Pipe handling apparatus

A pipe handling apparatus includes a lower mast, upper mast, and trailer. The lower mast and upper mast may be pivotably coupled at a hinge point. The trailer may be coupled to the lower mast by a hydraulic cylinder. The pipe handling apparatus may be transported to a drilling rig and the lower mast mechanically coupled to the drilling rig. The upper mast may be pivoted relative to the lower mast at the hinge point. The lower mast and upper mast may be pivoted from the horizontal position to the vertical position by the hydraulic cylinder.

Skip to: Description  ·  Claims  ·  References Cited  · Patent History  ·  Patent History
Description
CROSS REFERENCE TO RELATED APPLICATIONS

This application is a U.S. non-provisional application which claims priority from U.S. provisional application No. 62/367,977, filed Jul. 28, 2016, which is incorporated by reference herein in its entirety.

TECHNICAL FIELD/FIELD OF THE DISCLOSURE

The present disclosure relates to a drilling rig and specifically a pipe handling apparatus for a drilling rig.

BACKGROUND OF THE DISCLOSURE

When drilling a wellbore, a drill string is extended from the drilling rig into the wellbore. The drill string includes a bit at its lowermost end. The drill string is typically formed from a plurality of end-to-end joined pipe sections. As the wellbore is drilled, additional lengths of drill pipe are added to the drill string to increase the length thereof. The additional lengths of drill pipe, typically sections of two or three individual drill pipes known collectively as a pipe stand, may be stored vertically on the drilling rig. The pipe stands are typically placed standing up on the drilling floor supported by fingerboards at an upper position. The fingerboards separate the stored pipe stands into rows, and prevent the pipe stands from falling over. Typically, the pipe stands lean towards the back of the fingerboard.

SUMMARY

The present disclosure provides for a pipe handling apparatus for a drilling rig. The pipe handling apparatus may include a lower mast. The pipe handling apparatus may further include an upper mast pivotably coupled to the lower mast at a hinge point. The pipe handling apparatus may further include a trailer mechanically coupled to the lower mast by a lifting hydraulic cylinder.

The present disclosure also provides for a method. The method may include providing a pipe handling apparatus. The pipe handling apparatus may include a lower mast including a rig coupler. The pipe handling apparatus may include an upper mast pivotably coupled to the lower mast at a hinge point. The pipe handling apparatus may include a trailer. The method may include transporting the pipe handling apparatus to a drilling rig, mechanically coupling the lower mast to the drilling rig with the rig coupler and a coupling point of the drilling rig, pivoting the upper mast relative to the lower mast at the hinge point, and lifting the lower mast and upper mast from a horizontal position to a vertical position using a lifting hydraulic cylinder mechanically coupled between the lower mast and the trailer.

BRIEF DESCRIPTION OF THE DRAWINGS

The present disclosure is best understood from the following detailed description when read with the accompanying figures. It is emphasized that, in accordance with the standard practice in the industry, various features are not drawn to scale. In fact, the dimensions of the various features may be arbitrarily increased or reduced for clarity of discussion.

FIG. 1 depicts a side view of a pipe handling apparatus consistent with at least one embodiment of the present disclosure and a drilling rig.

FIG. 2 depicts the pipe handling apparatus and drilling rig of FIG. 1 in an alternate position.

FIG. 3 depicts the pipe handling apparatus and drilling rig of FIG. 1 in an alternate position.

FIG. 4 depicts the pipe handling apparatus and drilling rig of FIG. 1 in an alternate position.

FIG. 5 depicts the pipe handling apparatus and drilling rig of FIG. 1 in an alternate position.

FIG. 6 depicts the pipe handling apparatus and drilling rig of FIG. 1 in an alternate position.

FIG. 7 depicts the pipe handling apparatus and drilling rig of FIG. 1 in an alternate position.

FIG. 8 depicts the pipe handling apparatus and drilling rig of FIG. 1 in an alternate position.

