Patents Issued in January 31, 2013
-
Publication number: 20130030565Abstract: A method for compensating for planter shut off delay in a planter includes automatically calculating by an intelligent control associated with the planter, a time delay look-ahead distance based on groundspeed of the planter and a time delay, and a total look-ahead distance based on the time delay look-ahead distance and a distance delay look ahead distance. The method further includes determining by the intelligent control if seeding should be off or on at a point in the field at the total look ahead distance, and sending a signal to a row shutoff device of the planter to control the seeding. A control system is also provided.Type: ApplicationFiled: July 28, 2011Publication date: January 31, 2013Applicant: AG LEADER TECHNOLOGYInventor: ROGER R. ZIELKE
-
Publication number: 20130030566Abstract: This invention provides a system and method for dispensing medication and a dispensing apparatus that comprises a plurality of compartments in an array within a housing, the compartments having respective lids, each of the lids being movable from a closed position to an open position, the respective lids each having a latch that secures the lid in a locked configuration in the closed position. The apparatus has an actuator mechanism that selectively unlocks the latch of each of the lids at a predetermined time so as to place the unlocked lid in an unlocked configuration that enables the lid to be moved to the open position. The compartments of the medication dispenser each receive a removable cup therein that is accessible when a respective of the lids associated therewith is in the open position. Other features, such as communication and messaging and/or audible/visual displays can also be provided.Type: ApplicationFiled: June 4, 2012Publication date: January 31, 2013Applicant: MEDMINDER SYSTEMS, INC.Inventors: Eran Shavelsky, Woodie C. Flowers, Justin F. Aiello
-
Publication number: 20130030567Abstract: An assembly and method for automated installation of a flexible seal to a periphery of a component. The method may include positioning the periphery of the component adjacent to a seal feed assembly; employing a motor to move the seal toward the periphery of the component until a predetermined torque on the motor is reached; stopping movement of the motor when the predetermined torque is reached; moving the component relative to the seal feed assembly; and, as the component is moved relative to the seal feed assembly, automatically maintaining the predetermined torque in the motor by moving the seal toward the periphery of the component. The component may be a vehicle door to which a seal is installed.Type: ApplicationFiled: July 26, 2011Publication date: January 31, 2013Applicant: GM GLOBAL TECHNOLOGY OPERATIONS LLCInventors: Paul R. Pleace, Craig A. Rodriguez, Jean-Yves Chretien, Robert J. Scheuerman, Peter W. Tavora
-
Publication number: 20130030568Abstract: The present invention discloses a method of controlling a robot system and an apparatus thereof. The method of controlling a robot system in accordance with an embodiment of the present invention can include: initializing the master controller by use of a boot loader equipped in the robot system; executing a runtime by loading a runtime execution code stored in a storage space of the master controller; and loading and executing an application program stored in the storage space of the master controller. With an embodiment of the present invention, it becomes possible to manage the application program more efficiently for realizing the functions of the robot system.Type: ApplicationFiled: April 23, 2010Publication date: January 31, 2013Applicant: Samsung Heavy Ind. Co., Ltd.Inventors: Tae Jin Park, Jae Hoon Kim, Young Youl Ha, Sang Dong Park, Sung Min Yoon, Min Su Kim
-
Publication number: 20130030569Abstract: There is provided a control apparatus and control method for robot arm, robot, control program for robot arm, and integrated electronic circuit, which can improve robot arm operability upon performing tasks such as cooperative conveyance and direct teaching. The grip portion separated from the end effector attached to the robot arm is provided. When a person grips and shifts the grip portion, a tracking control unit controls so that the robot arm follows the shift. A fixing switch unit switches between a fixing state where, upon switching to “playback mode”, a fixing portion is located at a fixed position to fix the end effector and the grip portion to maintain a gap distance therebetween and a relatively shiftable state where, upon switching to “teaching mode”, the fixing portion is located at an accommodated position to relatively shift them from each other without maintaining the gap distance.Type: ApplicationFiled: September 28, 2012Publication date: January 31, 2013Applicant: PANASONIC CORPORATIONInventor: PANASONIC CORPORATION
-
Publication number: 20130030570Abstract: Provided is a robot device including an image input unit for inputting an image of surroundings, a target object detection unit for detecting an object from the input image, an object position detection unit for detecting a position of the object, an environment information acquisition unit for acquiring surrounding environment information of the position of the object, an optimum posture acquisition unit for acquiring an optimum posture corresponding to the surrounding environment information for the object, an object posture detection unit for detecting a current posture of the object from the input image, an object posture comparison unit for comparing the current posture of the object to the optimum posture of the object, and an object posture correction unit for correcting the posture of the object when the object posture comparison unit determines that there is a predetermined difference or more between the current posture and the optimum posture.Type: ApplicationFiled: July 10, 2012Publication date: January 31, 2013Applicant: Sony CorporationInventors: Satoru SHIMIZU, Kenta Kawamoto, Yoshiaki Iwai
