MULTI-CLUSTER UPLINK TRANSMISSION IN WIRELESS COMMUNICATION NETWORK
A method in a wireless communication device comprises determining transmission powers for at least two clusters, wherein each cluster includes at least one physical resource block (RB), determining a difference in a characteristic of the transmission powers determined for the at least two clusters, and varying a transmit power allocated to at least one cluster if the difference in the characteristic exceeds a power spread threshold, wherein the power allocated to each cluster is a function of pathloss between the wireless communication device and a serving base station.
The present disclosure relates generally to wireless communications and, more particularly, to managing transmit power in a wireless communication device for multi-cluster transmissions.
BACKGROUNDOFDM-based multi-cluster transmission has been specified in 3GPP LTE Rel-10 uplink within a component carrier and with carrier aggregation (e.g., intra-band contiguous carrier aggregation of two or more carriers), including simultaneous Physical Uplink Shared Channel (PUSCH)+PUSCH, PUSCH+Physical Uplink Control Channel (PUCCH), and SRS+SRS transmissions where the transmissions are made by a single power amplifier (PA) in the user equipment (UE). The need to meet out-of-band (including spurious emissions) and in-band emissions requirements necessitates a Maximum Power Reduction (MPR) on the uplink (UL) transmit power in the multi-cluster case. Recently, RAN4 endorsed a MPR mask equation for adoption into TR 36.807 wherein the mask is described as a piece-wise linear curve that is a function of an allocation ratio, which is equal to a sum of ratios of Resource Block (RB) allocation sizes of different clusters to the total UL bandwidth (BW) expressed in number of RBs.
Several problems arise with the proposed framework for RAN4. When there is a large power imbalance between any two clusters, the resource allocation can be either limited by Out-of-Band/In-Band (OOB/IB) emissions or by an error vector magnitude (EVM) on the cluster with lower transmit power. The current solution in TR 36.807 does not address this. For simultaneous PUSCH+PUCCH transmission with power spectral density (PSD) imbalance between PUSCH and PUCCH transmit powers, the current TR 36.807 formulation likely allows for a MPR that is much higher than necessary, which would lead to sub-optimal UE implementations and some loss in UL spectral efficiency. Further the MPR equation that is piece-wise linear in the allocation ratio (A) but, independent of other parameters such as edge ratio (E), gap ratio (G), etc. leads to over-dimensioning of the MPR, which again lead to the problems identified above.
Others have observed that PUSCH+PUCCH with power imbalance leads to a lower required backoff than allowed by the TR 36.807 piecewise linear mask. As a result UL spectral efficiency is negatively impacted if there are inefficiencies in UE implementations that make use of more backoff than is necessary. In general, using a piece-wise linear function of just one parameter (as in TR 36.807) can lead to over-dimensioning of the allowed MPR (more pessimistic than required to meet requirements). For example, from
The various aspects, features and advantages of the invention will become more fully apparent to those having ordinary skill in the art upon careful consideration of the following Detailed Description thereof with the accompanying drawings described below. The drawings may have been simplified for clarity and are not necessarily drawn to scale.
In
In
In one implementation, the wireless communication system is compliant with the 3GPP Universal Mobile Telecommunications System (UMTS) LTE protocol, also referred to as EUTRA or 3GPP LTE or some later generation thereof, wherein the base unit transmits using an orthogonal frequency division multiplexing (OFDM) modulation scheme on the downlink and the user terminals transmit on the uplink using a single carrier frequency division multiple access (SC-FDMA) scheme. The instant disclosure is particularly relevant to 3GPP LTE Release 10 (Rel-10) and later versions thereof, but may also be applicable to other wireless communication systems. More generally the wireless communication system may implement some other open or proprietary communication protocol, for example, IEEE 802.16(d) (WiMAX), IEEE 802.16(e) (mobile WiMAX), among other existing and future protocols. The disclosure is not intended to be implemented in any particular wireless communication system architecture or protocol. The architecture may also include the use of spreading techniques such as multi-carrier CDMA (MC-CDMA), multi-carrier direct sequence CDMA (MC-DS-CDMA), Orthogonal Frequency and Code Division Multiplexing (OFCDM) with one or two dimensional spreading. The architecture in which the features of the instant disclosure are implemented may also be based on simpler time and/or frequency division multiplexing/multiple access techniques, or a combination of these various techniques. In alternate embodiments, the wireless communication system may utilize other communication system protocols including, but not limited to, TDMA or direct sequence CDMA. The communication system may be a Time Division Duplex (TDD) or Frequency Division Duplex (FDD) system.
