Patents by Inventor Takashi Tameshige

Takashi Tameshige has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 8386830
    Abstract: There is disclosed a high speed switching method for a disk image delivery system fail-over. A management server sends a disk image of an active server in advance to a standby server. When receiving a report that the active server has failed, the management server judges whether or not it is possible for the standby server to perform the service of the failed active server based on service provision management server information held by the management server and if possible, instructs the standby server to perform the service of the active server. Even if the disk image delivered in advance is different from the disk image of the failed active server, switching of the service to the standby server can be performed more quickly through resetting the setting values of unique information and installing the additional pieces of software on the standby server by the management server than redelivering an appropriate disk image.
    Type: Grant
    Filed: January 4, 2011
    Date of Patent: February 26, 2013
    Assignee: Hitachi, Ltd.
    Inventors: Takashi Tameshige, Yoshifumi Takamoto, Keisuke Hatasaki
  • Patent number: 8307242
    Abstract: In a computer system including server apparatuses such as an active server and a standby server connected to a storage apparatus, when the active server fails, a management server changes over connection to the storage apparatus from the active server to standby server to thereby hand over operation to the standby server. The management server refers to a fail-over strategy table in which apparatus information of the server apparatuses is associated with fail-over methods to select fail-over strategy in consideration of apparatus information of the active and standby servers.
    Type: Grant
    Filed: October 20, 2011
    Date of Patent: November 6, 2012
    Assignee: Hitachi, Ltd.
    Inventors: Shigeki Arata, Takashi Tameshige
  • Publication number: 20120215924
    Abstract: A resource distribution method capable of lending surplus resources among a plurality of services and reducing the maintenance cost of the surplus resources is provided. Computer resources in the standby system have a dead standby state in which at least an application is not installed. A plurality of services or a plurality of users share the computer resources in the standby system. As a result, improvement of the utilization factor of idle computer resources and server integration are implemented, and the cost required to maintain the computer resources is reduced. Furthermore, load prediction is conducted as regards individual services by using past operation history. Idle computer resources secured from services having surplus and maintained are thrown in according to a result of the prediction.
    Type: Application
    Filed: May 2, 2012
    Publication date: August 23, 2012
    Inventors: Takashi TAMESHIGE, Yoshifumi TAKAMOTO
  • Patent number: 8195800
    Abstract: A resource distribution method capable of lending surplus resources among a plurality of services and reducing the maintenance cost of the surplus resources is provided. Computer resources in the standby system have a dead standby state in which at least an application is not installed. A plurality of services or a plurality of users share the computer resources in the standby system. As a result, improvement of the utilization factor of idle computer resources and server integration are implemented, and the cost required to maintain the computer resources is reduced. Furthermore, load prediction is conducted as regards individual services by using past operation history. Idle computer resources secured from services having surplus and maintained are thrown in according to a result of the prediction.
    Type: Grant
    Filed: December 15, 2008
    Date of Patent: June 5, 2012
    Assignee: Hitachi, Ltd.
    Inventors: Takashi Tameshige, Yoshifumi Takamoto
  • Publication number: 20120131379
    Abstract: High availability computer system and fault correction method. If a fault occurs in the current-system physical device allocated to the current-system virtual device of the virtual server, the virtualization mechanism of the physical server configures, for the standby-system virtual device of the virtual server, the standby-system physical device, as a physical device which is used at a high priority, and the virtualization mechanism distributes the request issued from the standby-system virtual device of another virtual server to a standby-system physical device, but, when such a standby-system physical device does not exist, the virtualization mechanism distributes the request to a standby-system physical device configured for high priority usage.
    Type: Application
    Filed: March 5, 2010
    Publication date: May 24, 2012
    Applicant: HITACHI, LTD.
    Inventors: Takashi Tameshige, Yoshifumi Takamoto, Keisuke Hatasaki
  • Patent number: 8171119
    Abstract: With a management server that is connected via a network to at least one physical server including a physical server with a virtualization facility for providing a virtual server to a client and deploys a program to the at least one physical server as necessary, and by a program deployment method for such a management server for deploying a program to the at least one physical server as necessary, there is provided units for detecting one or more nodes which are any of the physical server, the virtualization facility, and the virtual server and connected via the network, acquiring first configuration information about a virtual layer of each detected node for each detected node, and selectively deploying the program to the relevant node based on the first configuration information for each acquired node.
    Type: Grant
    Filed: January 20, 2011
    Date of Patent: May 1, 2012
    Assignee: Hitachi, Ltd.
