom within the scope of the invention and that obvious structural and/or functional modifications will occur to a person skilled in the art.
Claims
1. In a bridge construction having a deck spanning a distance between spaced abutment structures, an improved bridge approach and abutment structure comprising:
- a wall structure including a pair of opposing spaced wall systems;
- said wall systems being assembled from a plurality of pre-cast tilt-wall panels, each tilt-wall panel comprising a pre-cast monolithic concrete structure having a top edge, a bottom edge, and opposing side edges running between said top and bottom edges; and
- fill material disposed within said peripheral wall structure.
2. A bridge construction according to claim 1, wherein said fill material comprises light-weight cellular concrete.
3. A bridge construction according to claim 1, wherein said fill material is formed by a plurality of sequentially poured layers.
4. A bridge construction according to claim 3, wherein at least one of said layers is includes a coloring agent whereby said at least one of said layers is colored differently than the remainder of said layers.
5. In a bridge construction having a deck spanning a distance between spaced abutment structures, an improved bridge approach and abutment structure comprising:
- a peripheral footing defining a bridge approach;
- a peripheral generally vertical wall structure having a bottom supported by said footing, said wall structure having a top;
- said peripheral wall structure formed by an anterior wall system and a pair of opposing wing wall systems;
- said anterior wall system assembled from a plurality of generally vertically disposed pre-cast tilt-wall panels, each tilt-wall panel comprising a pre-cast monolithic concrete structure having a top edge, a bottom edge, and opposing side edges running between said top and bottom edges, said plurality of anterior wall system tilt-wall panels installed in side-by-side relation with said side edges generally adjacent, each panel extending continuously from the bottom of said wall structure to the top thereof;
- said opposing wing wall systems being assembled from a plurality of generally vertically disposed pre-cast tilt-wall panels, each tilt-wall panel comprising a pre-cast monolithic concrete structure having a top edge, a bottom edge, and opposing side edges running between said top and bottom edges, said plurality of wing wall system tilt-wall panels generally installed in side-by-side relation with said side edges generally adjacent, each panel extending continuously from the bottom of said wall structure to the top thereof;
- each panel being braced by an elongate rigid member having a first end affixed to an interior side of the panel and a second end anchored to the ground within said peripheral wall structure; and
- fill material disposed within said peripheral wall structure, said fill material comprising a plurality of sequentially poured layers of engineered fill.
6. A bridge construction according to claim 5, wherein said engineered fill comprises light-weight cellular concrete.
7. A bridge construction according to claim 5, wherein at least one of said layers includes a coloring agent whereby said at least one of said layers is colored differently than the remainder of said layers.
8. A bridge construction according to claim 7, wherein said at least one colored layer contains utility conduit.
9. A bridge construction according to claim 5, further including a tie-back slab within said fill material, a reinforcing bar having first end embedded in said tie-back slab and a second end affixed to one of said panels.
10. A method of forming a bridge approach and abutment construction, said method including the steps of:
- forming a peripheral footing defining a bridge approach;
- placing a generally vertical, peripheral wall structure having a bottom supported by said footing, said wall structure having a top;
- said peripheral wall structure formed by an anterior wall system and a pair of opposing wing wall systems;
- said anterior wall system formed by a plurality of generally vertically disposed pre-cast tilt-wall panels, each tilt-wall panel comprising a pre-cast monolithic concrete structure having a top edge, a bottom edge, and opposing side edges running between said top and bottom edges, said plurality of anterior wall system tilt-wall panels installed in side-by-side relation with said side edges generally adjacent, each panel extending continuously from the bottom of said wall structure to the top thereof;
- said opposing wing wall systems being assembled from a plurality of generally vertically disposed pre-cast tilt-wall panels, each tilt-wall panel comprising a pre-cast monolithic concrete structure having a top edge, a bottom edge, and opposing side edges running between said top and bottom edges, said plurality of wing wall system tilt-wall panels generally installed in side-by-side relation with said side edges generally adjacent, each panel extending continuously from the bottom of said wall structure to the top thereof;
- providing an elongate rigid brace for each of said tilt-wall panels, said brace comprising an elongate rigid member having a first end affixed to an interior side of the panel and a second end anchored to the ground within said peripheral wall structure; and
- sequentially pouring fill material within said peripheral wall structure, said fill material poured in discrete layers having a predetermined depth, said fill material comprising engineered fill;
- allowing each of said poured discrete layers a time to cure; and
- repeating the pouring of fill material until a predetermined fill level is reached.
11. A method of forming a bridge approach and abutment construction according to claim 10, wherein said fill material comprises light-weight cellular concrete.
12. A method of forming a bridge approach abutment construction according to claim 10, wherein at least one of said layers includes a coloring agent whereby said at least one of said layers is colored differently than the remainder of said layers.
13. A method of forming a bridge approach and abutment construction according to claim 10, wherein said at least one colored layer contains utility conduit.
Type: Application
Filed: Jun 25, 2010
Publication Date: Dec 30, 2010
Inventor: Anthony Abreu (Hialeah Gardens, FL)
Application Number: 12/823,610
International Classification: E01D 19/00 (20060101); E01D 21/00 (20060101);