DETAILED DESCRIPTION

It is to be understood that the following disclosure provides many different embodiments, or examples, for implementing different features of various embodiments. Specific examples of components and arrangements are described below to simplify the present disclosure. These are, of course, merely examples and are not intended to be limiting. In addition, the present disclosure may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed.

FIG. 1 depicts drilling rig 10 and pipe handling apparatus 100. Drilling rig 10 is shown and described herein as a slingshot rig, but may be any land-based drilling rig. FIG. 1 depicts drilling rig 10 in a drilling floor-lowered position.

In some embodiments, pipe handling apparatus 100 may be configured to be transported by trailer 101. In some embodiments, trailer 101 may be a rockover trailer having wheels 103 and trailer body 105. In some embodiments, pipe handling apparatus 100 may be transported within a wellsite and between wellsites by truck 107 using trailer 101. In some embodiments, pipe handling apparatus 100 may include upper mast 109 and lower mast 111. In some embodiments, upper mast 109 may be pivotably coupled to lower mast 111 at hinge point 117. In some embodiments, pipe handling apparatus 100 may include fingerboards 113 and pipe handler 115 as discussed further herein below.

In some embodiments, pipe handling apparatus 100 may be transportable in a collapsed position as depicted in FIG. 1, in which upper mast 109 is pivoted at hinge point 117 to be substantially parallel to and proximate lower mast 111. Upper mast 109 and lower mast 111 may be substantially horizontal when in the collapsed position. In some embodiments, pipe handling apparatus 100 may be sized such that pipe handling apparatus 100 complies with one or more transportation regulations. For example and without limitation, in some embodiments, pipe handling apparatus 100 and trailer 101 may be formed such that pipe handling apparatus 100 is at most 8′6″ (2.6 m wide. In some embodiments, pipe handling apparatus 100 and trailer 101 may be formed such that pie handling apparatus 100 is at most 9′6″ (2.9 m in height. By forming pipe handling apparatus 100 within these or other applicable size limits, pipe handling apparatus 100 may be a non-permit load when transported in the collapsed position.

In some embodiments, to rig up pipe handling apparatus 100 to drilling rig 10 and position pipe handling apparatus 100 to an operational position as described herein below, pipe handling apparatus 100 may be transported to the wellsite at which drilling rig 10 is located. In some embodiments, pipe handling apparatus 100 may be transported to be proximal to V-door side 12 of drilling rig 10 as depicted in FIG. 2. As used herein, V-door side 12 of drilling rig 10 refers to the side of drilling rig 10 through which tubular members such as, for example and without limitation, drill pipe and casing is introduced onto drilling rig 10 by pipe handling apparatus 100. In some embodiments, V-door side 12 of drilling rig 10 may correspond with the side of drilling rig 10 at which a V-door (not shown) is located, however the use of the term “V-door side” is not intended to limit the scope of this disclosure to a drilling rig 10 having a V-door.

In some embodiments, once pipe handling apparatus 100 is positioned proximal to drilling rig 10, truck 107 may be disconnected from trailer 101 as depicted in FIG. 3. In some such embodiments, trailer body 105 may be positioned on the ground.

In some embodiments, lower mast 111 may include one or more rig couplers 119. Rig couplers 119 may, in some embodiments, be connection points for mechanically coupling pipe handling apparatus 100 to drilling rig 10. In some embodiments, drilling rig 10 may include one or more corresponding coupling points 121 positioned to receive rig couplers 119. In some embodiments, rig couplers 119 and coupling points 121 may mechanically couple pipe handling apparatus 100 to drilling rig 10 such that pipe handling apparatus 100 may pivot relative to drilling rig 10 as discussed further herein below.