-
Publication number: 20130030571Abstract: A robotized surgery system (10) comprises at least one robot arm (11) which acts under the control of a control console (12) intended for the surgeon. The console (12) comprises an eye tracking system (21) for detecting the direction of the surgeon's gaze and for entering commands depending on the directions of the gaze detected. The console (22) comprises advantageously a screen (23) with at least one zone (23) for viewing the operating field and, among the commands which can be performed depending on the gaze directions, there is advantageously an automatic command for enabling or disabling the movement of the robot arm (11) when a gaze direction which falls within or outside of said zone (23) of the screen is detected.Type: ApplicationFiled: April 1, 2011Publication date: January 31, 2013Applicant: SOFAR SPAInventors: Emilio Ruiz Morales, Damien Brasset, Paolo Invernizzi
-
Publication number: 20130030572Abstract: A motion control interface device includes an FPGA configured to implement a step generation algorithm that generates step control signals for a motion device. The signals are not determined based directly on time, but instead are determined from the position of the motion device. More particularly, the step generation algorithm operates to keep track of a position fraction based on the position. The position fraction is incremented (or decremented) at each clock tick of the FPGA. The algorithm generates rising edge signals when the position fraction crosses a particular threshold value, referred to as the rising edge threshold value. Similarly, the algorithm signals direction changes when the position fraction crosses a threshold referred to as the direction change threshold value.Type: ApplicationFiled: July 29, 2011Publication date: January 31, 2013Inventor: Kiran Sreekantham
-
Publication number: 20130030573Abstract: A method and device are disclosed for automatically providing control parameters for a plurality of coal mills supplying coal powder for example to a furnace of a power plant. An exemplary method includes (a) acquiring a multiplicity of operation variables indicative of a load of an individual coal mill for each of the coal mills; (b) acquiring a demand variable indicative of a coal demand from the plant; (c) supplying the acquired multiplicity of operation variables and the demand variable to a computing system; (d) calculating the control parameters based on the multiplicity of operation variables and the demand variable using a multivariable calculation algorithm; and (e) providing the calculated control parameters for controlling each coal mill individually.Type: ApplicationFiled: September 19, 2012Publication date: January 31, 2013Applicant: ABB RESEARCH LTDInventors: Mehmet MERCANGOEZ, Tarun Mathur, Thomas Von Hoff
-
Publication number: 20130030574Abstract: A method for detecting heating, ventilation, and air conditioning (HVAC) components is provided. The method includes the steps of measuring an initial current at a current sensor in a circuit, while a relay is de-energized; energizing the relay; measuring, at a periodic interval, an energized current while the relay is energized; incrementing a counter if an absolute difference between a first voltage related to the energized current and a second voltage related to the initial current is above a threshold; and determining a HVAC component is present if the counter exceeds a pre-determined value during a pre-determined time period.Type: ApplicationFiled: October 31, 2011Publication date: January 31, 2013Applicant: TRANE INTERNATIONAL INC.Inventors: Timothy Wayne Storm, Daniel J. Mitchell
-
Publication number: 20130030575Abstract: A method for controlling a system includes receiving temperature and humidity measurements of supply air to a serviced space, return air from the serviced space, and outside air, wherein the outside air includes air outside the serviced space, calculating a volumetric flow rate of the outside air entering the system using the received temperature and humidity measurements of the supply air, the return air, and the outside air, calculating an air change per hour (ACH) rate in the serviced space using the calculated volumetric flow rate of the air outside the serviced space entering the system and the volume of the serviced space, and controlling the ACH rate in the serviced space.Type: ApplicationFiled: July 27, 2012Publication date: January 31, 2013Applicant: CARRIER CORPORATIONInventor: Daniel J. Dempsey
-
Publication number: 20130030576Abstract: A thermostatic controller is configured for curtailing load when energy price rate is high. One or more energy price rates received by a receiver device are stored in an electronic memory. A microprocessor is operable to select from the one or more energy price rates the lowest energy price rate received within a given time period for establishing a base energy price rate. The microprocessor is operable to determine if the energy price rate for a present time period exceeds the base energy price rate by more than a first percentage or multiplier factor of the base energy price rate. In response to an energy price rate that exceeds the base energy price rate by more than the first percentage or multiplier factor, the microprocessor is configured to select a first temperature offset corresponding to the first percentage or multiplier factor and change the set point temperature by the first temperature offset.Type: ApplicationFiled: October 8, 2012Publication date: January 31, 2013Applicant: EMERSON ELECTRIC CO.Inventor: EMERSON ELECTRIC CO.