As indicated above, OFDM-based multi-cluster transmission (e.g., multi-cluster DFT-S-OFDMA with DFT-spreading in each cluster or across clusters, multi-cluster SC-FDMA transmission) within a component carrier and with carrier aggregation (e.g., intra-band contiguous carrier aggregation of two or more carriers) has been specified in 3GPP LTE Rel-10, including simultaneous PUSCH+PUSCH, PUSCH+PUCCH and SRS+SRS transmissions where the transmissions are made by a single power amplifier (PA) in the user equipment (UE). While one embodiment described herein is implemented with a single PA, other embodiments may be implemented using multiple amplifiers. RAN4 recently endorsed an MPR formula for UE multi-cluster transmission for intra-band carrier aggregation (CA) (TR 36.307) as follows:
where A=sum of allocation ratios=a1+a2+ . . . +aN, where a1, . . . , aN are allocation ratios of different clusters, wherein an allocation ratio is the ratio of the number of allocated RBs in a cluster to the configured uplink (UL) bandwidth (NRB). Alternatively, A=NRB
In LTE, the UE sets a PUSCH transmit power in subframe n as determined by the equation:
where PPUSCH(n) is the PUSCH transmit power in uplink subframe n, PCMAX(n) is the configured maximum transmit power, MPUSCH(n) is the bandwidth of the PUSCH resource assignment in subframe n, PO
In the above equation, i is the number of subframes over which power offsets derived from transmit power control (TPC) commands were accumulated. Therefore, i=n−nRESET where, nRESET is the subframe index of the subframe where power accumulation due to TPC commands was last reset. The TPC commands are transmitted in downlink control information (DCI) transported over PDCCH (Physical Downlink Control Channel). The serving cell can transmit a TPC command applicable to loop 1 on subframe (n−k) where for example k=4 or k=6. Upon receiving the TPC command, the UE applies the closed-loop power control update:
f(i)=f(i−1)+δPUSCH(i−KPUSCH)
where δPUSCH is determined based on the TPC command applicable to loop j and KPUSCH=4 or 6.
Similarly, power control for other physical uplink channel transmissions such as PUCCH, SRS, Demodulation Reference Signal (DM-RS), etc. can be formulated and similar equations can be written down for PUCCH, SRS, and DM-RS transmissions.
Embodiment 1; Problems 1 & 2The MPR parameterization in TR 36.807 leads to inconsistent application of backoff when there is a large power imbalance between the clusters. The clusters may be in the same component carrier (CC) (e.g., one or more cluster corresponding to PUSCH and one cluster (with one RB) corresponding to PUCCH) or in multiple component carriers (e.g., one PUSCH cluster in each component carrier with possibly one of the PUSCH carrying Uplink Control Information or UCIPUCCH on one CC and PUSCH(s) on same and/or different CCs, one cluster corresponding to SRS transmission in each component carrier (SRS+SRS)). The power or PSD imbalance may be a result of for example different resource allocation sizes for the different clusters, different power control targets, or different number of antenna ports active on the different clusters. For example, consider the case of three clusters with allocation ratios a1, a2 and a3 (and transmit power levels p1, p2 and p3 as determined by the respective power control equations). The following condition must be satisfied: Pmin=−44 dBm<=10 log 10(p1), 10 log 10(p2), 10 log 10(p3), 10 log 10(p1+p2+p3)<=PC,MAX=23 dBm.
