Patents by Inventor Takashi Tameshige
Takashi Tameshige has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Publication number: 20150205650Abstract: A system redundancy verification method, which is to be executed in a computer system, the computer system comprising a first computer, a second computer, a storage system, and a management computer, the system redundancy verification method including: a step of obtaining, by the management computer, first hardware information on the first computer and second hardware information on the second computer; a step of obtaining, by the management computer, first storage area information on the storage area; a step of obtaining, by the second computer the second storage area information from the storage system, and a step of comparing, by the management computer, the first hardware information and the first storage area information with the second hardware information and the second storage area information, and determining whether a failover is implementable between the first computer and the second computer.Type: ApplicationFiled: November 2, 2012Publication date: July 23, 2015Applicant: Hitachi, Ltd.Inventors: Keita Shimada, Yoshifumi Takamoto, Takashi Tameshige, Yujiro Ichikawa, Tomohito Uchida
-
Publication number: 20150095424Abstract: An information acquisition method whereby a management computer provided with a processor, a memory, and an interface acquires information of a plurality of computers via a network, the method including: a first step in which the management computer sets, in acquisition group information, a group of computers for acquiring information among the plurality of computers; a second step in which the management computer determines a sequence in which information is acquired for each group, then determines the sequence of computers for acquiring information in the group; a third step in which the management computer outputs an instruction for acquiring information of computers in the determined sequence; and a fourth step in which an information acquisition execution unit acquires the information of the computers of each group in the determined sequence on the basis of the instruction to acquire the information.Type: ApplicationFiled: April 23, 2012Publication date: April 2, 2015Applicant: HITACHI, LTD.Inventors: Keita Shimada, Yoshifumi Takamoto, Takashi Tameshige, Kentarou Watanabe, Yutaka Kudo
-
Patent number: 8996701Abstract: A resource distribution method capable of lending surplus resources among a plurality of services and reducing the maintenance cost of the surplus resources is provided. Computer resources in the standby system have a dead standby state in which at least an application is not installed. A plurality of services or a plurality of users share the computer resources in the standby system. As a result, improvement of the utilization factor of idle computer resources and server integration are implemented, and the cost required to maintain the computer resources is reduced. Furthermore, load prediction is conducted as regards individual services by using past operation history. Idle computer resources secured from services having surplus and maintained are thrown in according to a result of the prediction.Type: GrantFiled: May 2, 2012Date of Patent: March 31, 2015Assignee: Hitachi, Ltd.Inventors: Takashi Tameshige, Yoshifumi Takamoto
-
Publication number: 20150074251Abstract: A computer system, comprising: at least one computer; at least one network apparatus; at least one storage apparatus; and a plurality of service systems for use in execution of given services, the at least one computer including a system control part for managing the plurality of service systems, the system control part being configured to: hold system configuration information and evaluation information; obtain configuration information of the plurality of service systems from the system configuration information, in a case of evaluating the reliability of the plurality of service systems in the services; calculate the evaluation values of the plurality of service systems; and generate information that indicates the reliability of the plurality of service systems based on the calculated evaluation values.Type: ApplicationFiled: April 16, 2012Publication date: March 12, 2015Applicant: HITACHI, LTD.Inventors: Takashi Tameshige, Masaaki Iwasaki, Yutaka Kudo
-
Publication number: 20150067401Abstract: A computer recovery method for a computer system, the computer system having: a management computer having a processor and a memory; and a computer having a processor, a memory, and a monitoring part for notifying, when an abnormality occurs, the management computer of the abnormality, the management computer being configured to instruct recovery from the abnormality, the computer recovery method having: a first step of obtaining, by the management computer, hardware components and software components of the computer as configuration information; a second step of receiving, by the management computer, notification of an abnormality from the monitoring part of the computer; and a third step of generating, by the management computer, after the notification is received, component string information for identifying a component where the abnormality has occurred from the configuration information.Type: ApplicationFiled: June 22, 2012Publication date: March 5, 2015Applicant: HITACHI, LTD.Inventors: Yujiro Ichikawa, Yoshifumi Takamoto, Takashi Tameshige, Masaaki Iwasaki, Masayasu Asano
