Building methods
A method of building a structure, the method including the steps of: 1. fabricating a generally longitudinal, steel sub-structure of the structure with a cable retainer attached to, or forming part of, the substructure and that extends substantially longitudinally therealong; 2. assembling the sub-structure into a structure; 3. inserting a cable into the cable retainer; 4. after step 2, applying a tensile force to the cable relative to the cable retainer; and 5. after step 4, bonding the cable to the cable retainer.
Latest S2 Holdings Pty Limited Patents:
This application is a continuation application of U.S. patent application Ser. No. 11/572,407, filed Jan. 19, 2007, which is a national phase application of International Application No. PCT/AU2005/001077, filed Jul. 21, 2005, designating the United States and claiming priority to Australian Patent Application No. 2004904034, filed Jul. 21, 2004, both of which are incorporated by reference herein in their entirety.
FIELD OF THE INVENTIONThe present invention relates to a method of building a structure and also to a method to strengthening, or reducing the deflection of, a built structure.
The invention has been primarily developed for use in relation to steel portal frame structures and will be described hereinafter with reference to this application. However, the invention is not limited to this field of use and is also applicable for other structural and architectural works.
BACKGROUND OF THE INVENTIONWhen designing a structure or building, consideration must be given to, amongst others requirements, the requirements of strength, deflection and dynamics. It is common for additional material to be required in a structure to satisfy deflection requirements, when compared to the material required to satisfy strength requirements. The additional material increases material and construction costs and can also adversely affect the building's dynamic response (particularly to earthquakes) and also requires a corresponding increase in the building's foundations.
It is important that the amount of materials used in building structures is minimised from a cost and environmental standpoint. It is an object of the present invention to reduce the material required in a building whilst still satisfying deflection criteria.
SUMMARY OF THE INVENTIONAccordingly, in a first aspect, the present invention provides a method of building a structure, the method including the steps of:
-
- 1. fabricating a generally longitudinal, steel sub-structure of the structure with a cable retainer attached to, or forming part of, the sub-structure and that extends substantially longitudinally therealong;
- 2. assembling the sub-structure into a structure;
- 3. inserting a cable into the cable retainer;
- 4. after step 2, applying a tensile force to the cable, relative to the cable retainer; and
- 5. after step 4, bonding the cable to the cable retainer.
In a second aspect, the present invention provides a method of building a structure, the method including the steps of:
-
- 1. fabricating a generally longitudinal, steel sub-structure of the structure with a cable retainer attached to, or forming part of, the sub-structure and that extends substantially longitudinally therealong;
- 2. inserting cable into the cable retainer;
- 3. after step 2, applying a tensile force to the cable, relative to the cable retainer; and
- 4. after step 3, bonding the cable to the cable retainer; and
- 5. assembling the sub-structure into a structure.
In a third aspect, the present invention provides a method of strengthening, or reducing the deflection of, a built structure, the method including the steps of:
-
- 1. attaching a cable retainer to a generally longitudinal, steel sub-structure of the structure with the cable retainer extending substantially longitudinally therealong;
- 2. inserting cable into the cable retainer;
- 3. applying a tensile force to the cable, relative to the cable retainer; and
- 4. after step 3, bonding the cable to the cable retainer.
The cable retainers are adapted to follow the tensile line of resistance the sub-structure is subjected when loaded during use.
Preferably, the method includes assembling at least two sub-structures into a structure.
Preferably also, the method includes inserting at least two cables into the cable retainer.
The cable is preferably bonded to the cable retainer by any one of the following: welding, gluing (including grouting, most preferably with cementitous grout), or by expanding the cable retainer relative to the cable or shrinking the cable relative to the cable retainer (for example by heating the cable retainer and/or by cooling the cable and thereafter allowing them to shrink and/or expand into engagement with one another) prior to inserting the cable into the cable retainer.
The tensile force is preferably applied to the cable by jacking.
The structure is preferably a steel portal frame structure, more preferably produced from I or T section beams or from tubular truss assemblies.
When the sub-structure is in the form of an I or T section beam, the cable retainer are attached to the web of the beam and, most preferably, passes through the flange of the beam. When the sub-structure is a truss assembly, the cable retainer is in the form of one of the tubular members integral with the truss.
The sub-structure is preferably utilised in the centre span of the structure. However, the sub-structure can also be used in the columns or walls of the structure.