Consider the example of aggregating 2 contiguous UL carriers with PUSCH+PUCCH on one carrier and PUSCH on the other carrier. Suppose, cluster #1 a1=0.5 (PUSCH on carrier #1, 25 PRB allocation for 10 MHz), cluster #2 a2=0.02 (PUCCH on carrier #1 with 1 PRB for 10 MHz) and cluster #3 a3=0.1 (PUSCH on carrier #2 with 5 PRBs for 10 MHz) resulting in A=a1+a2+a3=0.62. From TR 36.807, an MPR=3.3 dB is allowed. In the limiting case that the power for cluster 1 is reduced close to the minimum transmit power of −44 dBm, although the first cluster is active, the UE total transmission power is mostly contained within cluster #2 and cluster #3. In such a case, the IB and OOB signals resulting from phase noise, IQ imbalance and PA non-linearity are dominated by cluster #2 and cluster #3. From an IB/OOB emissions standpoint, it is as if the UE is transmitting on just two clusters and thus the MPR required should be typically smaller. With only cluster #2 and cluster #3 active, the new total allocation ratio is A′=a2+a3=0.12 and the TR 36.807 equation allows an MPR=6.1 dB (>3.3 dB) which may not be the correct order of the power reduction limit necessary for transmitting cluster #2 and cluster #3 only.
IQ imbalance originates from the LO and mixer (gain and phase imbalance in the IQ modulator). This together with DC offset (LO leakage) and PA non-linearity leads to an image problem. The desired transmission of a 10 PRB allocation on the upper edge of the aggregated BW results in an image on the lower side of the BW that is around 25 dB lower in PSD. With single PA architecture, the IB image can result in increased EVM in multi-cluster transmissions if the second cluster falls on RBs that overlap with the image of the first cluster. Again, arbitrary power imbalance between the clusters leads to the UE being unable to meet transmission signal quality requirements applicable to individual clusters. A simple approach may be to relax the transmit EVM requirements (17.5% for BPSK/QPSK and 12.5% for 16 QAM) which may or may not be acceptable from a UL demodulation standpoint. Alternatively, meeting the EVM requirements would necessitate more stringent linearity requirements in transmitter components (such as PA, modulators, mixers etc.), which increases UE cost and/or current drain. This would result in the linearity requirements of the transmitter to be driven more by EVM and not so much by ACLR (Adjacent Channel Leakage Ratio) or OOB emissions requirements.
Solution A to Problems 1 & 2One solution to the problems described above is to add a transmission power dimension to the MPR parameterization: MPR=f(A, E, B, G, W, {p1, p2, . . . , pN}) where {p1, p2, . . . , pN} denotes either the transmission power of the N clusters or the cluster PSDs (i.e., PSD of a j-th cluster, PSDj=pj/Mj where Mj is the number of RBs in the j-th cluster). The spread of the power allocation can then be limited by stating in the specification that the piecewise linear MPR parameterization in TR 36.807 is applicable only if the difference between the maximum and minimum satisfies an upper bound as follows:
Lspread:=max{p1, p2, . . . , pN}−min{p1, p2, . . . , pN}<=Lmax−min (say Lmax−min such that 10 log 10(Lmax−min)<=15 dB).
Alternately, different piecewise linear masks can be applied to different ranges of Lspread. For example, MPR=f1(A) if 0<=Lspread<=a first threshold (e.g., f1(A) can be the same piecewise linear function as specified in TR 36.807). MPR=f2(A) if first threshold<Lspread<=a second threshold (e.g., f2(A) is a second MPR bound); and an MPR requirement is not specified for Lspread>second threshold. If f2(A) allows a larger backoff than that allowed by f1(A), the UE will be able to address both the large power imbalance and also maintain transmit signal quality on the clusters with lower transmit power by simply reducing the transmission power on the cluster with the maximum transmit power. The UE transmits on the clusters with the determined transmit powers.
Solution B to Problems 1 & 2An alternative solution to the problems described in connection with process 300 illustrated in
In
In one case, the wireless communication device reduces a transmit power allocated to at least one cluster if the difference in the power characteristic exceeds the threshold. The transmit power allocated to the at least one cluster may be reduced subject to the following expressions:
where {circumflex over (P)}PUSCH,j(i) is a linear value of the power allocated to a j-th PUSCH channel in subframe i; {circumflex over (P)}c,max(i) is a configured maximum transmit power; {circumflex over (P)}PUCCH(i) is a linear value of the power allocated to a PUCCH channel in subframe i; wj(i) is a power scaling factor applied to a j-th PUSCH channel in subframe i; Index j=j0 corresponds to a PUSCH channel carrying Uplink Control Information (UCI). In one implementation, a power scaling factor wj(i) is set to zero for at least one index j. The UE transmits on the clusters with the determined transmit powers.
