Internal voltage generator
An internal voltage generator includes a high efficient charge pump. The internal voltage generator includes an oscillation signal generator for receiving a reference voltage and a pumping voltage to thereby output an oscillation signal, a pump control logic for outputting a pumping control signal and a precharge signal in response to the oscillation signal, and a charge pump for precharging the pair of bootstrapping node by connecting the pair of bootstrapping node in response to the precharge signal to thereby generate the pumping voltage of a predetermined level after precharging the pair of bootstrapping node into a level of the power supply voltage and charge sharing the pair of bootstrapping node and the pumping voltage in response to the precharge signal. Herein, the pumping control signal controls a pumping operation and the precharge signal precharges a pair of bootstrapping node for generating the pumping voltage by pumping a power supply voltage.
Latest Hynix Semiconductor Inc. Patents:
The present invention relates to an internal voltage generator; and, more particularly, to an internal voltage generator including a high efficient charge pump.
DESCRIPTION OF RELATED ARTSThe present application contains subject matter related to Korean patent application No. 2005-36243, filed in the Korean Patent Office on Apr. 29, 2005, the entire contents of which are incorporated herein by reference.
Generally, a DRAM supplies a pumping voltage VPP which is higher than a power supply voltage VCC to a word line, i.e., a gate of a cell transistor, to thereby increase a transmission speed of a cell data without any data distortion. Further, a back bias voltage VBB lower than a ground voltage VSS is supplied to a bulk of the cell transistor of the DRAM because of the abovementioned reason.
The pumping voltage VPP and the back bias voltage VBB are generated by a charge pump. Therefore, a performance of the charge pump is critical for generating the pumping voltage VPP and the back bias voltage VBB.
As shown, the conventional pumping voltage VPP generator includes a level shifter 1, a VPP level detector 2, a ring oscillator 3, a pump control logic 4, and a doubler charge pump 5.
The level shifter 1 outputs a shifted reference voltage VR1 by shifting a voltage level of a reference voltage VREF. The VPP level detector 2 detects a level of the pumping voltage VPP in response to the shifted reference voltage VR1 to thereby output a pumping enable signal PPE. The ring oscillator 3 generates an oscillation signal OSC in response to the pumping enable signal PPE. The pump control logic 4 generates pumping control signals PS1, PS2, G1, and G2 in response to the oscillation signal OSC. The doubler charge pump 5 generates the pumping voltage VPP in response to the control signals PS1, PS2, G1, and G2 to thereby transmit the pumping voltage VPP to the VPP level detector 2.
As shown in
As shown in
The doubler charge pump 5 performs a pumping operation in response to the pumping control signals PS1, PS2, G1, and G2 to thereby increase the pumping voltage VPP level. When the pumping voltage VPP level reaches a target voltage level, the VPP level detector 2 sets the pumping enable signal to a logic level ‘L’ to thereby stop the pumping operation.
An electric charge generated through the pumping operation is stored in the MOS capacitors MC1 to MC4 connected between the pumping voltage VPP and the ground voltage VSS. The electric charge stored in the MOS capacitors MC1 to MC4 is maintained a constant value and used for driving the word line. When the word line is driven by the electric charges stored in the MOS capacitors MC1 to MC4, the pumping voltage VPP level decreases. When voltage VPP decreases to a specified level, the VPP level detector 2 activates the pumping enable signal to a logic level ‘H’ to thereby operate the charge pump 5.
Referring to
The electric charge in the first bootstrapping node PS1—b is transmitted to a pumping voltage VPP terminal through the first PMOS transistor P1. As a result, the pumping voltage VPP level becomes stable after the first bootstrapping node PS1—b and the pumping voltage VPP are charge shared.
When a second precharge control signal G2 changes from the ground voltage VSS level to the power supply voltage VCC level, a voltage at a second precharge node G2—b is bootstrapped. Then, the voltage at the second precharge node G2—b changes from the power supply voltage VCC level to the double power supply voltage 2VCC level. The third NMOS transistor N3 is turned on in response to the voltage at the second precharge node G2—b. Therefore, the second bootstrapping node PS2—b is precharged with the power supply voltage VCC level.
When the second precharge control signal G2 changes from the power supply voltage VCC level to the ground voltage VSS level, the voltage at the second precharge node G2—b reaches the power supply voltage VCC level. Therefore, the third NMOS transistor N3 is turned off.
After the first pumping control signal PS1 changes from the power supply voltage VCC level to the ground voltage VSS level, the voltage of first bootstrapping node PS1—b becomes the power supply voltage VCC level. Also, the second pumping control signal PS2 is changed from the ground voltage VSS level to the power supply voltage VCC level. Thus, the electric charge is shared between the second bootstrapping node PS2—b and the pumping voltage VPP terminal through the second PMOS transistor P2.
After a predetermined time, a first precharge control signal G1 is changed from the ground voltage VSS level to the power supply voltage VCC level. Then, a voltage level of a third bootstrapping node G1—b is changed from the power supply voltage VCC level to the double power supply voltage 2VCC level. The second NMOS transistor N2 is turned on in response to the voltage of the first precharge node G1—b to thereby precharge the first bootstrapping node PS1—b with the power supply voltage VCC level.
When the first precharge control signal G1 changes from the power supply voltage VCC level to the ground voltage VSS level, the voltage of the first precharge node G1—b becomes the power supply voltage VCC level to thereby turn off the second NMOS transistor N2.
As shown in
Generally, a current efficiency of the doubler VPP charge pump 5 is defined by an equation ((2VCC−VPP)×C/2VCC×C)×100) level. Herein, C denotes a capacitance of the first and the second bootstrapping nodes PS1—b and PS2—b. For example, when the power supply voltage VCC is 2.5V and the target level of the pumping voltage VPP is 3.5V, the current efficiency becomes 30%. The theoretical maximum value of the pumping value VPP is the double power supply voltage 2VCC. Therefore, when the power supply voltage VCC is 2.5V, the theoretical maximum value of the pumping value VPP is 5V. That is, the current efficiency is generated by dividing the electric charge of the pumping voltage VPP by the electric charge of the power supply voltage VCC.
As shown, the conventional back bias current generator includes a level shifter 6, a VBB level detector 7, a ring oscillator 8, a pump control logic 9, and a doubler charge pump 10.
The level shifter 6 outputs a shifted reference voltage VR1 by level shifting a reference voltage VREF. The VBB level detector 7 detects a level of the back bias voltage VBB in response to the shifted reference voltage VR1 to thereby output a back bias enable signal BBE. The ring oscillator 8 generates an oscillation signal OSC in response to the back bias enable signal BBE. The pump control logic 9 generates pumping control signals PS3, PS4, G3, and G4 in response to the oscillation signal OSC. The doubler charge pump 10 generates the back bias voltage VBB in response to the pumping control signals PS3, PS4, G3, and G4 to thereby transmit the back bias voltage VBB to the VBB level detector 7.
As shown in
The third precharge charge control signal G3 changes from the power supply voltage VCC level to ground voltage VSS level while the third pumping control signal PS3 is up to a power supply voltage VCC level to thereby precharge a bootstrapping node. The fourth precharge control signal G4 maintains the power supply voltage VCC level. The fourth precharge control signal G4 is changes from the power supply voltage VCC level into ground voltage VSS level while the fourth pumping control signal PS4 is up to a power supply voltage VCC level to thereby precharge the bootstrapping node. At this time, the third precharge control signal holds the power supply voltage VCC level.
As shown in
The doubler charge pump 10 performs a pumping operation in response to the pumping control signals PS3, PS4, G3, and G4 to thereby decrease the back bias voltage VBB level. Then, when the back bias voltage VBB level arrives at the target voltage level, the VBB level detector 7 sets the back bias enable signal BBE to the logic level ‘H’ to thereby stop the pumping operation.