In one form, the cable retainer extends within the boundaries of its associated sub-structure. In another form, the cable retainer is attached to the sub-structure external the boundaries of sub-structure.
A preferred form of the present invention will now be described by way of example with reference to the accompanying drawings wherein:
The centre span 22 has a first cable retainer 28 attached thereto, by welding in the regions 30 and via the struts 32 in the region 34. Each of the columns 24 also have cable retainers 36 attached thereto by welding.
Cables, represented by double headed arrows 38 and 40, are passed through the cable retainers 28 and 36 respectively. The cables 38, 40 are tensioned relative to the cable retainers 28, 36 respectively then bonded to the cable retainers 28, 36 respectively, prior to releasing the tension in the cables. The tensioning, bonding and releasing steps shall be described in more detail below.
The cable retainers 28, 36 extend generally along the longitudinal direction of their associated centre span (sub-structure) 22 or column (sub-structure) 24. More particularly, the cable retainers 28, 36 are positioned to follow the tensile line of resistance of their associated sub-structure when the structure 20 is subjected to its intended load during use.
For example, the steel portal frame structure 20 shown in
The resulting structure is able to better resist deflection under its designed load conditions as the tension applied to the cables relative to their associated sub-structure stores strain energy in the resulting sub-structure. Accordingly, as forces are applied to structure, the counter strain stored in the sub-structure resists the application of that load.
The resulting structure can, within certain boundaries, accept load with reduced strain and thus has an increased load carrying capacity for a given deflection. A 50-100% reduction in deflection can result compared to a similar sized existing structure.
The steel portal frame structures shown in
The structure 50 shown in
The structure 60 shown in
The structure 70 shown in
The structure 80 shown in
The structure 90 shown in
The structure 100 shown in
The structure 110 shown in
The structure 120 shown in
The structure 130 shown in
The structure 140 shown in
As an alternative, one or more of the sub-structures can be assembled and tensioned according to the method described above, and then subsequently attached to the sub-structures. For example, the centre span sub-structure can be assembled on the ground and, after tensioned cables have been bonded thereto, be raised into its final position and connected to the column sub-structures.
As a further alternative, cable retainers can be added to a pre-existing structure, or a new structure built without them, which are then tensioned and bonded in the manner described above. This finds particular application in improving the strength and/or deflection performance of an existing built structure or structure whose design is complete.
The structures described above can be designed to meet strength and dynamic requirements, whilst reducing the need to increase the material added to the structure to satisfy deflection requirements. The embodiments described previously advantageously enable the span of a structure to be increased whilst using the same amount of materials to thus provide a larger structure for the same material cost. Conversely, a structure with a like span to an existing structure can be produced using a reduced amount of materials. The structures described above are also lighter and cheaper than existing comparable structures, particularly when foundation saving are taken into account.
Although the invention has been described with reference to specific embodiments, it would be appreciated by those skilled in the art that the invention can be embodied in many other forms. For example, the cable retainers can be of any shape and any number of cables can be inserted therein.
Claims
1. A method of building a portal frame structure, the method including the steps of:
- (a) fabricating a first generally longitudinal, steel wall sub-structure of the portal frame structure with a first cable retainer attached to, or forming part of, the first wall sub-structure and that extends substantially longitudinally therealong;
- (b) fabricating a second generally longitudinal, steel wall sub-structure of the portal frame structure with a second cable retainer attached to, or forming part of, the second wall sub-structure and that extends substantially longitudinally therealong;
- (c) fabricating a generally longitudinal, steel centre span sub-structure of the portal frame structure with a third cable retainer attached to, or forming part of, the centre span sub-structure and that extends substantially longitudinally therealong;
- (d) assembling the first wall, second wall and centre span sub-structures into the portal frame structure in an assembled configuration;
- (e) inserting first, second and third cables into the first, second and third cable retainers respectively;
- (f) after step (d), applying tensile force to the first, second and third cables, relative to the first, second and third cable retainers respectively; and
- (g) after step (f), bonding the first, second and third cables to the first, second and third cable retainers respectively to substantially maintain the portal frame structure in the assembled configuration,
- wherein the first, second and third cable retainers are in the form of tubular members which follow a respective tensile line of resistance the first, second and third sub-structures are subjected to when loaded during intended use, at least a portion of at least one of the first, second and third cable retainers being coupled to and positioned outwardly beyond an external boundary surface of the respective sub-structure when in the assembled configuration so as to have at least a 50% reduction in deflection of the portal frame structure when under load compared to a portal frame structure which does not include cables following tensile lines of resistance, and wherein the first wall, second wall and centre span sub-structures do not substantially change shape or change positioning from the assembled configuration when tensile force is applied to the first, second and third cables in step (f).
