Method of calculating pore pressure while drilling
A method for calculating pore pressure of a subsurface includes the steps of obtaining a resistivity value while drilling in a region wherein there is a shallow depth (reference depth) where shale is in a hydrostatic condition, or where shale is not in hydrostatic condition but where the pore pressure at such depth can be estimated and calculating, using a processor, a pore pressure at a drilling location based on the following Formula (I): PP=OvB−(OvB−Hyd)(R/R0)øn wherein PP is pore pressure, OvB is the overburden value associated with the drilling location, Hyd is hydrostatic pore pressure, R is a measured value of resistivity, R0 is the resistivity at a reference depth or is an imposed value of resistivity, and øn is a normalized value of porosity.
Latest STATOIL GULF SERVICES LLC Patents:
- Reservoir stimulation method and system
- Method, system and non-transitory computer-readable medium for forming a seismic image of a geological structure
- Well system of acquiring information of hydraulic fracture geometry for evaluating and optimizing well spacing for multi-well pad
- Reservoir stimulation method and apparatus
- Proppant additives for hydraulic fracturing
1. Field of the Invention
The present invention relates to a method of calculating pore pressure. The method will calculate pore pressure only looking at one log while drilling, for example resistivity logs.
2. Description of Background Art
As shown in
Formations in which pore pressure exceeds hydrostatic pressure at a given depth are referred to as overpressured. The mechanism of overpressure itself does not modify the scope of the present invention.
When drilling in an overpressured formation, the mud weight (i.e., the weight of drilling fluids injected into the borehole) must be high enough to prevent either the pore pressure from moving formation fluids into the borehole in case of high enough permeability formation (e.g., sand) or the pore pressure from breaking down the formation and eventually causing borehole-walls collapse in case of low enough permeability formation (e.g., shale). In the worst case of a high enough permeability formation, formation fluids entering a borehole may result in loss of the well and/or injury to personnel operating the drilling rig. Accordingly, for safe and economic drilling, it is essential that the pore pressure be predicted with sufficient accuracy. In particular, it is beneficial to predict pore pressure pre-drill, i.e., either before any drilling has commenced and/or at a location that the drill bit has not yet reached.
Further, when drilling in overpressured formations, the number of required casing strings (i.e., structural supports inserted into the borehole) may be increased. Specifically, if a sufficiently accurate pre-drill pore pressure prediction is not available, additional casing strings may be inserted prematurely to avoid the possibility of well control problems (e.g., influx of formation fluids, borehole collapse, etc.). Prematurely inserting casing strings may delay the drilling operation and/or reduce the size of the borehole and result in financial loss.
The knowledge of accurate pore pressure is crucial when drilling a well in order to ensure the success of the drilling operation. Pore pressure is also a controlling input parameter in borehole stability modeling, well planning, design, and wellpath optimization.
A problem often encountered when drilling wells in many parts of the world is narrow drilling margins that require great precision in pore pressure prediction in order to prevent any shale instability problem resulting in risk of lost circulation and/or gas kicks/blowouts.
There is a great need in the art for a method that makes it possible to accurately predict pore pressure in real time measurements at the rig site. If such data were available, it would also be useful for identifying high risk shallow water zones, optimizing mud weight, detecting shallow hazard zones, detecting abnormal pressure zones, determining formation strength for wellpath optimization, and, in general, for obtaining the most trouble-free, cost effective drilling.
One of the conventional methods of predicting pore pressure is Eaton's method. Eaton's method involves the following equation:
PP=OvB−(OvB−Hyd)F
wherein PP is pore pressure, OvB is the overburden value associated with the drilling location, Hyd is hydrostatic pore pressure, and F is (in case of resistivity logs):
(R/RE)1.2
wherein R is the measured value of resistivity and RE is the normal compaction trend of resistivity.
The problem with Eaton's method is that the user must pick the correct normal compaction trend, which is sometimes difficult and implies the analysis of offset wells and regional maps. As such, Eaton's method almost never can be applied while drilling, with the knowledge of the real time logs.
Therefore, there is an industry-wide need for a more flexible method of calculating pore pressures.
