STANDING WAVE NUCLEAR FISSION REACTOR AND METHODS
Disclosed embodiments include nuclear fission reactor cores, nuclear fission reactors, methods of operating a nuclear fission reactor, and methods of managing excess reactivity in a nuclear fission reactor.
The present application is a divisional of U.S. patent application Ser. No. 15/477,794 filed Apr. 3, 2017, which is a continuation of U.S. patent application Ser. No. 12/930,259 filed Dec. 30, 2010, which is a continuation application of U.S. patent application Ser. No. 12/925,985 filed Nov. 2, 2010, which is related to and claims the benefit under 35 USC § 119(e) of U.S. Provisional Patent Application No. 61/280,370, filed Nov. 2, 2009.
The United States Patent Office (USPTO) has published a notice to the effect that the USPTO's computer programs require that patent applicants reference both a serial number and indicate whether an application is a continuation or continuation-in-part. Stephen G. Kunin, Benefit of Prior-Filed Application, USPTO Official Gazette Mar. 18, 2003, available at http://www.uspto.gov/web/offices/com/sol/og/2003/week11/patbene.htm. The present Applicant Entity (hereinafter “Applicant”) has provided above a specific reference to the application(s) from which priority is being claimed as recited by statute. Applicant understands that the statute is unambiguous in its specific reference language and does not require either a serial number or any characterization, such as “continuation” or “continuation-in-part,” for claiming priority to U.S. patent applications. Notwithstanding the foregoing, Applicant understands that the USPTO's computer programs have certain data entry requirements, and hence Applicant is designating the present application as a continuation-in-part of its parent applications as set forth above, but expressly points out that such designations are not to be construed in any way as any type of commentary and/or admission as to whether or not the present application contains any new matter in addition to the matter of its parent application(s).
All subject matter of the Related Application and of any and all parent, grandparent, great-grandparent, etc. applications of the Related Application is incorporated herein by reference to the extent such subject matter is not inconsistent herewith.
BACKGROUNDThe present patent application relates to nuclear fission reactors and methods.
SUMMARYDisclosed embodiments include nuclear fission reactor cores, nuclear fission reactors, methods of operating a nuclear fission reactor, and methods of managing excess reactivity in a nuclear fission reactor.
The foregoing is a summary and thus may contain simplifications, generalizations, inclusions, and/or omissions of detail; consequently, those skilled in the art will appreciate that the summary is illustrative only and is NOT intended to be in any way limiting. In addition to any illustrative aspects, embodiments, and features described above, further aspects, embodiments, and features will become apparent by reference to the drawings and the following detailed description. Other aspects, features, and advantages of the devices and/or processes and/or other subject matter described herein will become apparent in the teachings set forth herein.
In the following detailed description, reference is made to the accompanying drawings, which form a part hereof. In the drawings, the use of similar or the same symbols in different drawings typically indicates similar or identical items, unless context dictates otherwise.
The illustrative embodiments described in the detailed description, drawings, and claims are not meant to be limiting. Other embodiments may be utilized, and other changes may be made, without departing from the spirit or scope of the subject matter presented here.
One skilled in the art will recognize that the herein described components (e.g., operations), devices, objects, and the discussion accompanying them are used as examples for the sake of conceptual clarity and that various configuration modifications are contemplated. Consequently, as used herein, the specific exemplars set forth and the accompanying discussion are intended to be representative of their more general classes. In general, use of any specific exemplar is intended to be representative of its class, and the non-inclusion of specific components (e.g., operations), devices, and objects should not be taken limiting.
The present application uses formal outline headings for clarity of presentation. However, it is to be understood that the outline headings are for presentation purposes, and that different types of subject matter may be discussed throughout the application (e.g., device(s)/structure(s) may be described under process(es)/operations heading(s) and/or process(es)/operations may be discussed under structure(s)/process(es) headings; and/or descriptions of single topics may span two or more topic headings). Hence, the use of the formal outline headings is not intended to be in any way limiting.
Overview
Referring now to
Still by way of overview, a nuclear fission reactor core 12 is disposed in a reactor vessel 14. A central core region 16 (
A peripheral core region 24 (
An in-vessel handling system 28 is configured to shuffle ones of the fissile nuclear fuel assemblies 18 and ones of the fertile nuclear fuel assemblies 20a and 20b. The nuclear fission reactor 10 also includes a reactor coolant system 30.
Continuing by way of non-limiting overview, according to some aspects methods are provided for operating a nuclear fission reactor. Given by way of non-limiting example, in some embodiments fissile nuclear fuel material in a plurality of fissile nuclear fuel assemblies is fissioned in a central core region of a nuclear fission reactor core of a nuclear fission reactor. Fissile material is bred in ones of a plurality of fertile nuclear fuel assemblies in the central core region of the nuclear fission reactor core, and selected ones of the plurality of fissile nuclear fuel assemblies and selected ones and selected others of the plurality of fertile nuclear fuel assemblies are shuffled in a manner that establishes a standing wave of breeding fissile nuclear fuel material and fissioning fissile nuclear fuel material.
Continuing by way of non-limiting overview, according to some aspects methods are provided for managing excess reactivity in a nuclear fission reactor. Given by way of non-limiting example, in some embodiments criticality with a positive quantity of reactivity is achieved in a central core region of a reactor core of a nuclear fission reactor. The quantity of reactivity is increased until a predetermined burnup level is achieved in selected ones of fuel assemblies in the reactor core, and the increase in reactivity is compensated for.
Details will be set forth below by way of non-limiting examples.