In another case the wireless communication device increases the transmit power allocated to the at least one cluster if the difference in the power characteristic exceeds the threshold. The transmit power allocated to the at least one cluster may be increased subject to the expressions:
where {circumflex over (P)}PUSCH,j(i) is a linear value of the power allocated to a j-th PUSCH channel in subframe i; {circumflex over (P)}c,max(i) is a configured maximum transmit power; {circumflex over (P)}PUCCH(i) is a linear value of the power allocated to PUCCH channel in subframe i; wj(i) is a power scaling factor applied to a j-th PUSCH channel in subframe i; Index j=j0 corresponds to a PUSCH carrying Uplink Control Information (UCI).
In an LTE Rel-10, as per the specification TS 36.213 version a.1.0, PUSCH transmission power may be scaled with respect to {circumflex over (P)}PUCCH(i) and {circumflex over (P)}CMAX(i), where {circumflex over (P)}PUCCH(i) and {circumflex over (P)}CMAX(i) are respectively the linear values of the PUCCH transmit power and Pc,max [dB]. The component carrier with index c is designated as serving cell c. If the total transmit power of the UE in subframe i would exceed {circumflex over (P)}CMAX(i), the UE scales {circumflex over (P)}PUSCH,c(i) for the serving cell c in subframe i such that the condition
The weights wc(i) here are a function of the subframe index i. The specification allows wc(i) values for certain serving cells to be zero. But, all the serving cells that have a non-zero scaling factor wc(i) have the same scaling factor wc(i)=w(i).
In the above inequality, {circumflex over (P)}PUCCH(i) is the linear value of PPUCCH(i), {circumflex over (P)}PUSCH,c(i) is the linear value of PPUSCH,c(i), {circumflex over (P)}c,max is the linear value of the UE total configured maximum output power PCMAX in subframe i is as defined in 3GPP specification TS 36.101 and wc(i) is a scaling factor of {circumflex over (P)}PUSCH,c(i) for serving cell c where 0≦wc(i)≦1. In case there is no PUCCH transmission in subframe i, {circumflex over (P)}PUCCH(i)=0.
If the UE has PUSCH transmission with UCI on cell j and PUSCH without UCI in the remaining cells, and the total transmit power of the UE would exceed {circumflex over (P)}CMAX(i), the UE scales {circumflex over (P)}PUSCH,c(i) for the serving cells without UCI in subframe i such that the condition
is satisfied where {circumflex over (P)}PUSCH,j(i) is the PUSCH transmit power for the cell with UCI and wc(i) is a scaling factor of {circumflex over (P)}PUSCH,c(i) for serving cell c without UCI.
Consider the simplest case of PUSCH+PUCCH. If it turns out that {circumflex over (P)}PUCCH(i)−{circumflex over (P)}PUSCH,c(i) exceeds a threshold, the UE can simply be allowed to suspend PUSCH transmission or transmit PUSCH with a larger EVM limit. Similar treatment can be offered to PUSCH (non-UCI)+PUSCH (UCI). If the UE drops PUSCH in a predictable way (i.e., determined by known thresholds and equations), the eNB demodulation performance is not degraded. Additionally, the eNB may be able to schedule a different user (UE2) on the RBs (e.g., non-adaptive retransmissions) which the original user (UE1) drops PUSCH on leading to utilization of resources and improved UL spectral efficiency.
For PUSCH (non-UCI)+PUSCH (non-UCI) and no PUCCH, the transmit powers on the two PUSCH clusters can be re-scaled such that the PSD differences between the clusters are below a threshold Pspread,
where {circumflex over (P)}PUSCH,j(i) is a linear value of the power allocated to a j-th PUSCH channel in subframe i; {circumflex over (P)}c,max(i) is a configured maximum transmit power; {circumflex over (P)}PUCCH(i) is a linear value of the power allocated to PUCCH channel in subframe i; wj(i) is a power scaling factor applied to a j-th PUSCH channel in subframe i; Index j=j0 corresponds to a PUSCH carrying Uplink Control Information (UCI).