-
Patent number: 8880936Abstract: It is provided a management computer which refers to switching level information including switching patterns to be used at a time of switching the first task to the second application server; sets a level of a degree of safety for each of the switching patterns; refers to a stop time for each first task which is allowed upon switching the first task to the second application server; selects one of the switching patterns having a switching time that is shorter than the stop time of the task requirement information which is set to the first task and having the level of the degree of safety that is highest among the switching patterns of the switching level information; stops the second task of the second application server by the selected one of the switching patterns; and then controls the second application server to provide the first task.Type: GrantFiled: August 26, 2010Date of Patent: November 4, 2014Assignee: Hitachi, Ltd.Inventors: Yujiro Ichikawa, Yoshifumi Takamoto, Keisuke Hatasaki, Takashi Tameshige
-
Patent number: 8874952Abstract: High availability computer system and fault correction method. If a fault occurs in the current-system physical device allocated to the current-system virtual device of the virtual server, the virtualization mechanism of the physical server configures, for the standby-system virtual device of the virtual server, the standby-system physical device, as a physical device which is used at a high priority, and the virtualization mechanism distributes the request issued from the standby-system virtual device of another virtual server to a standby-system physical device, but, when such a standby-system physical device does not exist, the virtualization mechanism distributes the request to a standby-system physical device configured for high priority usage.Type: GrantFiled: March 5, 2010Date of Patent: October 28, 2014Assignee: Hitachi, Ltd.Inventors: Takashi Tameshige, Yoshifumi Takamoto, Keisuke Hatasaki
-
Publication number: 20140317625Abstract: A method of controlling a virtual machine, including: detecting a predetermined trigger by a management server; acquiring a relationship between a virtualization unit and a virtual machine operated on a physical computer; specifying a virtual machine as a migration target based on preset trigger definition information; determining a physical computer of a migration destination based on a preset first control pattern to generate a first plan to migrate the virtual machine as the migration destination; transforming the first control pattern to a second control pattern; generating a second plan to migrate the virtual machine as the migration destination; performing arithmetic an evaluation value of the first plan and an evaluation value of the second plan; selecting one of the evaluation values meeting a predetermined condition as an execution plan; and migrating by the management server the virtual machine as the migration target based on the selected execution plan.Type: ApplicationFiled: December 8, 2011Publication date: October 23, 2014Applicant: HITACHI, LTD.Inventors: Yujiro Ichikawa, Yoshifumi Takamoto, Takashi Tameshige
-
Patent number: 8850152Abstract: An example of the invention is a method of data migration from a source volume including storage areas of a plurality of source storage tiers different in performance capability to a destination volume including storage areas of a plurality of destination storage tiers different in performance capability, data relocation being performed among the plurality of source storage tiers in accordance with accesses to the source volume during the data migration. The method includes: starting the data migration between volumes from the source volume to the destination volume; acquiring information on a data arrangement in the source volume determined based on an access history to the source volume during the data migration between volumes from the source volume to the destination volume; and determining a data arrangement in the destination volume during the data migration between volumes based on the data arrangement indicated by the acquired information.Type: GrantFiled: May 17, 2012Date of Patent: September 30, 2014Assignee: Hitachi, Ltd.Inventors: Kentaro Watanabe, Takashi Tameshige, Masayasu Asano, Mutsumi Hosoya, Hideo Saito
-
Publication number: 20140259014Abstract: Each of hypervisors operates on one of physical servers, and a virtual server operates in accordance with a file image on one of data stores. A management server, when being instructed to execute a task that is configured by a series of steps for a hypervisor on the physical server, gives an instruction for changing the execution place of a step to a temporary execution place and executing the task in a case where there is no restriction on the execution place of the step and instructs a default hypervisor to execute the task in a case where there is a restriction on the execution place of the step.Type: ApplicationFiled: October 6, 2011Publication date: September 11, 2014Inventors: Kentaro Watanabe, Yoshifumi Takamoto, Takashi Tameshige
-