Illustrative Nuclear Fission Reactors
In the discussion set forth below, details regarding extra-core components of the nuclear fission reactor 10 will be set forth first by way of non-limiting examples. Details regarding extra-core components of the nuclear fission reactor 10 will be set forth next by way of non-limiting examples. This ordering of discussion details will facilitate an understanding of establishment of a standing wave of breeding and fissioning in the nuclear fission reactor core 10.
Extra-Core Components
Still referring to
Embodiments of the nuclear fission reactor 10 are based on elements of liquid metal-cooled, fast reactor technology. For example, in various embodiments the reactor coolant system 30 includes a pool of liquid sodium disposed in the reactor vessel 14. In such cases, the nuclear fission reactor core 12 is submerged in the pool of sodium coolant in the reactor vessel 14. The reactor vessel 14 is surrounded by a containment vessel 32 that helps prevent loss of sodium coolant in the unlikely case of a leak from the reactor vessel 14.
In various embodiments the reactor coolant system 30 also includes reactor coolant pumps 34. The reactor coolant pumps 34 may be any suitable pump as desired, such as for example electromechanical pumps or electromagnetic pumps.
In various embodiments the reactor coolant system 30 also includes heat exchangers 36. The heat exchangers 36 are disposed in the pool of primary liquid sodium. The heat exchangers 36 have non-radioactive intermediate sodium coolant on the other side of the heat exchangers 36. To that end, the heat exchangers 36 may be considered intermediate heat exchangers. Steam generators (not shown for clarity in
The reactor coolant pumps 34 circulate primary sodium coolant through the nuclear fission reactor core 12. The pumped primary sodium coolant exits the nuclear fission reactor core 12 at a top of the nuclear fission reactor core 12 and passes through one side of the heat exchangers 36. Heated intermediate sodium coolant is circulated via intermediate sodium loops 42 to the steam generators (not shown) that, in turn, generate steam to drive turbines (not shown) and electrical generators (not shown).
During periods of reactor shut down, in some embodiments plant electrical loads are powered by the electrical grid and decay heat removal is provided by pony motors (not shown for clarity) on the reactor coolant pumps 34 that deliver reduced reactor coolant flow through heat transport systems.
Referring additionally to
In the safety class decay heat removal system 38b (
Referring back to
It will be appreciated that the in-vessel handling system 28 permits movement of the selected fissile nuclear fuel assemblies 18 and fertile nuclear fuel assemblies 20a and 20b without removing the moved fissile nuclear fuel assemblies 18 and fertile nuclear fuel assemblies 20a and 20b from the nuclear fission reactor 10.
In various embodiments, the in-vessel handling system 28 includes a rotating plug 48 and a rotating plug 50 that are both vertically spaced apart from the top of the nuclear fission reactor core 12. The rotating plug 50 is smaller than the rotating plug 48 and is disposed on top of the rotating plug 48. An offset arm machine 52 extends through the rotating plug 48 to the top of the nuclear fission reactor core 12. The offset arm machine 52 is rotatable through the rotating plug 48. A straight pull machine 54 extends through the rotating plug 50 to the top of the nuclear fission reactor core 12.
Lower ends of the offset arm machine 52 and the straight pull machine 54 include suitable gripping devices, such as grapples or the like, that enable gripping of selected fissile nuclear fuel assemblies 18 and fertile nuclear fuel assemblies 20a and 20b (and in some applications, as will be discussed below, neutron absorber assemblies disposed in the peripheral core region 24) by the offset arm machine 52 and the straight pull machine 54 during movement operations.
Rotation of the rotating plugs 48 and 50 and the offset arm machine 52 allows the offset arm machine 52 and the straight pull machine 54 to be localized to any desired position for pulling a selected assembly out of the nuclear fission reactor core 12 and for re-inserting the selected assembly into the nuclear fission reactor core 12 at any desired empty location.
In some embodiments the in-vessel handling system 28 may be further configured to move ones of the neutron absorber assemblies among selected locations in the peripheral core region 24. In such cases, the locations in the peripheral core region 24 may be selected from predetermined radial locations in the peripheral core region 24 based upon a predetermined burnup level of nuclear fuel assemblies 18, 20a, and/or 20b (depending upon stage of core life and burnup levels) that are located in the peripheral core region 24. In some other embodiments, the in-vessel handling system 28 may be further configured to rotate ones of the neutron absorber assemblies.
In some other embodiments, the in-vessel handling system 28 may be further configured to shuffle ones of the fissile nuclear fuel assemblies 18 and ones of the fertile nuclear fuel assemblies 20a and/or 20b (depending upon stage of core life and burnup levels) between the central core region 16 and a portion of the reactor vessel 14 that is located as desired exterior the nuclear fission reactor core 12.
In-Core Components
Given by way of nonlimiting overview, in embodiments of the nuclear fission reactor core 12 a sufficient number of fissile nuclear fuel assemblies achieve initial criticality and sufficient breeding to approach a steady state reactor core breed-and-burn (breeding-and-fissioning) condition. The fissile assemblies are primarily located in the central core region 16, which generates most of the core power. Fertile nuclear fuel assemblies are placed in the central core region 16 and the peripheral core region 24 and their number is selected such that reactor operation is possible for up to 40 years or more without the need to bring new fuel into the reactor. The initial core loading is configured to achieve criticality with a small amount of excess reactivity and ascension to full power output shortly after initial reactor startup. Excess reactivity increases because of breeding until a predetermined burnup is achieved in a selected number of fuel assemblies. The reactivity increase is compensated by movable reactivity control assemblies, which are gradually inserted into the core to maintain core criticality.
Still given by way of non-limiting overview, a wave of breeding and fissioning (a “breed-burn wave” is originated in the central core region 16 but does not move through fixed core material. Instead, a “standing” wave of breeding and fissioning (“burning”) is established by periodically moving core material in and out of the breed-burn region. This movement of fuel assemblies is referred to as “fuel shuffling” and will be described in more detail later.