One of the main bases of the present invention is to properly normalize or scale logs. For example, if we look at the porosity and resistivity logs, and we cross plot these quantities for a number of wells, we may have the plot shown in
The first embodiment of the present invention is directed to a method for calculating pore pressure of a subsurface, comprising obtaining a resistivity value while drilling from a depth of reference up to a specific depth, and evaluating a value of PP in the shale at a depth of reference (PP[depth of reference] ) (this value can be also hydrostatic pressure at the depth where shale starts to become under compacted); and calculating, using a processor, a predicted pore pressure at a drilling location based on the following Formula (II):
PP=OvB−(OvB−Hyd)(R/R0[depth of reference])øn
wherein PP is calculated pore pressure, OvB is the overburden value associated with the drilling location, Hyd is hydrostatic pore pressure, R is the measured value of resistivity from the depth of reference where pore pressure in the shale is known or approximated or estimated, up to any specific depth (R[specific depth]) where the pressure has to be calculated (for example the position of the drill bit while drilling), R0[depth of reference]is an imposed value of the resistivity at the depth of reference that is evaluated as:
R0[depth of reference]−(OvB−Hyd)R0/(OvB−PP[depth of reference])
Here R0 is the measured value of resistivity at the depth of reference, and øn is defined as a normalized porosity ø/øo. Because the value of the porosity at the reference depth is øo, øn is a vector increasing from 1 up to 1/(R[specific depth]/R0), which is the normalized resistivity at the specific depth, for example at the position of the drill bit. Because of the noise present in the log, the resistivity at depth of reference R0 can be estimated as the average along a relatively large depth. In this case, the function ø/øo goes from R0/R[depth reference]. The resistivity and porosity logs can be smoothed in order to minimize the influence of the noise with a low pass filter, or a moving average, or any other techniques that can reduce the noise.
At this point, the calculation of pore pressure can keep going at deeper intervals, having the new depth of reference as the specific depth at the previous step (old):
New Z[depth of reference ]=Old [specific depth]
The pore pressure at the new depth of reference in the shale is the value of pore pressure calculated at the previous step
PP=OvB−(OvB−Hyd)(R/R0[depth of reference] )øn
These calculations can continue until the maximum or desired depth is reached. In each step, the difference Z[specific depth]−Z[depth of reference] should be short enough in a way that the relation between normalized resistivity and porosity can be approximated by 1/(ø/øo). The inventor verified that this is the case for the majority of compartments. However, the interval of analysis Z[specific depth]−Z[depth of reference] cannot be too short because of the noise in the data. An interval too short can corrupt the pore pressure calculation adding spurious effects from noise that cannot be filtered out because of the length of the interval.
The method may also include adjusting, using the processor, a drilling operation associated with the drilling location based on the predicted pore pressure. The step of adjusting the drilling operation may include at least one selected from the group consisting of adjusting a drilling fluid density, adjusting a drilling trajectory, and optimizing a number of casing strings in a borehole. The drilling location may include a location below an operating drill bit in a borehole. The predicted pore pressure may be displayed on a graphical user interface.
The second embodiment of the present invention is directed to a non-transitory computer readable medium comprising instructions to perform a method for pore pressure calculation, the instructions executable on a processor and comprising functionality for obtaining a resistivity value while drilling from a depth of reference up to a specific depth, and evaluating a value of PP in the shale at a depth of reference (PP[depth of reference]) (this value can be also hydrostatic pressure at the depth where shale starts to become under compacted); and calculating, using a processor, a predicted pore pressure at a drilling location based on the following Formula (II):
PP=OvB−(OvB−Hyd)(R/R0[depth of reference])øn
wherein PP is calculated pore pressure, OvB is the overburden value associated with the drilling location, Hyd is hydrostatic pore pressure, R is the measured value of resistivity from the depth of reference) where pore pressure in the shale is known or approximated or estimated, up to any specific depth (R[specific depth]) where the pressure has to be calculated (for example the position of the drill bit while drilling), R0[depth of reference] is an imposed value of the resistivity at the depth of reference that is evaluated as:
R0[depth of reference]=(OVB−Hyd)R0/(OvB−PP[depth of reference])
Here, R0 is the measured value of resistivity at the depth of reference, and øo is defined as a normalized porosity ø/ø0. Because the value of the porosity at the reference depth is øo, øn is a vector increasing from 1 up to 1/(R[specific depth]/R0), which is the normalized resistivity at the specific depth, for example at the position of the drill bit. Because of the noise present in the log, the resistivity at depth of reference R0 can be estimated as the average along a relatively large depth. In this case the function ø/øo goes from R0/R[depth reference]. The resistivity and porosity logs can be smoothed in order to minimize the influence of the noise with a low pass filter, or a moving average, or any other techniques that can reduce the noise.