Referring to
Concurrently, the fourth pumping signal PS4 changes from the power supply voltage VCC level to the ground voltage VSS level. Then, the level of a fourth bootstrapping node PS4—bchanges from the ground voltage VSS level to the negative power supply voltage −VCC level. The electric charge in the fourth bootstrapping node PS4—b is charge-shared to a back bias voltage VBB terminal. After a predetermined time, the back bias voltage VBB and the third bootstrapping node PS3—barrives at a stable state.
When the third precharge control signal G3 changes from the power supply voltage VCC level to the ground voltage VSS level, the third PMOS transistor P3 is turned on to thereby precharge a third bootstrapping node G3—b with the ground voltage VSS level. Therefore, the tenth NMOS transistor N10 is turned off.
After the fourth pumping control signal PS4 changes from the ground voltage VSS level to the power supply voltage VCC level, the voltage loaded in the fourth bootstrapping node PS4—b is bootstrapped to the ground voltage VSS level. Therefore, the ninth NMOS transistor N9 is turned on in response to the voltage of the fourth bootstrapping node PS4—b.
Concurrently, the third pumping control signal PS3 changes from the power supply voltage VCC level to the ground voltage VSS level, the voltage of third bootstrapping node PS3—b is bootstrapped to the negative power supply voltage −VCC level. Then, the electric charge in the third bootstrapping node PS3—b is charge shared to a back bias voltage VBB terminal.
After a predetermined time, a fourth precharge control signal G4 is changed from the power supply voltage VCC level to the ground voltage VSS level, and the fourth PMOS transistor P4 is turned on to thereby precharge the fourth bootstrapping node G4—b to the ground voltage VSS level. Therefore, the ninth NMOS transistor N9 is turned off.
As shown in
Generally, a current efficiency of the doubler VBB charge pump 10 is defined by an equation ((−VCC−VBB)×C/−VCC×C)×100.
Herein, C denotes a capacitance of the third and the fourth bootstrapping nodes PS3—b and PS4—b. For example, when the power supply voltage VCC is 2.5V and the target level of the back bias voltage VBB is −1V, the current efficiency becomes 60%. The theoretical maximum absolute value of the back bias value VBB is the negative power supply voltage −VCC level. Therefore, when the power supply voltage VCC is 2.5V, the theoretical maximum absolute value of the back bias value VBB is −2.5V. That is, the current efficiency is generated by dividing the electric charge of the back bias voltage VBB by the electric charge of the power supply voltage VCC.
As shown, the conventional tripler pumping voltage generator includes a level shifter 11, a VPP level detector 12, a ring oscillator 13, a pump control logic 14, and a tripler charge pump 15. Herein, the level shifter 11, the VPP level detector 12, and the ring oscillator 13 are similar to those shown in
As shown in
As shown in
As shown in
First, the fifth precharge control signal G5 changes from the ground voltage VSS level to the power supply voltage VCC level to thereby turn on the eleventh NMOS transistor N11. The fifth pumping control signal PS5 is changed from the ground voltage VSS level into the power supply voltage VCC level and, therefore, a voltage loaded in a fifth bootstrapping node PS5—b becomes the negative power supply voltage −VCC level. Then, the voltage loaded in the fifth bootstrapping node PS5—b is precharged with the external voltage VCC level.
When the fifth precharge control signal G5 changes from the power supply voltage VCC level to the ground voltage VSS, the eleventh NMOS transistor N11 is turned off. The fifth pumping control signal PS5 is changed from the ground voltage VSS level to the power supply voltage VCC level and, therefore, the voltage loaded in the fifth bootstrapping node PS5—bbecomes the double power supply voltage 2VCC level.
When the sixth precharge control signal G6 is changed from the ground voltage VSS level to the power supply voltage VCC level, the twelfth NMOS transistor N12 is turned on. Then, the sixth pumping control signal PS6 is changed from the power supply voltage VCC level into the ground voltage VSS level and, therefore, the voltage loaded in the sixth bootstrapping node PS6—b becomes the negative power supply voltage −VCC level.
Afterward, the voltage loaded in the sixth bootstrapping node PS6—b is precharged with the voltage loaded in the fifth bootstrapping node PS5—b to thereby change to the power supply voltage VCC level. Then, the sixth precharge control signal G6 is changed from the power supply voltage VCC level to the ground voltage VSS level to thereby turn off the twelfth NMOS transistor N12. When the sixth pumping control signal PS6 is changed from the ground voltage VSS level to the power supply voltage VCC level, consequently, the voltage loaded in the sixth bootstrapping node PS6—b becomes the double power supply voltage 2VCC level.
When the seventh precharge control signal G7 is changed from the ground voltage VSS level to the power supply voltage VCC level, the thirteenth NMOS transistor N13 is turned on. Accordingly, the pumping voltage VPP is charge shared with the voltage loaded in the sixth bootstrapping node PS6—b.
According to the operation of the tripler charge pump 15A shown in
The pumping control signals G5b, G6b, G7b, PS5b, and PS6b, each having an opposite phase with the pumping control signals G5, G6, G7, PS5, and PS6, are used for a charge pumping operation with the pumping control signals G5, G61 G7, PS5, and PS6. That is, the control signals G5, G6, G7, PS5, and PS6 and the control signals G5b, G6b, G7b, PS5b, and PS6b are alternately used for providing the pumping voltage VPP with the electric charge.
In the conventional tripler charge pump 15, because the precharge voltage level of the voltages loaded in the fifth and the sixth bootstrapping nodes PS5—b and PS6—b are the power supply voltage VCC level and the double power supply voltage 2VCC level, respectively, the maximum level of the voltages loaded in the fifth and the sixth bootstrapping nodes PS5—b and PS6—b can be the double power supply voltage 2VCC level and the triple power supply voltage 3VCC.
As shown in
The tripler charge pump 15B shown in
Generally, a current efficiency of the tripler VPP charge pump 15 is defined by an equation ((3VCC−VPP)×C/3VCC×C)×100. Herein, C denotes a capacitance of the bootstrapping nodes PS5—b, PS5b—b, PS6—b, and PS6b—b. For example, when the power supply voltage VCC is 1.5V and the target level of the pumping voltage VPP is 3.5V, the current efficiency becomes 22%. The theoretical maximum absolute value of the pumping value VPP is the triple power supply voltage 3VCC level. Therefore, when the power supply voltage VCC is 1.5V, the theoretical maximum value of the pumping value VPP is 4.5V. That is, the current efficiency is generated by dividing the electric charge of the pumping voltage VPP by the electric charge of the power supply voltage VCC.
The conventional tripler back bias voltage generator includes a level shifter 16, a VBB level detector 17, a ring oscillator 18, a pump control logic 19, and tripler charge pump 20. Herein, the level shifter 16, the VBB level detector 17, and the ring oscillator 18 are similar to those shown in
As shown in
As shown in
The eighth precharge control signal G8 changes from the ground voltage VSS level to the power supply voltage VCC level to thereby turn on the seventeenth NMOS transistor N17. The seventh pumping control signal PS7 is changed from the ground voltage VSS level into the power supply voltage VCC level and, therefore, a voltage loaded in a seventh bootstrapping node PS7—b becomes the power supply voltage VCC. Then, the voltage loaded in the seventh bootstrapping node PS7—b is precharged with the ground voltage VSS level.
When the eighth precharge control signal G8 is changed from the power supply voltage VCC level into the ground voltage VSS, the seventeenth NMOS transistor N17 is turned off. Then, the seventh pumping control signal PS7 is changed from the ground voltage VSS level to the power supply voltage VCC level and, therefore, the voltage loaded in the seventh bootstrapping node PS7—b becomes the negative power supply voltage −VCC level.