Details regarding components within the nuclear fission reactor core 12 will now be discussed by way of non-limiting examples. When relevant, differences over core life in composition and/or burnup levels of fuel assemblies and/or locations of fuel assemblies within the nuclear fission reactor core 12 will be noted.
Regardless of stage of core life, the central core region 16 includes the movable reactivity control assemblies 22. The movable reactivity control assemblies 22 suitably may be provided as control rods and may be moved axially in and/or out of the central core region 16 by associated control rod drive mechanisms. It will be appreciated that axial position of the movable reactivity control assemblies 22 may be adjusted by the control rod drive mechanisms to insert neutron absorbing material into the central core region 16 and/or to remove neutron absorbing material from the central core region 16 as desired (such as to compensate for increases in reactivity, to compensate for decreases in reactivity, to shut down the reactor for planned shutdowns, and/or to start up the reactor after the reactor has been shut down). It will also be appreciated that in some embodiments the movable reactivity control assemblies 22 may perform safety functions, shut as rapidly inserting neutron absorbing material to rapidly shut down the reactor (that is, scramming the reactor). In some embodiments, neutron absorbing material disposed in the movable reactivity control assemblies 22 may include hafnium hydride.
Also regardless of stage of core life, the peripheral core region 24 includes the neutron absorber assemblies 26. Unlike the movable reactivity control assemblies 22 (which may be moved during reactor operation as desired, such as to compensate for increases in reactivity), the neutron absorber assemblies 26 remain in-place and do not move during reactor operation. The neutron absorber assemblies 26 help maintain a low core power level in the peripheral core region 24. This low power level helps to simplify coolant flow requirements in the peripheral core region 24. This low power level also helps to mitigate further increases in burnup in fuel assemblies that previously have been used for power production in the central core region 16 and subsequently have been moved from the central core region 16 to the peripheral core region 24. In some embodiments, neutron absorbing material disposed in the neutron absorber assemblies 26 may include hafnium hydride.
However, as discussed above, in some embodiments, if desired the neutron absorber assemblies 26 may be moved by the in-vessel handling system 28 among selected locations in the peripheral core region 24. As mentioned above, the locations in the peripheral core region 24 may be selected from predetermined radial locations in the peripheral core region 24 based upon a predetermined burnup level of nuclear fuel assemblies 18, 20a, and/or 20b (depending upon stage of core life and burnup levels) that are located in the peripheral core region 24. As also discussed above, in some other embodiments the neutron absorber assemblies 26 may be rotated by the in-vessel handling system 28.
Now that the movable reactivity control assemblies 22 and the neutron absorber assemblies 26 have been discussed, the nuclear fuel assemblies 18, 20a, and 20b will be discussed. As mentioned above, this discussion includes references to various stages of core life.
Regardless of stage of core life, fertile material in the fertile nuclear fuel assemblies 20 (that is, the fertile nuclear fuel assemblies 20a and the fertile nuclear fuel assemblies 20b) includes U238. In various embodiments, the U238 may include natural uranium and/or depleted uranium. Thus, in various embodiments at least one of the fertile nuclear fuel assemblies 20a may include U238 that includes natural uranium. In some other embodiments, at least one of the fertile nuclear fuel assemblies 20a may include U238 that includes depleted uranium. In some embodiments, at least one of the fertile nuclear fuel assemblies 20b may include U238 that includes natural uranium. In some embodiments, at least one of the fertile nuclear fuel assemblies 20b may include U238 that includes depleted uranium. That is, at any point in core life any one or more of the nuclear fuel assemblies 20a may include U238 that includes natural uranium, any one or more of the nuclear fuel assemblies 20a may include U238 that includes depleted uranium, any one or more of the nuclear fuel assemblies 20b may include U238 that includes natural uranium, and/or any one or more of the nuclear fuel assemblies 20b may include U238 that includes depleted uranium.
Thus, regardless of stage of core life, the U238 in the fertile nuclear fuel assemblies 20a and/or 20b need not be limited to any one of natural uranium or depleted uranium. Therefore, at any stage in core life, one or more of the nuclear fuel assemblies 20a may include natural uranium, one or more of the nuclear fuel assemblies 20a may include depleted uranium, one or more of the nuclear fuel assemblies 20b may include natural uranium, and/or one or more of the nuclear fuel assemblies 20b may include depleted uranium.
At beginning of life (BOL), in various embodiments the central core region 16 includes the fissile nuclear fuel assemblies 18, the fertile nuclear fuel assemblies 20a, and the movable reactivity control assemblies 22, and the peripheral core region includes the fertile nuclear fuel assemblies 20b and the neutron absorber assemblies 26. The fertile nuclear fuel assemblies 20a and 20b, the movable reactivity control assemblies 22, and the neutron absorber assemblies 26 have been discussed above for all stages of core life, including BOL.
At BOL, the central core region 16 includes the fissile nuclear fuel assemblies 18 and the fertile nuclear fuel assemblies 20, and during core life (and possibly at end-of-life) the central core region 16 includes the fissile nuclear fuel assemblies 18 and the fertile nuclear fuel assemblies 20a and/or 20b. The nuclear fuel assemblies 18 and 20 may be arranged as desired within the central core region 16. In some embodiments, the nuclear fuel assemblies 18 and 20 may be arranged symmetrically within the central core region 16.
At BOL, the fissile nuclear fuel assemblies 18 include enriched fissile nuclear assemblies 18a. In various embodiments, enriched fissile material in the enriched fissile nuclear assemblies 18a includes U235. Uranium in the enriched fissile nuclear fuel assemblies 18a is typically enriched less than twenty percent (20%) in the U235 isotope. It will be appreciated that in some embodiments (such as the first of a fleet of the nuclear fission reactors 10), at BOL all of the fissile material in the fissile nuclear fuel assemblies 18a includes U235.
