Integrated cabinet for energy storage
The broken lines in the drawings depict portions of the integrated cabinet for energy storage that form no part of the claimed design.
Claims
The ornamental design for an integrated cabinet for energy storage as shown and described.
| D285680 | September 16, 1986 | Cederberg |
| D396234 | July 21, 1998 | Yamaguchi |
| D485537 | January 20, 2004 | Hindle |
| D575733 | August 26, 2008 | Murata |
| D590360 | April 14, 2009 | Eglof |
| D631839 | February 1, 2011 | Mockenhaupt |
| D731425 | June 9, 2015 | Hart |
| D763191 | August 9, 2016 | Shatek |
| D860957 | September 24, 2019 | Gao |
| D902141 | November 17, 2020 | Zheng |
| D908649 | January 26, 2021 | Jauhonen |
| D916006 | April 13, 2021 | Leitner |
| D919584 | May 18, 2021 | Reese |
| D958745 | July 26, 2022 | Zheng |
| D976832 | January 31, 2023 | Jorgensen |
| D1005939 | November 28, 2023 | Zhong |
| D1010784 | January 9, 2024 | Berry |
| 20180342892 | November 29, 2018 | Zhou |
| 20210060368 | March 4, 2021 | Jiang |
- “Sembcorp's rapid response Bess system online”, by Pamela Largue, published on powerengineeringint.com on Oct. 22, 2019. URL: <https://www.powerengineeringint.com/emissions-environment/sembcorps-rapid-response-bess-system-online/>. (Year: 2019).
Type: Grant
Filed: Feb 24, 2020
Date of Patent: Nov 12, 2024
Assignee: SUNGROW POWER SUPPLY CO., LTD. (Anhui)
Inventors: Sigen Zheng (Anhui), Guohong Li (Anhui), Zengfu Ding (Anhui), Yang Liu (Anhui)
Primary Examiner: Rosemary K Tarcza
Application Number: 29/725,253