Thus, with solution B, if the power/PSD difference between clusters is greater than a threshold Pspread then the UE is allowed to rescale the powers to bring the power difference between clusters below the threshold Pspread. The powers of the PUCCH and PUSCH with UCI do not change due to priority. The UE may set the power of some PUSCH without UCI to zero, if the power difference condition cannot be satisfied.
Embodiment 2; Problem 3Others have observed that a PUSCH+PUCCH with power imbalance among clusters leads to a lower required backoff than allowed by the proposed TR 36.807 piecewise linear mask. As a result, uplink spectral efficiency is negatively impacted if there are inefficiencies in UE implementations that make use of more backoff than is necessary.
Solution to Problem 3One solution to problem 3 above is described in connection with process 400 illustrated in
In one embodiment, each cluster is on a different carrier and in another embodiment all of the clusters are on a common carrier. In a LTE Rel-10 implementation, one of the at least two clusters is for a PUCCH transmission and another of the at least two clusters is for a PUSCH transmission. Alternatively, the at least two clusters are both for a PUSCH transmission. Alternatively, the at least two clusters are both for a SRS transmission. In other implementations the clusters could be used for transmissions other than PUCCH PUSCH and SRS such as Demodulation Reference Signal (DM-RS) transmission. The at least two clusters, whether for PUCCH and PUSCH transmission, PUSCH only transmissions, SRS and SRS transmission, or some other transmission or transmissions, may be on the same or different carriers.
In
For PUSCH+PUCCH, PUCCH cluster is typically transmitted at a higher power than PUSCH cluster which will likely need a smaller MPR than that specified by the 36.307 formula. The MPR mask can be modified for the case of PUSCH+PUCCH to:
where αj>0 and ΔPSD=maximum of the PSD difference PUSCH and PUCCH clusters. If ΔPSD=0, this formula becomes identical to the TR 36.807 formula.
It is likely that the IB/OOB emission levels can be more accurately described as a function of the difference in the transmission powers on the clusters rather than on the PSDs (due to their dependence of IB/OOB components on the signal self-convolution). If this is the case, an alternative could be to express the MPR mask as a function of the absolute transmission power difference:
where αj>0 and ΔP is the maximum of difference in the transmission powers between any two clusters. Again for the equal power case, ΔP=0, and we get the back the TR 36.807 formula.
More generally, MPR=g(ΔP,A) can be used to generalize this dependence. A precise relationship between MPR and ΔPSD or ΔP has not yet been established. But, by Taylor series approximation, MPR can be expressed as a linear or even a piece-wise linear function of ΔPSD or ΔP. Higher order polynomial terms (e.g., quadratic or cubic) can be used to improve the accuracy of the fit.
In one embodiment, the MPR limit is computed based on the following equation:
MPR=α0(RA,RΔP)−α1(RA,RΔP)A−α2(RA,RΔP)ΔP,
for A∈RA and ΔP∈RΔP
where AA is an allocation ratio of the clusters; ΔP is a difference in the power characteristic for the two clusters; RA is a range of values that A can take; RΔP is a range of values ΔP can take; {αj(RA,RΔP)}j=0,1,2 are non-negative real numbers that depend on the range of A and ΔP.
In
In general, using a piece-wise linear function of just one parameter (as in TR 36.807) can lead to over-dimensioning of the allowed MPR. For example, from
One solution to problem 4 above is described in connection with process 600 illustrated in
In one embodiment, each cluster is on a different carrier and in another embodiment all of the clusters are on a common carrier. In a LTE Rel-10 implementation, one of the at least two clusters is for a PUCCH transmission and another of the at least two clusters is for a PUSCH transmission. Alternatively, the at least two clusters are both for a PUSCH transmission. Alternatively, the at least two clusters are both for a SRS transmission. In other implementations the clusters could be used for transmissions other than PUCCH PUSCH and SRS such as Demodulation Reference Signal (DM-RS) transmission. The at least two clusters, whether for PUCCH and PUSCH transmission, PUSCH only transmissions, SRS and SRS transmission or some other transmission or transmissions, may be on the same or different carriers.