However, in other embodiments (such as in later nth-of-a-kind members of a fleet of the nuclear fission reactors 10), as will be discussed below at BOL at least some of the fissile material in the fissile nuclear fuel assemblies 18a may include Pu239 (that has been bred in previous members of the fleet of nuclear fission reactors 10).
It will be further appreciated that only a small mass of fissile nuclear fuel material (relative to the total mass of nuclear fuel material, including fertile nuclear fuel material, included in the nuclear fission reactor core 10 and, as will be appreciated, as opposed to a conventional fast breeder reactor) is entailed in initiating a breeding-and-fissioning (breed-burn) wave in the nuclear fission reactor core 10. Illustrative initiation and propagation of a breeding-and-fissioning (breed-burn) wave is described by way of example and not of limitation in U.S. patent application Ser. No. 11/605,943, published as U.S. Patent Publication 2008/0123797, entitled AUTOMATED NUCLEAR POWER REACTOR FOR LONG-TERM OPERATION, naming RODERICK A. HYDE, MURIEL Y. ISHIKAWA, NATHAN P. MYHRVOLD, and LOWELL L. WOOD, JR. as inventors, filed 28 Nov. 2006, the contents of which are hereby incorporated by reference. It will further be noted that it is within the capacity of a person of skill in the art of nuclear fission reactor design and operation to determine, without undue experimentation, the amount of fissile nuclear fuel material that is entailed in initiating a breeding-and-fissioning (breed-burn) wave in a nuclear fission reactor core 10 of any size as desired.
It will also be appreciated that a breed-burn wave does not move through fixed core material. Instead, a “standing” wave of breeding and burning (fissioning) is established by periodically moving core material in and out of the breed-burn region. This movement of fuel assemblies is referred to as “fuel shuffling” and will be described in more detail later.
It will be appreciated that after BOL the nuclear fission reactor 10 has been started up and the enriched fissile nuclear fuel assemblies 18a have begun fissioning. Some of the neutrons may be absorbed by nuclei of fertile material, such as U238, in the fertile nuclear fuel assemblies 20a in the central core region 16. As a result of such absorption, in some instances the U238 will be converted via capture to U239, then via B decay to Np239, then via further B decay to Pu239. Thus, in such cases the fertile material (that is, U238) in the fertile nuclear fuel assemblies 20a will have been bred to fissile material (that is, Pu239) and, as a result, such fertile nuclear fuel assemblies 20a will have been converted into bred nuclear fuel assemblies 18b.
Therefore, it will be appreciated that after BOL the fissile nuclear fuel assemblies 18 in the central core region 16 include the enriched fissile nuclear fuel assemblies 18a and the bred fissile nuclear fuel assemblies 18b. As discussed above, fissile material in the enriched fissile nuclear fuel assemblies 18a may include U235 and fissile material in the bred fissile nuclear fuel assemblies 18b may include Pu239.
Some of the other neutrons may be absorbed by other nuclei of fertile material, such as U238, in the fertile nuclear fuel assemblies 20a in the central core region 16. As a result of such absorption, in some other instances it will be appreciated that the U238 in some of the fertile nuclear fuel assemblies 20a may undergo fast fission.
It will be further appreciated that, after BOL, some neutrons may leak from the central core region 16 to the peripheral core region 24. In such cases, some of the leaked neutrons may be absorbed by fertile material (such as U238) in the fertile nuclear fuel assemblies 20b in the peripheral core region 24. As a result of such absorption and as discussed above, in some instances the U238 will be converted via capture to U239, then via B decay to Np239, then via further B decay to Pu239. Thus, in such cases the fertile material (that is, U238) in the fertile nuclear fuel assemblies 20b will have been bred to fissile material (that is, Pu239) and, as a result, such fertile nuclear fuel assemblies 20b will have been converted into bred nuclear fuel assemblies 18b. Thus, in such cases, after BOL the peripheral core region 24 may include ones of the bred fissile nuclear fuel assemblies 18b.
Some of the other leaked neutrons may be absorbed by other nuclei of fertile material, such as U238, in the fertile nuclear fuel assemblies 20b in the peripheral core region 24. As a result of such absorption, in some other instances it will be appreciated that the U238 in some of the fertile nuclear fuel assemblies 20b may undergo fast fission. As discussed above, the neutron absorber assemblies 26 help maintain a low power level in the peripheral core region even though fast fission of U238 in the fertile nuclear fuel assemblies 20b in the peripheral core region 24 may occur.
The enriched fissile nuclear fuel assemblies 18a will undergo burnup after BOL. After some time after BOL, the enriched fissile nuclear fuel assemblies 18a will accumulate sufficient burnup such that it will be desired to shuffle (or move) such enriched fissile nuclear fuel assemblies 18a from the central core region 16 to the peripheral core region 24 (with the in-vessel handling system 28). It will be appreciated that a person of skill in the art of nuclear fission reactor design and operation will be able to determine, without undue experimentation, a burnup level at which one of the enriched fissile nuclear fuel assemblies 18a is to be shuffled from the central core region 16 to the peripheral core region 24. Thus, in such cases, the peripheral core region 24 may further include selected ones of the enriched fissile nuclear fuel assemblies 18a having at least a predetermined burnup level.