2. The method as claimed in claim 1, wherein the method includes inserting at least two cables into one or more of the first, second and third cable retainers.
3. The method as claimed in claim 1, wherein the tensile force is applied to the first, second and third cables by jacking.
4. The method as claimed in claim 1, wherein the sub-structures are produced from I or T section beams or from tubular truss assemblies.
5. The method as claimed in claim 1, wherein the sub-structures are produced from I or T section beams having at least one web and at least one flange, and the respective cable retainers are attached to the web of the respective beam.
6. The method as claimed in claim 5, wherein the cables pass through the flanges of the respective beams.
7. The method as claimed in claim 1, wherein the sub-structures are truss assemblies, and each of the cable retainers is a tubular member integral with the respective truss assemblies.
8. The method as claimed in claim 1, wherein at least a portion of the third cable retainer extends below an apex of the centre span sub-structure and is configured to be subjected to downward and horizontal directed loads during intended use.
9. The method as claimed in claim 1, wherein at least a portion of the third cable retainer extends above an apex of the centre span sub-structure and is configured to be subjected to upward and horizontal directed loads during intended use.
10. A method of building a portal frame structure, the method including the steps of:
- (a) fabricating a first generally longitudinal, steel wall sub-structure of the portal frame structure with a first cable retainer attached to, or forming part of, the first sub-structure and that extends substantially longitudinally therealong;
- (b) fabricating a second generally longitudinal, steel wall sub-structure of the portal frame structure with a second cable retainer attached to, or forming part of, the second sub-structure and that extends substantially longitudinally therealong;
- (c) fabricating a generally longitudinal, steel centre span sub-structure of the portal frame structure with a third cable retainer attached to, or forming part of, the third sub-structure and that extends substantially longitudinally therealong;
- (d) inserting first, second and third cables into the first, second and third cable retainers respectively;
- (e) after step (d), applying tensile force to the first, second and third cables, relative to the first, second and third cable retainers respectively;
- (f) after step (e), bonding the first, second and third cables to the first, second and third cable retainers respectively to maintain each of the first wall, second wall and the centre span sub-structures in respective tensioned configurations; and
- (g) assembling the first wall, second wall and centre span sub-structures into the portal frame structure with the first wall, second wall and centre span sub-structures being substantially maintained in the respective tensioned configurations,
- wherein the first, second and third cable retainers are in the form of tubular members which follow a respective tensile line of resistance the first, second and third sub-structures are subjected to when loaded during intended use, at least a portion of at least one of the first, second and third cable retainers being coupled to and positioned outwardly beyond an external boundary surface of the respective sub-structure when in an assembled configuration so as to have at least a 50% reduction in deflection of the portal frame structure when under load compared to a portal frame structure which does not include cables following tensile lines of resistance, and wherein the first wall, second wall and centre span sub-structures do not substantially change shape when tensile force is applied to the first, second and third cables in step (e).
11. The method as claimed in claim 10, wherein at least a portion of the third cable retainer extends below an apex of the centre span sub-structure and is configured to be subjected to downward and horizontal directed loads during intended use.
12. The method as claimed in claim 10, wherein at least a portion of the third cable retainer extends above an apex of the centre span sub-structure and is configured to be subjected to upward and horizontal directed loads during intended use.
13. A method of strengthening, or reducing deflection of, a built portal frame structure in an assembled configuration comprising a first generally longitudinal, steel wall sub-structure, a second generally longitudinal, steel wall sub-structure and a third generally longitudinal, steel centre span sub-structure, the method including the steps of:
- (a) attaching first, second and third cable retainers to the first, second and third sub-structures of the built portal frame structure respectively, with the first, second and third cable retainers extending substantially longitudinally therealong the first, second and third sub-structures respectively;
- (b) inserting first, second and third cables into the first, second and third cable retainers respectively;
- (c) applying a tensile force to the first, second and third cables, relative to the first, second and third cable retainers respectively; and
- (d) after step (c), bonding the first, second and third cables to the first, second and third cable retainers respectively to substantially maintain the built portal frame structure in the assembled configuration,
- wherein the first, second and third cable retainers are in the form of tubular members which follow a respective tensile line of resistance the first, second and third sub-structures are subjected to when loaded during intended use, at least a portion of at least one of the first, second and third cable retainers being coupled to and positioned outwardly beyond an external boundary surface of the built portal frame structure when in the assembled configuration so as to have at least a 50% reduction in deflection of the portal frame structure when under load compared to a portal frame structure which does not include cables following tensile lines of resistance, and wherein the first wall, second wall and centre span sub-structures do not substantially change shape or change positioning from the assembled configuration when tensile force is applied to the first, second and third cables in step (c).