In some embodiments, as depicted in FIG. 4, one or more positioning hydraulic cylinders 123 may be coupled between trailer 101 and lower mast 111. Positioning hydraulic cylinders 123 may in some embodiments be utilized to lift upper and lower masts 109, 111 such that rig couplers 119 are aligned with the height of coupling points 121. In some embodiments, as depicted in FIG. 5, positioning hydraulic cylinders 123 may be used to move upper and lower masts 109, 111 such that rig couplers 119 engage coupling points 121. In some embodiments, one or more fasteners such as pins may be inserted to mechanically couple rig couplers 119 with coupling points 121.

In some embodiments, as depicted in FIG. 6, one or more lifting hydraulic cylinders 124 may mechanically couple between trailer 101 and lower mast 111. Lifting hydraulic cylinders 124 may in some embodiments be used to lift upper and lower masts 109, 111 into a raised position as further described below. In some embodiments, positioning hydraulic cylinders 123 may be used as lifting hydraulic cylinders 124. In some embodiments, lifting hydraulic cylinders 124 may raise upper and lower masts 109, 111 to be substantially horizontal by pivoting upper and lower masts 109, 111 at rig couplers 119. In some embodiments, as depicted in FIG. 7, upper mast 109 may be pivoted relative to lower mast 111 at hinge point 117. In some embodiments, fingerboards 113 may pivot into the deployed positions as depicted in FIG. 7. In some embodiments, fingerboards 113 may be provided separately from pipe handling apparatus 100 and may be mechanically coupled to pipe handling apparatus 100. Lifting hydraulic cylinders 124 may then be used to lift pipe handling apparatus 100 into the vertical position as depicted in FIG. 8. In some embodiments, pipe handling apparatus 100 may be mechanically coupled to drilling rig 10 by upper beam 125, which may be pivotably coupled to upper mast 109. Lifting hydraulic cylinders 124 may be decoupled from lower mast 111, and trailer 101 may be transported away from drilling rig 10 for storage.

The foregoing outlines features of several embodiments so that a person of ordinary skill in the art may better understand the aspects of the present disclosure. Such features may be replaced by any one of numerous equivalent alternatives, only some of which are disclosed herein. One of ordinary skill in the art should appreciate that they may readily use the present disclosure as a basis for designing or modifying other processes and structures for carrying out the same purposes and/or achieving the same advantages of the embodiments introduced herein. One of ordinary skill in the art should also realize that such equivalent constructions do not depart from the scope of the present disclosure and that they may make various changes, substitutions, and alterations herein without departing from the spirit and scope of the present disclosure.

Claims

1. A pipe handling apparatus for a drilling rig transportable separately from the drilling rig comprising:

a lower mast;
an upper mast, the upper mast pivotably coupled to the lower mast at a hinge point, the lower mast and upper mast distinct from a mast of the drilling rig; and
a trailer, the trailer mechanically coupled to the lower mast by a lifting hydraulic cylinder.

2. The pipe handling apparatus of claim 1, further comprising a fingerboard.

3. The pipe handling apparatus of claim 1, further comprising a pipe handler.

4. The pipe handling apparatus of claim 1, wherein the lower mast further comprises a rig coupler, the rig coupler mechanically and pivotably coupled to a coupling point on a V-door side of a drilling rig.

5. The pipe handling apparatus of claim 4, further comprising a positioning hydraulic cylinder mechanically coupled between the trailer and the lower mast such that the rig coupler is aligned with a height of the coupling point.

6. The pipe handling apparatus of claim 5, wherein the positioning cylinders is adapted to raise the upper and lower mast to be substantially horizontal.

7. The pipe handling apparatus of claim 1, wherein the trailer is a rockover trailer.

8. The pipe handling apparatus of claim 1, wherein the upper mast and the lower mast are substantially parallel in a lowered position or in a raised position.

9. The pipe handling apparatus of claim 8, wherein the upper mast and lower mast are substantially horizontal in a collapsed position.

10. The pipe handling apparatus of claim 9, wherein the pipe handling apparatus is less than 8′ 6″ wide and less than 9′ 6″ high when the upper mast and lower mast are in a collapsed position.