When the ninth precharge control signal G9 is changed from the ground voltage VSS level into the power supply voltage VCC level, the eighteenth NMOS transistor N18 is turned on. Then, the eighth pumping control signal PS8 is changed from the ground voltage VSS level to the power supply voltage VCC level and, therefore, the voltage loaded in the eighth bootstrapping node PS8—b becomes the ground voltage VSS level.
Then, the ninth precharge control signal G9 is changed from the power supply voltage VCC level into the ground voltage VSS level to thereby turn off the eighteenth NMOS transistor N18. When the eighth pumping control signal PS8 is changed from the power supply voltage VCC level to the ground voltage VSS level, consequently, the voltage loaded in the eighth bootstrapping node PS8—b becomes the negative power supply voltage −VCC level.
Further, when the tenth precharge control signal G10 is changed from the ground voltage VSS level to the power supply voltage VCC level, the nineteenth NMOS transistor N19 turned on. Accordingly, the back bias voltage VBB is charge shared with the voltage loaded in the eighth bootstrapping node PS8—b. Therefore, the back bias voltage VBB level becomes lower than the ground voltage VSS level.
According to the operation of the tripler charge pump 20A shown in
The pumping control signals G8b, G9b, G10b, PS7b, and PS8b, each having an opposite phase with the pumping control signals G8, G9, G10, PS7, and PS8, are used for a charge pumping operation with the pumping control signals G8, G9, G10, PS7, and PS8. That is, the control signals G8, G9, G10, PS7, and PS8 and the control signals G8b, G9b, G10b, PS7b, and PS8b are alternately used for providing the back bias voltage VBB with the electric charge.
In the conventional tripler charge pump 20, because the precharge voltage level of the seventh and the eighth bootstrapping nodes PS7—b and PS8—b are the ground voltage VSS level and the negative power supply voltage −VCC level respectively, the maximum level of the voltages loaded in the fifth and the sixth bootstrapping nodes PS7—b and PS8—b can be the negative power supply voltge −VCC level and the double negative power supply voltage −2VCC level.
As shown in
Also, the tripler charge pump 20B shown in
Generally, a current efficiency of the tripler VBB charge pump 20 is defined by an equation ((−2VCC−VBB)×C/−2VCC×C)×100. Herein, C denotes a capacitance of the bootstrapping nodes PS7—b, PS7b—b, PS8—b, and PS8b—b. For example, when the power supply voltage VCC is 1.5V and the target level of the back bias voltage VBB is −2V, the current efficiency becomes 33%. The theoretical maximum absolute value of the pumping value VPP is the triple power supply voltage −3V. Therefore, when the power supply voltage VCC is 1.5V, the theoretical maximum absolute value of the back bias value VBB is −3V. That is, the current efficiency is generated by dividing the electric charge of the back bias voltage VBB by the electric charge of the power supply voltage VCC.
The abovementioned conventional internal voltage generators discharge the electric charge remained in the bootstrapping nodes after finishing the charge sharing with the pumping voltage VPP or the back bias voltage VBB. Therefore, the current efficiency of the conventional internal voltage generators is significantly low.
SUMMARY OF THE INVENTIONIt is, therefore, an object of the present invention to provide an internal voltage generator including a high efficient charge pump.
In accordance with an aspect of the present invention, there is provided an internal voltage generator including an oscillation signal generation block for receiving a reference voltage and a pumping voltage to thereby output an oscillation signal, a pump control logic for outputting a pumping control signal and a precharge signal in response to the oscillation signal, wherein the pumping control signal controls a pumping operation and the precharge signal precharges a pair of bootstrapping nodes for generating the pumping voltage by pumping a power supply voltage, and a charge pump for precharging the pair of bootstrapping nodes by connecting the pair of bootstrapping nodes in response to the precharge signal to thereby generate the pumping voltage of a predetermined level after precharging the pair of bootstrapping nodes to a level of the power supply voltage and charge sharing the pair of bootstrapping node and the pumping voltage in response to the precharge signal.
In accordance with another aspect of the present invention, there is provided an internal voltage generator including an oscillation signal generation block for receiving a reference voltage and a back bias voltage to thereby output an oscillation signal, a pump control logic for outputting a pumping control signal and a precharge signal in response to the oscillation signal, wherein the pumping control signal controls a pumping operation and the precharge signal precharges a pair of bootstrapping nodes for generating the back bias voltage by pumping a ground voltage, and a charge pump for precharging the pair of bootstrapping nodes by connecting the pair of bootstrapping nodes in response to the precharge signal to thereby generate the back bias voltage of a predetermined level after precharging the pair of bootstrapping nodes into a level of the power supply voltage and charge sharing the pair of bootstrapping nodes and the ground voltage in response to the precharge signal.
The above and other objects and features of the present invention will become apparent from the following description of preferred embodiments taken in conjunction with the accompanying drawings, in which:
Hereinafter, an internal voltage generator including a high efficient charge pump in accordance with the present invention will be described in detail referring to the accompanying drawings.
As shown, the pumping voltage VPP generator includes a level shifter 100, a VPP level detector 110, a ring oscillator 120, a pump control logic 130, and a doubler charge pump 140.
The level shifter 100 outputs a shifted reference voltage VR1 by shifting a level of a reference voltage VREF. The VPP level detector 110 detects a level of the pumping voltage VPP in response to the shifted reference voltage VR1 to thereby output a pumping enable signal PPE. The ring oscillator 120 generates an oscillation signal OSC in response to the pumping enable signal PPE. The pump control logic 130 generates pumping control signals PS9, PS10, G11, and G12 and a first precharge signal PB1 in response to the oscillation signal OSC. The doubler charge pump 140 generates the pumping voltage VPP in response to the control signals PS9, PS10, G11, and G12 and the first precharge signal PB1 to thereby output the pumping voltage VPP to the VPP level detector 110.
As shown, the level shifter 100 is provided with three PMOS transistors P21 to P23, seven NMOS transistors N23 to N29, and five resistors R1 to R5. The level shifter 100 receives the reference voltage VREF through a gate of the twenty third NMOS transistor N23 and a voltage loaded on a first node NODE1. The voltage loaded on the first node NODE1 is inputted through a gate of the twenty fourth NMOS transistor N24. Herein, the twenty third and the twenty fourth NMOS transistors N23 and N24 form a current mirror differential amplifier together with a twenty first and a twenty second PMOS transistors P21 and P22.
After receiving the reference voltage VREF and the voltage loaded on the first node NODE1, the level shifter 100 compares the reference voltage VREF level with the voltage loaded on the first node NODE1 to thereby equalize the level of the first node NODE1 with the reference voltage VREF level.
The twenty sixth to twenty ninth NMOS transistors N26 to N29 perform a switching operation. Normally, the twenty seventh NMOS transistor N27 is turned on in response to a default signal DF to thereby output the shifted reference voltage VR1 of the reference voltage VREF level. On the contrary, when a different level of the reference voltage is required, i.e., when the shifted reference voltage VR1 is different from the reference voltage VREF, one of the NMOS transistors N26, N28, and N29 is turned on. That is, the default signal DF is inactivated; and one of trimming signals TR1 to TR3 is activated to activated corresponding NMOS transistor.
In order to inactivate the default signal DF and to activate the trimming signals TR1 to TR3, a test mode code can be inputted or a fuse cutting can be performed. The shifted reference voltage generated through the above procedure is outputted to the VPP level detector 110.
As shown, the VPP level detector 110 is provided with four resistors R6 to R9, a first and a second fuses F1 and F2, two PMOS transistors P24 and P25, three NMOS transistor N30 to N32, and an inverter INV57.