14. The method as claimed in claim 13, wherein at least a portion of the third cable retainer extends below an apex of the centre span sub-structure and is configured to be subjected to downward and horizontal directed loads during intended use.
15. The method as claimed in claim 13, wherein at least a portion of the third cable retainer extends above an apex of the centre span sub-structure and is configured to be subjected to upward and horizontal directed loads during intended use.
1554061 | September 1925 | Wylie |
1686910 | October 1928 | Frease |
2234663 | March 1941 | Anderegg |
2675695 | April 1954 | Coff |
2822068 | February 1958 | Hendrix |
2877506 | March 1959 | Almoslino |
2986246 | May 1961 | Lester |
3010257 | November 1961 | Naillon |
3247635 | April 1966 | Burns |
3251162 | May 1966 | Strimple |
3280521 | October 1966 | Keathly |
3341995 | September 1967 | Docken |
3362117 | January 1968 | Raden |
3778946 | December 1973 | Wood et al. |
3971179 | July 27, 1976 | Bodocsi et al. |
4047341 | September 13, 1977 | Bernardi |
4125978 | November 21, 1978 | Schildge, Jr. |
4144686 | March 20, 1979 | Gold |
4275537 | June 30, 1981 | Pinson |
4393637 | July 19, 1983 | Mosier |
4607470 | August 26, 1986 | Ecker |
4631883 | December 30, 1986 | Harris et al. |
4676045 | June 30, 1987 | Ellen |
4890437 | January 2, 1990 | Quaile |
5050366 | September 24, 1991 | Gardner et al. |
5159790 | November 3, 1992 | Harding |
5175968 | January 5, 1993 | Saucke |
5218801 | June 15, 1993 | Hereford |
5299445 | April 5, 1994 | Yee |
5313749 | May 24, 1994 | Conner |
5426899 | June 27, 1995 | Jones |
5471812 | December 5, 1995 | Muller |
5487242 | January 30, 1996 | Stafford |
5671572 | September 30, 1997 | Siller-Franco |
6145268 | November 14, 2000 | Korzen |
6155019 | December 5, 2000 | Ashton et al. |
6892410 | May 17, 2005 | Tokuno et al. |
7721496 | May 25, 2010 | Carlson et al. |
20020083659 | July 4, 2002 | Sorkin |
20020194808 | December 26, 2002 | Ratliff |
20030182886 | October 2, 2003 | Parrish |
20030213192 | November 20, 2003 | Pittman |
20040065030 | April 8, 2004 | Zambelli et al. |
20040148880 | August 5, 2004 | Hayes |
61086/90 | February 1991 | AU |
2 137 051 | January 1996 | CA |
1 609 806 | April 1970 | DE |
3 515 052 | October 1986 | DE |
0 060 352 | September 1982 | EP |
0 211 671 | February 1987 | EP |
0 237 667 | September 1987 | EP |
1 054 106 | November 2000 | EP |
2 666 607 | March 1992 | FR |
08-041820 | February 1996 | JP |
11-158819 | June 1999 | JP |
11-190100 | July 1999 | JP |
93/22521 | November 1993 | WO |
00/28168 | May 2000 | WO |
01/42584 | June 2001 | WO |
01/96679 | December 2001 | WO |
- Portal. (n.d.). Collins English Dictionary—Complete & Unabridged 10th Edition. Retrieved Apr. 4, 2012, from Dictionary.com website: http://dictionary.reference.com/browse/portal.
Type: Grant
Filed: Jun 23, 2010
Date of Patent: May 21, 2013
Patent Publication Number: 20100257814
Assignee: S2 Holdings Pty Limited (North Ryde)
Inventor: Murray Ellen (North Ryde)
Primary Examiner: Brian Glessner
Assistant Examiner: Joshua Ihezie
Application Number: 12/821,919
International Classification: E04B 1/00 (20060101);