Publication number: 20140143398Abstract: Provided is a computer system, including: at least one storage system providing at least one logical volume, at least one host computer including an I/O device, and a management computer, in which the management computer creates a virtual computer within a network segment to which the management computer belongs, the virtual computer including an I/O device that is the same as the I/O device of the host computer in number and type, defines a connection between the logical volume and the virtual computer, stores a program in the logical volume connected to the virtual computer, sets identification information on the host computer in the virtual computer, releases the connection between the logical volume that stores the program and the virtual computer, and defines a connection between the logical volume whose connection has been released and the host computer.Type: ApplicationFiled: October 4, 2013Publication date: May 22, 2014Applicant: HITACHI, LTD.Inventors: Takashi TAMESHIGE, Yoshifumi TAKAMOTO
-
Publication number: 20140047083Abstract: The present invention relates to a management information generation method for a management information generation apparatus (20) in a system (1) including a plurality of managed objects (10, 12, 13, 14), to generate management information for the managed objects (10, 12, 13, 14). A control part (21) of the management information generation apparatus (20) stores configuration information (300) of the managed objects (10, 12, 13, 14) in the system (1), as well as management information (100) previously configured for some managed objects (10, 12, 13, 14) of the plurality of managed objects (10, 12, 13, 14) into a storage part (28). A configuration part (21) of the management information generation apparatus (20) uses the configuration information (300) and the previously configured management information (100) to generate the management information (100) for the other managed objects (10, 12, 13, 14) of the plurality of managed objects (10, 12, 13, 14).Type: ApplicationFiled: May 10, 2011Publication date: February 13, 2014Applicant: HITACHI, LTD.Inventors: Yujiro Ichikawa, Yoshifumi Takamoto, Takashi Tameshige
-
Publication number: 20140032753Abstract: A computer system and node search method capable of reducing node discovery time in the computer system with a large number of nodes and a large number of supported protocols is proposed. The computer system includes a management server which is connected to each of first and second nodes via a network and collects and manages first information for each of the first and second nodes including network addresses of the first and second nodes and a protocol type of a communication protocol to be used when communicating with the first or second node. When the management server searches the first and second nodes over the network and detects the second node, it acquires the network address of each first node managed by the second node and the protocol type of the communication protocol to be used when communicating with the first node.Type: ApplicationFiled: May 16, 2011Publication date: January 30, 2014Applicant: Hitachi, Ltd.Inventors: Kentaro Watanabe, Yoshifumi Takamoto, Takashi Tameshige, Yujiro Ichikawa
-
Publication number: 20140019624Abstract: In order to effectively use the resources on a network, there is provided a management server (200) for selecting each resource of a resource information table (211) as a test resource, if the extraction probability for each resource is equal to or greater than the random numbers probability generated by a random number generation part (221), forming a test server by combining the selected resources, performing the job by using the formed test server, and applying the test server as the server of the particular network if the execution result of the job meets the job determination method.Type: ApplicationFiled: April 1, 2011Publication date: January 16, 2014Applicant: HITACHI, LTDInventors: Shoichi Kusuta, Tomohito Uchida, Yoshifumi Takamoto, Takashi Tameshige
-
Publication number: 20140019667Abstract: The present invention is provided with: computers provided with a processor, a memory, and an I/O interface; an I/O switch for connecting a plurality of the computers with an I/O adapter; a management computer for managing the I/O switch and the computers; and a first network for connecting the computers with the management computer. The I/O switch has a dedicated adaptor connected to the management computer. The management computer selects from the plurality of computers a computer for performing data transfer, commands the I/O switch to connect the I/O interface of the selected computer and the dedicated adaptor, transfers data between the selected computer, senses that data transfer with the selected computer has been completed, and commands the I/O switch to disconnect the dedicated adaptor from the I/O interface of the selected computer after completion of the data transfer with the selected computer has been sensed.Type: ApplicationFiled: June 6, 2011Publication date: January 16, 2014Inventors: Keita Shimada, Yoshifumi Takamoto, Tomohito Uchida, Takashi Tameshige
-