-
Publication number: 20130030577Abstract: A method of detecting and responding to a threat condition includes receiving, at a sensing module, an input acquired in proximity to a pipeline of a fluid distribution system, the input including data associated with a vibration measurement of the pipeline acquired by a sensor exterior of the pipeline. The method also includes determining whether the input indicates a threat condition by comparing the data to a previously recorded baseline vibration measurement. The method further includes automatically closing a first fluid transmission valve in response to a determined threat condition, thereby restricting flow of fluid through the pipeline in a vicinity of the first fluid transmission valve, and wirelessly transmitting a message for receipt by a control module that is remote from the sensing module, the message including indications of the determined threat condition, the first fluid transmission valve, and an identifier associated with the sensing module.Type: ApplicationFiled: May 31, 2012Publication date: January 31, 2013Inventors: John A. Jarrell, Robert C. Hendrickson
-
Publication number: 20130030578Abstract: An appliance including a housing, a dispenser, and a water supply mechanism. The appliance includes a drink supply mechanism configured to removably hold a plurality of drink supply containers, a user interface panel, and a computer. The computer is configured to: cause the user interface panel to display a plurality of different images, each image associated with a different one of a plurality of different beverages which correspond to a drink supply in at least one of the plurality of drink supply containers held by the drink supply mechanism, enable the user interface panel to receive an input from a user of a selected one of the plurality of different displayed images, and after receiving the input from the user of the selected one of the plurality of different displayed images, cause the dispenser to dispense the beverage corresponding to the selected image.Type: ApplicationFiled: September 28, 2012Publication date: January 31, 2013Applicant: BEVERAGE WORKS, INC.Inventor: BEVERAGE WORKS, INC.
-
Publication number: 20130030579Abstract: Devices and methods for the decentralized, coordinated control of the active power losses of an electrical distribution system are provided. For example, a controller may include a network interface and data processing circuitry. The network interface may receive first measurements associated with a segment of an electrical distribution system and transmit a control signal configured to control equipment of the segment of the electrical distribution system. The data processing circuitry may run digital simulations of the segment of the electrical distribution system in various equipment configurations, selecting from among the various equipment configurations an equipment configuration that is expected to cause the active power losses of the segment to approach a desired value. The data processing circuitry then may generate the control signal, which may cause the equipment of the segment of the electrical distribution system to conform to the equipment configuration.Type: ApplicationFiled: July 26, 2011Publication date: January 31, 2013Applicant: GENERAL ELECTRIC COMPANYInventors: Borka Milosevic, Willem Hendrik Du Toit, Aleksandar Vukojevic
-
Publication number: 20130030580Abstract: A network of collection, charging and distribution machines collect, charge and distribute portable electrical energy storage devices (e.g., batteries, supercapacitors or ultracapacitors). Locations of collection, charging and distribution machines having available charged portable electrical energy storage devices are communicated to or acquired by a mobile device of a user, or displayed on a collection, charging and distribution machine. The locations are indicated on a graphical user interface on a map on a user's mobile device relative to the user's current location. The user may use their mobile device select particular locations on the map to reserve an available portable electrical energy storage device. The system nay also warn the user that the user is near an edge of the pre-determined area having portable electrical energy storage device collection, charging and distribution machines. Reservations may also be made automatically based on information regarding a potential route of a user.Type: ApplicationFiled: July 26, 2012Publication date: January 31, 2013Applicant: GOGORO, INC.Inventors: Hok-Sum Horace Luke, Yi-Tsung Wu, Jung-Hsiu Chen, Yulin Wu, Chien Ming Huang, TsungTing Chan, Shen-Chi Chen, Feng Kai Yang
-
Publication number: 20130030581Abstract: A network of collection, charging and distribution machines collect, charge and distribute portable electrical energy storage devices (e.g., batteries, supercapacitors or ultracapacitors). To charge, the machines employ electrical current from an external source, such as the electrical grid or an electrical service of an installation location. As demand at individual collection, charging and distribution machines increases or decreases relative to other collection, charging and distribution machines, a distribution management system initiates redistribution of portable electrical energy storage devices from one collection, charging and distribution machine to another collection, charging and distribution machine in an expeditious manner. Also, redeemable incentives are offered to users to return or exchange their portable electrical energy storage devices at selected collection, charging and distribution machines within the network to effect the redistribution.Type: ApplicationFiled: July 26, 2012Publication date: January 31, 2013Applicant: GOGORO, INC.Inventors: Hok-Sum Horace Luke, Matthew Whiting Taylor
-
Publication number: 20130030582Abstract: Various methods and systems are provided for evaluation of events such as the startup of power generation units. In one embodiment, a method includes obtaining operational data associated with a power generation unit, the operational data corresponding to a predefined period of time; determining start and end times for a startup phase associated with the power generation unit based upon a set of predefined startup conditions corresponding to the startup phase; and generating a network page including the start and times. In another embodiment, a system includes a unit evaluation system executable in a computing device that includes logic that obtains operational data associated with a power generation unit, the operational data corresponding to a predefined period of time and logic that determines start and end times for an event phase associated with the power generation unit based upon a set of predefined conditions corresponding to the event phase.Type: ApplicationFiled: July 29, 2011Publication date: January 31, 2013Applicant: SOUTHERN COMPANY SERVICES, INC.Inventors: Antonio Chamblin, Kenneth Clifford Barnett
-