Likewise, the bred fissile nuclear fuel assemblies 18b will also undergo burnup after BOL. After some time after BOL, the bred fissile nuclear fuel assemblies 18b will accumulate sufficient burnup such that it will be desired to shuffle (or move) such bred fissile nuclear fuel assemblies 18b from the central core region 16 to the peripheral core region 24 (with the in-vessel handling system 28). It will be appreciated that a person of skill in the art of nuclear fission reactor design and operation will be able to determine, without undue experimentation, a burnup level at which one of the enriched fissile nuclear fuel assemblies 18b is to be shuffled from the central core region 16 to the peripheral core region 24. Thus, in such cases, the peripheral core region 24 may further include selected ones of the bred fissile nuclear fuel assemblies 18b having at least a predetermined burnup level.
It will further be appreciated that, as discussed above, some of the fertile nuclear fuel assemblies 20b in the peripheral core region 24 will be converted to the bred fissile nuclear fuel assemblies 18b. As also discussed above, the fertile nuclear fuel assemblies 20b may have been subject to neutron flux levels in the peripheral core region 24 below neutron flux levels in the central core region 16 to which the fertile nuclear fuel assemblies 20a have been subjected. As a result, the peripheral core region 24 may include ones of the bred fissile nuclear fuel assemblies 18b (that is, converted from the fertile nuclear fuel assemblies 20b in the peripheral core region 24) having less than a predetermined burnup level.
During various stages of core life, ones of the neutron absorber assemblies 26 may be moved by the in-vessel handling system 28 among any of several locations in the peripheral core region 24. The locations in the peripheral core region 24 may include predetermined radial locations in the peripheral core region 24 that are selectable based upon a predetermined burnup level of nuclear fuel assemblies 18 and 20 that are located in the peripheral core region 24.
Toward end-of-life (EOL), the enriched fissile nuclear fuel assemblies 18a may have undergone sufficient burnup such that the enriched fissile nuclear fuel assemblies 18a have been shuffled (moved) from the central core region 16 to the peripheral core region 24. Thus, toward EOL the fissile nuclear fuel assemblies 18 that are located in the central core region 16 are the bred fissile nuclear fuel assemblies 18b. Therefore, toward EOL, the fissile nuclear fuel assemblies 18 (in the central core region 16) include the bred fissile nuclear fuel assemblies 18b, and the peripheral core region 24 includes enriched fissile nuclear fuel assemblies 18a having at least a predetermined burnup level.
It will be appreciated that, toward EOL, the peripheral core region may also include bred fissile fuel assemblies 18b. Some of the bred fissile nuclear fuel assemblies 18b in the peripheral core region 24 may include selected ones of the bred fissile nuclear fuel assemblies 18b that have been shuffled from the central core region 16 to the peripheral core region 24 and that have at least a predetermined burnup level. It will further be appreciated that some others of the bred fissile nuclear fuel assemblies 18b in the peripheral core region 24 may include (i) ones of the bred fissile nuclear fuel assemblies 18b that have been shuffled from the central core region 16 to the peripheral core region 24 that have less than a predetermined burnup level and/or (ii) ones of the bred fissile nuclear fuel assemblies 18b that have been converted from ones of the fertile nuclear fuel assemblies 20b (that have resided in the peripheral core region 24) that have less than a predetermined burnup level.
Embodiments of the nuclear fission reactor 10 lend themselves to fuel recycling. Some embodiments of the nuclear fission reactor 10 may discharge their fuel at an average burnup of approximately 15% of initial heavy metal atoms, with axial peaking making the peak burnup in the range of 28-32%. Meanwhile, fissile material bred in various embodiments of the nuclear fission reactor 10 of nominal ‘smear’ composition may remain critical to over 40% average burnup (even without any fission product removal) via melt refining. Including the effect of periodic melt refining can allow burn-ups exceeding 50% to be achieved. Therefore, fuel discharged from a first generation nuclear fission reactor 10 still has most of its potential life remaining from a neutronic standpoint (even before any “life extension” associated with thermal removal of fission products during recladding is considered) and would be available for re-use without any need for chemical reprocessing.
To that end and as mentioned above, in some embodiments (such as in later nth-of-a-kind members of a fleet of the nuclear fission reactors 10), at BOL at least some of the fissile material in the fissile nuclear fuel assemblies 18a may include Pu239 (that has been bred in previous members of the fleet of nuclear fission reactors 10). In some such cases, one or more of the fissile nuclear fuel assemblies 18 may include fissile material that has been discharged from a nuclear fission reactor. Moreover, in some of these cases the fissile nuclear fuel assemblies 18 that include fissile material that has been discharged from a nuclear fission reactor may include re-clad fissile fuel assemblies.
In such embodiments, the fissile nuclear fuel assemblies 18 may be recycled via fuel recladding—a process in which the old clad is removed and the used fuel is refabricated into new fuel. The fissile fuel material is recycled through thermal and physical (but not chemical) processes. The used fuel assemblies are disassembled into individual fuel rods which then have their cladding mechanically cut away. The used fuel then undergoes a high temperature (1300-1400° C.) melt refining process in an inert atmosphere which separates many of the fission products from the fuel in two main ways: (i) the volatile and gaseous fission products (e.g., Br, Kr, Rb, Cd, I, Xe, Cs) simply escape; while (ii) the more than 95% of the chemically-reactive fission products (e.g., Sr, Y, Te, Ba, and rare earths) become oxidized in a reaction with the zirconia crucible and are readily separated. The melt-refined fuel can then be cast or extruded into new fuel slugs, placed into new cladding with a sodium bond, and integrated into new fuel assemblies.