At this point, the calculation of pore pressure can continue at deeper intervals, having the new depth of reference as the specific depth at the previous step (old): New Z[depth of reference]=Old Z[specific depth]
The pore pressure at the new depth of reference in the shale is the value of pore pressure calculated at the previous step
PP=OvB−(OvB−Hyd)(R/R0[depth of reference])øn
These calculations can continue until the maximum or desired depth is reached. In each step, the difference Z[specific depth]−Z[depth of reference] should be short enough in a way that the relation between normalized resistivity and porosity can be approximated by 1/(ø/øo). The inventor verified that this is the case for the majority of compartments. However, the interval of analysis Z[specific depth]−Z[depth of reference] cannot be too short because of the noise in the data. An interval too short can corrupt the pore pressure calculation adding spurious effects from noise that cannot be filtered out because of the length of the interval.
The method may also include adjusting, using the processor, a drilling operation associated with the drilling location based on the predicted pore pressure. The step of adjusting the drilling operation may include at least one selected from the group consisting of adjusting a drilling fluid density, adjusting a drilling trajectory, and optimizing a number of casing strings in a borehole. The drilling location may include a location below an operating drill bit in a borehole. The predicted pore pressure may be displayed on a graphical user interface.
The third embodiment of the present invention is directed to a downhole tool configured to perform a method for pore pressure prediction, the downhole tool comprising a processor; a memory comprising software instructions for enabling the downhole tool under control of the processor to obtain a resistivity value while drilling from a depth of reference up to a specific depth, and evaluating a value of PP in the shale at a depth of reference (PP[depth of reference]) (this value can be also hydrostatic pressure at the depth where shale starts to become under compacted); and calculating, using a processor, a predicted pore pressure at a drilling location based on the following Formula (II):
PP=OvB−(OvB−Hyd)(R/R0[depth of reference])øn
wherein PP is calculated pore pressure, OvB is the overburden value associated with the drilling location, Hyd is hydrostatic pore pressure, R is the measured value of resistivity from the depth of reference where pore pressure in the shale is known or approximated or estimated, up to any specific depth (R[specific depth]) where the pressure has to be calculated (for example the position of the drill bit while drilling), R0[depth of reference] is an imposed value of the resistivity at the depth of reference that is evaluated as:
R0[depth of reference]−(OvB−Hyd)R0/(OvB−PP[depth of reference])
Here R0 is the measured value of resistivity at the depth of reference, and øo is defined as a normalized porosity ø/øo. Because the value of the porosity at the reference depth is øo, øn is a vector increasing from 1 up to 1/(R[specific depth]/R0), which is the normalized resistivity at the specific depth, for example at the position of the drill bit. Because of the noise present in the log, the resistivity at depth of reference R0 can be estimated as the average along a relatively large depth. In this case the function ø/øo goes from R0/R[depth reference]. The resistivity and porosity logs can be smoothed in order to minimize the influence of the noise with a low pass filter, or a moving average, or any other techniques that can reduce the noise.
At this point, the calculation of pore pressure can continue at deeper intervals, having the new depth of reference as the specific depth at the previous step (old): New Z[depth of reference]=Old Z[specific depth]
The pore pressure at the new depth of reference in the shale is the value of pore pressure calculated at the previous step
PP=OvB−(OvB−Hyd)(R/R0[depth of reference])øn
These calculations can continue until the maximum or desired depth is reached. In each step, the difference Z[specific depth]−Z[depth of reference] should be short enough in a way that the relation between normalized resistivity and porosity can be approximated by 1/(ø/øo). The inventor verified that this is the case for the majority of compartments. However, the interval of analysis Z[specific depth]−Z[depth of reference] cannot be too short because of the noise in the data. An interval too short can corrupt the pore pressure calculation adding spurious effects from noise that cannot be filtered out because of the length of the interval.
The method may also include adjusting, using the processor, a drilling operation associated with the drilling location based on the predicted pore pressure. The step of adjusting the drilling operation may include at least one selected from the group consisting of adjusting a drilling fluid density, adjusting a drilling trajectory, and optimizing a number of casing strings in a borehole. The drilling location may include a location below an operating drill bit in a borehole. The predicted pore pressure may be displayed on a graphical user interface.
Further scope of applicability of the present invention will become apparent from the detailed description given hereinafter. However, it should be understood that the detailed description and specific examples, while indicating preferred embodiments of the invention, are given by way of illustration only, since various changes and modifications within the spirit and scope of the invention will become apparent to one of ordinary skill in the art from this detailed description.