Publication number: 20130030583Abstract: An energy management system is augmented with sharing of non-binding consumer premises (CP) energy forecasts. Generally speaking, information sourced at a CP is received by CP equipment. The CP equipment creates a non-binding energy forecast for the CP using the CP-sourced information. The forecast is transmitted from the CP equipment to management premises (MP) equipment. The MP equipment may use the forecast to regulate at least one of electricity supply or demand at the CP.Type: ApplicationFiled: July 29, 2011Publication date: January 31, 2013Inventor: James E. Owen
-
Publication number: 20130030584Abstract: A power distribution system is provided, including at least one capacitor bank with a capacitor bank controller, a transformer, at least one voltage regulating device with a voltage regulating device controller, and a controller. The capacitor bank is selectively connected to the feeder and a capacitor bank controller. The capacitor bank controller controls a switch for selectively connecting the capacitor bank to the feeder. The transformer delivers power to the power distribution system through the feeder. The transformer converts a transmission or a sub-transmission voltage into a distribution voltage. The controller is in communication with the capacitor bank controller, the voltage regulating device, and the transformer. The controller selectively switches the at least one capacitor bank to adjust voltage in the feeder. The controller selectively sends commands to the voltage regulating device to change a source voltage.Type: ApplicationFiled: July 25, 2011Publication date: January 31, 2013Applicant: GENERAL ELECTRIC COMPANYInventors: Borka Milosevic, Kamal Mannar, Aleksandar Vukojevic
-
Publication number: 20130030585Abstract: A system and method for providing energy assessment and optimization in a data center that includes at least one cooling provider, and at least one cooling consumer, the at least one cooling consumer having cooling requirements. The method according to one aspect includes receiving data regarding cooling availability and power consumption for the at least one cooling consumer, cooling capacity of the at least one cooling provider, and a physical relationship between the at least one cooling consumer and the at least one cooling provider in the data center, storing the received data, determining airflow distribution effectiveness between the at least one cooling consumer and the at least one cooling provider, and displaying at least one value representative of the effectiveness of the distribution of airflow in the data center between the at least one cooling consumer and the at least one cooling provider.Type: ApplicationFiled: June 26, 2012Publication date: January 31, 2013Inventors: Neil Rasmussen, James W. VanGilder, Xuanhang Zhang
-
Publication number: 20130030586Abstract: Devices and methods for the decentralized, coordinated control of the voltage of an electrical distribution system are provided. For example, a controller may include a network interface and data processing circuitry. The network interface may receive first measurements associated with a segment of an electrical distribution system and transmit a control signal configured to control equipment of the segment of the electrical distribution system. The data processing circuitry may run digital simulations of the segment of the electrical distribution system in various equipment configurations, selecting from among the various equipment configurations an equipment configuration that is expected to cause the voltage deviation of the segment to approach a desired value. The data processing circuitry then may generate the control signal, which may cause the equipment of the segment of the electrical distribution system to conform to the equipment configuration.Type: ApplicationFiled: July 26, 2011Publication date: January 31, 2013Applicant: GENERAL ELECTRIC COMPANYInventors: Borka Milosevic, Willem Hendrik Du Toit, Aleksandar Vukojevic
-
Publication number: 20130030587Abstract: A power curtailment system is electrically coupled to a power converter and configured to control the power converter to adjust output power of the power converter in response to a power curtailment requirement condition. The power curtailment system includes at least one sensor configured to measure at least one environmental factor in an environment of the power converter over time. The power curtailment system further includes a controller configured to adjust a power curve over time based on the at least one environmental factor and, upon the power curtailment requirement condition, control the power converter to provide an adjusted output power based on data from the power curve and the power curtailment requirement condition.Type: ApplicationFiled: July 29, 2011Publication date: January 31, 2013Applicant: GENERAL ELECTRIC COMPANYInventors: Said Farouk Said El-Barbari, Juan Manuel de Bedout, David Smith, Anthony William Galbraith
-
Publication number: 20130030588Abstract: In a multiphase electrical power construction and assignment, a processor: determines a phase and voltage configuration for bi-directional power device pairs; determines a given bi-directional power device pair is to be coupled to a given phase connection based on the configuration; determines whether the given bi-directional power devices in the given bi-directional power device pair are to be coupled to each other; confirms that the given bi-directional power device pair is not coupled to any of the plurality of phase connections; couples the given bi-directional power device pair to the given phase connections, where power signals of the given bi-directional power device pair are synchronized with a power signal of the given phase connection; and in response to determining that the given bi-directional power devices are to be coupled to each other, couples each of the bi-directional power devices to a short bus.Type: ApplicationFiled: December 29, 2011Publication date: January 31, 2013Applicant: POWERGETICS, INC.Inventor: Lynn Smith
-
Publication number: 20130030589Abstract: A load control device is able to receive radio-frequency (RF) signals from a Wi-Fi-enabled device, such as a smart phone, via a wireless local area network. The load control device comprises a controllably conductive device adapted to be coupled in series between an AC power source and an electrical load, a controller for rendering the controllably conductive device conductive and non-conductive, and a Wi-Fi module operable to receive the RF signals from the wireless network. The controller controls the controllably conductive device to adjust the power delivered to the load in response to the wireless signals received from the wireless network. The load control device may further comprise an optical module operable to receive an optical signal, such that the controller may obtain an IP address from the received optical signal and control the power delivered to the load in response to a wireless signal that includes the IP address.Type: ApplicationFiled: June 29, 2012Publication date: January 31, 2013Applicant: LUTRON ELECTRONICS CO., INC.Inventors: Michael W. Pessina, Theodore F. Economy, John C. Browne, JR.
