Patent number: 11635284
Abstract: Provided are a testing apparatus for a pile end settlement of a rock-socketed driven PHC tube pile and an installation method thereof. The testing apparatus comprises a PHC tube pile, two measuring tubes, a cross pile tip, a pile tip steel plate, a fixer fixed in the PHC tube pile, a perforated steel plate located at a pile top of the PHC tube pile and a jack pressed on the perforated steel plate. The two measuring tubes are symmetrically arranged, the fixer is provided with two first measuring tube outlet holes, and the two measuring tubes respectively pass through the first measuring tube outlet holes of the fixer; and the perforated steel plate is also provided with two second measuring tube outlet holes, and the two measuring tubes respectively pass through the second measuring tube outlet holes of the perforated steel plate. (FIG.
Type:
Grant
Filed:
June 22, 2022
Date of Patent:
April 25, 2023
Assignees:
QINGDAO UNIVERSITY OF TECHNOLOGY, Qingdao Green Technology Geotechnical Engineering Co., Ltd, Zhongji JiuRui Geotechnical Engineering Co., Ltd., Shandong Luqiao Group Co., Ltd., Jinan, China, China State Construction Zhongxin Construction Engineering Co., Ltd.Shandong Branch
Inventors:
Yonghong Wang, Mingyi Zhang, Xiang Fang, Bo Han, Qijun Zhang, Yishun Jiang, Shiqiang Li, Dazhong Xu, Jun Wang, Chuantong Zhang, Yuning Ge, Yamei Zhang, Weihui Tian, Ziguang Jia, Xiaoning Liu