In one embodiment, the characteristics of the at least two clusters is selected from a group comprising: a size of the at least two clusters; a spectral distance between the at least two clusters; a distance between outermost clusters of the at least two clusters to an edge of a carrier for each of the outermost clusters; a full span in a frequency domain of the at least two clusters; an absolute value of the size difference between the cluster at the left-most edge and the right-most edge of the configured UL bandwidth; or a difference in a power characteristic for the at least two clusters. In another embodiment, the first attribute and the second attribute each include one or more of the following characteristics: a size of the at least two clusters; a spectral distance between the at least two clusters; a distance between clusters to an edge of a carrier for the at least two clusters; a full span in a frequency domain of the at least two clusters; a size difference between a cluster with the maximum size and a cluster with a minimum size; a difference in a power characteristic for the at least two clusters.
In
In
The basis for equating MPR to the lower (or minimum) of the two power reduction limits is explained below.
Consider a function of two variables Y=f(X1,X2). Suppose that
where χj is the set of the range of values that Xj can take. Clearly, we have the following inequalities:
Y≦min{g1(X1),g2(X2)}≦g1(X1).
In other words, using min{g1(X1),g2(X2)} can potentially lead to a tighter upper bound on Y than simply using g1(X1). In TR 36.807, for the MPR requirements, we have Y=MPR and X1=A. Instead of using the point-wise maximum g1(X1), a piece-wise linear function is used as a mask for bounding MPR as a function of A. From the above observation, if we constructed a similar piece-wise linear approximation or mask for g2(X2) based on some other variable X2∈{W, E, G, B}, we can achieve a bound on MPR that is potentially lower that the individual masks g1(X1) and g2(X2) by taking the minimum.
This can be illustrated with an example. Suppose that X2=G, the Gap ratio. The piece-wise linear upper bound for g2(X2) is shown in
This approach can be extended to the multiple variable case Y≦min{g1(X1),g2(X2),g3(X3), . . . }. In addition, joint dependences in one or more of the masks can be considered. For example, we can group the variables such that Y≦min{g1(X1),g23(X2,X3)} where the function g23(X2,X3) describes a joint dependence of MPR on X2 and X3. For example, the variables E and W are closely related and may be grouped together to obtain a joint mask.
The solutions A, B, C and D can be merged into a unified solution as follows:
Step 1. UE determines nominal UL transmit powers for different clusters based on power control equations and also determines if the power difference between the cluster with maximum transmit power pmax and minimum transmit power pmin is above a threshold, pmax−pmin>Pspread. Two options are possible:
Option 1: pmin corresponds to a non-UCI PUSCH, in which case the UE rescales power of this non-UCI PUSCH cluster such that the power difference is brought to within Pspread. The UE uses the equation MPR=f1(A, . . . ) to compute the MPR. Proceed to step 2.
Option 2: pmin corresponds to UCI PUSCH, in which case, the power cannot be rescaled. The UE uses equation MPR=f2(A, . . . ) to determine MPR. Proceed to step 2.
Step 2. There are two possibilities:
-
- i. If the equation selected is MPR=f1(A, . . . ), MPR is limited by OOB/in-band emissions. Three sub-options are possible:
- a. Option i-1: The MPR mask as defined in TR 36.807 can be used to compute MPR although it may be suboptimal.
- b. Option i-2: MPR can determined using the MPR=g(delta P, A) parameterization in Solution C that uses a smaller backoff when there is a power imbalance such that power imbalance is limited to Pspread.
- c. Option i-3: Solution D can be used where MPR is determined using MPR=min(g1,g2) to further reduce the allowed MPR.
- ii. If the equation selected is MPR=f2(A, . . . ), then the allocation is limited by EVM. We need a larger MPR mask relative to that in TR 36.807.
- i. If the equation selected is MPR=f1(A, . . . ), MPR is limited by OOB/in-band emissions. Three sub-options are possible:
While the present disclosure and the best modes thereof have been described in a manner establishing possession and enabling those of ordinary skill to make and use the same, it will be understood and appreciated that there are equivalents to the exemplary embodiments disclosed herein and that modifications and variations may be made thereto without departing from the scope and spirit of the inventions, which are to be limited not by the exemplary embodiments but by the appended claims.