-
Publication number: 20130030590Abstract: An apparatus and method for managing consumption of electricity of loads at a site which includes energy storage, a system controller, and load shedding ability. The system controller monitors energy consumption of the site and discharges energy into the site when consumption exceeds a maximum consumption threshold. If energy storage is depleted while consumption remains in excess of the threshold the controller may engage load shedding to prevent consumption from exceeding the maximum threshold. Additionally, the energy storage device may recharge during a peak consumption period due to load shedding reducing consumption below the maximum threshold, and the energy storage device may use this recovered energy to further mitigate the peak; in some embodiments, repetitively. Supplemental and additional load mitigation techniques may also be implemented to increase effectiveness and efficiency of the systems and methods.Type: ApplicationFiled: July 30, 2012Publication date: January 31, 2013Applicant: GREEN CHARGE NETWORKS LLCInventor: Ronald D. Prosser
-
Publication number: 20130030591Abstract: A voltage control and conservation (VCC) system is provided, which includes three subsystems, including an energy delivery (ED) system, an energy control (EC) system and an energy regulation (ER) system. The VCC system is configured to monitor energy usage at the ED system and determine one or more energy delivery parameters at the EC system. The EC system may then provide the one or more energy delivery parameters to the ER system to adjust the energy delivered to a plurality of users for maximum energy conservation.Type: ApplicationFiled: August 6, 2012Publication date: January 31, 2013Inventors: Phillip W. Powell, Steven K. Parker, Melissa A. Bollbach, Mark L. Pruett
-
Publication number: 20130030592Abstract: A unit includes a receiving member of sensor information of the unit, a communication member with the other units, a storage member for storing target building information and information on sensors and facilities in an information-exchangeable manner, an identification member for identifying an internal unit and an external unit of the other building by specific information, an optimization member for reading an energy calculation expression, etc., of the internal unit, selecting an operation condition provided, and performing simulation of the entire target building, a related-unit searching member for searching the other internal unit and the external unit for a related unit, an optimization member for reading an operation condition from the related units, performing simulation for optimization, and an operation member for operating the facilities on the basis of the operation condition and the sensor information.Type: ApplicationFiled: September 24, 2010Publication date: January 31, 2013Inventor: Bumpei Magori
-
Publication number: 20130030593Abstract: A method and apparatus comprising a switch and a charging management module. The switch is configured to control an electrical connection between a charging device for a battery and a power source. A current flows from the power source through the charging device to the battery to charge the battery when the electrical connection is present between the charging device and the power source. The charging management module is configured to identify a period of time for charging the battery and to control the switch to electrically connect the charging device for the battery to the power source during the period of time identified for charging the battery.Type: ApplicationFiled: July 27, 2011Publication date: January 31, 2013Applicant: THE BOEING COMPANYInventors: Lijun Gao, John M. Fifield, George M. Roe
-
Publication number: 20130030594Abstract: Aspects of the invention provide for an electric vehicle charging station (EVCS). In one embodiment, the EVCS may include: a charging outlet configured to receive a chargeable device; a contactor operably connected to the charging outlet and electrically connected to an advanced metering infrastructure (AMI) meter; and an EVCS controller configured to receive a set of instructions from the AMI meter about modifying an amount of power supplied to the charging outlet, wherein the EVCS controller is configured to modify the amount of power supplied to the charging outlet via the contactor in response to receiving the set of instructions.Type: ApplicationFiled: July 27, 2011Publication date: January 31, 2013Applicant: GENERAL ELECTRIC COMPANYInventors: Brian Matthew Aiken, Christopher Charles Yasko
-
Publication number: 20130030595Abstract: Methods and apparatus for implementing power management systems using a peak demand factor are described and disclosed herein. An exemplary method includes gathering load samples from a site, generating a plurality of peak demand factors based on the load samples, performing an analysis to determine feasible demand reduction based on the peak demand factors, such as by plotting the demand reduction against the peak demand factors and finding one or more points at which demand reduction is particularly advantageous, selecting a maximum percentage of peak reduction matched with a peak demand factor, and implementing a power management system corresponding to the selected peak demand factor. Embodiments disclosed may provide means for quickly determining a superior peak demand reduction strategy or configuration for a site, thereby reducing the time and labor costs of excessive experimentation presently used to implement demand management systems.Type: ApplicationFiled: July 27, 2012Publication date: January 31, 2013Applicant: GREEN CHARGE NETWORKS LLC.Inventor: Bryan M. Chow