Publication number: 20130346584Abstract: A control method for a virtual computer comprising a plurality of physical computers, a management server for managing the plurality of physical computers, and at least one virtual computer, which is provided by a virtualizing part executed on each of the plurality of physical computers, the management server controlling the at least one virtual computer and the virtualization part, the control method comprising: detecting, by the management server, a relationship between the virtualization part and the virtual computer operating on the plurality of physical computers; detecting, by the management server, an operation state of the virtual computer; and one of restraining and permitting, by the management server, when the management server issues a command for changing a state to one of the virtualization part and the virtual computer, issuance of the command based on an operation state of the virtual computer in a coupling relationship with the virtualization part.Type: ApplicationFiled: June 2, 2011Publication date: December 26, 2013Applicant: HITACHI, LTD.Inventors: Takashi Tameshige, Yujiro Ichikawa
-
Patent number: 8595737Abstract: Occupancy amount of physical resource of a virtual server (VS) is calculated based on maximum physical resource amount indicating performance of a physical server (PS), the occupied virtual resource coefficient indicating relation of physical resource amount used by the VS to the physical resource amount allocated to the VS and the allocated physical resource coefficient indicating relation of the allocated physical resource to the maximum physical resource amount of the PS, and change value of the occupied physical resource amount from a predetermined occupied physical resource amount is calculated based on the calculated occupancy amount and the predetermined occupied physical resource amount.Type: GrantFiled: February 25, 2010Date of Patent: November 26, 2013Assignee: Hitachi, Ltd.Inventors: Yujirou Ichikawa, Yoshifumi Takamoto, Keisuke Hatasaki, Takashi Tameshige
-
Publication number: 20130311740Abstract: An example of the invention is a method of data migration from a source volume including storage areas of a plurality of source storage tiers different in performance capability to a destination volume including storage areas of a plurality of destination storage tiers different in performance capability, data relocation being performed among the plurality of source storage tiers in accordance with accesses to the source volume during the data migration. The method includes: starting the data migration between volumes from the source volume to the destination volume; acquiring information on a data arrangement in the source volume determined based on an access history to the source volume during the data migration between volumes from the source volume to the destination volume; and determining a data arrangement in the destination volume during the data migration between volumes based on the data arrangement indicated by the acquired information.Type: ApplicationFiled: May 17, 2012Publication date: November 21, 2013Applicant: HITACHI, LTD.Inventors: Kentaro Watanabe, Takashi Tameshige, Masayasu Asano, Mutsumi Hosoya, Hideo Saito
-
Patent number: 8554890Abstract: Provided is a computer system, including: at least one storage system providing at least one logical volume, at least one host computer including an I/O device, and a management computer, in which the management computer creates a virtual computer within a network segment to which the management computer belongs, the virtual computer including an I/O device that is the same as the I/O device of the host computer in number and type, defines a connection between the logical volume and the virtual computer, stores a program in the logical volume connected to the virtual computer, sets identification information on the host computer in the virtual computer, releases the connection between the logical volume that stores the program and the virtual computer, and defines a connection between the logical volume whose connection has been released and the host computer.Type: GrantFiled: September 27, 2006Date of Patent: October 8, 2013Assignee: Hitachi, Ltd.Inventors: Takashi Tameshige, Yoshifumi Takamoto
-
Publication number: 20130227585Abstract: A processing control method whereby a management server: assigns work to and executes said work on a computer; sets the processing start time and the processing end time for the aforementioned work as task execution information; sets a first physical resource amount, which is the amount of the physical resources of the aforementioned computer needed for execution of the aforementioned processing; acquires a second physical resource amount, which is the amount of the physical resources of the aforementioned computer that are being used; updates the processing start time for the aforementioned work to a time that is close to the current time when the aforementioned computer has the physical resources of the sum of the aforementioned first physical resource amount and the aforementioned second physical resources; and instructs the aforementioned computer to begin the aforementioned processing when the current time reaches the aforementioned processing start time.Type: ApplicationFiled: December 16, 2010Publication date: August 29, 2013Applicant: HITACHI, LTD.Inventors: Yujiro Ichikawa, Yoshifumi Takamoto, Takashi Tameshige