11. A method comprising:

providing a pipe handling apparatus, the pipe handling apparatus including: a lower mast including a rig coupler; an upper mast, the upper mast pivotably coupled to the lower mast at a hinge point; and a trailer;
transporting the pipe handling apparatus to a drilling rig, the drilling rig having a mast distinct from the upper and lower mast of the pipe handling apparatus;
mechanically coupling the lower mast to a V-door side of the drilling rig with the rig coupler and a coupling point of the drilling rig;
pivoting the upper mast relative to the lower mast at the hinge point; and
lifting the lower mast and upper mast from a horizontal position to a vertical position using a lifting hydraulic cylinder mechanically coupled between the lower mast and the trailer.

12. The method of claim 11, wherein mechanically coupling the lower mast to the drilling rig further comprises aligning the rig coupler with the coupling point of the drilling rig.

13. The method of claim 12, wherein aligning the rig coupler with the coupling point of the drilling rig further comprises lifting the lower mast with a positioning hydraulic cylinder mechanically coupled between the trailer and the lower mast.

14. The method of claim 13, wherein the positioning hydraulic cylinder is the lifting hydraulic cylinder.

15. The method of claim 11, wherein the pipe handling apparatus further comprises a fingerboard pivotably coupled to the upper or lower mast, and the method further comprises pivoting the fingerboard into a deployed position.

16. The method of claim 11, further comprising mechanically coupling a fingerboard to the upper or lower mast.

17. The method of claim 11, further comprising mechanically coupling the upper mast to the drilling rig with an upper beam that is pivotably coupled to the upper mast.

18. The method of claim 11, wherein the trailer is a rockover trailer.

19. The method of claim 11, wherein transporting the pipe handling apparatus to the drilling rig is performed with the upper mast and the lower mast substantially horizontal.

20. The method of claim 11 further comprising after the step of lifting the lower mast and upper mast from a horizontal position to a vertical position:

decoupling the lifting hydraulic cylinder from the lower mast.
Referenced Cited
U.S. Patent Documents
1733484 October 1929 Davis
2332479 October 1943 Woolslayer et al.
2345253 March 1944 Funk
2347115 April 1944 Lewis
2594847 April 1952 Bates et al.
3028881 April 1962 Koomey et al.
3255836 June 1966 Hoppmann et al.
3433268 March 1969 Greer
3483933 December 1969 Dyer et al.
3676984 July 1972 Clark
3716149 February 1973 Scaggs
3739853 June 1973 Wales
3802137 April 1974 Armstrong
3851770 December 1974 Jenkins
3922825 December 1975 Eddy et al.
3937334 February 10, 1976 Bleyl
3942593 March 9, 1976 Reeve, Jr. et al.
3991887 November 16, 1976 Trout
4021978 May 10, 1977 Busse et al.
4029165 June 14, 1977 Miller et al.
RE29541 February 21, 1978 Russell
4117941 October 3, 1978 McCleskey et al.
4221088 September 9, 1980 Patterson
4235566 November 25, 1980 Beeman et al.
4267675 May 19, 1981 Cochran
4290495 September 22, 1981 Elliston
4403898 September 13, 1983 Thompson
4407629 October 4, 1983 Willis
4421179 December 20, 1983 Boyadjieff
4473977 October 2, 1984 Reed
4474254 October 2, 1984 Etter et al.
4478015 October 23, 1984 Lawrence et al.
4478291 October 23, 1984 Futros
4488708 December 18, 1984 Frye
4493382 January 15, 1985 Collins et al.
4587778 May 13, 1986 Woolslayer et al.
4744710 May 17, 1988 Reed
4757592 July 19, 1988 Reed
4759414 July 26, 1988 Willis
4823870 April 25, 1989 Sorokan
4834604 May 30, 1989 Brittain et al.
4837992 June 13, 1989 Hashimoto
4850439 July 25, 1989 Lund
4899832 February 13, 1990 Bierscheid, Jr.
4979578 December 25, 1990 Landry
5107940 April 28, 1992 Berry
5248005 September 28, 1993 Mochizuki
5305833 April 26, 1994 Collins
5375667 December 27, 1994 Trevisani
5492436 February 20, 1996 Suksumake
5921336 July 13, 1999 Reed
6161358 December 19, 2000 Mochizuki et al.
6343892 February 5, 2002 Kristiansen
6491477 December 10, 2002 Bennett, Jr. et al.
6581525 June 24, 2003 Smith
6634436 October 21, 2003 Desai
6779614 August 24, 2004 Oser
6848515 February 1, 2005 Orr et al.
6955223 October 18, 2005 Orr et al.
6962030 November 8, 2005 Conn
6976540 December 20, 2005 Berry
7228919 June 12, 2007 Fehres et al.
7255180 August 14, 2007 Beato et al.
7306055 December 11, 2007 Barnes
7308953 December 18, 2007 Barnes
7401656 July 22, 2008 Wood et al.
7404697 July 29, 2008 Thompson
7600585 October 13, 2009 Patton et al.
7628229 December 8, 2009 Wood et al.
7765749 August 3, 2010 Palidis
7819207 October 26, 2010 Cowan
7832974 November 16, 2010 Fikowski et al.
7931076 April 26, 2011 Ditta et al.
7967540 June 28, 2011 Wright et al.
7992646 August 9, 2011 Wright et al.
8051930 November 8, 2011 Barnes et al.
8181698 May 22, 2012 Springett et al.
8250816 August 28, 2012 Donnally et al.
8297362 October 30, 2012 Strider et al.
8468753 June 25, 2013 Donnally et al.
8474216 July 2, 2013 Goerner
8516751 August 27, 2013 Konduc et al.
8549815 October 8, 2013 Donnally et al.
8555564 October 15, 2013 Wasterval
8561685 October 22, 2013 Rodgers
8661743 March 4, 2014 Flusche
8720128 May 13, 2014 Vogt
8813436 August 26, 2014 Donnally et al.
8863449 October 21, 2014 Donnally et al.
8904716 December 9, 2014 Donnally et al.
8936424 January 20, 2015 Barnes
8985238 March 24, 2015 Sorokan et al.
8997435 April 7, 2015 Reddy et al.
9016004 April 28, 2015 Vogt
9027287 May 12, 2015 Trevithick et al.
9091125 July 28, 2015 Konduc et al.
9091126 July 28, 2015 Thiessen et al.
9091128 July 28, 2015 Orgeron
9132871 September 15, 2015 Crisp et al.
9140080 September 22, 2015 Flusche
9151412 October 6, 2015 Trevithick et al.
9163462 October 20, 2015 Donnally et al.
9212481 December 15, 2015 Stramandinoli
9228394 January 5, 2016 Wijning et al.
9249626 February 2, 2016 Flusche
9260929 February 16, 2016 Mark
9267328 February 23, 2016 Flusche