-
Publication number: 20130030596Abstract: A battery monitoring device for real-time measurement and monitoring of a battery module driving an actual load and having a plurality battery cells connected together in series, has a plurality of power and impedance calculators provided for the respective battery cells, and configured to receive voltage signals and current signals from the battery cells, respectively and to measure instantaneous power values and internal impedance characteristics of the battery cells, respectively, and a battery module state manager configured to receive output data of the power and impedance calculators via an internal bus.Type: ApplicationFiled: July 30, 2012Publication date: January 31, 2013Applicant: YOKOGAWA ELECTRIC CORPORATIONInventors: Syuhei OKADA, Satoshi YOSHITAKE
-
Publication number: 20130030597Abstract: Devices and methods for the decentralized, coordinated control of the power factor on an electrical distribution system are provided. For example, a controller may include a network interface and data processing circuitry. The network interface may receive first measurements associated with a segment of an electrical distribution system and transmit a control signal configured to control equipment of the segment of the electrical distribution system. The data processing circuitry may run simulations of the segment of the electrical distribution system in various equipment configurations, selecting from among the various equipment configurations an equipment configuration that is expected to cause the power factor to approach a desired value. The data processing circuitry then may generate the control signal, which may cause the equipment of the segment of the electrical distribution system to conform to the equipment configuration and thereby control the power factor.Type: ApplicationFiled: July 26, 2011Publication date: January 31, 2013Applicant: GENERAL ELECTRIC COMPANYInventors: Borka Milosevic, Willem Hendrik Du Toit, Aleksandar Vukojevic
-
Publication number: 20130030598Abstract: Devices and methods for the decentralized, coordinated control of the voltage and active power losses of an electrical distribution system in light of one another are provided. For example, a controller may include a network interface and data processing circuitry. The network interface may receive first measurements associated with a segment of an electrical distribution system and transmit a control signal configured to control equipment of the segment of the electrical distribution system. The data processing circuitry may run simulations of the segment of the electrical distribution system in various equipment configurations, selecting from among the various configurations one that is expected to cause the voltage deviation and the active power losses of the segment to approach desired values while keeping power factor within a desired range.Type: ApplicationFiled: July 26, 2011Publication date: January 31, 2013Applicant: GENERAL ELECTRIC COMPANYInventors: Borka Milosevic, Willem Hendrik Du Toit, Aleksandar Vukojevic
-
Publication number: 20130030599Abstract: Devices and methods for decentralized coordinated Volt/VAR control are provided. Such a device may allow, for example, an operational parameter such as voltage, power losses, a combination of these, and/or power factor to be optimized on a segment of an electrical distribution system under certain conditions. For example, a controller may include a network interface to receive measurements and data processing circuitry to optimize a voltage deviation, active power losses, or a combination thereof, based at least in part on the total load on the segment of the electrical distribution system.Type: ApplicationFiled: July 26, 2011Publication date: January 31, 2013Applicant: General Electric CompanyInventors: Borka Milosevic, Willem Hendrik Du Toit, Aleksandar Vukojevic
-
Publication number: 20130030600Abstract: Systems and methods for managing a programmable thermostat are described herein. One or more system embodiments include a programmable thermostat having a first management profile; a data acquisition subsystem; and a data analysis subsystem. The data acquisition subsystem is configured to receive thermostat data from the programmable thermostat, and the data analysis subsystem is configured to receive the thermostat data from the data acquisition subsystem, and determine a second management profile for the programmable thermostat based, at least in part, on the thermostat data.Type: ApplicationFiled: July 27, 2011Publication date: January 31, 2013Applicant: HONEYWELL INTERNATIONAL INC.Inventors: Pradeep Shetty, Wendy Foslien, Keith Curtner, Purnaprajna R. Mangsuli, Soumitri Kolavennu
-
Publication number: 20130030601Abstract: Disclosed is a technique for controlling the stability of a vehicle via in-wheel motors. More specifically, a steering angle, a wheel speed, a lateral G-Force, and a yaw rate calculated, and the lateral G-Force is compared with a predetermined lateral G-Force threshold. Next, a predetermined yaw rate control threshold is compared with a difference between an actual yaw rate and a demand yaw rate based on the calculated steering angle and wheel speed. The demand yaw rate and the actual yaw rate are then compared when the difference between the demand yaw rate and the actual yaw rate is greater than the yaw rate control threshold, and a final torque value is generated according to the difference between the demand yaw rate and the actual yaw rate.Type: ApplicationFiled: December 6, 2011Publication date: January 31, 2013Applicant: Hyundai Motor CompanyInventor: Sangyon Yoon
-