    Inventors: Takashi Tameshige, Yoshifumi Takamoto
  • Publication number: 20120036393
    Abstract: In a computer system including server apparatuses such as an active server and a standby server connected to a storage apparatus, when the active server fails, a management server changes over connection to the storage apparatus from the active server to standby server to thereby hand over operation to the standby server. The management server refers to a fail-over strategy table in which apparatus information of the server apparatuses is associated with fail-over methods to select fail-over strategy in consideration of apparatus information of the active and standby servers.
    Type: Application
    Filed: October 20, 2011
    Publication date: February 9, 2012
    Inventors: SHIGEKI ARATA, Takashi Tameshige
  • Patent number: 8074099
    Abstract: In a computer system including server apparatuses such as an active server and a standby server connected to a storage apparatus, when the active server fails, a management server changes over connection to the storage apparatus from the active server to standby server to thereby hand over operation to the standby server. The management server refers to a fail-over strategy table in which apparatus information of the server apparatuses is associated with fail-over methods to select fail-over strategy in consideration of apparatus information of the active and standby servers.
    Type: Grant
    Filed: August 19, 2009
    Date of Patent: December 6, 2011
    Assignee: Hitachi, Ltd.
    Inventors: Shigeki Arata, Takashi Tameshige
  • Publication number: 20110270962
    Abstract: Devices unnecessary for deployment are invalidated during the deployment. A method of building a system and a management server for establishing a system according to the present invention have the following configuration. The management server obtains server information from a server connected through a network, refers to the obtained server information to select devices unnecessary for deployment among devices connected to the server, and invalidates the selected devices.
    Type: Application
    Filed: July 14, 2011
    Publication date: November 3, 2011
    Applicant: HITACHI, LTD.
    Inventors: Takashi TAMESHIGE, Yoshifumi TAKAMOTO, Keisuke HATASAKI, Kazuhide AIKOH, Yujirou ICHIKAWA, Takeshi TERAMURA
  • Publication number: 20110213939
    Abstract: Provided is a deployment method for a server system that includes a storage system having logical disks where disk images are stored and plural servers connected to the storage system via a storage network, the method including the step of causing a deploy management module to copy the logical disks which store the disk images to a free area of the storage system before a deployment command is received. According to this invention, disk images are quickly deployed to servers.
    Type: Application
    Filed: May 11, 2011
    Publication date: September 1, 2011
    Inventors: Takashi TAMESHIGE, Yoshifumi TAKAMOTO
  • Patent number: 8001221
    Abstract: Devices unnecessary for deployment are invalidated during the deployment. A method of building a system and a management server for establishing a system according to the present invention have the following configuration. The management server obtains server information from a server connected through a network, refers to the obtained server information to select devices unnecessary for deployment among devices connected to the server, and invalidates the selected devices.
    Type: Grant
    Filed: February 18, 2009
    Date of Patent: August 16, 2011
    Assignee: Hitachi, Ltd.
    Inventors: Takashi Tameshige, Yoshifumi Takamoto, Keisuke Hatasaki, Kazuhide Aikoh, Yujirou Ichikawa, Takeshi Teramura
  • Patent number: 7958503
    Abstract: Provided is a deployment method for a server system that includes a storage system having logical disks where disk images are stored and plural servers connected to the storage system via a storage network, the method including the step of causing a deploy management module to copy the logical disks which store the disk images to a free area of the storage system before a deployment command is received. According to this invention, disk images are quickly deployed to servers.
    Type: Grant
    Filed: December 3, 2009
    Date of Patent: June 7, 2011
    Assignee: Hitachi, Ltd.
    Inventors: Takashi Tameshige, Yoshifumi Takamoto
  • Publication number: 20110113127
    Abstract: With a management server that is connected via a network to at least one physical server including a physical server with a virtualization facility for providing a virtual server to a client and deploys a program to the at least one physical server as necessary, and by a program deployment method for such a management server for deploying a program to the at least one physical server as necessary, there is provided units for detecting one or more nodes which are any of the physical server, the virtualization facility, and the virtual server and connected via the network, acquiring first configuration information about a virtual layer of each detected node for each detected node, and selectively deploying the program to the relevant node based on the first configuration information for each acquired node.
    Type: Application
    Filed: January 20, 2011
    Publication date: May 12, 2011
    Applicant: HITACHI, LTD.
    Inventors: Takashi TAMESHIGE, Yoshifumi TAKAMOTO
  • Publication number: 20110107138
    Abstract: There is disclosed a high speed switching method for a disk image delivery system fail-over. A management server sends a disk image of an active server in advance to a standby server. When receiving a report that the active server has failed, the management server judges whether or not it is possible for the standby server to perform the service of the failed active server based on service provision management server information held by the management server and if possible, instructs the standby server to perform the service of the active server. Even if the disk image delivered in advance is different from the disk image of the failed active server, switching of the service to the standby server can be performed more quickly through resetting the setting values of unique information and installing the additional pieces of software on the standby server by the management server than redelivering an appropriate disk image.