The VPP level detector 110 receives the pumping voltage VPP and compares the shifted reference voltage VR1 with a voltage loaded in a second node NODE2 to thereby output the pumping enable signal PPE.
That is, when the pumping voltage VPP level is lower than a target voltage level, the voltage loaded at the second node NODE2 is lower than the shifted reference voltage VR1; and, as a result, the pumping enable signal PPE becomes a logic level ‘H’. On the contrary, when the pumping voltage VPP level is the same with or higher than the target voltage level, the voltage loaded on the second node NODE2 is higher than the shifted reference voltage VR1; and, therefore, the pumping enable signal becomes a logic level ‘L’.
When it is required to change the pumping voltage VPP level, one of the fuses F1 and F2 is cut to thereby change a resistance ratio of a resistance between the pumping voltage VPP and the second node NODE2 and a resistance between the second node NODE2 and the ground voltage VSS. The VPP level detector 110 determines a performance quality of the pumping voltage generator. In other words, the conventional pumping voltage generator operates stably and consumes less power according to the performance of the VPP level detector 110.
The ring oscillator 120 includes a NAND gate ND5 and six inverters IV58 to IV63. The ring oscillator 120 is enabled when the pumping enable signal PPE is the logic level ‘H’ to thereby generate the oscillation signal OSC.
As shown in
As shown, the doubler charge pump 140 includes a precharge controller 141 and a charge pump 142. The precharge controller 141 is provided with two PMOS transistors P26 and P27, two NMOS transistors N33 and N34, and an inverter IV74. The charge pump 142 is provided with seven NMOS transistors N35 to N41, three PMOS transistors P28 to P30, and four MOS capacitors MC49 to MC52.
In the precharge controller 141, the PMOS transistors P26 and P27 are parallel connected each other and are coupled to the pumping voltage VPP. The thirty third NMOS transistor N33, connected between the twenty sixth PMOS transistor P26 and the ground voltage VSS, receives the first precharge signal PB1 outputted from the pump control logic 130 through a gate. The thirty fourth NMOS transistor N34, connected between the twenty seventh PMOS transistor P27 and the ground voltage VSS, receives an inverted first precharge signal PB1, inverted by the inverter IV74, through a gate thereof. Further, a precharge drive signal PBd1 is outputted through a common node of the twenty seventh PMOS transistor P27 and the thirty fourth NMOS transistor N34.
Herein, the first precharge signal PB1 is inputted to the doubler charge pump 140 to thereby increase the current efficiency by reusing the electric charge, remaining in the bootstrapping node.
Comparing the charge pump 142 with the conventional doubler charge pump 5 shown in
That is, the charge pump 142 firstly precharges the ninth and the tenth bootstrapping nodes PS9—b and PS10—b into the power supply voltage VCC level by using the eleventh and the twelfth precharge control signals G11 and G12. Then, as the first precharge signal PB1 becomes a logic level ‘L’, the electric charge remaining in the ninth and the tenth bootstrapping nodes PS9—b and PS10—b is not discharged but reused. Therefore, the bootstrapping nodes PS9—b and PS10—bare precharged with (VCC+(VPP−VCC)/2) level. Consequently, the current efficiency of the charge pump is improved to increase the pumping voltage VPP level.
Hereinafter, the operation of the doubler charge pump 140 shown in
First, when the ninth pumping control signal PS9 is changed from the ground voltage VSS level into the power supply voltage VCC level, the ninth bootstrapping node PS9—bis bootstrapped. Then, the ninth bootstrapping node PS9—b is charge-shared with the pumping voltage VPP terminal to adjust the tenth bootstrapping node PS10—b to (VPP−VCC) level. After the thirty seventh NMOS transistor N37 is turned on, the tenth bootstrapping node PS10—b is precharged with the power supply voltage VCC level.
Subsequently, when the precharge control signal is enabled into the logic level ‘L’, the ninth bootstrapping node PS9—b of the pumping voltage VPP level is precharged by using the tenth bootstrapping node PS10—b of the power supply voltage VCC level. Therefore, the ninth and the tenth bootstrapping nodes PS9—b and PS10b are charged with (VCC+(VPP−VCC)/2) level or (VPP-(VPP−VCC)/2) level.
According to the abovementioned method, a remained electric charge occurring when the ninth bootstrapping node PS9—b is changed from the pumping voltage VPP level into the (VPP−VCC) level is provided to the tenth bootstrapping node PS10—b instead of being wasted through the power supply voltage VCC terminal.
Therefore, the ninth bootstrapping node PS9—b is charged with (VPP−VCC−(VPP−VCC)/2) which is lower than (VPP−VCC). Thereafter, when the thirty seventh NMOS transistor N37 is turned on, the ninth bootstrapping node PS9—b is precharged with the power supply voltage VCC level. Then, when the tenth pumping control signal PS10 is changed from the ground voltage VSS to power supply voltage VCC level, the tenth bootstrapping node PS10—b can be bootstrapped to (2VCC+(VPP−VCC)/2) level because of the electric charge provided from the ninth bootstrapping node PS9—b to the tenth bootstrapping node PS11—b.
Referring to
Therefore, the current efficiency of the doubler charge pump 140 shown in
As shown, the back bias voltage VBB generator includes a level shifter 200, a VBB level detector 210, a ring oscillator 220, a pump control logic 230, and a doubler charge pump 240.
The level shifter 200 outputs a shifted reference voltage VR1 by shifting a level of a reference voltage VREF. The VBB level detector 210 detects a level of the back bias voltage VBB in response to the shifted reference voltage VR1 to thereby output a back bias enable signal BBE. The ring oscillator 220 generates an oscillation signal OSC in response to the back bias enable signal BBE. The pump control logic 230 generates pumping control signals PS11, PS12, G13, and G14 and a second precharge signal PB2 in response to the oscillation signal OSC. The doubler charge pump 240 outputs the back bias voltage VBB in response to the pumping control signals PS11, PS12, G13, and G14 and the second precharge signal PB2 to the VBB level detector 210.
As shown, the VBB level detector 210 includes five PMOS transistors P31 to P35, three NMOS transistors N42 to N44, and two inverters IV75 and IV76. Further, the VBB level detector 210 is provided in form of a PMOS resistance divider which is coupled between a core voltage VCORE and the ground voltage VSS. Herein, the core voltage VCORE is used inside of a DRAM core area.
The PMOS transistors P31 and P32 receive the ground voltage and the back bias voltage through gates, respectively. If an absolute value of the back bias voltage VBB is lower than a predetermined value, i.e., if a back bias voltage VBB level is closer to the ground voltage than a target level, a resistance of the thirty second PMOS transistor P32, receiving the back bias voltage VBB, is increased. Thus, a voltage level loaded on the detection node DET is also increased. Then, the back bias enable signal BBE having a logic level ‘L’ is outputted through the inverters IV75 and IV76.
The ring oscillator 220 includes a NOR gate NOR2 and six inverters IV77 to IV82. The ring oscillator 220 is enabled when the back bias enable signal BBE is the logic level ‘L’ to thereby generate the oscillation signal OSC.
AS shown, the pump control logic 230 is provided with eleven inverters IV83 to IV93 and three NAND gates ND8 to ND10. Herein, the tenth NAND gate ND10 receives the thirteenth and the fourteenth precharge control signals G13 and G14. The inverters IV91 to IV93 delay an output of the tenth NAND gate ND10 to thereby generate the second precharge signal PB2. As a result, the pump control logic 230 generates the back bias control signals PS11, PS12, G13, and G14 and the second precharge signal PB2 shown in
As shown, the doubler charge pump 240 includes a precharge controller 241 and a charge pump 242. The precharge controller 241 is provided with two PMOS transistors P36 and P37, two NMOS transistors N45 and N46, and two inverters IV94 and IV95. The charge pump 242 is provided with four NMOS transistors N47 to N50, six PMOS transistors P38 to P43, and four MOS capacitors MC53 to MC56.