Publication number: 20130030602Abstract: A lane assistance system using an in-wheel system according to an exemplary embodiment of the present invention may include determining a lane deviation danger of a vehicle whether a vehicle is in danger of deviating from a lane, calculating a necessary yaw rate to assist a driver in maintaining a the vehicle in the intended lane of travel, calculate a demand yaw rate through a difference between the calculated necessary yaw rate and an actual yaw rate, and calculate a distribution amount of a driving torque of torque vectoring for achieving the demand yaw rate. In doing so, the lane assistance system controls the torque selectively applied to each wheel according to the above calculations.Type: ApplicationFiled: December 8, 2011Publication date: January 31, 2013Applicant: HYUNDAI MOTOR COMPANYInventor: Ji Yoel Joeng
-
Publication number: 20130030603Abstract: A bicycle communication adapter is provided with a voltage converting component, a signal converting component and a superimposing component. The voltage converting component is configured to convert a received voltage supplied from a bicycle electrical management system to a converted voltage suitable for at least one of a plurality of electric devices of a bicycle electrical system. The signal converting component is configured to convert a received signal outputted from a bicycle electrical management system into a converted signal compliant with a standard for power line communication. The superimposing component is configured to superimpose the converted signal converted by the signal converting component onto the converted voltage converted by the voltage converting component.Type: ApplicationFiled: July 12, 2012Publication date: January 31, 2013Applicant: SHIMANO INC.Inventors: Akinori HASHIMOTO, Tetsuya MATSUMOTO
-
Publication number: 20130030604Abstract: A controller system for vehicle which has a plurality of driving modes which influence driving feeling, and performs selection from the driving modes and the regulation by inputs from a selecting switch, a forward sequence regulating switch, and a reverse sequence regulating switch. For each input from the selecting switch, changing to the driving mode according to a predetermined normal order. For each input from each of the regulating switches, the current controlled step is changed in a predetermined tendency direction. In a state where the controlled step reaches a final step, the state of the final step is maintained even when the same regulating signal is inputted.Type: ApplicationFiled: July 24, 2012Publication date: January 31, 2013Inventors: Takeru Ohshima, Satoshi Takaya, Ichiro Umetani
-
Publication number: 20130030605Abstract: A vehicle monitoring system permits a user to designate some usage as personal, such that the location of the vehicle is not tracked (or not recorded or not reported). The user can designate the usage as personal in terms of time of day or day of the week or in terms of geographic areas. Optionally, in calculating a route, the system may take into account a safety index; i.e. which route is safer. The system may also take into account which route will consume less energy, particularly where the vehicle is an electric vehicle, which has different efficiencies in certain types of road conditions.Type: ApplicationFiled: July 27, 2012Publication date: January 31, 2013Inventors: Otman A. Basir, William Ben Miners
-
Publication number: 20130030606Abstract: A method of autonomously convoying vehicles traveling along a route with a leader vehicle being in communication with at least one follower vehicle. The at least one follower vehicle receives a communication relating to a target offset position and route data. Tracking data is generated and derived from on-board sensing devices of the at least one follower vehicle that includes a traveled path of the leader vehicle sensed by the at least one follower vehicle. The route data is compared to the tracking data for identifying accuracy between the route data relative to the tracking data. An adjusted target offset position and a set of trajectory points that provides a trajectory path of travel from a current position of the at least one follower vehicle to the adjusted target offset position are determined based on the accuracy between the route data and the tracking data.Type: ApplicationFiled: July 25, 2011Publication date: January 31, 2013Applicant: GM GLOBAL TECHNOLOGY OPERATIONS LLCInventors: Upali Priyantha MUDALIGE, Shuqing ZENG
-
Publication number: 20130030607Abstract: A method for operating an aircraft to prevent/recover from a stall condition includes the steps of detecting an actual vertical velocity of the aircraft, calculating vertical velocity error of the aircraft, the vertical velocity error being based upon a comparison between the actual vertical velocity of the aircraft and a commanded vertical velocity of the aircraft, and determining if the aircraft is in one of a near stalled condition and a stalled condition based upon at least the detected vertical velocity error and the polarity of the vertical velocity error. The method further includes the steps of taking control of the aircraft from an operator of the aircraft, reducing a bank angle of the aircraft, pitching the aircraft downward, and increasing the airspeed of the aircraft if the aircraft's airspeed is outside an airspeed window if the aircraft is in one of the near stalled condition and the stalled condition.Type: ApplicationFiled: February 7, 2011Publication date: January 31, 2013Applicant: BELL HELICOPTER TEXTRON INC.Inventors: Kynn J. Schulte, Robert L. Fortenbaugh, Kenneth E. Builta
-