The present invention will now be described with reference to the accompanying drawings.
The present invention is directed to a method for calculating pore pressure based on a resistivity log and only one pressure measurement or pressure estimation as reference. This method calculates a resistivity reference based on a pressure measurement at one specific depth. Then, a calculation of pore pressure for all deeper points is made. This calculation does not require any other parameters, normal compaction trends, or a tuning coefficient.
Specifically, values are plotted on a graph with pressure on the x-axis and depth on the y-axis. An overburden line shows the maximum pressure to be expected based on the depth and density of the region. A hydrostatic line is the minimum pressure to be expected based on the region. Then, based on a single pore pressure measurement, pore pressures can be predicted up to the depth where resistivity measurements are available. These pore pressures are between the overburden line and the hydrostatic line.
As discussed above, one conventional method of predicting pore pressure is Eaton's method. Eaton's method involves the following equation, in case resistivity logs are available:
PP=OvB−(OvB−Hyd)F
wherein PP is pore pressure, OvB is the overburden associated with the drilling location, Hyd is hydrostatic pore pressure, and F is:
(R/RE)1.2
wherein R is the measured value of resistivity and RE is the normal compaction trend of resistivity.
The present invention improves upon Eaton's method in order to more accurately predict pore pressure in a way that the calculation can be done while drilling. Specifically, the modified equation is the following Formula (I):
PP=OvB−(OvB−Hyd)(R/R0[depth of reference])øn
wherein PP is calculated pore pressure, OvB is the overburden value associated with the drilling location, Hyd is hydrostatic pore pressure, R is the measured value of resistivity from the depth of reference where pore pressure in the shale is known or approximated or estimated up to any specific depth (R[specific depth]) where the pressure has to be calculated (for example the position of the drill bit while drilling), R0[depth of reference] is an imposed value of the resistivity at the depth of reference that is evaluated as:
R0[depth of reference]=(OvB−Hyd)R0/(OvB−PP[depth of reference])
Here R0 is the measured value of resistivity at the depth of reference, and øn is defined as a normalized porosity ø/øo. Because the value of the porosity at the reference depth is øo, øn is a vector increasing from 1 up to 1/(R[specific depth]/R0), which is the normalized resistivity at the specific depth, for example at the position of the drill bit. Because of the noise present in the log, the resistivity at depth of reference R0 can be estimated as the average along a relatively large depth. In this case, the function ø/øo goes from R0/R[depth reference]. The resistivity and porosity logs can be smoothed in order to minimize the influence of the noise with a low pass filter, or a moving average, or any other techniques that can reduce the noise.
At this point, the calculation of pore pressure can continue at deeper intervals, having the new depth of reference as the specific depth at the previous step.
Thus, the method of the present invention can calculate pore pressure without the need of a normal compaction trend or tuning parameters. The method only needs one calibration point where pore pressure has to be known and a resistivity log.
With the pore pressure calculations explained, the different embodiments of the present invention can be further explained. In general, embodiments of the present invention provide a method and system for pore pressure prediction using the formulas discussed above. Then, a drilling operation associated with the drilling location is adjusted based on the predicted pore pressure.
In one or more embodiments of the present invention, the computing environment 205 may include one or more computer systems (e.g., computer system A 210, computer system N 215) configured to perform drilling-related tasks. In one or more embodiments of the present invention, the computer system(s) (e.g., 210, 215) may be web servers, embedded systems (e.g., a computer located in a downhole tool), desktop computers, laptop computers, personal digital assistants, any other similar type of computer system, or any combination thereof.
Specifically, in one or more embodiments of the present invention, one or more of the computer systems (e.g., 210, 215) may include a pore pressure calculator 235. In one or more embodiments of the present invention, the pore pressure calculator 235 may be located in a single computer system (e.g., 210, 215), distributed across multiple computer systems (e.g., 210, 215), or any combination thereof. In one or more embodiments of the present invention, the pore pressure calculator 235 may include one or more software modules, one or more hardware modules, or any combination thereof. Further, in one or more embodiments of the present invention, the pore pressure calculator may be configured to communicate with each other via function calls, application program interfaces (APIs), a network protocol (i.e., a wired or wireless network protocol), electronic circuitry, any other similar type of communication and/or communication protocol, or any combination thereof.
In one or more embodiments of the invention, the pore pressure calculator 235 may be configured to calculate a predicted pore pressure based on Formula (I).