In the precharge controller 241, the PMOS transistors P36 and P37, cross connected each other, are parallel connected to the pumping voltage VPP. The forty fifth NMOS transistor N45, connected between the thirty sixth PMOS transistor P36 and the ground voltage VSS, receives the second precharge signal PB2 outputted from the pump control logic 230 through a gate. The forty sixth NMOS transistor N46, connected between the thirty seventh PMOS transistor P37 and the ground voltage VSS, receives the delayed second precharge signal PB2, delayed by the inverters IV94 and IV95, through a gate. Further, a second precharge drive signal PBd2 is outputted through a common node of the thirty seventh PMOS transistor P37 and the forty sixth NMOS transistor N46.
Comparing the charge pump 242 with the conventional doubler charge pump 10 shown in
That is, the charge pump 242 firstly precharges the eleventh and the twelfth bootstrapping nodes PS11—b and PS12—bto the ground voltage VSS level by using the thirteenth and the fourteenth precharge control signals G13 and G14. Then, as the second precharge signal PB2 becomes the logic level ‘L’, the electric charge remaining in the eleventh and the twelfth bootstrapping nodes PS11—b and PS12—b is not discharged but reused. Therefore, the precharge level of the eleventh and the twelfth bootstrapping nodes PS11—b and PS12—b is lowered. Thus, the current efficiency of the charge pump 242 is increased to decrease the back bias voltage VBB level.
Hereinafter, the operation of the doubler charge pump 240 shown in
First, after the eleventh and the twelfth bootstrapping nodes PS11—b and PS12—b are bootstrapped into the negative power supply voltage −VCC and the power supply voltage VCC level respectively, the eleventh bootstrapping node PS11—b and the back bias voltage VBB are charge shared with each other. Then, the thirty ninth PMOS transistor P39 is turned on to thereby precharge the twelfth bootstrapping node P12—b with the ground voltage VSS level.
Subsequently, when the second precharge signal PB2 is activated as the logic level ‘L’, the twelfth bootstrapping node PS12—b having the ground voltage VSS level is precharged by the eleventh bootstrapping node PS11—b having the back bias voltage VBB level. Therefore, the eleventh and the twelfth bootstrapping nodes PS11—b and PS12—b become (VSS-(VSS−VBB)/2) level.
According to the abovementioned method, the electric charge, occurred when the eleventh bootstrapping node PS11—bis changed from the back bias voltage VBB level into the (−(VSS−VBB)/2) level, is provided to the twelfth bootstrapping node PS12—b, instead of being wasted through the ground voltage VSS terminal.
Therefore, the twelfth bootstrapping node PS12—b becomes (−VCC+(VBB−VSS)/2) level or (−VCC−(VSS−VBB)/2) level. Herein, (−VCC+(VBB−VSS)/2) level or (−VCC−(VSS−VBB)/2) level are lower than the negative power supply voltage −VCC level. The eleventh bootstrapping node PS11—b is bootstrapped into ((VBB−VSS)/2+VCC) level. Thereafter, when the thirty eighth PMOS transistor P38 is turned on, the eleventh bootstrapping node PS11—b is precharged with the ground voltage VSS level.
Referring to
Therefore, the current efficiency of the doubler charge pump 240 shown in
As shown, the tripler pumping voltage generator includes a level shifter 300, a VPP level detector 310, a ring oscillator 320, a pump control logic 330, and a tripler charge pump 340.
The level shifter 300 outputs a shifted reference voltage VR1 by shifting a level of a reference voltage VREF. The VPP level detector 310 detects a level of the pumping voltage VPP in response to the shifted reference voltage VR1 to thereby output a pumping enable signal PPE. The ring oscillator 320 generates an oscillation signal OSC in response to the pumping enable signal PPE. The pump control logic 330 generates pumping control signals PS13, PS14, G15, G16, and G17 and a third precharge signal PB3 in response to the oscillation signal OSC. The tripler charge pump 340 generates the pumping voltage VPP in response to the control signals PS13, PS14, G15, G16, and G17 and a third precharge signal PB3 to thereby transmit the pumping voltage VPP to the VPP level detector 310.
Herein, the level shifter 300, the VPP level detector 310, and the ring oscillator 320 is similar with those shown in
As shown in
The pump control logic 330 shown in
Herein, the pumping control signals PS13b, PS14b, G15b, G16b, and G17b are of opposite phase with those of the pumping control signals PS13, PS14, G15, G16, and G17.
First, as shown in
In the first precharge controller 341, the PMOS transistors P44 and P45 are parallel connected each other and are coupled to the pumping voltage VPP. The fifty first NMOS transistor N51, connected between the forty fourth PMOS transistor P44 and the ground voltage VSS, receives the third precharge signal PB3 outputted from the pump control logic 330 through a gate. The fifty second NMOS transistor N52, connected between the forty fifth PMOS transistor P45 and the ground voltage VSS, receives the inverted third precharge signal PB3, inverted by the inverter IV113, through a gate. Further, a third precharge drive signal PBd3 is outputted through a common node of the forty fifth PMOS transistor P45 and the fifty second NMOS transistor N52.
As compared with the charge pump 15A shown in
As shown in
In the second precharge controller 343, the PMOS transistors P48 and P49 are parallel connected each other and are coupled to the pumping voltage VPP. The fifty ninth NMOS transistor N59, connected between the forty eighth PMOS transistor P48 and the ground voltage VSS, receives the third precharge signal PB3 outputted from the pump control logic 330 through a gate. The sixtieth NMOS transistor N60, connected between the forty ninth PMOS transistor P49 and the ground voltage VSS, receives the inverted third precharge signal PB3, inverted by the inverter IV114, through a gate. Further, a third precharge drive signal PBd3 is outputted through a common node of the forty ninth PMOS transistor P49 and the sixtieth NMOS transistor N60.
Further, as compared with the charge pump 15B shown in
The first and the second precharge controllers 341 and 343 have the same structure; and the first and the second charge pumps 342 and 344 have almost the same structure. However, while the precharge control signals G15 to G17b inputted to the first charge pump 342 are inputted through the MOS capacitors MC57 to MC66 in order to control the NMOS transistors N53 to N58, the precharge control signals G15 to G17b are inputted through the inverters IV115 to IV120 in order to control the PMOS transistors P50 to P55 in the second charge pump 344. As a result, the first and the second charge pumps 342 and 344 perform the substantially same operation.
That is, the third precharge signal PB3 is inputted to the tripler charge pump 340 to increase the current efficiency by reusing the electric charge remained in the bootstrapping node.
Hereinafter, the operation of the charge pump 340A is explained.
First, after the thirteenth bootstrapping node PS13—b is precharged with the power supply voltage VCC level in response to the fifteenth precharge control signal G15, the third precharge signal PB3 is activated as a logic level ‘L’. Then, the thirteenth pair of bootstrapping node PS13—b and PS13b—bare precharged. Therefore, the electric charge remained in the thirteenth bootstrapping node PS13—b is used to increase the voltage levels of the pair of bootstrapping node PS13—band PS13b—b up to (VCC+(PS14b—b−VCC)/2) level and (VCC+(PS14—b−VCC)/2) level respectively.