Referring additionally to
In various embodiments the metal fuel may be alloyed with about 3% to about 8% zirconium to dimensionally stabilize the alloy during irradiation and to inhibit low-temperature eutectic and corrosion damage of the cladding. A sodium thermal bond fills the gap that exists between the alloy fuel and the inner wall of the clad tube to allow for fuel swelling and to provide efficient heat transfer which keeps the fuel temperatures low. Individual fuel pins 56 may have a thin wire 58 from about 0.8 mm diameter to about 1.6 mm diameter helically wrapped around the circumference of the clad tubing to provide coolant space and mechanical separation of individual fuel pins 56 within the housing of the fuel assembly 18 and 20 (that also serves as the coolant duct). In various embodiments the cladding, wire wrap, and housing may be fabricated from ferritic-martensitic steel because of its irradiation performance as indicated by a body of empirical data.
Large power differences between the fissile nuclear fuel assemblies 18 in the central core region 16 and the fertile nuclear fuel assemblies 20a and/or 20b in the peripheral core region 24 entail significant differences in assembly flow distribution to match flow to power and thus outlet temperature. In various embodiments this flow distribution is accomplished through orifices, such as a combination of fixed and variable orifices, which make it possible to optimize primary coolant flow proportionally to predicted assembly power.
Referring now to
The fuel assembly flow receptacles 62 have orifices 60 that may be used to match flow to power generated in the nuclear fuel assemblies. For example, the fuel assembly flow receptacles 62 under the peripheral core region 24 have very high-pressure-drop orifices 60 to minimize the flow into very low-power fertile nuclear fuel assemblies 20. On the other hand, the fuel assembly flow receptacles 62 below the nuclear fuel assemblies 18 and 20 in the central core region 16 may be divided into several groups having orifices 60 ranging from very low resistance to higher resistance to match the radial power profile in the central core region 16.
In addition to the fixed orifices 60, in some embodiments each nuclear fission fuel assembly 18 and 20 may have an ability to adjust assembly flow by rotation during fuel shuffling operations to enable minor flow adjustments at the assembly level, if desired.
Thus, in some embodiments, the fuel assembly flow receptacles 62 may define a group of reactor coolant flow orifices 60 in the central core region 16 and another group of reactor coolant flow orifices 60 in the peripheral core region 24. The group of reactor coolant flow orifices 60 in the central core region 16 may include reactor coolant flow orifice groups. In such cases, flow rate through a selected one of the reactor coolant flow orifice groups may be based upon a power profile at a radial location of the selected one of the reactor coolant flow orifice groups. Moreover, flow rate through the reactor coolant flow orifices 60 in the peripheral core region 24 may include a predetermined flow rate based upon power level in the peripheral core region 24.
In various embodiments, the orifices 60 include fixed orifices. In other embodiments, variable orifices may be provided (via rotation of the nuclear fuel assemblies 18 and 20). In some other embodiments, the orifices 60 may include fixed orifices and variable orificing may also be provided (via rotation of the nuclear fuel assemblies 18 and 20).
In some other embodiments and referring additionally to
Utilization of fuel in the nuclear fission reactor core 12 may be further increased by offsetting the assemblies axially (in addition to shuffling the nuclear fuel assemblies 18 and 20 radially). It will be appreciated that relative neutron flux distribution is higher in the central axial zone of the nuclear fission reactor core 12 than in the axial extents of the nuclear fission reactor core 12, as shown by curve 67. Such axially offsetting can allow for fuel bred near the axial extents of the fertile nuclear fuel assemblies 20 to be moved closer to (or, if needed, further from) the central axial zone of the nuclear fission reactor core 12. Such offsetting can thus allow for a higher degree of control of burn-up in the axial dimension, which can further help yield higher fuel utilization.
In some embodiments the stepped core support grid plate 66a may include a single axially-sectioned assembly. In some embodiments the level of offset could be fixed and could include a pre-determined fuel management strategy. In some other embodiments the level of offset may be altered through the use of spacers, such as risers or shims or the like, that may be installed at the bottom of the nuclear fuel assemblies 18 and 20 or directly onto the stepped core support grid plate 66a.
Aspects of operation of embodiments of the nuclear fission reactor core 12 will be explained.
It will be appreciated that various design features of embodiments of the nuclear fission reactor core 10 can help increase the maximum burnup and fluence the fuel can sustain before the accumulation of fission products makes the fuel subcritical.
For example, the fissile nuclear fuel assemblies 18 in the central core region 16 are surrounded by subcritical feed fuel (that is, the fertile nuclear fuel assemblies 20 in the central core region 16 and in the peripheral core region 24), which absorbs leakage neutrons and uses them to breed new fuel. It will be appreciated by those of skill in the art of nuclear reactor design and operation that past a thickness of feed fuel surrounding the central core region 16 of approximately 70 cm (or, depending upon size of the fertile nuclear fuel assemblies 20, about 5 assembly rows) the fraction of neutrons leaking from the nuclear fission reactor core 12 is reduced toward zero.
Such neutron conserving features accomplish two things. First, they minimize the burnup and fluence entailed in achieving breeding-and-fissioning wave propagation, which in turn eases material degradation issues and enables embodiments of the nuclear fission reactor 10 to be made with existing materials. Second, they increase the maximum burnup and fluence the fuel can sustain before the accumulation of fission products makes the fuel subcritical. This second point is illustrated in
Referring additionally to
Meanwhile, as shown by the curve 72, feed fuel in embodiments of the nuclear fission reactor core 12 begins as subcritical fertile fuel in the fertile nuclear fuel assemblies 20 and gains reactivity as Pu239 is bred in. Once the fuel becomes critical, excess reactivity is offset by breeding additional subcritical feed fuel (it will be noted that during the first 50 MWd/kgHM of burn-up, the driver fuel makes the reactor critical). A total fuel burnup of up to 400 MWd/kgHM or higher can be achieved before the fuel becomes subcritical, and since the fuel begins as nearly all U238, the U238 utilization fraction can be greater than 40%.