9291012 March 22, 2016 Wells, Sr.
9334668 May 10, 2016 Wijning et al.
9353601 May 31, 2016 Hause
9382766 July 5, 2016 Flusche
9399890 July 26, 2016 Mark
9441423 September 13, 2016 Donnally et al.
9366053 June 14, 2016 Thiessen et al.
9464488 October 11, 2016 Thiessen
9488014 November 8, 2016 Sparkman et al.
9562407 February 7, 2017 Magnuson
9631443 April 25, 2017 Folk
9650840 May 16, 2017 Cheng et al.
9677298 June 13, 2017 Konduc et al.
9708861 July 18, 2017 Reddy et al.
9790751 October 17, 2017 Reddy et al.
9810027 November 7, 2017 Reddy et al.
9845813 December 19, 2017 Shimizu et al.
9879442 January 30, 2018 Magnuson et al.
9926719 March 27, 2018 Reddy et al.
20020001255 January 3, 2002 Flood
20030172599 September 18, 2003 Frink
20080237170 October 2, 2008 Altman et al.
20080251267 October 16, 2008 Cicognani
20090000218 January 1, 2009 Lee et al.
20090025980 January 29, 2009 Callander et al.
20090053013 February 26, 2009 Maltby
20090159294 June 25, 2009 Abdollahi
20090200856 August 13, 2009 Chehade et al.
20090272540 November 5, 2009 Rodgers
20100034619 February 11, 2010 Orgeron
20100329823 December 30, 2010 Baumler
20110072737 March 31, 2011 Wasterval
20110174545 July 21, 2011 Hartke et al.
20120168179 July 5, 2012 Havinga et al.
20120304553 December 6, 2012 Konduc et al.
20130302114 November 14, 2013 Reddy
20130305632 November 21, 2013 Rivera, Sr. et al.
20130343836 December 26, 2013 Flusche
20140014417 January 16, 2014 Smith et al.
20140054097 February 27, 2014 Bryant et al.
20140133939 May 15, 2014 Richardson
20140298735 October 9, 2014 Vogt
20150259984 September 17, 2015 Taggart
20150300104 October 22, 2015 Orgeron
20150315861 November 5, 2015 Zachariasen et al.
20160186495 June 30, 2016 Flusche
20160215592 July 28, 2016 Helms et al.
20160280524 September 29, 2016 Crisp et al.
20160369570 December 22, 2016 Reddy et al.
20170106925 April 20, 2017 Gupta et al.
20170292334 October 12, 2017 Reddy et al.
20170350153 December 7, 2017 Reddy et al.
20180016851 January 18, 2018 Reddy et al.
20180119496 May 3, 2018 Reddy et al.
20180128056 May 10, 2018 Gupta et al.
Foreign Patent Documents
2755483 November 2010 CA
2753417 February 2011 CA
201778661 March 2011 CN
849533 September 1952 DE
2751370 July 2014 EP
2556042 June 1985 FR
2016025521 February 2016 WO
2016048458 March 2016 WO
Other references
  • www.peerless-ca-trailers, “Oil and Gas, Drilling and Well Servicing” , 2014 (Year: 2014).
  • Nabors 990 Proyecto Llanos_WMV; https://www.youtube.com/watch?v=6BgfgWumRIU, Nabors Rig 990 Chichimene, Colombia; Youtube.com; Aug. 10, 2011 (231 pages).
  • Drilling Contractor; “Nabors modular Rig 702 in Papua New Guinea—bound for ExxonMobil”; Drilling Contractor, in Drilling Rigs & Automation, News, Jul. 6, 2011; 2 pages; www.drillingcontractor.org.
  • Drilling Contractor; “Nabors to base all future land rigs on Minimum Area AC rig concept”; Drilling Contractor, in News, Aug. 22, 2011; 2 pages; www.drillingcontractor.org.
  • Sebastion, Simone; “Big drill soon begins long commute to work”; Houston Chronicle, Sunday, Jul. 3, 2011; 3 pages; www.chron.com.
  • Gaddy, Dean E., “Critical path analysis improves rig-moving procedures”, Oil & Gas Journal, Nov. 16, 1998 (5 pages).
Patent History
Patent number: 10584541
Type: Grant
Filed: Jul 21, 2017
Date of Patent: Mar 10, 2020
Patent Publication Number: 20180030788
Assignee: NABORS DRILLING TECHNOLOGIES USA, INC. (Houston, TX)
Inventors: Padira Reddy (Richmond, TX), Ashish Gupta (Houston, TX), Denver Lee (Houston, TX)
Primary Examiner: Lynn E Schwenning
Application Number: 15/656,894
Classifications
Current U.S. Class: Pivoting Derrick (414/22.56)
International Classification: E21B 15/00 (20060101); E21B 19/14 (20060101); E04H 12/34 (20060101);