Further, after precharged with the double power supply voltage 2VCC level in response to the sixteenth precharge control signal G16, the fourteenth bootstrapping node PS14—bis further precharged with the bootstrapping node PS14b—b in response to the third precharge signal PB3 having the logic level ‘L’. Therefore, the electric charge remained in the fourteenth bootstrapping node PS14—b is used to increase each voltage level of the fourteenth pair of bootstrapping node PS14—b and PS14b—b into each of (2VCC+(PS14b—b−2VCC)/2) level and (2VCC+(PS14—b−2VCC)/2) level.
Herein, the voltage level loaded on the fourteenth pair of bootstrapping node PS14—b and PS14b—b is the pumping voltage VPP level. Therefore, the prechage voltage level of the fourteenth pair of bootstrapping node PS14—b and PS14b—bbecome (2VCC+(VPP−2VCC)/2) level; and, thus, the voltage level of the fourteenth pair of bootstrapping node PS14—b and PS14b—b can be increased into (3VCC+(VPP−2VCC)/2) level. As a result, the current efficiency between the fourteenth pair of bootstrapping node PS14—b and PS14b—b and the pumping voltage VPP becomes (3VCC−VPP+(VPP−2VCC)/2)/3VCC) level and, therefore, the pumping voltage VPP can be increased up to (3VCC+(VPP−2VCC)/2) level.
When the fifteenth precharge control signal G15 is changed from the ground voltage VSS level to the power supply voltage VCC level, the fifty third NMOS transistor N53 is turned on to thereby precharge the thirteenth bootstrapping node PS13—b into the power supply voltage VCC level. Then, when the fifteenth precharge control signal G15 is changed from the power supply voltage VCC level to the ground voltage VSS level, the fifty third NMOS transistor N53 is turned off. After thirteenth pumping control signal PS13 is changed from the ground voltage VSS level to the power supply voltage VCC level, the thirteenth bootstrapped node PS13—b is bootstrapped into the double power supply voltage 2VCC level.
When the sixteenth precharge control signal G16 is changed from the ground voltage VSS level to the power supply voltage VCC level, the fifty fourth NMOS transistor N54 is turned on to thereby precharge the fourteenth bootstrapping node PS14—b with the power supply voltage VCC level. Then, the sixteenth precharge control signal G16 is changed from the power supply voltage VCC level to the ground voltage VSS level, the fifty fourth NMOS transistor N54 is turned off. After the fourteenth pumping control signal PS14 is changed from the ground voltage VSS level to the power supply voltage VCC level, the fourteenth bootstrapping node PS14—b is bootstrapped into the double power supply voltage 2VCC level.
Finally, when the seventeenth precharge control signal G17 is changed from the ground voltage VSS level into the power supply voltage VCC level, the charge sharing occurs between the fourteenth bootstrapping node PS14—b and the pumping voltage VPP. Concurrently, the fifteenth precharge control signal G15 is also changed from the ground voltage VSS level into the power supply voltage VCC level.
Therefore, the thirteenth bootstrapping node PS13—b is precharged with the voltage level of the fourteenth bootstrapping node PS14—b. Then, the thirteenth pair of bootstrapping node PS13—b and PS13b—b is charge-shared with each other in response to the third precharge signal PB3 having the logic level ‘L’. Thus, the voltage level of the thirteenth pair of bootstrapping node PS13—b and PS13b—bbecome (VCC+(VPS14—b−VCC)/2) level. Therefore, the bootstrapping node PS13b—b can be bootstrapped into (2VCC+(VPS14—b−VCC)/2) level when the pumping control signal PS13b is changed from the ground voltage VSS level into the power supply voltage VCC level. Herein, VPS14—b denotes the voltage loaded in the fifteenth bootstrapping node PS14—b.
In the same way, after precharged with the double power supply voltage VCC level in response to the sixteenth precharge control signal G16, the fourteenth bootstrapping node PS14—b is further precharged with the bootstrapping node PS14b—b in response to the third precharge signal PB3 having the logic level ‘L’. Thus, the voltage levels of the bootstrapping nodes PS14—b and PS14b—b become (2VCC+(VPP−2VCC)/2) level. Therefore, the pumping voltage VPP can be increased up to (3VCC+(VPP−2VCC)/2) level.
As shown in
Further, as shown in
As a result, the current efficiency of the charge pump 340 shown in
As shown, the tripler back bias voltage generator includes a level shifter 400, a VBB level detector 410, a ring oscillator 420, a pump control logic 430, and a tripler charge pump 440.
The level shifter 400 outputs a shifted reference voltage VR1 by level shifting a reference voltage VREF. The VBB level detector 410 detects a level of the back voltage VBB in response to the shifted reference voltage VR1 to thereby output a back bias enable signal BBE. The ring oscillator 420 generates an oscillation signal OSC in response to the back bias enable signal BBE. The pump control logic 430 generates pumping control signals PS15, PS16, G18, G19, and G20 and a fourth precharge signal PB4 in response to the oscillation signal OSC. The tripler charge pump 440 generates the pumping voltage VPP in response to the control signals PS15, PS16, G18, G19, and G20 and a fourth precharge signal PB4 to thereby transmit the back bias voltage VBB to the VBB level detector 410.
Herein, the level shifter 400, the VBB level detector 410, and the ring oscillator 420 is similar with those shown in
As shown in
The pump control logic 430 shown in
First, as shown in
In the first precharge controller 441, the PMOS transistors P58 and P59 are parallel connected each other and are coupled to the pumping voltage VPP. The sixty first NMOS transistor N61, connected between the fifth eighth PMOS transistor P58 and the ground voltage VSS, receives the fourth precharge signal PB4 outputted from the pump control logic 430 through a gate. The sixty second NMOS transistor N62, connected between the fifty nine PMOS transistor P59 and the ground voltage VSS, receives the inverted fourth precharge signal PB4, delayed by the two inverters IV138 and IV139, through a gate. Further, a fourth precharge drive signal PBd4 is outputted through a common node of the fifty ninth PMOS transistor P59 and the sixty second NMOS transistor N62.
Further, as compared with the charge pump 20A shown in
Meanwhile, as shown in
In the second precharge controller 443, the PMOS transistors P60 and P61 are parallel connected each other and are coupled to the pumping voltage VPP. The seventy first NMOS transistor N71, connected between the sixtieth PMOS transistor P60 and the ground voltage VSS, receives the fourth precharge signal PB4 outputted from the pump control logic 430 through a gate. The seventy second NMOS transistor N72, connected between the sixty first PMOS transistor P61 and the ground voltage VSS, receives the delayed fourth precharge signal PB4, delayed by the two inverters IV140 and IV141, through a gate. Further, a fourth precharge drive signal PBd4 is outputted through a common node of the sixty first PMOS transistor P61 and the seventy second NMOS transistor N72.
Further, as compared with the charge pump 20B shown in
The first and the second precharge controllers 441 and 443 have substantially the same structure; and the first and the second charge pumps 442 and 444 have almost substantially the same structure. However, while the precharge control signals G18 to G20b inputted to the first charge pump 442 are directly inputted through the MOS capacitors MC71 to MC80 to thereby control the NMOS transistors N63 to N68, the precharge control signals G18 to G20b are inputted to the MOS capacitors MC81 to MC90 via the inverters IV142 to IV147 to thereby control the PMOS transistors P62 to P67 in the second charge pump 444. As a result, the first and the second charge pumps 442 and 444 perform substantially the same operation.
That is, the fourth precharge signal PB4 is inputted to the tripler charge pump 440 to thereby increase the current efficiency by reusing the electric charge, remained in the bootstrapping nodes PS15—b to PS16b—b.
Hereinafter, the operation of the charge pump is explained.