Referring additionally to
Referring now to
Illustrative Methods
Following are a series of flowcharts depicting implementations. For ease of understanding, the flowcharts are organized such that the initial flowcharts present implementations via an example implementation and thereafter the following flowcharts present alternate implementations and/or expansions of the initial flowchart(s) as either sub-component operations or additional component operations building on one or more earlier-presented flowcharts. Those having skill in the art will appreciate that the style of presentation utilized herein (e.g., beginning with a presentation of a flowchart(s) presenting an example implementation and thereafter providing additions to and/or further details in subsequent flowcharts) generally allows for a rapid and easy understanding of the various process implementations. In addition, those skilled in the art will further appreciate that the style of presentation used herein also lends itself well to modular and/or object-oriented program design paradigms.
Given by way of overview and referring now to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Given by way of overview and referring now to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Given by way of overview and referring now to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
Referring to
All of the above U.S. patents, U.S. patent application publications, U.S. patent applications, foreign patents, foreign patent applications and non-patent publications referred to in this specification and/or listed in any Application Data Sheet, are incorporated herein by reference, to the extent not inconsistent herewith.
With respect to the use of substantially any plural and/or singular terms herein, those having skill in the art can translate from the plural to the singular and/or from the singular to the plural as is appropriate to the context and/or application. The various singular/plural permutations are not expressly set forth herein for sake of clarity.
The herein described subject matter sometimes illustrates different components contained within, or connected with, different other components. It is to be understood that such depicted architectures are merely exemplary, and that in fact many other architectures may be implemented which achieve the same functionality. In a conceptual sense, any arrangement of components to achieve the same functionality is effectively “associated” such that the desired functionality is achieved. Hence, any two components herein combined to achieve a particular functionality can be seen as “associated with” each other such that the desired functionality is achieved, irrespective of architectures or intermedial components. Likewise, any two components so associated can also be viewed as being “operably connected”, or “operably coupled,” to each other to achieve the desired functionality, and any two components capable of being so associated can also be viewed as being “operably couplable,” to each other to achieve the desired functionality. Specific examples of operably couplable include but are not limited to physically mateable and/or physically interacting components, and/or wirelessly interactable, and/or wirelessly interacting components, and/or logically interacting, and/or logically interactable components.
In some instances, one or more components may be referred to herein as “configured to,” “configured by,” “configurable to,” “operable/operative to,” “adapted/adaptable,” “able to,” “conformable/conformed to,” etc. Those skilled in the art will recognize that such terms (e.g. “configured to”) can generally encompass active-state components and/or inactive-state components and/or standby-state components, unless context requires otherwise.
While particular aspects of the present subject matter described herein have been shown and described, it will be apparent to those skilled in the art that, based upon the teachings herein, changes and modifications may be made without departing from the subject matter described herein and its broader aspects and, therefore, the appended claims are to encompass within their scope all such changes and modifications as are within the true spirit and scope of the subject matter described herein. It will be understood by those within the art that, in general, terms used herein, and especially in the appended claims (e.g., bodies of the appended claims) are generally intended as “open” terms (e.g., the term “including” should be interpreted as “including but not limited to,” the term “having” should be interpreted as “having at least,” the term “includes” should be interpreted as “includes but is not limited to,” etc.). It will be further understood by those within the art that if a specific number of an introduced claim recitation is intended, such an intent will be explicitly recited in the claim, and in the absence of such recitation no such intent is present. For example, as an aid to understanding, the following appended claims may contain usage of the introductory phrases “at least one” and “one or more” to introduce claim recitations. However, the use of such phrases should not be construed to imply that the introduction of a claim recitation by the indefinite articles “a” or “an” limits any particular claim containing such introduced claim recitation to claims containing only one such recitation, even when the same claim includes the introductory phrases “one or more” or “at least one” and indefinite articles such as “a” or “an” (e.g., “a” and/or “an” should typically be interpreted to mean “at least one” or “one or more”); the same holds true for the use of definite articles used to introduce claim recitations. In addition, even if a specific number of an introduced claim recitation is explicitly recited, those skilled in the art will recognize that such recitation should typically be interpreted to mean at least the recited number (e.g., the bare recitation of “two recitations,” without other modifiers, typically means at least two recitations, or two or more recitations). Furthermore, in those instances where a convention analogous to “at least one of A, B, and C, etc.” is used, in general such a construction is intended in the sense one having skill in the art would understand the convention (e.g., “a system having at least one of A, B, and C” would include but not be limited to systems that have A alone, B alone, C alone, A and B together, A and C together, B and C together, and/or A, B, and C together, etc.). In those instances where a convention analogous to “at least one of A, B, or C, etc.” is used, in general such a construction is intended in the sense one having skill in the art would understand the convention (e.g., “a system having at least one of A, B, or C” would include but not be limited to systems that have A alone, B alone, C alone, A and B together, A and C together, B and C together, and/or A, B, and C together, etc.). It will be further understood by those within the art that typically a disjunctive word and/or phrase presenting two or more alternative terms, whether in the description, claims, or drawings, should be understood to contemplate the possibilities of including one of the terms, either of the terms, or both terms unless context dictates otherwise. For example, the phrase “A or B” will be typically understood to include the possibilities of “A” or “B” or “A and B.”
With respect to the appended claims, those skilled in the art will appreciate that recited operations therein may generally be performed in any order. Also, although various operational flows are presented in a sequence(s), it should be understood that the various operations may be performed in other orders than those which are illustrated, or may be performed concurrently. Examples of such alternate orderings may include overlapping, interleaved, interrupted, reordered, incremental, preparatory, supplemental, simultaneous, reverse, or other variant orderings, unless context dictates otherwise. Furthermore, terms like “responsive to,” “related to,” or other past-tense adjectives are generally not intended to exclude such variants, unless context dictates otherwise.