    Type: Application
    Filed: January 4, 2011
    Publication date: May 5, 2011
    Applicant: HITACHI, LTD.
    Inventors: Takashi Tameshige, Yoshifumi Takamoto, Keisuke Hatasaki
  • Patent number: 7890792
    Abstract: There is disclosed a high speed switching method for a disk image delivery system fail-over. A management server sends a disk image of an active server in advance to a standby server. When receiving a report that the active server has failed, the management server judges whether or not it is possible for the standby server to perform the service of the failed active server based on service provision management server information held by the management server and if possible, instructs the standby server to perform the service of the active server. Even if the disk image delivered in advance is different from the disk image of the failed active server, switching of is the service to the standby server can be performed more quickly through resetting the setting values of unique information and installing the additional pieces of software on the standby server by the management server than redelivering an appropriate disk image.
    Type: Grant
    Filed: March 3, 2008
    Date of Patent: February 15, 2011
    Assignee: Hitachi, Ltd.
    Inventors: Takashi Tameshige, Yoshifumi Takamoto, Keisuke Hatasaki
  • Patent number: 7890613
    Abstract: With a management server that is connected via a network to at least one physical server including a physical server with a virtualization facility for providing a virtual server to a client and deploys a program to the at least one physical server as necessary, and by a program deployment method for such a management server for deploying a program to the at least one physical server as necessary, there is provided units for detecting one or more nodes which are any of the physical server, the virtualization facility, and the virtual server and connected via the network, acquiring first configuration information about a virtual layer of each detected node for each detected node, and selectively deploying the program to the relevant node based on the first configuration information for each acquired node.
    Type: Grant
    Filed: August 14, 2008
    Date of Patent: February 15, 2011
    Assignee: Hitachi, Ltd.
    Inventors: Takashi Tameshige, Yoshifumi Takamoto
  • Publication number: 20110010634
    Abstract: A highly reliable management apparatus and management method capable of allocating a resource that satisfies a user's request is suggested.
    Type: Application
    Filed: February 19, 2010
    Publication date: January 13, 2011
    Applicant: Hitachi, Ltd.
    Inventors: Keisuke Hatasaki, Yoshifumi Takamoto, Takashi Tameshige
  • Publication number: 20100332661
    Abstract: Even if software resources for a physical server are changed, log information about the physical server can be accurately matched against the software resources. If the need arises to migrate business applications in a physical server (migration source), from among a plurality of physical servers, to another physical server (migration destination), a management server collects log information, which has been collected by the migration source physical server, from the migration source physical server, collects identifiers for identifying the business applications at the migration source, and records the collected identifiers in the collected log information. Subsequently, when the business applications are migrated to the migration destination physical server, the management server records the identifiers for identifying the business applications in log information about the migration destination physical server.
    Type: Application
    Filed: February 19, 2010
    Publication date: December 30, 2010
    Applicant: Hitachi, Ltd.
    Inventor: Takashi Tameshige
  • Publication number: 20100325634
    Abstract: Occupancy amount of physical resource of a virtual server(VS) is calculated based on maximum physical resource amount indicating performance of a physical server(PS), the occupied virtual resource coefficient indicating relation of physical resource amount used by the VS to the physical resource amount allocated to the VS and the allocated physical resource coefficient indicating relation of the allocated physical resource to the maximum physical resource amount of the PS, and change value of the occupied physical resource amount from a predetermined occupied physical resource amount is calculated based on the calculated occupancy amount and the predetermined occupied physical resource amount.
    Type: Application
    Filed: February 25, 2010
    Publication date: December 23, 2010
    Applicant: Hitachi, Ltd.
    Inventors: Yujirou Ichikawa, Yoshifumi Takamoto, Keisuke Hatasaki, Takashi Tameshige
  • Publication number: 20100138686
    Abstract: In a computer system, including server apparatuses such as an active server and a standby server connected to a storage apparatus, when the active server fails, a management server changes over connection to the storage apparatus from the active server to standby server to thereby hand over operation to the standby server. The management server refers to a fail-over strategy table in which apparatus information of the server apparatuses is associated with fail-over methods to select fail-over strategy in consideration of apparatus information of the active and standby servers.
    Type: Application
    Filed: August 19, 2009
    Publication date: June 3, 2010
    Inventors: Shigeki Arata, Takashi Tameshige