When the eighteenth precharge control signal G18 is changed from the ground voltage VSS level to the power supply voltage VCC level, the sixty third NMOS transistor N63 is turned on to precharge the fifteenth bootstrapping node PS15—bwith the power supply voltage VCC level. Then, when the eighteenth precharge control signal G18 is changed from the power supply voltage VCC level to the ground voltage VSS level, the sixty third NMOS transistor N63 is turned off. After fifteenth pumping control signal PS15 is changed from the ground voltage VSS level to the power supply voltage VCC level, the fifteenth bootstrapped node PS15—b is bootstrapped into the negative power supply voltage −VCC level.
When the nineteenth precharge control signal G19 is changed from the ground voltage VSS level to the power supply voltage VCC level, the sixty fourth NMOS transistor N64 is turned on to precharge the sixteenth bootstrapping node PS16—bwith the power supply voltage VCC level. Further, the fifteenth bootstrapping node PS15—b of the negative power supply voltage VCC level is precharged with the sixteenth bootstrapping node PS16—b with the ground voltage VSS level.
Then, the nineteenth precharge control signal G19 is changed from the power supply voltage VCC level to the ground voltage VSS level, the sixty fourth NMOS transistor N64 is turned off. After the sixteenth pumping control signal PS16 is changed from the power supply voltage VCC level to the ground voltage VSS level, the sixteenth bootstrapping node PS16—b is bootstrapped into the negative power supply voltage −VCC level.
Finally, when the twentieth precharge control signal G20 is changed from the ground voltage VSS level into the power supply voltage VCC level, the charge sharing occurs between the sixteenth bootstrapping node PS16—b and the back bias voltage VBB. Concurrently, the eighteenth precharge control signal G18 is also changed from the ground voltage VSS level into the power supply voltage VCC level.
Therefore, the fifteenth bootstrapping node PS15—b is precharged with the voltage level of the sixteenth bootstrapping node PS16—b. Then, the fifteenth pair of bootstrapping node PS15—b and PS15b—b are charge shared with each other in response to the fourth precharge signal PB4 of the logic level ‘L’. Thus, the voltage level of the fifteenth pair of bootstrapping node PS15—b and PS15b—b become ((VPS16—b−(VSS))/2) level. Therefore, the bootstrapping node PS15b—b can be bootstrapped into (−VCC+(VPS16—b−(VSS))/2) level when the pumping control signal PS15b is changed from the power supply voltage VCC level into the ground voltage VSS level. Herein, VPS16—b denotes a voltage loaded at the sixteenth bootstrapping node PS16—b.
In the same way, after precharged with the negative power supply voltage −VCC level in response to the nineteenth precharge control signal G19, the sixteenth bootstrapping node PS16—b is further precharged by the bootstrapping node PS16b—b in response to the fourth precharge signal PB4 of the logic level ‘L’. Thus, the voltage level of the bootstrapping nodes PS16—b and PS16b—b become (−VCC+(VBB−(−VSS))/2) level. Therefore, the back bias voltage VBB can be decreased up to (−2VCC+(VBB−(−VCC))/2) level.
As shown in
As shown in
As a result, the current efficiency of the charge pump 440 shown in
As abovementioned, the present invention provides an internal voltage generator including a high efficient charge pump. Therefore, the present invention improves the electric charge driving capability. Further, the present invention generates internal voltages of stable voltage level and reduces a layout area.
While the present invention has been described with respect to the particular embodiments, it will be apparent to those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention as defined in the following claims.
Claims
1. An internal voltage generator, comprising:
- a periodic signal generation block configured to output a periodic signal in response to a pumping voltage and a reference voltage;
- a pump control logic circuit configured to output a pumping control signal and a precharge signal in response to the periodic signal; and
- a charge pump circuit configured to include a pair of bootstrapping nodes alternately sharing charge with the pumping voltage in response to the pumping control signal, a switch unit sharing charge on the pair of bootstrapping nodes to increase the pumping voltage in response to a precharge drive signal before each bootstrapping node shares the charge with the pumping voltage, and a precharge controller pumping the precharge signal to output the precharge drive signal.
2. The internal voltage generator as recited in claim 1, wherein the periodic signal generation block includes:
- a level shifter for level shifting the reference voltage to thereby generate a shifted reference voltage;
- a pumping voltage level detector for detecting a level of the pumping voltage in response to the shifted reference voltage to thereby output a pumping enable signal; and
- a ring oscillator for generating the periodic signal in response to the pumping enable signal.
3. The internal voltage generator as recited in claim 2, wherein the pump control logic includes:
- a first logic means for delaying the periodic signal for a predetermined time to thereby generate first pumping control signals for bootstrapping the pair of bootstrapping nodes;
- a second logic means for logically combining the periodic signal with a delayed periodic signal to thereby generate second pumping control signals for precharging the pair of bootstrapping nodes bootstrapped in response to the first pumping control signals; and
- a third logic means for logically combining the second pumping control signals with each other to thereby generate the precharge signal.
4. The internal voltage generator as recited in claim 3, wherein the first logic means is provided with a plurality of inverters for generating the first pumping control signals by delaying the periodic signal for the predetermined time, wherein the first pumping control signals are two opposite phases of signals.
5. The internal voltage generator as recited in claim 3, wherein the second logic means is provided with a plurality of logic elements for logically combining the periodic signal and the delayed periodic signal to thereby activate the second pumping control signals prior to rising and falling edges of the periodic signal, respectively.
6. The internal voltage generator as recited in claim 5, wherein the third logic means includes another plurality of logic elements for logically combining the second pumping control signals to respectively activate the precharge signal in response to activation of the second pumping control signals.
7. The internal voltage generator as recited in claim 2, wherein the pump control logic includes:
- a first logic means for delaying the periodic signal for a first predetermined time to thereby generate first pumping control signals for bootstrapping the pair of bootstrapping nodes;
- a second logic means for delaying the periodic signal for a second predetermined time to thereby generate second pumping control signals having an opposite phase of the first pumping control signals, respectively;
- a third logic means for logically combining the periodic signal and a delayed periodic signal to thereby generate third pumping control signals for precharging the pair of bootstrapping nodes into the level of the power supply voltage;
- a fourth logic means for generating fourth pumping control signals having an opposite phase of the third pumping control signals, respectively; and
- a fifth logic means for logically combining the periodic signal and a delayed periodic signal to thereby activate the precharge signal after charge sharing the pair of bootstrapping nodes and the pumping voltage.
8. The internal voltage generator as recited in claim 7, wherein the first logic means is provided with a plurality of inverters for generating the first pumping control signals by delaying the periodic signal for the first predetermined time, wherein the first pumping control signals are two opposite phases of signals.
9. The internal voltage generator as recited in claim 7, wherein the second logic means is provided with a plurality of inverters for generating the second pumping control signals by delaying the periodic signal for the second predetermined time.
10. The internal voltage generator as recited in claim 7, wherein the third logic means includes:
- a first logic block for logically combining the periodic signal and an inverted periodic signal; and
- a plurality of inverters for delaying an output of the first logic block for different predetermined times to thereby output third pumping control signals.
11. The internal voltage generator as recited in claim 7, wherein the fourth logic means includes:
- a first logic block for logically combining the periodic signal and an inverted periodic signal; and
- a plurality of inverters for delaying an output of the first logic block for different predetermined times to thereby output the fourth pumping control signals.
12. The internal voltage generator as recited in claim 7, wherein the fifth logic means includes:
- a first NAND gate for logically combining the periodic signal and the delayed periodic signal;
- a NOR gate for logically combining the periodic signal and the delayed periodic signal; and
- a second NAND gate receiving outputs from the first NAND gate and the NOR gate to thereby output the precharge signal.
13. The internal voltage generator as recited in claim 1, wherein the precharge controller includes:
- first and second PMOS transistors cross coupled to each other and connected to a terminal providing the precharge drive signal; and
- first and second NMOS transistors respectively connected between a ground voltage and the first and second PMOS transistors, the first and second NMOS transistors respectively receiving the precharge signal and an inverted precharge signal through a gate thereof.