In one embodiment of the present invention, a drilling location corresponds to a location that has not yet been drilled. In other words, the drill bit has not reached the drilling location. However, the drilling location is in the intended path of the drill bit and, unless the trajectory of the borehole changes, the drill bit will eventually reach the drilling location. In one embodiment of the present invention, the method described in
Turning to
In Step 320, a predicted pore pressure at a drilling location is calculated using Formula (I). Then, in Step 340, the drilling operation is adjusted based on the calculated pore pressure. Specifically, in one or more embodiments of the present invention, adjusting the drilling operation may involve adjusting a drilling fluid density (i.e., increasing or decreasing the drilling fluid density as appropriate), adjusting a drilling trajectory (e.g., to avoid an overpressured area, to pass through a low-pressure area, etc.), optimizing the number of casing strings in the borehole (i.e., adding a casing string, delaying addition of a casing string, etc.), or any other similar type of adjustment.
These steps can continue until the maximum or desired depth is reached (Step 350).
One or more embodiments of the present invention provide a means for accurately calculating a pore pressure. Accordingly, one or more embodiments of the present invention may prevent formation fluids from entering a borehole, thereby preventing damage to the well and/or personnel operating a drilling rig. Further, one or more embodiments of the present invention may prevent the financial overhead of prematurely inserting casing strings.
The present invention may be implemented on virtually any type of computer regardless of the platform being used. For example, as shown in
Furthermore, one of ordinary skill in the art will appreciate that one or more elements of the aforementioned computer system 400 may be located at a remote location and connected to the other elements over a network. Further, software instructions to perform embodiments of the present invention may be stored on a non-transitory computer readable medium such as a compact disc (CD), a diskette, a tape, a file, or any other non-transitory computer readable storage device. In addition, in one embodiment of the present invention, the predicted pore pressure (including all the pore pressures calculated using the method described in
The invention being thus described, it will be obvious that the same may be varied in many ways. Such variations are not to be regarded as a departure from the spirit and scope of the invention, and all such modifications as would be obvious to one skilled in the art are intended to be included within the scope of the following claims.
Claims
1. A method of estimating pore pressure (PP) of a subsurface at a drilling location, the method comprising: wherein PP is the pore pressure, OvB is an overburden pressure value associated with the drilling location, Hyd is hydrostatic pore pressure, R is the measured resistivity value for the interval from the depth of reference to the depth of the drilling location, R0[depth of reference] is the imposed resistivity value at the depth of reference, and øn is a normalized value of porosity;
- measuring a resistivity value (R0) while drilling in a region having a pore pressure (PP[depth of reference]) that is known or can be approximated at a depth of reference;
- determining from the resistivity value (R0) and the pore pressure (PP[depth of reference]) at the depth of reference an imposed resistivity value (R0[depth of reference]) at the depth of reference;
- measuring a resistivity value (R) in an interval of the subsurface from the depth of reference to a depth of the drilling location;
- calculating, using a processor, the pore pressure (PP) at the drilling location based on the following Formula (I): PP=OvB−(OvB−Hyd)(R/R0[depth of reference])øn
- adjusting, using the processors, a drilling operation associated with a new drilling location based on the estimated pore pressure, wherein said adjusting comprises optimizing a number of casing strings in the borehole; and
- repeating the steps of the method using the depth of the drilling location as a new depth of reference to estimate pore pressure at the new drilling location of the subsurface wherein a pore pressure at the new depth of reference is the estimated pore pressure (PP) at the drilling location.
2. The method of claim 1, wherein adjusting the drilling operation further comprises at least one of adjusting a drilling fluid density and adjusting a drilling trajectory.