Publication number: 20130030608Abstract: A network of collection, charging and distribution machines collect, charge and distribute portable electrical energy storage devices (e.g., batteries, supercapacitors or ultracapacitors). To avoid theft and tampering of the portable electrical energy storage devices, by default, each portable electrical energy storage device is locked in and operably connected to the vehicle to which it provides power unless the vehicle comes within the vicinity of a collection, charging and distribution machine or other authorized external device such as that in a service center. Once within the vicinity of a collection, charging and distribution machine or other authorized external device a locking mechanism in the vehicle or within the portable electrical energy storage device unlocks and allows the portable electrical energy storage device to be exchanged or serviced.Type: ApplicationFiled: July 26, 2012Publication date: January 31, 2013Applicant: GOGORO, INC.Inventors: Matthew Whiting Taylor, Yi-Tsung Wu, Hok-Sum Horace Luke, Huang-Cheng Hung
-
Publication number: 20130030609Abstract: The present invention relates to a method (300) and a system (100) for guiding a robotic garden tool to a predetermined position. The robotic garden tool includes a control unit (104) and a sensor unit (102) to detect signals. The sensor unit (102) detects a first signal (110) from a first signal source (106) and the robotic garden tool follows the first signal (110) at a varying distance from the first signal source (106) that is less than or equal to a maximum distance to the first signal source, towards the predetermined position. Wherein, the varying distance is a function of the strength of the detected first signal (110). While detecting the first signal (110), the sensor unit may also detect a second signal (112) from a second signal source (108).Type: ApplicationFiled: April 14, 2010Publication date: January 31, 2013Applicant: HUSQVARNA ABInventor: Patrik Jägenstedt
-
Publication number: 20130030610Abstract: Automatic estimation process and device for a flight parameter vector in an aircraft, as well as detection methods and assemblies for a failure affecting such a vector. The detection device (1) comprises means (5) for estimating, on an observation window, a coefficient vector allowing to determine a linear relationship between the searched flight parameter vector and explanatory values, by implementing a PLS regression, and means (5) to use such a coefficient vector so as to calculate, thru a linear modeling, an estimated value of said flight parameter vector.Type: ApplicationFiled: June 8, 2012Publication date: January 31, 2013Applicant: AIRBUS OPERATIONS (SAS)Inventors: Philippe Goupil, Florian Cazes, Rémy Dayre, Hervé Le Berre, Corinne Mailhes, Marie Chabert, Patrice Michel
-
Publication number: 20130030611Abstract: The device (1) includes means (21) for predicting a stabilizing altitude to which the aircraft will reach a setting approach speed, means (22) for comparing predicted stabilizing altitude to a setting stabilizing altitude and means (24) for establishing an optimized vertical trajectory when the difference between predicted stabilizing altitude and setting stabilizing altitude is more than a predetermined altitude threshold.Type: ApplicationFiled: July 26, 2012Publication date: January 31, 2013Applicant: AIRBUS OPERATIONS (SAS)Inventors: Florian CONSTANS, Mickael Lefebvre
-
Publication number: 20130030612Abstract: Method and device for an optimal management of the energy of an aircraft. The device (1) includes means (5) for determining, in an iterative manner, according to a predicted energy state and according to a management strategy, optimal commands of means (S1,S2, S3, S4, S5, S6) for controlling the energy of the aircraft, which allow the aircraft to reach a given point of a trajectory in a given operational state.Type: ApplicationFiled: July 26, 2012Publication date: January 31, 2013Applicant: AIRBUS OPERATIONS (SAS)Inventors: Florian CONSTANS, Mickael Lefebvre
-
Publication number: 20130030613Abstract: A computer-implemented method, system, and/or computer program product evaluates a real-time condition of a construct of an airport runway. A processor receives a set of temporally-spaced runway vibrations. This set of temporally-spaced runway vibrations is measured by a set of smart sensors on an airport runway after a landing aircraft touches down on the airport runway. Using data that describes the set of temporally-spaced runway vibrations as inputs to an analysis algorithm, a real-time physical condition of a construct of the airport runway is determined.Type: ApplicationFiled: July 27, 2011Publication date: January 31, 2013Applicant: INTERNATIONAL BUSINESS MACHINES CORPORATIONInventors: ROBERT R. FRIEDLANDER, JAMES R. KRAEMER
-
Publication number: 20130030614Abstract: The present invention relates to a method for detecting landing quality of an aircraft, comprising: determining whether a vertical speed rate is greater than a first preset value or a vertical acceleration is greater than a second value when the aircraft landing; collecting landing data; generating a landing message based on collected landing data in response to that the vertical speed rate is greater than the first preset value or the vertical acceleration is greater than the second value when the aircraft landing; storing or transmitting the landing message; and determining the landing quality of the aircraft based on the landing data in the landing message.Type: ApplicationFiled: July 26, 2012Publication date: January 31, 2013Applicant: AIR CHINA LIMITEDInventors: Huifeng DING, Jiaju WU, Yubin WU, Yi ZHU, Minjie TANG, Zhiping HUANG, Lei CHEN, Jiang YUAN