14. The internal voltage generator as recited in claim 1, wherein the charge pump circuit is a cross coupled doubler charge pump, which includes:
- a plurality of switches for bootstrapping the pair of bootstrapping nodes by increasing a power supply voltage; and
- a plurality of MOS capacitors for selectively charging the pair of bootstrapping nodes in response to the precharge signal.
15. The internal voltage generator as recited in claim 1, wherein the charge pump circuit is a tripler charge pump, which includes:
- a plurality of switches, sequentially turned on, for bootstrapping the pair of bootstrapping nodes by increasing a power supply voltage; and
- a plurality of MOS capacitors for selectively charging the pair of bootstrapping nodes in response to the precharge signal when the corresponding switch is turned on.
16. An internal voltage generator, comprising:
- a periodic signal generation block for detecting a level of a back bias voltage by using a reference voltage to thereby output a periodic signal;
- a pump control logic for outputting a pumping control signal and a precharge signal in response to the periodic signal; and
- a charge pump including a pair of bootstrapping nodes alternately sharing charge with the back bias voltage in response to the pumping control signal, and a switch unit sharing charge on the pair of bootstrapping nodes to decrease the back bias voltage in response to a precharge drive signal before each bootstrapping node shares the charge with the back bias voltage, and a precharge controller pumping the precharge signal to output the precharge drive signal.
17. The internal voltage generator as recited in claim 16, wherein the periodic signal generation block includes:
- a level shifter for level shifting the reference voltage to thereby generate a shifted reference voltage;
- a back bias voltage level detector for detecting a level of the back bias voltage in response to the shifted reference voltage to thereby output a back bias enable signal; and
- a ring oscillator for generating the periodic signal in response to the back bias enable signal.
18. The internal voltage generator as recited in claim 17, wherein the pump control logic includes:
- a first logic means for delaying the periodic signal for a predetermined time to thereby generate first pumping control signals for bootstrapping the pair of bootstrapping nodes;
- a second logic means for logically combining the periodic signal with a delayed periodic signal to thereby generate second pumping control signals for precharging the pair of bootstrapping nodes bootstrapped in response to the first pumping control signals; and
- a third logic means for logically combining the second pumping control signals with each other to thereby generate the precharge signal.
19. The internal voltage generator as recited in claim 18, wherein the first logic means is provided with a plurality of inverters for generating the first pumping control signals by delaying the periodic signal for the predetermined time, wherein the first pumping control signals are two opposite phase of signals.
20. The internal voltage generator as recited in claim 18, wherein the second logic means is provided with a plurality of logic elements for logically combining the periodic signal and the delayed periodic signal to thereby activate the second pumping control signals prior to rising and falling edges of the periodic signal, respectively.
21. The internal voltage generator as recited in claim 20, wherein the third logic means includes another plurality of logic elements for logically combining the second pumping control signals to respectively activate the precharge signal in response to activation of the second pumping control signals.
22. The internal voltage generator as recited in claim 17, wherein the pump control logic includes:
- a first logic means for delaying the periodic signal for a predetermined time to thereby generate first pumping control signals for bootstrapping the pair of bootstrapping nodes;
- a second logic means for delaying the periodic signal for a predetermined time to thereby generates second pumping control signals having an opposite phase of the first pumping control signals, respectively;
- a third logic means for logically combining the periodic signal and a delayed periodic signal to thereby generate third pumping control signals for precharging the pair of bootstrapping nodes into the level of the power supply voltage;
- a fourth logic means for generating fourth pumping control signals having an opposite phase of the third pumping control signals, respectively; and
- a fifth logic means for logically combining the periodic signal and a delayed periodic signal to thereby activate the precharge signal after charge sharing the pair of bootstrapping nodes and the back bias voltage.
23. The internal voltage generator as recited in claim 22, wherein the first logic means is provided with a plurality of inverters for generating the first pumping control signals by delaying the periodic signal for the predetermined time, wherein the first pumping control signals are two opposite phases of signals.
24. The internal voltage generator as recited in claim 22, wherein the second logic means is provided with a plurality of inverters for generating the second pumping control signals by delaying the periodic signal for the predetermined time.
25. The internal voltage generator as recited in claim 22, wherein the third logic means includes:
- a first logic block for logically combining the periodic signal and an inverted periodic signal; and
- a plurality of inverters for delaying an output of the first logic block for different predetermined times to thereby output-the third pumping control signals.
26. The internal voltage generator as recited in claim 22, wherein the fourth logic means includes:
- a first logic block for logically combining the periodic signal and an inverted periodic signal; and
- a plurality of inverters for delaying an output of the first logic block for different predetermined times to thereby output the fourth pumping control signals.
27. The internal voltage generator as recited in claim 22, wherein the fifth logic means includes:
- a first NAND gate for logically combining the periodic signal and the delayed periodic signal;
- a NOR gate for logically combining the periodic signal and the delayed periodic signal; and
- a second NANP gate receiving outputs from the first NAND gate and the NOR gate to thereby output the precharge signal.
28. The internal voltage generator as recited in claim 16, wherein the precharge controller includes:
- first and second PMOS transistors cross coupled to each other and connected to a terminal providing a precharge drive signal; and
- first and second NMOS transistors respectively connected between a ground voltage and the first and second PMOS transistors, the first and second NMOS transistors respectively receiving the precharge signal and a delayed precharge signal through a gate thereof.
29. The internal voltage generator as recited in claim 16, wherein the charge pump is a cross coupled doubler charge pump, which includes:
- a plurality of switches for bootstrapping the pair of bootstrapping nodes by pumping ground voltage; and
- a plurality of MOS capacitors for selectively charging the pair of bootstrapping nodes in response to the precharge signal.
30. The internal voltage generator as recited in claim 16, wherein the charge pump is a tripler charge pump, which includes:
- a plurality of switches, sequentially turned on, for bootstrapping the pair of bootstrapping nodes by pumping a ground voltage; and
- a plurality of MOS capacitors for selectively charging the pair of bootstrapping nodes in response to the precharge signal when the corresponding switch is turned on.
6097161 | August 1, 2000 | Takano et al. |
6097428 | August 1, 2000 | Wu et al. |
6240025 | May 29, 2001 | Park |
6297624 | October 2, 2001 | Mitsui et al. |
6307425 | October 23, 2001 | Chevallier et al. |
6323721 | November 27, 2001 | Proebsting |
6326834 | December 4, 2001 | Akita et al. |
6333873 | December 25, 2001 | Kumanoya et al. |
6535051 | March 18, 2003 | Kim |
6809573 | October 26, 2004 | Kim |
6861872 | March 1, 2005 | Suh |
7304531 | December 4, 2007 | Kim |
20040232957 | November 25, 2004 | Do |
10-125097 | May 1998 | JP |
1999-0061048 | July 1999 | KR |
2001-0003414 | January 2001 | KR |
I222081 | October 2004 | TW |
- English Translation of Taiwanese Office Action and Search Report issued in Taiwanese Patent Application No. 09147414 dated on Apr. 22, 2008.
Type: Grant
Filed: Dec 30, 2005
Date of Patent: Nov 11, 2008
Patent Publication Number: 20060244518
Assignee: Hynix Semiconductor Inc. (Kyoungki-Do)
Inventors: Sang-Jin Byeon (Ichon-shi), Jae-Jin Lee (Ichon-shi)
Primary Examiner: Lincoln Donovan
Assistant Examiner: Terry L Englund
Attorney: McDermott Will & Emery LLP
Application Number: 11/321,873
International Classification: G05F 1/563 (20060101); H02M 3/18 (20060101);