3. The method of claim 1, wherein the drilling location comprises a location below an operating drill bit in a borehole.
4. The method of claim 1, wherein the estimated pore pressure is displayed on a graphical user interface.
5. A non-transitory computer readable medium comprising instructions to perform a method for pore pressure (PP) estimation at a drilling location of a subsurface, the instructions executable on a processor and comprising functionality for: wherein PP is the pore pressure, OvB is an overburden pressure value associated with the drilling location, Hyd is hydrostatic pore pressure, R is the measured resistivity value for the interval from the depth of reference to the depth of the drilling location, R0[depth of reference] is the imposed resistivity value at the depth of reference, and øn is a normalized value of porosity;
- measuring a resistivity value (R0) while drilling in a region having a pore pressure (PP[depth of reference]) that is known or can be approximated at a depth of reference;
- determining from the resistivity value (R0) and the pore pressure (PP[depth of reference]) at the depth of reference an imposed resistivity value (R0[depth of reference]) at the depth of reference;
- measuring a resistivity value (R) in an interval of the subsurface from the depth of reference to a depth of the drilling location;
- calculating, using a processor, the pore pressure (PP) at the drilling location based on the following Formula (I): PP=OvB−(OvB−Hyd)(R/R0[depth of reference])øn
- adjusting, using the processors, a drilling operation associated with a new drilling location based on the estimated pore pressure, wherein said adjusting comprises optimizing a number of casing strings in the borehole; and
- repeating the steps of the method using the depth of the drilling location as a new depth of reference to estimate pore pressure at the new drilling location of the subsurface wherein a pore pressure at the new depth of reference is the estimated pore pressure (PP) at the drilling location.
6. The non-transitory computer readable medium of claim 5 wherein adjusting the drilling operation comprises at least one selected from the group consisting of adjusting a drilling fluid density and adjusting a drilling trajectory.
7. The non-transitory computer readable medium of claim 5, wherein the drilling location comprises a location below an operating drill bit in a borehole.
8. The non-transitory computer readable medium of claim 5, wherein the estimated pore pressure is displayed on a graphical user interface.
9. A downhole tool configured to perform a method for pore pressure (PP) estimation at a drilling location of a subsurface, the downhole tool comprising: wherein PP is the pore pressure, OvB is an overburden pressure value associated with the drilling location, Hyd is hydrostatic pore pressure, R is the measured resistivity value for the interval from the depth of reference to the depth of the drilling location, R0[depth of reference] is the imposed resistivity value at the depth of reference, and on is a normalized value of porosity;
- a processor;
- a memory comprising software instructions for enabling the downhole tool under control of the processor to:
- measure a resistivity value (R0) while drilling in a region having a pore pressure (PP[depth of reference]) that is known or can be approximated at a depth of reference;
- determine from the resistivity value (R0) and the pore pressure (PP[depth of reference]) at the depth of reference an imposed resistivity value (R0[depth of reference]) at the depth of reference;
- measure a resistivity value (R) in an interval of the subsurface from the depth of reference to a depth of the drilling location;
- calculate, using a processor, the pore pressure at the drilling location based on the following Formula (I): PP=OvB−(OvB−Hyd)(R/R0[depth of reference])øn
- adjust, using the processors, a drilling operation associated with a new drilling location based on the estimated pore pressure, wherein said adjusting comprises optimizing a number of casing strings in the borehole; and
- repeat the steps of the method using the depth of the drilling location as a new depth of reference to estimate pore pressure at the new drilling location of the subsurface wherein a pore pressure at the new depth of reference is the estimated pore pressure (PP) at the drilling location.
10. The downhole tool of claim 9, wherein adjusting the drilling operation comprises at least one selected from the group consisting of adjusting a drilling fluid density and adjusting a drilling trajectory.
11. The downhole tool of claim 9, wherein the drilling location comprises a location below an operating drill bit in a borehole.
12. The downhole tool of claim 9, wherein the estimated pore pressure is displayed on a graphical user interface.
20040244972 | December 9, 2004 | Sayers et al. |
20070285274 | December 13, 2007 | Esmersoy |
20100000791 | January 7, 2010 | Alberty |
WO 91/04500 | April 1991 | WO |
WO 9104500 | April 1991 | WO |
- Eaton, “The Effect of Overburden Stress on Geopressure Prediction from Well Logs,” Journal of Petroleum Technology, vol. 24, No. 08, Aug. 1972, pp. 929-934.
- Eaton, “The Equation for Geopressure Prediction from Well Logs,” Society of Petroleum Engineers, Sep. 1975, SPE 5544, pp. 1-5 (11 pages).
Type: Grant
Filed: Mar 12, 2015
Date of Patent: Aug 6, 2019
Patent Publication Number: 20160265342
Assignee: STATOIL GULF SERVICES LLC (Houston, TX)
Inventor: Giuseppe De Prisco (Houston, TX)
Primary Examiner: Reema Patel
Assistant Examiner: Steven M Christopher
Application Number: 14/645,535
International Classification: E21B 7/06 (20060101); E21B 47/06 (20120101); E21B 21/08 (20060101); E21B 17/00 (20060101); G01V 3/38 (20060101);