Claims
1-8. (canceled)
9. A method in a wireless communication device, the method comprising:
- determining a difference in a power characteristic for at least two clusters, wherein each cluster includes at least one physical resource block;
- determining a power reduction that is bounded by a maximum power reduction (“MPR”) limit that is dependent on a power attribute, wherein the power attribute is the difference in the power characteristic for the at least two clusters;
- determining PCMAX based on the power reduction; and
- based on PCMAX, determining an uplink transmit power and a power headroom.
10. The method of claim 9 wherein the MPR limit is based on a piecewise linear function.
11. (canceled)
12. The method of claim 9 wherein the MPR limit is computed based on the equation:
- MPR=α0(RA,RΔP)−α1(RA,RΔP)A−α2(RA,RΔP)ΔP,
- for A∈RA and ΔP∈RΔP
- where: A is an allocation ratio of the clusters; ΔP is a difference in the power characteristic for the two clusters; RA is a range of values that A can take; RΔP is a range of values ΔP can take; and {αj(RA,RΔP)}j=0,1,2 are non-negative real numbers that depend on the range of A and ΔP.
13. The method of claim 9 wherein at least one of the at least two clusters is for Physical Uplink Control Channel transmission and another of the at least two clusters is for Physical Uplink Shared Channel transmission.
14. The method of claim 9 wherein the at least two clusters are for Physical Uplink Shared Channel transmission.
15. The method of claim 9 wherein the at least two clusters are for Sounding Reference Signal transmission.
16. The method of claim 9 wherein the at least two clusters are for Demodulation Reference Signal transmission.
17. A method in a wireless communication device, the method comprising:
- determining a first attribute and a second attribute based on characteristics of at least two clusters, wherein each cluster includes at least one resource block, and wherein the first attribute is different than the second attribute;
- determining a first power reduction value as function of the first attribute;
- determining a second power reduction value as function of the second attribute;
- determining an maximum power reduction (“MPR”) limit based on the first power reduction value and second power reduction value;
- determining a power reduction that is bounded by the MPR limit;
- determining PCMAX based on the power reduction; and
- based on PCMAX, determining an uplink transmit power and a power headroom.
18. The method of claim 17 wherein the characteristics of at least two clusters are selected from a group consisting of: a size of the at least two clusters, a spectral distance between the at least two clusters, a distance between outermost clusters of the at least two clusters to an edge of a carrier for each of the outermost clusters, a full span in a frequency domain of the at least two clusters, an absolute value of the size difference between the cluster at the left-most edge and the right-most edge of the configured uplink bandwidth, and a difference in a power characteristic for the at least two clusters.
19. The method of claim 17 wherein the first attribute and the second attribute each include one at least one of the following characteristics: a size of the at least two clusters, a spectral distance between the at least two clusters, a distance between clusters to an edge of a carrier for the at least two clusters, a full span in a frequency domain of the at least two clusters, an absolute value of the size difference between the cluster at the left-most edge and the right-most edge of the configured uplink bandwidth, and a difference in a power characteristic for the at least two clusters.
20. The method of claim 17 wherein at least one of the at least two clusters is for Physical Uplink Control Channel transmission and another of the at least two clusters is for Physical Uplink Shared Channel transmission.
21. The method of claim 17 wherein the at least two clusters are for Physical Uplink Shared Channel transmission.
22. The method of claim 17 wherein determining the MPR limit includes equating the MPR limit to a lower of the first and second power reduction values.
23. The method of claim 17 wherein the at least two clusters are for Sounding Reference Signal transmission.
24. The method of claim 17 wherein the at least two clusters are for Demodulation Reference Signal transmission.
Type: Application
Filed: Oct 31, 2013
Publication Date: Feb 27, 2014
Inventors: Sandeep H. Krishnamurthy (Arlington Heights, IL), Colin D. Frank (Park Ridge, IL), Vijay Nangia (Algonquin, IL)
Application Number: 14/068,001
International Classification: H04W 52/30 (20060101);