Those skilled in the art will appreciate that the foregoing specific exemplary processes and/or devices and/or technologies are representative of more general processes and/or devices and/or technologies taught elsewhere herein, such as in the claims filed herewith and/or elsewhere in the present application.
While various aspects and embodiments have been disclosed herein, other aspects and embodiments will be apparent to those skilled in the art. The various aspects and embodiments disclosed herein are for purposes of illustration and are not intended to be limiting, with the true scope and spirit being indicated by the following claims.
Claims
1. A nuclear fission reactor core of a nuclear fission reactor, the nuclear fission reactor core comprising:
- a central core region and a peripheral core region located radially outward from the central core region;
- a first plurality of nuclear fuel assemblies in the central core region, the first plurality of nuclear fuel assemblies containing fissile nuclear fuel material;
- a second plurality of nuclear fuel assemblies in the central core region, the second plurality of nuclear fuel assemblies containing fertile fuel and/or fissile fuel bred up from fertile fuel in the nuclear fission reactor material;
- a third plurality of nuclear fuel assemblies in the peripheral core region, the third plurality of nuclear fuel assemblies containing fertile nuclear fuel material;
- means for absorbing neutrons in the peripheral core region;
- means for breeding the fertile nuclear fuel material into fissile fuel; and
- means for shuffling at least one of the first plurality of nuclear fuel assemblies and at least one of the second and/or third plurality of nuclear fuel assemblies to establish a standing wave of fissioning fissile nuclear fuel material in the central core region.
2. The nuclear fission reactor core of claim 1, wherein the means for shuffling includes means for shuffling at least one of the first plurality of nuclear fuel assemblies and at least one of the third plurality of nuclear fuel assemblies between the central core region and the peripheral core region to establish the standing wave of breeding fissile nuclear fuel material and fissioning fissile nuclear fuel material.
3. The nuclear fission reactor core of claim 2, wherein the means for shuffling includes means for shuffling at least one of the first plurality of nuclear fuel assemblies and at least one of the second plurality of nuclear fuel assemblies within the central core region to establish the standing wave.
4. The nuclear fission reactor core of claim 3, wherein the means for shuffling includes means for replacing at least one of the first plurality of nuclear fuel assemblies in the central core region with at least one of the second and/or third plurality of nuclear fuel assemblies.
5. The nuclear fission reactor core of claim 4, wherein the means for absorbing neutrons includes means for absorbing neutrons in a first portion of the third plurality of nuclear fuel assemblies in the peripheral core region.
6. The nuclear fission reactor core of claim 5, wherein the means for absorbing neutrons includes means for absorbing neutrons in a second portion of the first plurality of nuclear fuel assemblies shuffled from the central core region to the peripheral core region after burn up.
7. The nuclear fission reactor core of claim 6, wherein the means for absorbing neutrons in the peripheral core region comprises at least one neutron absorber assembly in the peripheral core region.
8. The nuclear fission reactor core of claim 1, further comprising:
- means for flowing reactor coolant in the central core region; and
- means for flowing reactor coolant in the peripheral core region.
9. A nuclear fission reactor comprising:
- a reactor vessel;
- a nuclear fission reactor core having a central core region and a peripheral core region located radially outward from the central core region in the reactor vessel, the central core region including: a first plurality of nuclear fuel assemblies containing fissile nuclear fuel material; a second plurality of nuclear fuel assemblies containing fertile nuclear fuel material; and a plurality of movable reactivity control assemblies; the peripheral core region including: a third plurality of nuclear fuel assemblies containing fertile nuclear fuel material; and a plurality of neutron absorber assemblies, locations of the plurality of neutron absorber assemblies based upon a predetermined stage of core life of the third plurality of nuclear fuel assemblies and any other nuclear fuel assemblies of the peripheral core region;
- means for establishing a standing wave of fissioning fissile nuclear fuel material, the means for establishing including shuffling at least one of the first plurality of nuclear fuel assemblies and at least one of the second and/or third plurality of nuclear fuel assemblies.
10. The nuclear fission reactor of claim 9, wherein the means for shuffling includes means for shuffling at least one of the first plurality of nuclear fuel assemblies and at least one of the third plurality of nuclear fuel assemblies between the central core region and the peripheral core region.
11. The nuclear fission reactor of claim 10, further comprising a reactor coolant system comprising a plurality of fuel assembly flow receptacles defining:
- a first plurality of reactor coolant flow orifices in the central core region; and
- a second plurality of reactor coolant flow orifices in the peripheral core region;
- wherein the first and second pluralities of reactor coolant flow orifices include fixed orifices.
12. The nuclear fission reactor of claim 11, wherein the first and second pluralities of reactor coolant flow orifices further include variable orifices.
Type: Application
Filed: Jun 12, 2022
Publication Date: Nov 17, 2022
Inventors: Charles E. Ahlfeld (La Jolla, CA), Thomas M. Burke (Prosser, WA), Tyler S. Ellis (Bellevue, WA), John R. Gilleland (Kirkland, WA), Jonatan Hejzlar (Cernosice), Pavel Hejzlar (Cernosice), Roderick A. Hyde (Redmond, WA), David G. McAlees (Bellevue, WA), Jon D. McWhirter (Kirkland, WA), Ashok Odedra (Bellevue, WA), Robert C. Petroski (Seattle, WA), Nicholas W. Touran (Seattle, WA), Joshua C. Walter (Kirkland, WA), Kevan D. Weaver (Redmond, WA), Thomas A. Weaver (San Mateo, CA), Charles Whitmer (North Bend, WA), Lowell L. Wood, Jr. (Bellevue, WA), George B. Zimmerman (Lafayette, CA)
Application Number: 17/838,238